 29 CFR Part 1910 Subpart D
Walking-Working Surfaces
Objectives
In this course, we will discuss the following:
 Hazards
 Definitions
 General requirements
 Guarding floor and wall openings and holes
 Ladders
 Scaffolds
 Other working surfaces
Hazards
Slips, trips and falls
− Falls constitute the majority of general industry
accidents and contribute to the majority of
construction accidents.
Definitions
Floor hole
− An opening measuring less than 12 inches but more
than 1 inch in its least dimension, in any floor,
platform, pavement, or yard, through which materials
but not persons may fall.
» Such as a belt hole, pipe opening, or slot opening
§1910.21(a)(1)
Definitions
Floor opening
− An opening measuring 12 inches or more in its least
dimension, in any floor, platform, pavement, or yard
through which persons may fall.
» Such as a hatchway, stair or ladder opening, pit, or large
manhole
» Floor openings occupied by elevators, dumb waiters,
conveyors, machinery, or containers are excluded from this
subpart.
§1910.21(a)(2)
Definitions
Wall hole
− An opening less than 30 inches but more than 1 inch
high, of unrestricted width, in any wall or partition.
» Such as a ventilation hole or drainage scupper
§1910.21(a)(10)
Definitions
Wall opening
− An opening at least 30 inches high and 18 inches
wide, in any wall or partition, through which persons
may fall.
» Such as an opening for a window, yard-arm doorway or
chute opening
§1910.21(a)(11)
Is this a floor hole or opening?
Housekeeping
− Workplaces shall be kept clean, orderly, and sanitary.
− Workroom floors shall be maintained as clean and dry
as possible.
− Every floor, working
place and passageway
shall be kept free from
protruding nails, splinters,
holes, or loose boards.
General Requirements §1910.22(a)
General Requirements
Aisles and passageways
− Aisles and passageways shall be kept clear and in
good repair.
− Permanent aisles and passageways shall be marked.
− Where mechanical handling equipment is used,
aisles, loading docks, and doorways shall maintain
sufficient safe clearances.
§1910.22(b)
General Requirements
Covers and guardrails
− Shall be provided to protect
workers from the hazards of
open pits, tanks, vats, ditches,
etc.
§1910.22(c)
General Requirements
Floor loading protection
− Load ratings shall be marked on plates of
approved design and be conspicuously posted.
− Unlawful to place a load rating limit greater than
approved by building official.
§1910.22(d)
Floor Openings
Stairway floor opening
− Shall be guarded by a standard railing
− Railing shall be provided on all exposed sides
(except at entrance to stairway)
§1910.23(a)(1)
Floor Openings
Ladderway floor opening or platform
− Guarded by a standard railing with standard toeboard
on all exposed sides (except at entrance to opening).
− Passage through the railing either provided with a
swinging gate or so offset that a person cannot walk
directly into the opening.
§1910.23(a)(2)
Floor Openings
Hatchway and chute floor opening
− Guarded by hinged floor opening cover equipped with
standard railings or permanently attached
§1910.23(a)(3)
Floor Openings
Skylight floor opening and hole
− Shall be guarded by a standard skylight screen or a
fixed standard railing on all exposed sides
§1910.23(a)(4)
Floor Openings
Pit and trapdoor floor opening
− Infrequently used openings shall be guarded by a
floor opening cover of standard strength and
construction.
− While the cover is not in place, the pit or trap
opening shall be constantly attended by someone or
shall be protected on all exposed sides by
removable standard railings.
§1910.23(a)(5)
Floor Openings
Manhole floor opening
− Shall be guarded by a standard manhole cover
which need not be hinged in place
− While the cover is not in place, the manhole opening
shall be constantly attended by someone or shall be
protected by removable standard railings.
§1910.23(a)(6)
Floor Openings
Temporary floor opening
− Shall have standard railings, or shall be constantly
attended by someone
§1910.23(a)(7)
Floor Openings
Every floor hole into which persons can
accidentally walk shall be guarded by either:
− A standard railing with standard toeboard on all
exposed sides, or
− A floor hole cover of standard strength and
construction
» While the cover is not in place, the floor hole shall be
constantly attended by someone or shall be protected by a
removable standard railing.
§1910.23(a)(8)
Wall Openings and Holes
Every wall opening from which there is
a drop of more than 4 feet shall be
guarded by:
− Rail, roller, picket fence, half door, or
equivalent barrier
Where exposure below to falling
materials, a removable toe board or
the equivalent shall also be provided.
§1910.23(b)
Open-Sided Floors and Platforms
Open-sided floors or platforms
− 4 feet or more above adjacent floor or ground level
shall be guarded by a standard railing (or equivalent)
on all open sides, except where there is an entrance
to a ramp, stairway, or fixed ladder.
§1910.23(c)
Railing shall be provided with a toeboard
wherever, beneath the open sides:
− Persons can pass
− There is moving machinery
− There is equipment with which falling materials could
create a hazard
§1910.23(c)(1)Open-Sided Floors and Platforms
Runways
− Shall be guarded by a standard railing on all open
sides 4 feet or more above floor or ground level
− Wherever tools, machine parts,
or materials are likely to be used
on the runway, a toeboard shall
also be provided on each
exposed side.
§1910.23(c)(2)Open-Sided Floors and Platforms
Regardless of height, a standard railing and
toeboard must be used to guard:
− Open-sided floors,
− Walkways,
− Platforms, or
− Runways
… located above or adjacent to dangerous
equipment, pickling or galvanizing tanks,
degreasing units, and similar hazards.
§1910.23(c)(3)Open-Sided Floors and Platforms
Is this correct?
Open-Sided Floors and Platforms
Stairway, Railings and Guards
 Every flights of stairs with four or more risers shall have
standard stair railings or handrails.
 On stairways less than 44 inches wide having both
sides enclosed, at least one handrail, preferably on the
right side descending.
§1910.23(d)(1)
Stairway, Railings and Guards
 On stairways less than 44
inches wide having one side
open, at least one stair railing
on open side.
 On stairways less than 44
inches wide having both sides
open, one stair railing on each
side.
§1910.23(d)(1)
Stairway, Railings and Guards
 On stairways >44 inches wide <88 inches wide,
one handrail on each enclosed side and one
stair railing on each open side.
 On stairways 88 or more inches wide, one
handrail on each enclosed side, one stair railing
on each open side, and one intermediate stair
railing located approximately midway of the
width.
§1910.23(d)(1)
Railings, Toeboards and Covers
Standard railings
− Consist of top rail, intermediate rail, and posts, and
have a vertical height of 42 inches from upper
surface of top rail to floor, platform, runway, or ramp
level.
− The intermediate rail shall be
approximately halfway between
the top rail and the floor,
platform, runway, or ramp.
§1910.23(e)
Railings, Toeboards and Covers
Handrails
− Height shall be not more than 34 inches nor less than
30 inches from upper surface of handrail to surface of
tread in line with face of riser or to surface of ramp
− A strength to withstand at least the
minimum requirement of 200 pounds
top rail pressure
§1910.23(e)
Railings, Toeboards and Covers
Toeboards
− Shall be 4 inches nominal in vertical height from its
top edge to the level of the floor, platform, runway,
or ramp
§1910.23(e)
Railings, Toeboards and Covers
Skylight screens
− Shall be capable of withstanding a load of at least
200 pounds
Wall opening barriers
− Shall be capable of withstanding
a load of at least 200 pounds
§1910.23(e)
Fixed Industrial Stairs
 Stair strength
− Shall be able to carry 5 times expected load;
minimum of 1,000 pounds
 Stair width
− Minimum width of 22 inches
§1910.24
Fixed Industrial Stairs
 Treads
− Shall be slip resistant with
uniform rise height and
tread width
§1910.24
Fixed Industrial Stairs
 Angle of stairway rise
− Fixed stairs shall be installed at angles to the
horizontal of between 30 degrees and 50 degrees
− Table D-1 gives rise/tread dimensions which will
produce a stairway within the permissible range
§1910.24
Fixed Industrial Stairs
 Vertical clearance
− A minimum clearance of 7 feet above any stair
tread to an overhead obstruction
§1910.24
Portable Ladders
Stepladders - three types
− Type I - Industrial stepladder
» 3 to 20 feet for heavy duty use, such as utilities,
contractors, and industrial use
− Type II - Commercial stepladder
» 3 to 12 feet for medium duty use, such as
painters, offices, and light industrial use
− Type III - Household stepladder
» 3 to 6 feet for light duty, such as light
household use
§1910.25 and 1910.26
Portable Ladders
Straight and extension ladders
− Length of single ladders or individual sections of
ladders shall not exceed 30 feet
− Two-section ladders shall not exceed 60
feet in length
Trestle ladders/Platform ladders
− Shall be not more than 20 feet in length
§1910.25 and 1910.26
Portable Ladders
Use and care
− Be maintained in good condition at all times
− Not be used for anything other than
intended use
− Shall be inspected frequently
» If defects are found, mark and take out
of service
− Designed as a one-man working
ladder based on a 200-pound load
§1910.25 and 1910.26
(cont’d)
Portable Ladders
− Base placed a distance from the
vertical wall equal to one-fourth
the working length of the ladder
− Must be placed with secure
footing
− Shall be placed as to prevent
slipping, or it shall be lashed, or
held in position
§1910.25 and 1910.26
(cont’d)
Portable Ladders
 When used to gain access to a roof or other area, shall
extend at least 3 feet above the point of support
 Tops of stepladders shall not be
used as steps
 Ladders shall not be placed on
boxes, barrels, or other unstable
bases
 Must be placed with the two rails
supported
§1910.25 and 1910.26
Portable Ladders
Portable metal ladders
− 1910.333(c)(7)
» Portable ladders shall
have non-conductive side
rails if they are used
where the employee or
the ladder could contact
exposed energized parts.
§1910.26(c)(3)(viii)
Fixed Ladders
 Cages or wells required if longer
than 20 feet to a maximum unbroken
length of 30 feet
− Platform with standard railings and
toeboard required every 30 feet (if no
safety device provided, every 20 feet)
 Cages shall extend down the ladder
to a point not less than 7 feet nor
more than 8 feet from base
 Cages shall extend a minimum of 42
inches above the top of landing
§1910.27
Fixed Ladders
 Ladder safety devices may be used on tower, water
tank and chimney ladders over 20 feet in unbroken
length instead of cage protection
− No landing platform required
 Preferred pitch of fixed ladders shall be considered to
come in the range of 75 degrees and 90 degrees with
the horizontal
 Permanently attached to a structure, building or
equipment
§1910.27
Fixed Ladders
 Shall be inspected regularly, with the intervals between
inspections being determined by use and exposure
 Metal ladders and appurtenances shall be painted or
otherwise treated to resist corrosion and rusting
 Wood ladders, when used under conditions where
decay may occur, shall be treated with a nonirritating
preservative
§1910.27
Scaffold Types
Pole Scaffold
Frame or Fabricated
Specialty
Scaffold Types
Pump Jack
Ladder Jack
Tube and Coupler
Mobile
Scaffold Types
Two-Point Swing
Float
Multipoint Adjustable
Scaffolding
General requirements for all scaffolds
− Shall not be altered or moved horizontally while in
use or occupied
− Overhead protection shall be
provided for men on a scaffold
exposed to overhead hazards
§1910.28
(cont’d)
Scaffolding
− Footing shall be sound, rigid, and capable of
carrying the maximum intended load
− Shall be capable of supporting
at least four times the maximum
intended load
− Planking shall be scaffold grade
§1910.28
(cont’d)
Scaffolding
− Shall be secured to permanent structures
− Screen mesh shall be provided between the toeboard
and the guardrail where persons are required to work
or pass under the scaffolds.
− Must be plumb, level, and squared.
§1910.28
(cont’d)
Scaffolding
− All planking or platforms shall be overlapped
(minimum 12 inches) or secured from movement.
− An access ladder or equivalent safe access shall be
provided.
− Scaffold planks shall extend over their end
supports not less than 6 inches nor more than
18 inches.
− Employees shall not work on scaffolds during
storms or high winds.
§1910.28
Scaffolding
General requirements for wood pole scaffolds
− Cross bracing shall be provided between the inner
and outer sets of poles
− Where planking is lapped, each plank shall lap its
end supports at least 12 inches
− Guardrails with a mid-rail, and toeboards, shall be
installed at all open sides on all scaffolds more than
10 feet above the ground or floor
» Toeboards shall be a minimum of 4 inches in height
§1910.28
Scaffolding §1910.28
Example of point loading
Scaffolding
 1910.28(c) Tube and coupler
 1910.28(d) Tubular welded frame
 1910.28(e) Outrigger
 1910.28(f) Masons’ adjustable multiple-point
suspension
 1910.28(g) Two-point suspension (swinging)
 1910.28(h) Stone setters’ adjustable multiple-point
suspension
 1910.28(i) Single-point adjustable suspension
 1910.28(j) Boatswain’s chair
 1910.28(k) Carpenters’ bracket (cont’d)
§1910.28
Scaffolding
 1910.28(l) Bricklayers’ square
 1910.28(m) Horse
 1910.28(n) Needle beam
 1910.28(o) Plasterers’, decorators’, and large area
 1910.28(p) Interior hung
 1910.28(q) Ladder-jack
 1910.28(r) Window-jack
 1910.28(s) Roofing brackets
 1910.28(t) Crawling board or chicken ladders
 1910.28(u) Float or ship
§1910.28
Mobile Ladder Stands and Scaffolds §1910.29
Mobile Ladder Stands and Scaffolds
 Work platforms and scaffolds shall be capable of
carrying the design load.
 Design working load of ladder stands shall be calculated
on the basis of one or more 200-pound persons
together with 50 pounds of equipment each.
 All ladder stands and scaffolds shall be capable of
supporting at least four times the design working load.
§1910.29
Mobile Ladder Stands and Scaffolds
Design load of all scaffolds
− Light - Designed and constructed to carry a working
load of 25 pounds per square foot.
− Medium - Designed and constructed to carry a
working load of 50 pounds per square foot.
− Heavy - Designed and constructed to carry a working
load of 75 pounds per square foot.
§1910.29
Mobile Ladder Stands and Scaffolds
Work levels
− Maximum work level height shall not exceed four
times the minimum or least base dimensions of any
mobile ladder stand or scaffold
− Minimum platform width for any work level shall not
be less than 20 inches for mobile scaffolds (towers).
− Ladder stands shall have a minimum step width of 16
inches
§1910.29
(cont’d)
Mobile Ladder Stands and Scaffolds
− Scaffold work levels 10 feet or higher above the ground
or floor shall have a standard guardrail, midrail, and
toeboard
− A climbing ladder or stairway shall be provided for
proper access and egress
§1910.29
Mobile Ladder Stands and Scaffolds
Wheels or casters
− Shall be properly designed for strength and
dimensions to support four times the design working
load.
− Scaffolds casters shall be provided with a positive
wheel and/or swivel lock to prevent movement.
− Ladder stands shall have at least two
of the four casters and shall be of the
swivel type.
§1910.29
Mobile Ladder Stands and Scaffolds
 1910.29(b) Mobile tubular welded frame scaffolds
 1910.29(c) Mobile tubular welded sectional folding
scaffolds
 1910.29(d) Mobile tube and coupler scaffolds
 1910.29(e) Mobile work platforms
 1910.29(f) Mobile ladder stands
§1910.29
Other Working Surfaces
Dockboards (bridge plates)
− Portable and powered dockboards shall be strong
enough to carry the load imposed on them.
− Portable dockboards shall be secured in position,
either by being anchored or equipped
with devices which will prevent their
slipping.
− Handholds, or other effective means,
shall be provided on portable
dockboards to permit safe handling.
§1910.30
Other Working Surfaces
Forging machine area
− Enough clearance between machines to allow
unobstructed operator movement
− Aisles shall be sufficient width to permit free
movement of employees bringing and removing
material
§1910.30
Other Working Surfaces
Veneer machinery
− Sides of steam vats shall extend to a height of not
less than 36 inches above the floor, working
platform, or ground.
− Large steam vats shall be provided walkways
between sections.
» Walkway shall be provided with a standard handrail on
each exposed side
− Workmen shall not ride or step on logs in steam
vats
§1910.30
Summary
In this course, we discussed:
 Hazards
 Definitions
 General requirements
 Guarding floor and wall openings and holes
 Ladders
 Scaffolds
 Other working surfaces
Thank You For Attending!
Final Questions?
Handouts
Place all handouts at the end of this presentation.

More Related Content

What's hot

TBT on Working at Height.ppt
TBT on Working at Height.pptTBT on Working at Height.ppt
TBT on Working at Height.pptmohammadillias
 
scaffolding safety.pdf
scaffolding safety.pdfscaffolding safety.pdf
scaffolding safety.pdfShahzadaGull1
 
Working at height regulations
Working at height regulationsWorking at height regulations
Working at height regulationsAlliver Revilla
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpointJomish John
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentationAlan Bate
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at workPaul Smith
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 
Scissor Lifts Powerpoint
Scissor Lifts PowerpointScissor Lifts Powerpoint
Scissor Lifts PowerpointBrad Schmidt
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training PresentationFAIZ FAREED
 
Construction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkConstruction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkInfinite Safety Ltd
 

What's hot (20)

Eta Scaffold Training
Eta Scaffold TrainingEta Scaffold Training
Eta Scaffold Training
 
A fall protection
A fall protectionA fall protection
A fall protection
 
Scaffolding safety at construction site
Scaffolding safety at construction siteScaffolding safety at construction site
Scaffolding safety at construction site
 
TBT on Working at Height.ppt
TBT on Working at Height.pptTBT on Working at Height.ppt
TBT on Working at Height.ppt
 
Hot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSHHot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSH
 
Work At Height
Work At HeightWork At Height
Work At Height
 
Mobile crane
Mobile craneMobile crane
Mobile crane
 
Work at height. The basic needs.
Work at height. The basic needs.Work at height. The basic needs.
Work at height. The basic needs.
 
Working at heights
Working at heightsWorking at heights
Working at heights
 
scaffolding safety.pdf
scaffolding safety.pdfscaffolding safety.pdf
scaffolding safety.pdf
 
Working at height regulations
Working at height regulationsWorking at height regulations
Working at height regulations
 
Working at heights training powerpoint
Working at heights training powerpointWorking at heights training powerpoint
Working at heights training powerpoint
 
Ladder safety
Ladder safetyLadder safety
Ladder safety
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentation
 
Excavation safety
Excavation safetyExcavation safety
Excavation safety
 
Lifting equipment at work
Lifting equipment at workLifting equipment at work
Lifting equipment at work
 
Working at-height
Working at-height Working at-height
Working at-height
 
Scissor Lifts Powerpoint
Scissor Lifts PowerpointScissor Lifts Powerpoint
Scissor Lifts Powerpoint
 
Crane Safety Training Presentation
Crane Safety Training PresentationCrane Safety Training Presentation
Crane Safety Training Presentation
 
Construction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkConstruction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox Talk
 

Viewers also liked

Walking Working Surfaces and Fall Protection by SMACNA
Walking Working Surfaces and Fall Protection by SMACNAWalking Working Surfaces and Fall Protection by SMACNA
Walking Working Surfaces and Fall Protection by SMACNAAtlantic Training, LLC.
 
Ladder Safety by Murray State University
Ladder Safety by Murray State UniversityLadder Safety by Murray State University
Ladder Safety by Murray State UniversityAtlantic Training, LLC.
 
Coping with Workplace Stress by SmallPrint
Coping with Workplace Stress by SmallPrintCoping with Workplace Stress by SmallPrint
Coping with Workplace Stress by SmallPrintAtlantic Training, LLC.
 
Managing Psychosocial Risks at Work by EU-OSHA
Managing Psychosocial Risks at Work by EU-OSHAManaging Psychosocial Risks at Work by EU-OSHA
Managing Psychosocial Risks at Work by EU-OSHAAtlantic Training, LLC.
 
Tips for Setting Healthy and Safe Boundaries To Reduce Stress by
Tips for Setting Healthy and Safe Boundaries To Reduce Stress byTips for Setting Healthy and Safe Boundaries To Reduce Stress by
Tips for Setting Healthy and Safe Boundaries To Reduce Stress byAtlantic Training, LLC.
 
Workplace Stress for Manager’s Training by IOSH
Workplace Stress for Manager’s Training by IOSHWorkplace Stress for Manager’s Training by IOSH
Workplace Stress for Manager’s Training by IOSHAtlantic Training, LLC.
 
Slips, Trips, and Fall Prevention Training by SIA
Slips, Trips, and Fall Prevention Training by SIASlips, Trips, and Fall Prevention Training by SIA
Slips, Trips, and Fall Prevention Training by SIAAtlantic Training, LLC.
 

Viewers also liked (20)

Walking Working Surfaces and Fall Protection by SMACNA
Walking Working Surfaces and Fall Protection by SMACNAWalking Working Surfaces and Fall Protection by SMACNA
Walking Working Surfaces and Fall Protection by SMACNA
 
Walking and Working Surfaces by FHMIC
Walking and Working Surfaces by FHMICWalking and Working Surfaces by FHMIC
Walking and Working Surfaces by FHMIC
 
Walking & Working Surfaces by OSHA
Walking & Working Surfaces by OSHAWalking & Working Surfaces by OSHA
Walking & Working Surfaces by OSHA
 
Walking & Working Surfaces by GTRI
Walking & Working Surfaces by GTRIWalking & Working Surfaces by GTRI
Walking & Working Surfaces by GTRI
 
Walking Working-Surface by ISRI
Walking Working-Surface by ISRIWalking Working-Surface by ISRI
Walking Working-Surface by ISRI
 
Walking - Working Surfaces by BWC Ohio
Walking - Working Surfaces by BWC OhioWalking - Working Surfaces by BWC Ohio
Walking - Working Surfaces by BWC Ohio
 
Ladder Safety by Murray State University
Ladder Safety by Murray State UniversityLadder Safety by Murray State University
Ladder Safety by Murray State University
 
Fixed and Portable Ladders by NPCA
Fixed and Portable Ladders by NPCAFixed and Portable Ladders by NPCA
Fixed and Portable Ladders by NPCA
 
Working Safely With Ladders by GO2HR
Working Safely With Ladders by GO2HRWorking Safely With Ladders by GO2HR
Working Safely With Ladders by GO2HR
 
Coping with Workplace Stress by SmallPrint
Coping with Workplace Stress by SmallPrintCoping with Workplace Stress by SmallPrint
Coping with Workplace Stress by SmallPrint
 
Workplace Stress Management by PASFAA
Workplace Stress Management by PASFAAWorkplace Stress Management by PASFAA
Workplace Stress Management by PASFAA
 
Stress in the Workplace by CCHA
Stress in the Workplace by CCHAStress in the Workplace by CCHA
Stress in the Workplace by CCHA
 
Managing Psychosocial Risks at Work by EU-OSHA
Managing Psychosocial Risks at Work by EU-OSHAManaging Psychosocial Risks at Work by EU-OSHA
Managing Psychosocial Risks at Work by EU-OSHA
 
Safe Work at Heights by Queensland
Safe Work at Heights by QueenslandSafe Work at Heights by Queensland
Safe Work at Heights by Queensland
 
Working at Height by TB Davies
Working at Height by TB DaviesWorking at Height by TB Davies
Working at Height by TB Davies
 
Tips for Setting Healthy and Safe Boundaries To Reduce Stress by
Tips for Setting Healthy and Safe Boundaries To Reduce Stress byTips for Setting Healthy and Safe Boundaries To Reduce Stress by
Tips for Setting Healthy and Safe Boundaries To Reduce Stress by
 
Workplace Stress for Manager’s Training by IOSH
Workplace Stress for Manager’s Training by IOSHWorkplace Stress for Manager’s Training by IOSH
Workplace Stress for Manager’s Training by IOSH
 
Ladder safety by ESD
Ladder safety by ESDLadder safety by ESD
Ladder safety by ESD
 
Fall Protection by Osha
Fall Protection by Osha Fall Protection by Osha
Fall Protection by Osha
 
Slips, Trips, and Fall Prevention Training by SIA
Slips, Trips, and Fall Prevention Training by SIASlips, Trips, and Fall Prevention Training by SIA
Slips, Trips, and Fall Prevention Training by SIA
 

Similar to Walking Working Surfaces by ENV

Walking and Working Surfaces Fall Protection by SMACNA
Walking and Working Surfaces Fall Protection by SMACNAWalking and Working Surfaces Fall Protection by SMACNA
Walking and Working Surfaces Fall Protection by SMACNAAtlantic Training, LLC.
 
Walk worksurfacesppt
Walk worksurfacespptWalk worksurfacesppt
Walk worksurfacespptColleen True
 
Walk worksurfaces
Walk worksurfacesWalk worksurfaces
Walk worksurfacesridhoa
 
06_ww_surfaces.ppt
06_ww_surfaces.ppt06_ww_surfaces.ppt
06_ww_surfaces.pptssusercd3f7b
 
THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...
THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...
THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...marvinfajardo5
 
Stairways and Ladders by Pennsylvani L&I
Stairways and Ladders by Pennsylvani L&IStairways and Ladders by Pennsylvani L&I
Stairways and Ladders by Pennsylvani L&IAtlantic Training, LLC.
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionMuizz Anibire
 
Scaffolding
ScaffoldingScaffolding
ScaffoldingFFSafety
 
Scaffolding-Training-PowerPoint-Presentation.pptx
Scaffolding-Training-PowerPoint-Presentation.pptxScaffolding-Training-PowerPoint-Presentation.pptx
Scaffolding-Training-PowerPoint-Presentation.pptxAthennaZomil
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
rule-1410-construction-safety.pptx rule-1410-construction-safety.pptx
rule-1410-construction-safety.pptx rule-1410-construction-safety.pptxrule-1410-construction-safety.pptx rule-1410-construction-safety.pptx
rule-1410-construction-safety.pptx rule-1410-construction-safety.pptxNoeAranel
 
Fall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardFall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardJohn Newquist
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5FFSafety
 

Similar to Walking Working Surfaces by ENV (20)

Walking and Working Surfaces by NPCA
Walking and Working Surfaces by NPCAWalking and Working Surfaces by NPCA
Walking and Working Surfaces by NPCA
 
Walking-Working Surfaces by PATHS
Walking-Working Surfaces by PATHSWalking-Working Surfaces by PATHS
Walking-Working Surfaces by PATHS
 
Walking and Working Surfaces Fall Protection by SMACNA
Walking and Working Surfaces Fall Protection by SMACNAWalking and Working Surfaces Fall Protection by SMACNA
Walking and Working Surfaces Fall Protection by SMACNA
 
Walk worksurfacesppt
Walk worksurfacespptWalk worksurfacesppt
Walk worksurfacesppt
 
Walk worksurfaces
Walk worksurfacesWalk worksurfaces
Walk worksurfaces
 
06_ww_surfaces.ppt
06_ww_surfaces.ppt06_ww_surfaces.ppt
06_ww_surfaces.ppt
 
OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements OSHA Trenching and Excavation Requirements
OSHA Trenching and Excavation Requirements
 
THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...
THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...
THE NATONAL BUILDING CODE OF THE PHILIPPINES and its revised rules and regula...
 
23 Eave Barriers
23 Eave Barriers23 Eave Barriers
23 Eave Barriers
 
Stairways and Ladders by Pennsylvani L&I
Stairways and Ladders by Pennsylvani L&IStairways and Ladders by Pennsylvani L&I
Stairways and Ladders by Pennsylvani L&I
 
Scaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&IScaffolds Training by Pennsylvania L&I
Scaffolds Training by Pennsylvania L&I
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall Protection
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Scaffolding-Training-PowerPoint-Presentation.pptx
Scaffolding-Training-PowerPoint-Presentation.pptxScaffolding-Training-PowerPoint-Presentation.pptx
Scaffolding-Training-PowerPoint-Presentation.pptx
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
4 water storage tank safety standards
4 water storage tank safety standards4 water storage tank safety standards
4 water storage tank safety standards
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
rule-1410-construction-safety.pptx rule-1410-construction-safety.pptx
rule-1410-construction-safety.pptx rule-1410-construction-safety.pptxrule-1410-construction-safety.pptx rule-1410-construction-safety.pptx
rule-1410-construction-safety.pptx rule-1410-construction-safety.pptx
 
Fall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standardFall Protection OSHA NEW General Industry 2017 standard
Fall Protection OSHA NEW General Industry 2017 standard
 
Scaffold 5
Scaffold 5Scaffold 5
Scaffold 5
 

More from Atlantic Training, LLC.

Stress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&IStress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&IAtlantic Training, LLC.
 
Workplace Harassment Prevention by UT EAP
Workplace Harassment Prevention by  UT EAPWorkplace Harassment Prevention by  UT EAP
Workplace Harassment Prevention by UT EAPAtlantic Training, LLC.
 
Preventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSUPreventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSUAtlantic Training, LLC.
 
Preventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&IPreventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&IAtlantic Training, LLC.
 
Warehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP LogisticsWarehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP LogisticsAtlantic Training, LLC.
 
Sexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by ShumakerSexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by ShumakerAtlantic Training, LLC.
 
New Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State UniversityNew Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State UniversityAtlantic Training, LLC.
 

More from Atlantic Training, LLC. (20)

Wellness for Supervisors by SWOSU
Wellness for Supervisors by SWOSUWellness for Supervisors by SWOSU
Wellness for Supervisors by SWOSU
 
Workplace Wellness by PHA
Workplace Wellness by PHAWorkplace Wellness by PHA
Workplace Wellness by PHA
 
Stress Management Training by SG
Stress Management Training by  SGStress Management Training by  SG
Stress Management Training by SG
 
Stress Management Training by SW
Stress Management Training by SWStress Management Training by SW
Stress Management Training by SW
 
Stress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&IStress and Worker Safety by Pennsylvania L&I
Stress and Worker Safety by Pennsylvania L&I
 
Respectful Workplace by RDTC
Respectful Workplace by RDTCRespectful Workplace by RDTC
Respectful Workplace by RDTC
 
Workplace Harassment by CLGW
Workplace Harassment by CLGWWorkplace Harassment by CLGW
Workplace Harassment by CLGW
 
Workplace Harassment Prevention by UT EAP
Workplace Harassment Prevention by  UT EAPWorkplace Harassment Prevention by  UT EAP
Workplace Harassment Prevention by UT EAP
 
Welding Safety by Pennsylvania L&I
Welding Safety by Pennsylvania L&IWelding Safety by Pennsylvania L&I
Welding Safety by Pennsylvania L&I
 
Slips Trips & Falls Training by Signal
Slips Trips & Falls Training by SignalSlips Trips & Falls Training by Signal
Slips Trips & Falls Training by Signal
 
Preventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSUPreventing Falls, Slips and Trips by MGSU
Preventing Falls, Slips and Trips by MGSU
 
Preventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&IPreventing Workplace Harassment by Pennsylvania L&I
Preventing Workplace Harassment by Pennsylvania L&I
 
Warehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP LogisticsWarehouses In Emergencies by WFP Logistics
Warehouses In Emergencies by WFP Logistics
 
Prevention of Sexual Harassment by USMC
Prevention of Sexual Harassment by USMCPrevention of Sexual Harassment by USMC
Prevention of Sexual Harassment by USMC
 
Sexual Harassment by DEOMI
Sexual Harassment by DEOMISexual Harassment by DEOMI
Sexual Harassment by DEOMI
 
Sexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by ShumakerSexual Harassment in the Workplace Training by Shumaker
Sexual Harassment in the Workplace Training by Shumaker
 
Sexual Harassment Training by NAP
Sexual Harassment Training by NAPSexual Harassment Training by NAP
Sexual Harassment Training by NAP
 
Supervision
SupervisionSupervision
Supervision
 
New Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State UniversityNew Employee Safety Orientation by Oregon State University
New Employee Safety Orientation by Oregon State University
 
Lifting & Rigging by NEIS
Lifting & Rigging by NEISLifting & Rigging by NEIS
Lifting & Rigging by NEIS
 

Recently uploaded

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...lizamodels9
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 

Recently uploaded (20)

2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➥9990211544 Top Esc...
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 

Walking Working Surfaces by ENV

  • 1.  29 CFR Part 1910 Subpart D Walking-Working Surfaces
  • 2. Objectives In this course, we will discuss the following:  Hazards  Definitions  General requirements  Guarding floor and wall openings and holes  Ladders  Scaffolds  Other working surfaces
  • 3. Hazards Slips, trips and falls − Falls constitute the majority of general industry accidents and contribute to the majority of construction accidents.
  • 4. Definitions Floor hole − An opening measuring less than 12 inches but more than 1 inch in its least dimension, in any floor, platform, pavement, or yard, through which materials but not persons may fall. » Such as a belt hole, pipe opening, or slot opening §1910.21(a)(1)
  • 5. Definitions Floor opening − An opening measuring 12 inches or more in its least dimension, in any floor, platform, pavement, or yard through which persons may fall. » Such as a hatchway, stair or ladder opening, pit, or large manhole » Floor openings occupied by elevators, dumb waiters, conveyors, machinery, or containers are excluded from this subpart. §1910.21(a)(2)
  • 6. Definitions Wall hole − An opening less than 30 inches but more than 1 inch high, of unrestricted width, in any wall or partition. » Such as a ventilation hole or drainage scupper §1910.21(a)(10)
  • 7. Definitions Wall opening − An opening at least 30 inches high and 18 inches wide, in any wall or partition, through which persons may fall. » Such as an opening for a window, yard-arm doorway or chute opening §1910.21(a)(11)
  • 8. Is this a floor hole or opening?
  • 9. Housekeeping − Workplaces shall be kept clean, orderly, and sanitary. − Workroom floors shall be maintained as clean and dry as possible. − Every floor, working place and passageway shall be kept free from protruding nails, splinters, holes, or loose boards. General Requirements §1910.22(a)
  • 10. General Requirements Aisles and passageways − Aisles and passageways shall be kept clear and in good repair. − Permanent aisles and passageways shall be marked. − Where mechanical handling equipment is used, aisles, loading docks, and doorways shall maintain sufficient safe clearances. §1910.22(b)
  • 11. General Requirements Covers and guardrails − Shall be provided to protect workers from the hazards of open pits, tanks, vats, ditches, etc. §1910.22(c)
  • 12. General Requirements Floor loading protection − Load ratings shall be marked on plates of approved design and be conspicuously posted. − Unlawful to place a load rating limit greater than approved by building official. §1910.22(d)
  • 13. Floor Openings Stairway floor opening − Shall be guarded by a standard railing − Railing shall be provided on all exposed sides (except at entrance to stairway) §1910.23(a)(1)
  • 14. Floor Openings Ladderway floor opening or platform − Guarded by a standard railing with standard toeboard on all exposed sides (except at entrance to opening). − Passage through the railing either provided with a swinging gate or so offset that a person cannot walk directly into the opening. §1910.23(a)(2)
  • 15. Floor Openings Hatchway and chute floor opening − Guarded by hinged floor opening cover equipped with standard railings or permanently attached §1910.23(a)(3)
  • 16. Floor Openings Skylight floor opening and hole − Shall be guarded by a standard skylight screen or a fixed standard railing on all exposed sides §1910.23(a)(4)
  • 17. Floor Openings Pit and trapdoor floor opening − Infrequently used openings shall be guarded by a floor opening cover of standard strength and construction. − While the cover is not in place, the pit or trap opening shall be constantly attended by someone or shall be protected on all exposed sides by removable standard railings. §1910.23(a)(5)
  • 18. Floor Openings Manhole floor opening − Shall be guarded by a standard manhole cover which need not be hinged in place − While the cover is not in place, the manhole opening shall be constantly attended by someone or shall be protected by removable standard railings. §1910.23(a)(6)
  • 19. Floor Openings Temporary floor opening − Shall have standard railings, or shall be constantly attended by someone §1910.23(a)(7)
  • 20. Floor Openings Every floor hole into which persons can accidentally walk shall be guarded by either: − A standard railing with standard toeboard on all exposed sides, or − A floor hole cover of standard strength and construction » While the cover is not in place, the floor hole shall be constantly attended by someone or shall be protected by a removable standard railing. §1910.23(a)(8)
  • 21. Wall Openings and Holes Every wall opening from which there is a drop of more than 4 feet shall be guarded by: − Rail, roller, picket fence, half door, or equivalent barrier Where exposure below to falling materials, a removable toe board or the equivalent shall also be provided. §1910.23(b)
  • 22. Open-Sided Floors and Platforms Open-sided floors or platforms − 4 feet or more above adjacent floor or ground level shall be guarded by a standard railing (or equivalent) on all open sides, except where there is an entrance to a ramp, stairway, or fixed ladder. §1910.23(c)
  • 23. Railing shall be provided with a toeboard wherever, beneath the open sides: − Persons can pass − There is moving machinery − There is equipment with which falling materials could create a hazard §1910.23(c)(1)Open-Sided Floors and Platforms
  • 24. Runways − Shall be guarded by a standard railing on all open sides 4 feet or more above floor or ground level − Wherever tools, machine parts, or materials are likely to be used on the runway, a toeboard shall also be provided on each exposed side. §1910.23(c)(2)Open-Sided Floors and Platforms
  • 25. Regardless of height, a standard railing and toeboard must be used to guard: − Open-sided floors, − Walkways, − Platforms, or − Runways … located above or adjacent to dangerous equipment, pickling or galvanizing tanks, degreasing units, and similar hazards. §1910.23(c)(3)Open-Sided Floors and Platforms
  • 26. Is this correct? Open-Sided Floors and Platforms
  • 27. Stairway, Railings and Guards  Every flights of stairs with four or more risers shall have standard stair railings or handrails.  On stairways less than 44 inches wide having both sides enclosed, at least one handrail, preferably on the right side descending. §1910.23(d)(1)
  • 28. Stairway, Railings and Guards  On stairways less than 44 inches wide having one side open, at least one stair railing on open side.  On stairways less than 44 inches wide having both sides open, one stair railing on each side. §1910.23(d)(1)
  • 29. Stairway, Railings and Guards  On stairways >44 inches wide <88 inches wide, one handrail on each enclosed side and one stair railing on each open side.  On stairways 88 or more inches wide, one handrail on each enclosed side, one stair railing on each open side, and one intermediate stair railing located approximately midway of the width. §1910.23(d)(1)
  • 30. Railings, Toeboards and Covers Standard railings − Consist of top rail, intermediate rail, and posts, and have a vertical height of 42 inches from upper surface of top rail to floor, platform, runway, or ramp level. − The intermediate rail shall be approximately halfway between the top rail and the floor, platform, runway, or ramp. §1910.23(e)
  • 31. Railings, Toeboards and Covers Handrails − Height shall be not more than 34 inches nor less than 30 inches from upper surface of handrail to surface of tread in line with face of riser or to surface of ramp − A strength to withstand at least the minimum requirement of 200 pounds top rail pressure §1910.23(e)
  • 32. Railings, Toeboards and Covers Toeboards − Shall be 4 inches nominal in vertical height from its top edge to the level of the floor, platform, runway, or ramp §1910.23(e)
  • 33. Railings, Toeboards and Covers Skylight screens − Shall be capable of withstanding a load of at least 200 pounds Wall opening barriers − Shall be capable of withstanding a load of at least 200 pounds §1910.23(e)
  • 34. Fixed Industrial Stairs  Stair strength − Shall be able to carry 5 times expected load; minimum of 1,000 pounds  Stair width − Minimum width of 22 inches §1910.24
  • 35. Fixed Industrial Stairs  Treads − Shall be slip resistant with uniform rise height and tread width §1910.24
  • 36. Fixed Industrial Stairs  Angle of stairway rise − Fixed stairs shall be installed at angles to the horizontal of between 30 degrees and 50 degrees − Table D-1 gives rise/tread dimensions which will produce a stairway within the permissible range §1910.24
  • 37. Fixed Industrial Stairs  Vertical clearance − A minimum clearance of 7 feet above any stair tread to an overhead obstruction §1910.24
  • 38. Portable Ladders Stepladders - three types − Type I - Industrial stepladder » 3 to 20 feet for heavy duty use, such as utilities, contractors, and industrial use − Type II - Commercial stepladder » 3 to 12 feet for medium duty use, such as painters, offices, and light industrial use − Type III - Household stepladder » 3 to 6 feet for light duty, such as light household use §1910.25 and 1910.26
  • 39. Portable Ladders Straight and extension ladders − Length of single ladders or individual sections of ladders shall not exceed 30 feet − Two-section ladders shall not exceed 60 feet in length Trestle ladders/Platform ladders − Shall be not more than 20 feet in length §1910.25 and 1910.26
  • 40. Portable Ladders Use and care − Be maintained in good condition at all times − Not be used for anything other than intended use − Shall be inspected frequently » If defects are found, mark and take out of service − Designed as a one-man working ladder based on a 200-pound load §1910.25 and 1910.26 (cont’d)
  • 41. Portable Ladders − Base placed a distance from the vertical wall equal to one-fourth the working length of the ladder − Must be placed with secure footing − Shall be placed as to prevent slipping, or it shall be lashed, or held in position §1910.25 and 1910.26 (cont’d)
  • 42. Portable Ladders  When used to gain access to a roof or other area, shall extend at least 3 feet above the point of support  Tops of stepladders shall not be used as steps  Ladders shall not be placed on boxes, barrels, or other unstable bases  Must be placed with the two rails supported §1910.25 and 1910.26
  • 43. Portable Ladders Portable metal ladders − 1910.333(c)(7) » Portable ladders shall have non-conductive side rails if they are used where the employee or the ladder could contact exposed energized parts. §1910.26(c)(3)(viii)
  • 44. Fixed Ladders  Cages or wells required if longer than 20 feet to a maximum unbroken length of 30 feet − Platform with standard railings and toeboard required every 30 feet (if no safety device provided, every 20 feet)  Cages shall extend down the ladder to a point not less than 7 feet nor more than 8 feet from base  Cages shall extend a minimum of 42 inches above the top of landing §1910.27
  • 45. Fixed Ladders  Ladder safety devices may be used on tower, water tank and chimney ladders over 20 feet in unbroken length instead of cage protection − No landing platform required  Preferred pitch of fixed ladders shall be considered to come in the range of 75 degrees and 90 degrees with the horizontal  Permanently attached to a structure, building or equipment §1910.27
  • 46. Fixed Ladders  Shall be inspected regularly, with the intervals between inspections being determined by use and exposure  Metal ladders and appurtenances shall be painted or otherwise treated to resist corrosion and rusting  Wood ladders, when used under conditions where decay may occur, shall be treated with a nonirritating preservative §1910.27
  • 47. Scaffold Types Pole Scaffold Frame or Fabricated Specialty
  • 48. Scaffold Types Pump Jack Ladder Jack Tube and Coupler Mobile
  • 50. Scaffolding General requirements for all scaffolds − Shall not be altered or moved horizontally while in use or occupied − Overhead protection shall be provided for men on a scaffold exposed to overhead hazards §1910.28 (cont’d)
  • 51. Scaffolding − Footing shall be sound, rigid, and capable of carrying the maximum intended load − Shall be capable of supporting at least four times the maximum intended load − Planking shall be scaffold grade §1910.28 (cont’d)
  • 52. Scaffolding − Shall be secured to permanent structures − Screen mesh shall be provided between the toeboard and the guardrail where persons are required to work or pass under the scaffolds. − Must be plumb, level, and squared. §1910.28 (cont’d)
  • 53. Scaffolding − All planking or platforms shall be overlapped (minimum 12 inches) or secured from movement. − An access ladder or equivalent safe access shall be provided. − Scaffold planks shall extend over their end supports not less than 6 inches nor more than 18 inches. − Employees shall not work on scaffolds during storms or high winds. §1910.28
  • 54. Scaffolding General requirements for wood pole scaffolds − Cross bracing shall be provided between the inner and outer sets of poles − Where planking is lapped, each plank shall lap its end supports at least 12 inches − Guardrails with a mid-rail, and toeboards, shall be installed at all open sides on all scaffolds more than 10 feet above the ground or floor » Toeboards shall be a minimum of 4 inches in height §1910.28
  • 56. Scaffolding  1910.28(c) Tube and coupler  1910.28(d) Tubular welded frame  1910.28(e) Outrigger  1910.28(f) Masons’ adjustable multiple-point suspension  1910.28(g) Two-point suspension (swinging)  1910.28(h) Stone setters’ adjustable multiple-point suspension  1910.28(i) Single-point adjustable suspension  1910.28(j) Boatswain’s chair  1910.28(k) Carpenters’ bracket (cont’d) §1910.28
  • 57. Scaffolding  1910.28(l) Bricklayers’ square  1910.28(m) Horse  1910.28(n) Needle beam  1910.28(o) Plasterers’, decorators’, and large area  1910.28(p) Interior hung  1910.28(q) Ladder-jack  1910.28(r) Window-jack  1910.28(s) Roofing brackets  1910.28(t) Crawling board or chicken ladders  1910.28(u) Float or ship §1910.28
  • 58. Mobile Ladder Stands and Scaffolds §1910.29
  • 59. Mobile Ladder Stands and Scaffolds  Work platforms and scaffolds shall be capable of carrying the design load.  Design working load of ladder stands shall be calculated on the basis of one or more 200-pound persons together with 50 pounds of equipment each.  All ladder stands and scaffolds shall be capable of supporting at least four times the design working load. §1910.29
  • 60. Mobile Ladder Stands and Scaffolds Design load of all scaffolds − Light - Designed and constructed to carry a working load of 25 pounds per square foot. − Medium - Designed and constructed to carry a working load of 50 pounds per square foot. − Heavy - Designed and constructed to carry a working load of 75 pounds per square foot. §1910.29
  • 61. Mobile Ladder Stands and Scaffolds Work levels − Maximum work level height shall not exceed four times the minimum or least base dimensions of any mobile ladder stand or scaffold − Minimum platform width for any work level shall not be less than 20 inches for mobile scaffolds (towers). − Ladder stands shall have a minimum step width of 16 inches §1910.29 (cont’d)
  • 62. Mobile Ladder Stands and Scaffolds − Scaffold work levels 10 feet or higher above the ground or floor shall have a standard guardrail, midrail, and toeboard − A climbing ladder or stairway shall be provided for proper access and egress §1910.29
  • 63. Mobile Ladder Stands and Scaffolds Wheels or casters − Shall be properly designed for strength and dimensions to support four times the design working load. − Scaffolds casters shall be provided with a positive wheel and/or swivel lock to prevent movement. − Ladder stands shall have at least two of the four casters and shall be of the swivel type. §1910.29
  • 64. Mobile Ladder Stands and Scaffolds  1910.29(b) Mobile tubular welded frame scaffolds  1910.29(c) Mobile tubular welded sectional folding scaffolds  1910.29(d) Mobile tube and coupler scaffolds  1910.29(e) Mobile work platforms  1910.29(f) Mobile ladder stands §1910.29
  • 65. Other Working Surfaces Dockboards (bridge plates) − Portable and powered dockboards shall be strong enough to carry the load imposed on them. − Portable dockboards shall be secured in position, either by being anchored or equipped with devices which will prevent their slipping. − Handholds, or other effective means, shall be provided on portable dockboards to permit safe handling. §1910.30
  • 66. Other Working Surfaces Forging machine area − Enough clearance between machines to allow unobstructed operator movement − Aisles shall be sufficient width to permit free movement of employees bringing and removing material §1910.30
  • 67. Other Working Surfaces Veneer machinery − Sides of steam vats shall extend to a height of not less than 36 inches above the floor, working platform, or ground. − Large steam vats shall be provided walkways between sections. » Walkway shall be provided with a standard handrail on each exposed side − Workmen shall not ride or step on logs in steam vats §1910.30
  • 68. Summary In this course, we discussed:  Hazards  Definitions  General requirements  Guarding floor and wall openings and holes  Ladders  Scaffolds  Other working surfaces
  • 69. Thank You For Attending! Final Questions?
  • 70. Handouts Place all handouts at the end of this presentation.

Editor's Notes

  1. The information in this presentation is provided voluntarily by the N.C. Department of Labor, Education Training and Technical Assistance Bureau as a public service and is made available in good faith. This presentation is designed to assist trainers conducting OSHA outreach training for workers. Since workers are the target audience, this presentation emphasizes hazard identification, avoidance, and control – not standards. No attempt has been made to treat the topic exhaustively. It is essential that trainers tailor their presentations to the needs and understanding of their audience. The information and advice provided on this Site and on Linked Sites is to provided solely on the basis that users will be responsible for making their own assessment of the matters discussed herein and are advised to verify all relevant representations, statements, and information. This presentation is not a substitute for any of the provisions of the Occupational Safety and Health Act of North Carolina or for any standards issued by the N.C. Department of Labor. Mention of trade names, commercial products, or organizations does not imply endorsement by the N.C. Department of Labor.
  2. (MS Clip Art)
  3. Photo from OSHA.gov
  4. (Photo from NCDOL-OSH Division)
  5. (Photo from NCDOL-OSH Division)
  6. (Photo from NCDOL-OSH Division)
  7. Photo from OSHA.gov
  8. Photo from NC OSH Division
  9. Photo from OSHA.gov
  10. Photo from OSHA.gov
  11. Photo from OSHA.gov
  12. (Photo from NCDOL-OSH Division)
  13. Photo from OSHA.gov
  14. Photo from OSHA.gov
  15. (Photo from CDC.gov)
  16. Photo from OSHA.gov
  17. Photo from OSHA.gov
  18. Photo from OSHA.gov
  19. Photo OSHA.gov
  20. (MS Clip Art)
  21. MS Clip Art
  22. Photo from OSHA.gov
  23. Photo from OSHA.gov
  24. Photo from OSHA.gov
  25. MS Clip Art
  26. Photo from OSH NC Division
  27. Photo from OSHA.gov
  28. Photo from OSHA.gov
  29. (MS Clip Art)
  30. Photo from OSHA.gov
  31. Photo from OSHA.gov
  32. Photo from OSHA.gov
  33. Photo from OSHA.gov
  34. Photo from OSHA.gov
  35. Photo from OSHA.gov
  36. Photo from OSHA.gov
  37. (MS Clip Art)
  38. MS Clip Art
  39. Photo from OSHA.gov
  40. Photo from OSHA.gov
  41. Photo from OSHA.gov
  42. Photo from OSHA.gov
  43. Photo from OSHA.gov
  44. Photo from OSHA.gov
  45. MS Clip Art
  46. MS Clip Art
  47. Photo from OSHA.gov
  48. Photo from OSHA.gov
  49. Photo from OSHA.gov
  50. Photo from NCDOL-OSH Division
  51. Photo from NCDOL-OSH Division
  52. Photo courtesy of OR OSHA
  53. Photo courtesy of OSHA.gov
  54. Photo- OSHA.gov
  55. Photo from OSHA.gov
  56. Illustration from OSHA.gov
  57. Illustration from OSHA.gov
  58. MS Clip Art
  59. MS Clip Art
  60. MS Clip Art
  61. Photo courtesy of OSHA.gov
  62. Photo courtesy – OSHA.gov
  63. MS Clip Art
  64. Photo from OSHA.gov
  65. Photo courtesy of OSHA.gov
  66. MS Clip Art
  67. Photo from OSHA.gov