RESERVOIR PLANNING STUDY:
A COMPREHENSIVE ASSESSMENT OF
EVANSTON’S WATER STORAGE NEEDS
Presentation to City Council
April 8, 2014
Reports Completed to Date
• CTL Group’s structural evaluation of 1913 facilities (2010)
• CTL Group’s structural evaluation of 1934 Reservoir and
1948 Settling Basins No. 1 & 2 (2012)
• CDM Smith’s review of CTL Group’s report on 1934
reservior (2013)
• CTL Group’s Inspection of 1934 Reservoir (2013)
• CDM Smith’s 1934 Reservoir Inspection Report (2013)
• Walker Restoration Consultants1934 Reservoir Roof Slab
Report (2013) prepared for Northwestern University
Reason for Current Study
• Comprehensive evaluation of several factors:
 Finished water storage requirements
 Water treatment requirements
 Efficient pump operation
Recommendations based on decision criteria:
 Industry best management practices
 Age and deteriorated condition of existing structures
 Life cycle cost for repair and / or replacement
Reason for Current Study
• Complete a life cycle cost analysis to weigh
short-term repairs against long-term solutions.
 Repairing the reservoir would extend its life by 20
years maximum
 Compare long-term financial impacts of building a
new reservoir now or in 20 years
 Is it cost-effective to invest millions of dollars
rehabilitating the 1913 and 1923 facilities when the
concrete structures are likely at the end of their
useful life?
Existing Condition of Storage Facilities
Evanston’s water storage is provided by five
facilities that must be evaluated together:
Storage Facility
Gross
Storage (MG)
Year of
Construction Condition
West Plant Clearwells 2.4 1913 and 1923 Poor
East Plant Clearwells 2.0 1948 and 1964 Unknown
Finished Water Reservoir 5.0 1934 Poor
South Standpipe 5.0 1984 Good
North Standpipe 7.5 1986 Good
Water Plant Structural Evaluations
and Concerns
1913 1923
1934
1948
1913 Clearwells Existing Condition
Vertical and horizontal
wall cracks are prevalent
inside the clearwells
1913 Clearwells Existing Condition
Cracking was also found
on the outer clearwell wall
faces and in the filter walls
above the clearwells
1913 Clearwells Existing Condition
“It is CTLgroup’s opinion that the most
reliable method to repair the clearwell cracks and
eliminate infiltration would be to 1) excavate to
expose all roof and wall surfaces, 2) execute full-
thickness crack repairs, and 3) apply a water proof
coating to all exterior surfaces. However, given
the highly-invasive nature of such a repair, it is
questionable whether such measures would be
considered practical”
John J. Roller, CTL Group, registered professional engineer and registered
structural engineer in the state of Illinois.
1934 Reservoir Existing Condition
• CTL Group found
cracks throughout the
underside of the roof
slab in their 2012
inspection
• Walker Restoration
Consultants found
“near disintegration” of
the top 1.5 – 2 inches
of the roof slab in their
2013 inspection
1934 Reservoir Existing Condition
Steel rebar is exposed
and corroded in many
locations on the roof slab
1934 Reservoir Existing Condition
CDM Smith’s 2013 report states of the 1934 Reservoir:
“Given that this concrete structure is about 80 years old,
the rate of deterioration and degradation is expected to be
accelerating for the remainder of its useful life. Under normal
conditions, the average expected useful life of a concrete
structure is about 100 years. This life span can be significantly
reduced if the concrete structure is subject to constant high
humidity and repeated freeze-thaw cycles. This is exactly the
case for the finished water reservoir, especially for the roof slab
of the reservoir. Therefore, …it is probable that the useful life of
the walls and the floor slab will not exceed 100 years.”
Wendell Yang, CDM Smith, registered professional engineer (1983)
and registered structural engineer (1985) in the state of Illinois.
QUESTIONS?
Study will consider six alternatives
• 1 – Replace 1934 Reservoir roof and modify to use
entire volume, repair 1913/1923 Clearwells
• 2 – Replace 1934 Reservoir in existing footprint, repair
1913/1923 Clearwells
• 3 – Replace 1934 Reservoir in larger footprint,
decommission 1913/1923 Clearwells
• 4 – Construct a new clearwell on the east side of
Sheridan Road, decommission 1934 Reservoir
• 5 – Construct a new reservoir and pumping station at
Leahy Park
• 6 – Repair 1934 Reservoir roof and modify to use
entire volume, repair 1913/1923 Clearwells

More Related Content

What's hot

Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacityonyx3
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirsfarooq husain
 
Reservoir ppt
Reservoir pptReservoir ppt
Reservoir pptY14ce952
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety DevicesTushar Dholakia
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineeringchala hailu
 
Canal alignment
Canal alignmentCanal alignment
Canal alignmentNaveenaa
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningRamanuj Jaldhari
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel studyroidghozi
 
Seepage through canals_seminar presentation
Seepage through canals_seminar presentationSeepage through canals_seminar presentation
Seepage through canals_seminar presentationRaj Bisen
 
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantagesabdqadeer
 
Canal of design
Canal of designCanal of design
Canal of designPREMKUMAR
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Denish Jangid
 

What's hot (20)

Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
Reservoir Planning
Reservoir PlanningReservoir Planning
Reservoir Planning
 
5 Reservoir Planning
5 Reservoir Planning5 Reservoir Planning
5 Reservoir Planning
 
1. reservoirs unit !
1. reservoirs   unit !1. reservoirs   unit !
1. reservoirs unit !
 
Reservoir capacity
Reservoir capacityReservoir capacity
Reservoir capacity
 
Storage and distribution reservoirs
Storage and distribution reservoirsStorage and distribution reservoirs
Storage and distribution reservoirs
 
Reservoir ppt
Reservoir pptReservoir ppt
Reservoir ppt
 
Diversion head works
Diversion head worksDiversion head works
Diversion head works
 
Dam safety & Safety Devices
Dam safety & Safety DevicesDam safety & Safety Devices
Dam safety & Safety Devices
 
Elements of dam engineering
Elements of dam engineeringElements of dam engineering
Elements of dam engineering
 
Design of a channel Reach
Design of a channel ReachDesign of a channel Reach
Design of a channel Reach
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Earthen Dam
Earthen DamEarthen Dam
Earthen Dam
 
Canals
CanalsCanals
Canals
 
Design of Lined Canal and Canal Lining
Design of Lined Canal and Canal LiningDesign of Lined Canal and Canal Lining
Design of Lined Canal and Canal Lining
 
Lined or non erodible design channel study
Lined or non erodible design channel studyLined or non erodible design channel study
Lined or non erodible design channel study
 
Seepage through canals_seminar presentation
Seepage through canals_seminar presentationSeepage through canals_seminar presentation
Seepage through canals_seminar presentation
 
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
• Sediment Transport • The Earthen Canal Section • Lined Canals & Its Advantages
 
Canal of design
Canal of designCanal of design
Canal of design
 
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...Canal & canal types with design of channels by dj sir covered kennedy lacey t...
Canal & canal types with design of channels by dj sir covered kennedy lacey t...
 

Viewers also liked

Contract How To Make An Agreement A Contract Etienne Lawyers
Contract   How To Make An Agreement A Contract Etienne LawyersContract   How To Make An Agreement A Contract Etienne Lawyers
Contract How To Make An Agreement A Contract Etienne LawyersEtienne Lawyers
 
Options contract on indian derivative market
Options contract on indian derivative marketOptions contract on indian derivative market
Options contract on indian derivative marketRitesh Sethi
 
Contract law lecture - 1 - definition and meaning(terminology)
Contract law   lecture - 1 - definition and meaning(terminology)Contract law   lecture - 1 - definition and meaning(terminology)
Contract law lecture - 1 - definition and meaning(terminology)Dr. Arun Verma
 
Void agreement / contract ppt
Void agreement / contract pptVoid agreement / contract ppt
Void agreement / contract pptHome
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Contracts & Agreements as per Business Law
Contracts & Agreements as per Business LawContracts & Agreements as per Business Law
Contracts & Agreements as per Business LawNidhi Seth
 

Viewers also liked (10)

Contract How To Make An Agreement A Contract Etienne Lawyers
Contract   How To Make An Agreement A Contract Etienne LawyersContract   How To Make An Agreement A Contract Etienne Lawyers
Contract How To Make An Agreement A Contract Etienne Lawyers
 
Options contract on indian derivative market
Options contract on indian derivative marketOptions contract on indian derivative market
Options contract on indian derivative market
 
Contract law lecture - 1 - definition and meaning(terminology)
Contract law   lecture - 1 - definition and meaning(terminology)Contract law   lecture - 1 - definition and meaning(terminology)
Contract law lecture - 1 - definition and meaning(terminology)
 
Void agreement / contract ppt
Void agreement / contract pptVoid agreement / contract ppt
Void agreement / contract ppt
 
Gravity dam
Gravity damGravity dam
Gravity dam
 
Earthen dam
Earthen damEarthen dam
Earthen dam
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Contracts
ContractsContracts
Contracts
 
Contracts & Agreements as per Business Law
Contracts & Agreements as per Business LawContracts & Agreements as per Business Law
Contracts & Agreements as per Business Law
 
Gravity dam
Gravity damGravity dam
Gravity dam
 

Similar to A3.1 reservoir apr8 2014

ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...
ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...
ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...IRJET Journal
 
Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...
Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...
Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...IJMER
 
Epa ord aehs 2015 v8 jhz rst cl
Epa ord  aehs 2015 v8 jhz rst clEpa ord  aehs 2015 v8 jhz rst cl
Epa ord aehs 2015 v8 jhz rst clChris Lutes
 
synopsis on design and estimation of intze tank
synopsis on design and estimation of intze tanksynopsis on design and estimation of intze tank
synopsis on design and estimation of intze tankganesh sharma
 
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleKook Dean
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tankAamir Patni
 
Struct Audit Mktg
Struct Audit MktgStruct Audit Mktg
Struct Audit Mktgstructaudit
 
Causes of Failure in Storage Facilities and Their Supports
Causes of Failure in Storage Facilities and Their SupportsCauses of Failure in Storage Facilities and Their Supports
Causes of Failure in Storage Facilities and Their Supportstheijes
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Dhaval Jadhav
 
LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...
LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...
LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...Ishwar Kumbar
 
DESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxDESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxSOUMILSENAPATI2
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdfRijuDasgupta
 
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...glennmcgillivray
 
Soil dynamic Earth Quick Engineering.pptx
Soil dynamic Earth Quick Engineering.pptxSoil dynamic Earth Quick Engineering.pptx
Soil dynamic Earth Quick Engineering.pptxSadafQasim3
 
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptxDesign-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptxLeenaMujahed
 
Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanShoaib Madridista
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdffreezefreeze2
 

Similar to A3.1 reservoir apr8 2014 (20)

ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...
ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...
ANALYSIS & DESIGN OF CIRCULAR COMPONENTS OF WATER TREATMENT PLANT USING PREST...
 
Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...
Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...
Economic Design of Water Tank of Different Shapes With Reference To IS: 3370 ...
 
Epa ord aehs 2015 v8 jhz rst cl
Epa ord  aehs 2015 v8 jhz rst clEpa ord  aehs 2015 v8 jhz rst cl
Epa ord aehs 2015 v8 jhz rst cl
 
synopsis on design and estimation of intze tank
synopsis on design and estimation of intze tanksynopsis on design and estimation of intze tank
synopsis on design and estimation of intze tank
 
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and ScheduleFINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
FINAL The Owens Lake Turnout Facility End Cap Budget and Schedule
 
Elevated water tank
Elevated water tankElevated water tank
Elevated water tank
 
Struct Audit Mktg
Struct Audit MktgStruct Audit Mktg
Struct Audit Mktg
 
Causes of Failure in Storage Facilities and Their Supports
Causes of Failure in Storage Facilities and Their SupportsCauses of Failure in Storage Facilities and Their Supports
Causes of Failure in Storage Facilities and Their Supports
 
Planning for the future of onshore wind and solar farm
Planning for the future of onshore wind and solar farmPlanning for the future of onshore wind and solar farm
Planning for the future of onshore wind and solar farm
 
Repairs and rehabilitation 2012
Repairs and rehabilitation 2012Repairs and rehabilitation 2012
Repairs and rehabilitation 2012
 
LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...
LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...
LATERAL STABILITY IMPROVEMENT FOR ELEVATED STEEL WATER STORAGE RESERVOIR IN S...
 
DESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxDESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptx
 
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
26901321007_SAPTADEEP DASGUPTA_CE(PE)701C.pdf
 
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
ICLR Friday Forum: Lot-level approaches to control urban flood risk (April 21...
 
May17
May17May17
May17
 
Soil dynamic Earth Quick Engineering.pptx
Soil dynamic Earth Quick Engineering.pptxSoil dynamic Earth Quick Engineering.pptx
Soil dynamic Earth Quick Engineering.pptx
 
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptxDesign-of-diversion-dam-in-tarbela-dam-pakistan.pptx
Design-of-diversion-dam-in-tarbela-dam-pakistan.pptx
 
Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
 
Lecture 0 design of spilways an overview
Lecture 0 design of spilways an overviewLecture 0 design of spilways an overview
Lecture 0 design of spilways an overview
 
The Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdfThe Great Leap Theory, Donald Bruce.pdf
The Great Leap Theory, Donald Bruce.pdf
 

More from cityofevanston

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020cityofevanston
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015cityofevanston
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationcityofevanston
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summitcityofevanston
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentationcityofevanston
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014cityofevanston
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentationcityofevanston
 
Penny Park Renovations
Penny Park RenovationsPenny Park Renovations
Penny Park Renovationscityofevanston
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Projectcityofevanston
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Reviewcityofevanston
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Reviewcityofevanston
 
A5 Chicago Ave Project Plan
A5 Chicago Ave Project PlanA5 Chicago Ave Project Plan
A5 Chicago Ave Project Plancityofevanston
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Developmentcityofevanston
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentationcityofevanston
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationcityofevanston
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitorscityofevanston
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012cityofevanston
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10cityofevanston
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-towncityofevanston
 

More from cityofevanston (20)

SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020SBA & City of Evanston Economic Injury Webinar - 4/1/2020
SBA & City of Evanston Economic Injury Webinar - 4/1/2020
 
Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015Zs city of evanston presentation 28 january 2015
Zs city of evanston presentation 28 january 2015
 
Human services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentationHuman services funding summit jan 27 2015 presentation
Human services funding summit jan 27 2015 presentation
 
Age friendlyhealth summit
Age friendlyhealth summitAge friendlyhealth summit
Age friendlyhealth summit
 
Divvy Community Meeting Presentation
Divvy Community Meeting PresentationDivvy Community Meeting Presentation
Divvy Community Meeting Presentation
 
Human services noyes ctr successes 2014
Human services noyes ctr successes 2014Human services noyes ctr successes 2014
Human services noyes ctr successes 2014
 
Hs cagngfrndlyupdte
Hs cagngfrndlyupdteHs cagngfrndlyupdte
Hs cagngfrndlyupdte
 
Leathers & Associates Penny Park Presentation
Leathers & Associates Penny Park PresentationLeathers & Associates Penny Park Presentation
Leathers & Associates Penny Park Presentation
 
Penny Park Renovations
Penny Park RenovationsPenny Park Renovations
Penny Park Renovations
 
Sheridan Road Improvement Project
Sheridan Road Improvement ProjectSheridan Road Improvement Project
Sheridan Road Improvement Project
 
FY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial ReviewFY 2014 Second Quarter Financial Review
FY 2014 Second Quarter Financial Review
 
SP1 Second Quarter Financial Review
SP1 Second Quarter Financial ReviewSP1 Second Quarter Financial Review
SP1 Second Quarter Financial Review
 
A5 Chicago Ave Project Plan
A5 Chicago Ave Project PlanA5 Chicago Ave Project Plan
A5 Chicago Ave Project Plan
 
P1 Sports Dome Planned Development
P1 Sports Dome Planned DevelopmentP1 Sports Dome Planned Development
P1 Sports Dome Planned Development
 
Sheridan Road City Council Presentation
Sheridan Road City Council PresentationSheridan Road City Council Presentation
Sheridan Road City Council Presentation
 
Sp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentationSp1 2013 street resurfacing presentation
Sp1 2013 street resurfacing presentation
 
Presentation - japanese visitors
Presentation - japanese visitorsPresentation - japanese visitors
Presentation - japanese visitors
 
Evanston committee 3 5-2012
Evanston committee 3 5-2012Evanston committee 3 5-2012
Evanston committee 3 5-2012
 
A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10A8 a10 chicago main intro of ordinances 2012 12/10
A8 a10 chicago main intro of ordinances 2012 12/10
 
Council meeting 3.20.12 cross fit e-town
Council meeting 3.20.12  cross fit e-townCouncil meeting 3.20.12  cross fit e-town
Council meeting 3.20.12 cross fit e-town
 

Recently uploaded

Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTaccounts329278
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024Energy for One World
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...anilsa9823
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationEnergy for One World
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...narwatsonia7
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...ResolutionFoundation
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceHigh Profile Call Girls
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...ankitnayak356677
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...ResolutionFoundation
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28JSchaus & Associates
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfahcitycouncil
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Roomishabajaj13
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxPeter Miles
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up NumberMs Riya
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersCongressional Budget Office
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.Christina Parmionova
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.Christina Parmionova
 

Recently uploaded (20)

Fair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CTFair Trash Reduction - West Hartford, CT
Fair Trash Reduction - West Hartford, CT
 
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
Delhi Russian Call Girls In Connaught Place ➡️9999965857 India's Finest Model...
 
DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024DNV publication: China Energy Transition Outlook 2024
DNV publication: China Energy Transition Outlook 2024
 
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
Lucknow 💋 Russian Call Girls Lucknow ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Club of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological CivilizationClub of Rome: Eco-nomics for an Ecological Civilization
Club of Rome: Eco-nomics for an Ecological Civilization
 
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
Call Girls Service Race Course Road Just Call 7001305949 Enjoy College Girls ...
 
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
(DIYA) Call Girls Saswad ( 7001035870 ) HI-Fi Pune Escorts Service
 
Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...Precarious profits? Why firms use insecure contracts, and what would change t...
Precarious profits? Why firms use insecure contracts, and what would change t...
 
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile ServiceCunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
Cunningham Road Call Girls Bangalore WhatsApp 8250192130 High Profile Service
 
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
Greater Noida Call Girls 9711199012 WhatsApp No 24x7 Vip Escorts in Greater N...
 
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...Powering Britain: Can we decarbonise electricity without disadvantaging poore...
Powering Britain: Can we decarbonise electricity without disadvantaging poore...
 
2024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 282024: The FAR, Federal Acquisition Regulations - Part 28
2024: The FAR, Federal Acquisition Regulations - Part 28
 
The Federal Budget and Health Care Policy
The Federal Budget and Health Care PolicyThe Federal Budget and Health Care Policy
The Federal Budget and Health Care Policy
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With RoomVIP Kolkata Call Girl Jatin Das Park 👉 8250192130  Available With Room
VIP Kolkata Call Girl Jatin Das Park 👉 8250192130 Available With Room
 
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxxIncident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
Incident Command System xxxxxxxxxxxxxxxxxxxxxxxxx
 
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas  Whats Up Number
##9711199012 Call Girls Delhi Rs-5000 UpTo 10 K Hauz Khas Whats Up Number
 
How the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists LawmakersHow the Congressional Budget Office Assists Lawmakers
How the Congressional Budget Office Assists Lawmakers
 
Climate change and occupational safety and health.
Climate change and occupational safety and health.Climate change and occupational safety and health.
Climate change and occupational safety and health.
 
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.WIPO magazine issue -1 - 2024 World Intellectual Property organization.
WIPO magazine issue -1 - 2024 World Intellectual Property organization.
 

A3.1 reservoir apr8 2014

  • 1. RESERVOIR PLANNING STUDY: A COMPREHENSIVE ASSESSMENT OF EVANSTON’S WATER STORAGE NEEDS Presentation to City Council April 8, 2014
  • 2. Reports Completed to Date • CTL Group’s structural evaluation of 1913 facilities (2010) • CTL Group’s structural evaluation of 1934 Reservoir and 1948 Settling Basins No. 1 & 2 (2012) • CDM Smith’s review of CTL Group’s report on 1934 reservior (2013) • CTL Group’s Inspection of 1934 Reservoir (2013) • CDM Smith’s 1934 Reservoir Inspection Report (2013) • Walker Restoration Consultants1934 Reservoir Roof Slab Report (2013) prepared for Northwestern University
  • 3. Reason for Current Study • Comprehensive evaluation of several factors:  Finished water storage requirements  Water treatment requirements  Efficient pump operation Recommendations based on decision criteria:  Industry best management practices  Age and deteriorated condition of existing structures  Life cycle cost for repair and / or replacement
  • 4. Reason for Current Study • Complete a life cycle cost analysis to weigh short-term repairs against long-term solutions.  Repairing the reservoir would extend its life by 20 years maximum  Compare long-term financial impacts of building a new reservoir now or in 20 years  Is it cost-effective to invest millions of dollars rehabilitating the 1913 and 1923 facilities when the concrete structures are likely at the end of their useful life?
  • 5. Existing Condition of Storage Facilities Evanston’s water storage is provided by five facilities that must be evaluated together: Storage Facility Gross Storage (MG) Year of Construction Condition West Plant Clearwells 2.4 1913 and 1923 Poor East Plant Clearwells 2.0 1948 and 1964 Unknown Finished Water Reservoir 5.0 1934 Poor South Standpipe 5.0 1984 Good North Standpipe 7.5 1986 Good
  • 6. Water Plant Structural Evaluations and Concerns 1913 1923 1934 1948
  • 7. 1913 Clearwells Existing Condition Vertical and horizontal wall cracks are prevalent inside the clearwells
  • 8. 1913 Clearwells Existing Condition Cracking was also found on the outer clearwell wall faces and in the filter walls above the clearwells
  • 9. 1913 Clearwells Existing Condition “It is CTLgroup’s opinion that the most reliable method to repair the clearwell cracks and eliminate infiltration would be to 1) excavate to expose all roof and wall surfaces, 2) execute full- thickness crack repairs, and 3) apply a water proof coating to all exterior surfaces. However, given the highly-invasive nature of such a repair, it is questionable whether such measures would be considered practical” John J. Roller, CTL Group, registered professional engineer and registered structural engineer in the state of Illinois.
  • 10. 1934 Reservoir Existing Condition • CTL Group found cracks throughout the underside of the roof slab in their 2012 inspection • Walker Restoration Consultants found “near disintegration” of the top 1.5 – 2 inches of the roof slab in their 2013 inspection
  • 11. 1934 Reservoir Existing Condition Steel rebar is exposed and corroded in many locations on the roof slab
  • 12. 1934 Reservoir Existing Condition CDM Smith’s 2013 report states of the 1934 Reservoir: “Given that this concrete structure is about 80 years old, the rate of deterioration and degradation is expected to be accelerating for the remainder of its useful life. Under normal conditions, the average expected useful life of a concrete structure is about 100 years. This life span can be significantly reduced if the concrete structure is subject to constant high humidity and repeated freeze-thaw cycles. This is exactly the case for the finished water reservoir, especially for the roof slab of the reservoir. Therefore, …it is probable that the useful life of the walls and the floor slab will not exceed 100 years.” Wendell Yang, CDM Smith, registered professional engineer (1983) and registered structural engineer (1985) in the state of Illinois.
  • 14. Study will consider six alternatives • 1 – Replace 1934 Reservoir roof and modify to use entire volume, repair 1913/1923 Clearwells • 2 – Replace 1934 Reservoir in existing footprint, repair 1913/1923 Clearwells • 3 – Replace 1934 Reservoir in larger footprint, decommission 1913/1923 Clearwells • 4 – Construct a new clearwell on the east side of Sheridan Road, decommission 1934 Reservoir • 5 – Construct a new reservoir and pumping station at Leahy Park • 6 – Repair 1934 Reservoir roof and modify to use entire volume, repair 1913/1923 Clearwells

Editor's Notes

  1. We called this a Reservoir Planning Study because the most immediate concern and most expensive component is the 1934 Reservoir. However, this is really a comprehensive study of all of Evanston’s water storage facilities, how they operate together, and how much storage we need based on water system operations and contractual requirements to our wholesale customers.
  2. In 2008 as the filter shop area was being constructed, unexpected damage occurred to the concrete structure. In 2009 the Department raised concerns about the structural integrity of the concrete in several locations of the treatment plant. Visual inspection of the older filter areas showed signs of concrete failure. Council members toured the plant facility and they were taken to the old filter areas to observe some of the conditions and concerns. CTL was awarded the first 2 studies based on responses to RFPs 10-75 ($56,250) and RFP 12-158 ($89,000) CTL’s study expressed immediate concern of the reservoir roof slab, since this was the first time the reservoir had been inspected. CDM was asked to review the CTL report, confirm the estimated cost to repair, and provide more information about the probable duration of the work and impact to the water treatment processes if the reservoir was taken out of service. Based on reports and concern that vehicles and snow load on reservoir might cause a problem, NU was advised of situation. They then hired Walker who did inspection in November with report dated December 2013. CTL re-inspected the reservoir again in 2013 ($20,000) and CDM also participated in the 2013 inspection ($24,262 for both reports and to participate in inspection) The 2013 inspection revealed that there was no significant deterioration between the 2012 and 2013 inspection.
  3. The overall goal of the department was to complete the structural evaluation of the concrete for the facilities built at different times. The Department had programed funding for concrete repairs in the CIP based on the reports. However, the findings that the 1913 (and assumed 1923) facilities as well as the 1934 facility are in such poor structural condition a comprehensive plan on how to approach the issues based on
  4. At the very least, we are facing an investment of several million dollars to repair the reservoir roof and the 1913/1923 clearwells, as well as to modify the reservoir in order to be able to use the entire volume. The analysis will determine whether it is cost-effective to invest millions of dollars in structures that are already at or near the end of their useful life, or if there is a more cost-effective option that will provide us with a reservoir that can last another 80-100 years. Furthermore, we know that IEPA loan and government bond interest rates are favorable now. We do not know if they will still be favorable in 15-20 years. The study will consider the uncertainty in future lending terms and factor that into the life cycle costs. With the completion of the parking garage, Northwestern will no longer need to use the reservoir top as a parking lot. Plans for that space include anything from tennis courts to a new sports facility.
  5. 1913 clearwell walls and bottom slab are known to be in poor condition and the roof slab has not undergone structural testing, but is assumed to be in the same condition as the 1934 reservoir roof slab since it is made of the same non-air-entrained concrete and exposed to the same conditions. Not only concerned with concrete, but also of valves and design By wholesale contracts, must equitably apportion the water stored at the plant in the event of emergency Evanston avg daily demand is 8 MG, therefore should have 16 MG storage (2 days). 12.5 in standpipes but only 3.1 at plant for total of 15.6. And this assumes that the structures are full and that they can be completely drained. Standpipes are scheduled to be painted in 2014 & 2015. would want them in service prior to doing any work at the plant
  6. The 1913 filtration plant (clearwells and filters) was inspected in 2010 by CTL Group. Significant structural deterioration was found. The adjacent 1923 filtration plant has not yet been inspected, but it is assumed to be in similar condition since it was constructed of the same non-air-entrained concrete as the 1913 plant. The 1934 reservoir and 1948 settling basins (No. 1 & No. 2) were inspected in 2012 by CTL Group. The settling basins are in good condition, with only minor defects found. The reservoir walls and floor slab showed deterioration, but nothing immediately concerning given the structure’s age. The reservoir roof showed significant deterioration in the 2012 inspection. Cores taken from the roof demonstrated that the slab was cracked throughout its entire thickness. The follow-up inspection in 2013 showed little change, meaning the slab should remain safe in the near-term. However, three consultants (CTL, CDM Smith, and Walker) have all recommended extensive rehabilitation or complete replacement of the slab within the next five years to prevent structural failure.
  7. CTL Group conducted a structural inspection of the entire 1913 facility in 2010. Cores were taken from the walls but not the roof slab. However, the roof slab is only 4” thick and has been subject to the same freeze/thaw damage as the 1934 Reservoir, so it is assumed to be in similar condition.
  8. Significant efflorescence on the outer clearwell wall face (as viewed from the adjacent pipe gallery) indicates moisture is getting through the walls through a significant horizontal crack visible at the top of this patch of efflorescence. Several vertical wall cracks are visible in the wall of Filter #2 above the clearwells.
  9. Cores were not taken from the roof slabs at the time of this study. Based on the findings at the 1934 Reservoir, it is likely the clearwell roof slab would have the same severe deterioration to the point where major rehabilitation or complete replacement of the roof slab would be warranted. CTL’s cost estimate for injecting resin into the cracks from the interior of the clearwells, plus other structural repairs needed in the 1913 facility, was almost $1 million in 2010. A major rehabilitation or complete replacement of the clearwell roof slabs would add several million dollars to the cost.
  10. Again, not only concerned about the concrete structure but also the valves, piping and design. The current reservoir has 48” pipe running through it. It does not have any baffling to ensure there is no short circuiting of the water and it has not wet well which would allow for complete draining of the structure.
  11. Conclusion: Repair or replacement of the reservoir roof slab will extend the life of this structure by 20 years at most. At that time we will have no alternative but to construct a new reservoir at increased cost.
  12. Alt. 1 is a temporary fix and would work only if it is determined that no additional storage is needed beyond being able to use the entire 5 MG. A new reservoir/clearwell would be needed within 20 years. Alt. 2 is for comparison to Alt. 1, to compare the life cycle cost of replacing the reservoir in kind today versus doing it in 15-20 years. Alt. 3 would require negotiation with NU, though it is certainly a possibility depending on NU’s future plans for North Campus. Alt. 4 would require the City purchase the Fahner residence at 2437 Sheridan Road, but at the same time perhaps there would be some offsetting concessions by Northwestern in exchange for relinquishing the City’s rights to the current reservoir site. Alt. 5 is a less ideal scenario from an operational perspective, but would provide much more area to work with in the case we need significantly more storage volume. Alt. 6 is similar to Alt. 1 except it involves rehab of the roof slab in place rather than complete replacement of the roof slab. This alternative was added to the scope by addendum on February 2, 2014, after the Utilities Dept. received a report from Northwestern’s structural consultant (Walker) proposing the procedure. As with Alt. 1, this is only a temporary fix.