Rethink Cooling Tower Water Treatment

1,660 views

Published on

Over the years Cooling Tower treatment involves heavy use of chemicals. Unfortunately these chemicals are not only costly, but also adds minerals in the water. This reduces Cycles Of Concentration [COC] & as a result in high blow down & more make up water demand. Using ozone operating cost is drastically reduced & blow down water quantity also reduces.

Published in: Technology

Rethink Cooling Tower Water Treatment

  1. 1. Rethink Cooling Towers Side Stream Filtration & Ozonation
  2. 2. Typical Cooling Towers • Cooling Tower Capacities • Flow rates • TSS • Microbiological load • Fouling • 500 TR – 5,000 TR • 500 – 5,000 m³/hr • 30 – 50 ppm • 10 – 10 MPN • Slime 62
  3. 3. Concern areas • Environment pollution - dirt (TSS) • Slime formation • Scaling • Corrosion • High dissolved solids - TDS • Microbiological growth • Formation of organic impurities • Frequent blow down • Efficiency
  4. 4. Requirement Customiz ation Optimiz ation Integrat ion
  5. 5. Solution • Main stream or side stream filtration • Optimized diffusion of Ozone
  6. 6. Solution - Filtration • Side stream filtration of 8 – 12 % of mainstream flow • Automatic Self cleaning filter • Pressure Sand Filter
  7. 7. Advantages - PSF • Worldwide proven technology • Depth Filtration • Excellent for fine silt • Online • Very low waste water • Long life • Negligible maintenance
  8. 8. Ozone Generation Oxygen Preparation Ozone Generation Ozone Injection Ozone Diffusion Ozone Contactor
  9. 9. Oxygen Preparation • Oxygen From Ambient Air • Oxygen concentrator • More than 90% concentration • Dry Industrial Grade Oxygen
  10. 10. Ozone Generator • High voltage, High frequency Generator • SS 316 Grade Ozone Cell • High Efficient Enameled Cell • Ozone Cell safety circuits • Dual Electrode Water Cooled Ozone Cell • Ozone under –ve Pressure
  11. 11. Ozone Injection & Diffusion • Venturi Ejector • Sparger • Chemone Diffuser cum Contactor • Valves, pumps etc • Water Trap • Ozone Vent
  12. 12. Advantages - ozonation • Considerable reduction in the use of chemicals except for pH balancing • Greatly reduces Blowdown • Ends discharge liabilities and chemical storage record keeping • Destroys all types of microorganisms instantly • Minimizes condenser fouling • decomposes organic waste by oxidation
  13. 13. Cont.... • removes existing calcium carbonate scale by destroying the biomass glue bonding agent • the most environmentally friendly oxidant • reduces the corrosion rate of metals, including copper heat exchangers • saves on energy costs by increasing the heat transfer efficiency of the chiller
  14. 14. Reduction of Operating Costs • Ozone reduces makeup water to the cooling tower by permitting more cycles between blow downs. • Reduces the cost and problems in ordering, shipping, handling, storage, and disposal of regular chemicals. • Reduces power consumption by keeping the chiller heat transfer efficiency high through cleaner condenser tubes.
  15. 15. Client : CIPLA Application : Cooling Tower WTP Present Cost Expected Savings In ChemicalsSite : Goa CT Capacity : 600 TR x 06 nos. Chemicals Application Quantity Rate/Kg Cost/Month Savings Quantity Cost/Month Kg/Month INR INR In % Kg/Month INR Nalco-73385 BIOCIDE 30 885 26,550 50 15 13,275 Nalco-73550 BIODETERGENT 18 780 14,040 50 9 7,020 Nalco-7320 CONTROL MICRO-ORGANISM 30 510 15,300 50 15 7,650 Nalco-7330 BIOCIDE 30 272 8,160 50 15 4,080 3DT-189 COOLING WATER TREATMENT 150 345 51,750 NIL 150 51,750 Nalco-3935 CONTROL MICROORGANISM 1,200 62 74,400 50 600 37,200 3DT-190 COOLING WATER TREATMENT 36 460 16,560 NIL 36 16,560 Sulphuric Acid 300 0 NIL 300 0 Sodium Hypochlorite 1,200 21 25,200 50 600 12,600 Total 231,960 150,135 Total Cost Savings Per Month Rs. 81,825 Total Cost Savings Per Year Rs. 981,900 Ozonator Cost (Supply + I & C + P & F + Tax) Rs. 1,345,000 Return On Investment [ROI] - Less than 16 months Yr 1.37 Reduction In Blow Down Water Quantity - Approx. 25 - 30 %
  16. 16. Installation Scheme Process Flow Diagram Suitable For 100 TR – 500 TR
  17. 17. Installation Scheme Process Flow Diagram Suitable For 300 TR – 5,000 TR
  18. 18. Installation Precautions • The feed gas preparation must include removal of particulate matter, moisture and oil. • Make-up water should be free from sediment, mud, and discoloration • Material of construction in the ozone treated system should be compatible with ozone • The ozone generator should be located in an air conditioned area for best ozone generation efficiency
  19. 19. Ozone Doze • 2.0 – 3.5 ppm in side stream water flow • 0.2 – 0.4 ppm in main stream water flow
  20. 20. Thanks Chemtronics Technologies (India) Pvt. Ltd. Solution Engineer : Mr. Sunil Shah - +91-93212 34527 E mail : sunilshah@chemtronicsindia.com www.chemtronicsindia.com www.ozonegeneratorindia.com

×