1. A 051213 JKW
Issued for approval - update to TC drgs
P 151113 JKW
Preliminary issue for comment
REV.
CONTRACTOR
APPROVALS
FABRICATION
DATE:DATE:
ISSUED FOR
APPROVAL
DATE:
ENGINEER OTHER
NOTES:FABRICATOR
RELEASE TO
SHOP FOR
DESCRIPTION
Released By:
REV.
DATE:
DESCRIPTION
DATE:
Approved By:
ARCHITECT
DATE:
DATE DATE
Approved By:Approved By:Approved By:
GA011052
HEYSHAM ONE POWER STATION
ISI EQUIPMENT FACILITY
MEZZANINE PLATFORMS
BBCS
JKW
A
PROJECT
LOCATION
DETAIL OF
CONTRACTOR
ARCHITECT
REVISION
DRAWING NO:CONTRACT NO:CHECKEDDRAWN
051213
1
DPL FABRICATIONS LTD
Q
12a
1. STEEL TO BE GRADE S275JR FOR SECTIONS & PLATES
AND GRADE S355JOH FOR HOLLOW SECTION
2. ALL PLATFORM FLOORING TO BE 12.5mm DURBAR PLT
- 1
Q
12a