7. Tank diameter T 0.28m
Depth of liquid H 0.2m
Baffle width B 0.03m
Impeller diameter D
0.112m
Impeller blade width w
0.025m
w H Impeller blade height h
0.025m
h Impeller clearance C 0.06m
C
D
Dimensionless parameters
D/T 0.4
B H/T 0.714
T B/T 0.107
Subdomain
攪拌葉設計 ρ=1000 kg/m3
η=0.01 Pa.s = 10 cp
11. Simulation of a MOCVD Reactor
動量平衡 (Momentum balance) 能量平衡 (Energy balance)
T
u T Cp k T C pTu Q
u u u u p 0 t
t
u 0
t
VIII,in
化學反應機構 (Chemical reaction)
VV,in 氣相反應 (Gas reaction)
TMGa+H2 MMGa+2CH4 (G1)
質量平衡 (Mass balance)
TBAs AsH+C4H8+H2 (G2)
ci
Di ci ci u Ri 表面反應 (Surface reaction)
t
MMGa+AsH GaAs(s)+CH4 (S1)
15. Benchmark test:
search for the global minimum
2 2 2 2
min F x1 x2 11 x1 x2 7 x1 3x2 57
s.t
5 xi 5, i 1, 2
Modified Himmelblau function,
1993
Global optimal solution
X(-3.79,-3.32)
F=43.3030
17. Optimal design of an MOCVD
reactor
Before After
GR dA GR dA
GR 8.65 10 9 m / min GR 11.65 10 9 m / min
A A
GR GR GR GR
dA 0.003504 dA 0.00220
GR GR
19. Concept of Pareto-optimal
solutions : non-dominated (Goldberg, 1989)
Feasible objective space
B dominate A
A C dominate A
B, C non-dominated
B
D, E non-dominated
f2
Second level
C E dominate A, B, C
D
D dominate A, B
E
Pareto-optimal front
f1
20. Optimal Pareto-front
solutions of an MOCVD
90
80 B
70
60
Uniformity index
50
40
30
20 C
D A
10
0
-10
-45 -40 -35 -30 -25 -20 -15 -10 -5 0
Growth Rate (nm/min)
21. Uncertainties ?
不明確因素 Uncertainty
is
everywhere.
Sources of uncertainties
- modeling errors
- physical parameter variations
- change of environments
- unknown dynamics
…
uncertainties
Deterministic design Not reliable
30. Quiz (1/3)
1. What are the main parts of a green
process? (1) high efficiency (2) low
pollution (3) low material and energy
consumptions (4) all the above.
2. Why a process should be operated at
its optimum condition? (1) low cost
and energy loss (2) high productivity
(3) high profit (4) all the above.
31. Quiz (2/3)
3. Why a control system is necessary in a
chemical process? (1) stable operation
(2) disturbance rejection (3) low
product variations (4) all the above.
4. Why a simulation tool is necessary for
process design? (1) low cost (2)
reliability (3) be able to achieve a
better design (4) all the above.
32. Quiz (3/3)
5. What are the main issues of process
analysis? (1) realization and operational
feasibility (2) maintenance (3) energy
consumptions (4) all the above.