BIM4T
BIM tender service
Exclusive service for architects and designers, investors, clients,
developers and contractors.
web: archetypes.design | email: projects@archetypes.design
In reality,
changes on site due to
mistakes and lack of
information
lead to increase of costs,
delay and often they
compromise the quality
of the final product.
In the Construction Industry, the Tender process should ensure that
Time, Cost, and Quality in a project are in a perfect balance.
web: archetypes.design | email: projects@archetypes.design
In reality,
just documents and
drawings are checked,
not the project itself.
Design mistakes will be
discovered just on site,
causing delay, extra-cost
and they will be cause for
litigation.
Design teams put in place processes to check mistakes and
inconsistency before issuing any document for tender.
web: archetypes.design | email: projects@archetypes.design
In reality,
BIM is still seen as a tool of
visualisation, not as a
method to manage the
project.
BIM advantages and
potential are pretty much
unknown by the majority
of contractors, clients, and
investors.
BIM promises to avoid design mistakes by helping managing the
workflow and all the information since the earliest stages to completion.
web: archetypes.design | email: projects@archetypes.design
However,
reality
can be different.
In theory, we should accept the reality that just on site we can sort out those
problems due to design mistakes due to lack of coordination.
web: archetypes.design | email: projects@archetypes.design
HOW IT IS...
❖ Even if we check the drawings, the project
goes unchecked
❖ Design teams across AEC fields work in
silos until they face problems on site
❖ Every time, design mistakes and lack of
coordination pop up on-site
❖ Any time you spot a problem on site, it
start an endless process to sort it out
❖ Approving a change on site, especially
whether with cost-implication, is trying
and complicated
❖ Sorting a mistakes on site very often
requires additional work or re-working and
always it causes delays
❖ When there is a problem on site, the blame
game start and everybody is focus on
pointing fingers rather than finding a
solution
❖ Waste of time and money and profit loss
are a predictable outcome in the industry
...HOW IT COULD BE
★ We should check whether there are
inconsistency in the project not in the
drawings
★ We should find a moment to coordinate
the design across all the AEC fields before
going on site..
★ Buildability check should be a priority long
before going on site
★ Sorting mistakes in the office is hundred
times faster than on site
★ Sorting issue with a phone call and not
with endless meetings
★ Amend a drawing at the right time is
better than do re-working on site
★ Enhance collaboration helps problem-
solving attitude, blame game does not.
★ De-risking the project making the process
a win-win for everybody involved.
web: archetypes.design | email: projects@archetypes.design
BIM in a nutshell.
web: archetypes.design | email: projects@archetypes.design
Many people think that BIM is just the 3D model.
Actually the model is just the “M” that weights just 20% of BIM
where the “I” (Information) is much more important.
In other words, if you are using a 3D model for your projects, this is
certainly an advantage but you are missing 80% of the benefits of BIM.
web: archetypes.design | email: projects@archetypes.design
The importance of “I” in BIM
For every single component it is possible to describe the Quality (from the simplest
description to full specification) and we know the Position from the model.
Quality and Position generate schedules (as finishes, fittings, doors and windows, etc).
From the model we extract the Quantity that, with price, give us the budget.
web: archetypes.design | email: projects@archetypes.design
Exploiting the full potential of BIM, we have developed
BIM4T
web: archetypes.design | email: projects@archetypes.design
BIM4T
Ten things to know:
1. It is a professional service, not a software
2. It helps on checking the project, it doesn’t replace design effort
3. It is applicable to every project, even those just drawn in 2D.
4. It works at any stage, but it is optimised for Tender
5. It gives the maximum accuracy of the Bill of Quantity
6. It guarantees the consistency among drawings, specs and BoQ
7. It is a reliable test of buildability
8. It helps in sharing information among designers and with client,
investors, and contractor
9. As service offer by a third party, it doesn’t require any special skill or
knowledge by the final user
10. It brings all the benefits of BIM in your projects immediately
web: archetypes.design | email: projects@archetypes.design
BIM4T
How it works.
BIM4T
is the missing piece
that optimise the process
without making it too
complicated or difficult to
be managed.
web: archetypes.design | email: projects@archetypes.design
BIM4T
It is based on an iterative process in 4 steps:
Check-in, Check-out, Estimate, Sign-off
web: archetypes.design | email: projects@archetypes.design
At BIM Check-In we collect all the
information the design teams have
prepared for tender.
This is exactly the same package of
information that the Contractors will use
to make their offer and, if successful, to
build the project.
Nothing more, nothing less.
BIM4T
It is based on an iterative process in 4 steps:
Check-in, Check-out, Estimate, Sign-off
web: archetypes.design | email: projects@archetypes.design
at Check-out we start the construction
process on screen(Construction
Modelling),
Including all its components and on the basis
of the information we’ve collected.
As we were in a real work site, we can:
● Check out all the information, their
completeness, clarity, consistency, and if they are
sufficient to complete the building process.
● Check out whether there are inconsistency in the
drawing which would mislead the builder.
● Check out inconsistencies among drawings,
specs and BoQ
● Check out clashing points (clash-detection)
among components (architectural, structural,
MEP)
If there is a problem, we tell the designers and they
can even use the model to figure a solution out.
They can do the changes, amend their documents
and put it forward for the second Check-out.
BIM4T
It is based on an iterative process in 4 steps:
Check-in, Check-out, Estimate, Sign-off
web: archetypes.design | email: projects@archetypes.design
BIM4T
It is based on an iterative process in 4 steps:
Check-in, Check-out, Estimate, Sign-off
When the model is right, so it is the
project and it remains to check the
budget with Estimate
● Bill of Quantity saving
98% of time normally
required with traditional
methods
● Max accuracy in
measurement and no
computing mistakes
● Integration with standard
Price books, market
information, quotation
● Flexibility in organising
the information to
simplify cost analysis
Checking the budget at early stages, before
issuing for tender, gives the opportunity of
value engineering the project and optimise the
budget.
web: archetypes.design | email: projects@archetypes.design
BIM4T
It is based on an iterative process in 4 steps:
Check-in, Check-out,, Estimate, Sign-off
When both design and cost
are right, the project is
ready for Sign-off and
moves to the next stage.
Now it’s possible to proceed with
tender, or negotiate the price
with the Contractor, or start the
works if BIM4T is part of a Design
& Build contract.
web: archetypes.design | email: projects@archetypes.design
BIM4T
Who & Why
1. Architects and Project Managers> Check and coordinated all
the design packages to avoid re-design during execution.
2. Interior Designers > integration and coordination of Interior
design with other AEC packages.
3. Private clients > Consistency among offers, transparency of costs,
clarity of contents.
4. Developers > Avoiding last minute changes, delays, increase of
cost, profit loss.
5. Investors > de-risking investment, reducing uncertainty of cost
and time, finance planning based on reliable information.
6. Contractors > check buildability of the project, completeness of
design information, avoiding litigation and waste of time.
7. All the stakeholders > upgrading to full project engineering,
standard and interactive package for construction, Smart Site
Management, Smart Building Servicing and Maintenance.
web: archetypes.design | email: projects@archetypes.design
Construction
Modelling
allows to build the
building virtually on the
screen, including all the
components, solving
all the issues before
starting on site.
BIM4T
Why it works.
web: archetypes.design | email: projects@archetypes.design
1
All the components, materials, fixture and fittings are
modelled: that way every detail is tested, all information
checked, and each components is counted in the estimate.
Three advantages of Construction Modelling
web: archetypes.design | email: projects@archetypes.design
2
Checking buildability of the project, planning stage of works,
temporary measures, Health & Safety risks, managing overlapping works.
Three advantages of Construction Modelling
web: archetypes.design | email: projects@archetypes.design
3
“clash detection” to find clashing points and to coordinate
components, service penetration planned in time to avoid re-work,
re-design, and delays.
Three advantages of Construction Modelling
web: archetypes.design | email: projects@archetypes.design
Consistency and clarity.
The Construction Model
is a graphic
representation of the
project.
The Estimate Model
represents the project
analytically.
Both are always
synchronised.
web: archetypes.design | email: projects@archetypes.design
Flexibility.
Quantity
information
Quality,
specs,
price
Cost
management
Maximum flexibility in
data management,
bespoke organisation of
information to simplify
cost analysis along with
client’s requirements and
complexity of the project.
Time
management
web: archetypes.design | email: projects@archetypes.design
The Bill of quantity is
generated automatically
from the model with no
mistakes. Crossing this
data with agreed pricing
information, the
estimate can be obtained
in a matter of seconds.
Exactness and speed.
web: archetypes.design | email: projects@archetypes.design
Talent wins games,
but teamwork and
intelligence win
championships.
Michael Jordan
BIM4T
Facts, statistic & Conclusions
web: archetypes.design | email: projects@archetypes.design
FROM THIS...
❖ Along with Peter Caplehorn,
Construction Product Association,
“Currently we draw every project
2.5 times and construct it 1.5
times”
❖ Inaccuracy in the tender
package is accountable for a
difference up to + 50% from initial
contract cost and actual cost at
closure.
❖ Design mistakes and lack of
coordination are accountable for
40- 50% of increased cost.
❖ 25-30 % of increased cost are
consequence of initial mispricing
the project.
❖ Lack of clarity in the construction
package leads to clients changes
of mind during construction with +
20% cost on average.
… TO THAT
❖ The UK government expects cost
savings up to 20% thanks to BIM
and process optimisation.
❖ It has been reported a return on
investment of 10:1 by applying
Construction Modelling (CM).
❖ Where CM is applied just to MEP
component, analysis of case studies
has proved savings as much as
10.2 % in project time and 7.2 % in
project cost.
❖ If CM is applied to the whole
construction (not just MEP) time
and cost savings are likely to be
around 20%
web: archetypes.design | email: projects@archetypes.design
STATISTIC
❖ 67% of professionals think that BIM is just for larger organisations and big
projects.
❖ The Office for National Statistics reported that in 2018 in the Construction
Industry there were around 295,000 (90.6%) Small firms (turnover up to 1M
turnover), around 30,000 (9%) Medium size firm (turnover from 1M to 30M)
and just 0.4% are Big firms (turnover over 30M)
❖ Just 69% of professionals use BIM (most of them are big firm over 51+
employees)
❖ Just 36% of small (up to 15 employees) and medium size firm (15-50
employees) use BIM
❖ 75% of BIM users use it just to create 3D models.
❖ Just 29% of BIM users coordinate the 3D model with Specs
❖ Just 15% of users use BIM on 100% of projects
❖ Just 46% use BIM across all stages
❖ In 72% of cases BIM is only used in the design stages (28% goes beyond)
❖ 67% of professionals think that BIM is just for larger organisations
❖ Just in 29% of cases BIM information are passed to who is responsible of the
management of the building
❖ 33% of works which have been developed with BIM are Residential
development.
❖ 90% of investors, developers, clients and designers are currently not
exploiting the potential of BIM because of the false belief that BIM is only
for big projects.
web: archetypes.design | email: projects@archetypes.design
SINCE:
1. Implementing BIM and Construction Modelling can potentially bring savings
up to 20% of the Construction Cost
BUT:
1. professionals working with small/medium residential firm using BIM in all
their residential projects are just 1.8% of the total and just 0.5% of firms can
offer offer BIM integrated services as we do.
WE CAN STATE THAT:
1. There will be years before professionals and operators in the AEC
industry will be ready to fully implement BIM bringing benefits to all
projects.
HENCE:
1. BIM4T is a VERY unique package of service free from all the common
mistakes typically affecting the Tender package.
IN CONCLUSION
1. BIM4T, regardless the form of contract/tender, ensures that the project is
buildable, the information is complete and accurate, measurements are
rights, price are transparent and, eventually, the cost is fair.
2. BIM4T makes immediately available all the benefit of BIM for your projects
3. BIM4T allows saving money, avoiding waste of time, and preserving the
quality of all your projects.
web: archetypes.design | email: projects@archetypes.design
Talent wins games,
but teamwork and
intelligence win
championships.
Michael Jordan
BIM4T
Teamwork is the K-factor.
web: archetypes.design | email: projects@archetypes.design
Carlo Bughi
March (hons) and chartered
Architect
Founder and Director at Archetypes
Design Ltd
With 20 years international experience as
Project Architect and Design Manager,
Carlo’s portfolio includes residential, mixed
use, commercial and urban development,
educational, small and big scale projects up
to 40M, high end and energy efficient
buildings.
Passionate about technology, innovation
and process optimisation, Carlo has been
professor at the University of Ferrara (Italy)
teaching Building Information Modeling
(BIM) for 7 years (2007-2014).
Pietro Massai
PhD Architect, BIM Manager
With an International PhD in Architecture and
Urban Planning, after 10 years of research and
teaching at University of Ferrara, Italy, Pietro
worked in India, Italy and the UK as Architect and
BIM developer, manager and coordinator.
His Maharaja Gaj Singh II City Research Centre for
the protection and restoration of Jodhpur’s old city
is one of the earliest projects in the world
exploiting BIM technologies for heritage projects.
Managing and coordinating BIM processes for
projects up to 20M, he developed systems to
optimize site monitoring, progress of work,
integrated digital survey, As-Built information,
Smart Maintenance Service.
Pietro started his collaboration with Avalon in
2019.
web: archetypes.design | email: projects@archetypes.design
BIM4T
Developed by:
BIM4T
BIM, actually.
web: archetypes.design | email: projects@archetypes.design

More Related Content

What's hot

What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
BIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 SlidesBIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 SlidesMike Bordenaro
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation Omar Selim
 
BIM Execution Plan (BXP)- What, Why, When and How
BIM Execution Plan (BXP)- What, Why, When and HowBIM Execution Plan (BXP)- What, Why, When and How
BIM Execution Plan (BXP)- What, Why, When and HowUnited-BIM
 
Bim level-2 information-management
Bim level-2 information-managementBim level-2 information-management
Bim level-2 information-managementIbrahem Naeem
 
Principles of building construction, information and communication
Principles of building construction, information and communicationPrinciples of building construction, information and communication
Principles of building construction, information and communicationmichael mcewan
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIMfitsum yonas
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesDaan Moreels
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!bimservicesindia1
 
Autodesk Revit MEP Fundamentals Slide Share
Autodesk Revit MEP Fundamentals Slide ShareAutodesk Revit MEP Fundamentals Slide Share
Autodesk Revit MEP Fundamentals Slide ShareRoger Mujica
 

What's hot (20)

What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
Kostenermittlung im Bauwesen
Kostenermittlung im BauwesenKostenermittlung im Bauwesen
Kostenermittlung im Bauwesen
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
BIM
BIMBIM
BIM
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 
BIM ppt
BIM pptBIM ppt
BIM ppt
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
BIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 SlidesBIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 Slides
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
BIM
BIMBIM
BIM
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
BIM Execution Plan (BXP)- What, Why, When and How
BIM Execution Plan (BXP)- What, Why, When and HowBIM Execution Plan (BXP)- What, Why, When and How
BIM Execution Plan (BXP)- What, Why, When and How
 
Bim level-2 information-management
Bim level-2 information-managementBim level-2 information-management
Bim level-2 information-management
 
Bim overview
Bim overviewBim overview
Bim overview
 
Principles of building construction, information and communication
Principles of building construction, information and communicationPrinciples of building construction, information and communication
Principles of building construction, information and communication
 
Building information modeling BIM
Building information modeling BIMBuilding information modeling BIM
Building information modeling BIM
 
BIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use casesBIM status report 2016 - BIM use cases
BIM status report 2016 - BIM use cases
 
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!3d, 4d, 5d and 6d bim provide exceptional results for building construction!
3d, 4d, 5d and 6d bim provide exceptional results for building construction!
 
Autodesk Revit MEP Fundamentals Slide Share
Autodesk Revit MEP Fundamentals Slide ShareAutodesk Revit MEP Fundamentals Slide Share
Autodesk Revit MEP Fundamentals Slide Share
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 

Similar to Bim4T: Building Information Modelling for Tender in the construction industry.

BIM- What are the Benefits of using Building Information Modelling (BIM) for ...
BIM- What are the Benefits of using Building Information Modelling (BIM) for ...BIM- What are the Benefits of using Building Information Modelling (BIM) for ...
BIM- What are the Benefits of using Building Information Modelling (BIM) for ...Building Information Modelling
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM ImplementationUnited-BIM
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architectsArpitGautam20
 
Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​Top BIM Company
 
Smeaton and Watt Profile 20 pages
Smeaton and Watt Profile 20 pages Smeaton and Watt Profile 20 pages
Smeaton and Watt Profile 20 pages Barun Chatterjee
 
How BIM training can help you if you are an architect or engineer
How BIM training can help you if you are an architect or engineerHow BIM training can help you if you are an architect or engineer
How BIM training can help you if you are an architect or engineernibtedu
 
Bim&supply chain
Bim&supply chainBim&supply chain
Bim&supply chainOmar Selim
 
CadPros Services - Broucher
CadPros Services - BroucherCadPros Services - Broucher
CadPros Services - BroucherAliana Oberoi
 
Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Ian Fairlie
 
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering LLC U.S.
 
8 Ways BIM Enhancing Construction Project Management (1).pptx
8 Ways BIM Enhancing Construction Project Management (1).pptx8 Ways BIM Enhancing Construction Project Management (1).pptx
8 Ways BIM Enhancing Construction Project Management (1).pptxMadhusudhanPandey1
 
How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsCAD Outsourcing
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
Optimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYCOptimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYCModulus Consulting
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?MarsBIM1
 
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMYee Len Wan
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfirfanakram32
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsTawwabKhan4
 
Application of BIM in civil industry
Application of BIM in civil industryApplication of BIM in civil industry
Application of BIM in civil industrySandya Devarajan
 
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfLearn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfnibtedu
 

Similar to Bim4T: Building Information Modelling for Tender in the construction industry. (20)

BIM- What are the Benefits of using Building Information Modelling (BIM) for ...
BIM- What are the Benefits of using Building Information Modelling (BIM) for ...BIM- What are the Benefits of using Building Information Modelling (BIM) for ...
BIM- What are the Benefits of using Building Information Modelling (BIM) for ...
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects
 
Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​Mapping Building Design & Construction with BIM Coordination​​
Mapping Building Design & Construction with BIM Coordination​​
 
Smeaton and Watt Profile 20 pages
Smeaton and Watt Profile 20 pages Smeaton and Watt Profile 20 pages
Smeaton and Watt Profile 20 pages
 
How BIM training can help you if you are an architect or engineer
How BIM training can help you if you are an architect or engineerHow BIM training can help you if you are an architect or engineer
How BIM training can help you if you are an architect or engineer
 
Bim&supply chain
Bim&supply chainBim&supply chain
Bim&supply chain
 
CadPros Services - Broucher
CadPros Services - BroucherCadPros Services - Broucher
CadPros Services - Broucher
 
Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08Zeidler_BIM_Brochure_08
Zeidler_BIM_Brochure_08
 
BIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in USBIM Engineering US., L.L.C. - VDC/BIM Services in US
BIM Engineering US., L.L.C. - VDC/BIM Services in US
 
8 Ways BIM Enhancing Construction Project Management (1).pptx
8 Ways BIM Enhancing Construction Project Management (1).pptx8 Ways BIM Enhancing Construction Project Management (1).pptx
8 Ways BIM Enhancing Construction Project Management (1).pptx
 
How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projects
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
Optimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYCOptimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYC
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?
 
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIMBuilding Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
Building Services & Civil Engineering Quantities (M5) - (Group Assignment) - BIM
 
Revit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdfRevit Online Training courses-BES.pdf
Revit Online Training courses-BES.pdf
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
Application of BIM in civil industry
Application of BIM in civil industryApplication of BIM in civil industry
Application of BIM in civil industry
 
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfLearn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
 

Recently uploaded

SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CANestorGamez6
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一Fi sss
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back17lcow074
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricksabhishekparmar618
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...Amil baba
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryWilliamVickery6
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social MediaD SSS
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一F La
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 

Recently uploaded (20)

SCRIP Lua HTTP PROGRACMACION PLC WECON CA
SCRIP Lua HTTP PROGRACMACION PLC  WECON CASCRIP Lua HTTP PROGRACMACION PLC  WECON CA
SCRIP Lua HTTP PROGRACMACION PLC WECON CA
 
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
(办理学位证)埃迪斯科文大学毕业证成绩单原版一比一
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
shot list for my tv series two steps back
shot list for my tv series two steps backshot list for my tv series two steps back
shot list for my tv series two steps back
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
Cosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable BricksCosumer Willingness to Pay for Sustainable Bricks
Cosumer Willingness to Pay for Sustainable Bricks
 
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
NO1 Famous Amil Baba In Karachi Kala Jadu In Karachi Amil baba In Karachi Add...
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
Design Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William VickeryDesign Portfolio - 2024 - William Vickery
Design Portfolio - 2024 - William Vickery
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media306MTAMount UCLA University Bachelor's Diploma in Social Media
306MTAMount UCLA University Bachelor's Diploma in Social Media
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
办理(宾州州立毕业证书)美国宾夕法尼亚州立大学毕业证成绩单原版一比一
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 

Bim4T: Building Information Modelling for Tender in the construction industry.

  • 1. BIM4T BIM tender service Exclusive service for architects and designers, investors, clients, developers and contractors. web: archetypes.design | email: projects@archetypes.design
  • 2. In reality, changes on site due to mistakes and lack of information lead to increase of costs, delay and often they compromise the quality of the final product. In the Construction Industry, the Tender process should ensure that Time, Cost, and Quality in a project are in a perfect balance. web: archetypes.design | email: projects@archetypes.design
  • 3. In reality, just documents and drawings are checked, not the project itself. Design mistakes will be discovered just on site, causing delay, extra-cost and they will be cause for litigation. Design teams put in place processes to check mistakes and inconsistency before issuing any document for tender. web: archetypes.design | email: projects@archetypes.design
  • 4. In reality, BIM is still seen as a tool of visualisation, not as a method to manage the project. BIM advantages and potential are pretty much unknown by the majority of contractors, clients, and investors. BIM promises to avoid design mistakes by helping managing the workflow and all the information since the earliest stages to completion. web: archetypes.design | email: projects@archetypes.design
  • 5. However, reality can be different. In theory, we should accept the reality that just on site we can sort out those problems due to design mistakes due to lack of coordination. web: archetypes.design | email: projects@archetypes.design
  • 6. HOW IT IS... ❖ Even if we check the drawings, the project goes unchecked ❖ Design teams across AEC fields work in silos until they face problems on site ❖ Every time, design mistakes and lack of coordination pop up on-site ❖ Any time you spot a problem on site, it start an endless process to sort it out ❖ Approving a change on site, especially whether with cost-implication, is trying and complicated ❖ Sorting a mistakes on site very often requires additional work or re-working and always it causes delays ❖ When there is a problem on site, the blame game start and everybody is focus on pointing fingers rather than finding a solution ❖ Waste of time and money and profit loss are a predictable outcome in the industry ...HOW IT COULD BE ★ We should check whether there are inconsistency in the project not in the drawings ★ We should find a moment to coordinate the design across all the AEC fields before going on site.. ★ Buildability check should be a priority long before going on site ★ Sorting mistakes in the office is hundred times faster than on site ★ Sorting issue with a phone call and not with endless meetings ★ Amend a drawing at the right time is better than do re-working on site ★ Enhance collaboration helps problem- solving attitude, blame game does not. ★ De-risking the project making the process a win-win for everybody involved. web: archetypes.design | email: projects@archetypes.design
  • 7. BIM in a nutshell. web: archetypes.design | email: projects@archetypes.design
  • 8. Many people think that BIM is just the 3D model. Actually the model is just the “M” that weights just 20% of BIM where the “I” (Information) is much more important. In other words, if you are using a 3D model for your projects, this is certainly an advantage but you are missing 80% of the benefits of BIM. web: archetypes.design | email: projects@archetypes.design
  • 9. The importance of “I” in BIM For every single component it is possible to describe the Quality (from the simplest description to full specification) and we know the Position from the model. Quality and Position generate schedules (as finishes, fittings, doors and windows, etc). From the model we extract the Quantity that, with price, give us the budget. web: archetypes.design | email: projects@archetypes.design
  • 10. Exploiting the full potential of BIM, we have developed BIM4T web: archetypes.design | email: projects@archetypes.design
  • 11. BIM4T Ten things to know: 1. It is a professional service, not a software 2. It helps on checking the project, it doesn’t replace design effort 3. It is applicable to every project, even those just drawn in 2D. 4. It works at any stage, but it is optimised for Tender 5. It gives the maximum accuracy of the Bill of Quantity 6. It guarantees the consistency among drawings, specs and BoQ 7. It is a reliable test of buildability 8. It helps in sharing information among designers and with client, investors, and contractor 9. As service offer by a third party, it doesn’t require any special skill or knowledge by the final user 10. It brings all the benefits of BIM in your projects immediately web: archetypes.design | email: projects@archetypes.design
  • 12. BIM4T How it works. BIM4T is the missing piece that optimise the process without making it too complicated or difficult to be managed. web: archetypes.design | email: projects@archetypes.design
  • 13. BIM4T It is based on an iterative process in 4 steps: Check-in, Check-out, Estimate, Sign-off web: archetypes.design | email: projects@archetypes.design
  • 14. At BIM Check-In we collect all the information the design teams have prepared for tender. This is exactly the same package of information that the Contractors will use to make their offer and, if successful, to build the project. Nothing more, nothing less. BIM4T It is based on an iterative process in 4 steps: Check-in, Check-out, Estimate, Sign-off web: archetypes.design | email: projects@archetypes.design
  • 15. at Check-out we start the construction process on screen(Construction Modelling), Including all its components and on the basis of the information we’ve collected. As we were in a real work site, we can: ● Check out all the information, their completeness, clarity, consistency, and if they are sufficient to complete the building process. ● Check out whether there are inconsistency in the drawing which would mislead the builder. ● Check out inconsistencies among drawings, specs and BoQ ● Check out clashing points (clash-detection) among components (architectural, structural, MEP) If there is a problem, we tell the designers and they can even use the model to figure a solution out. They can do the changes, amend their documents and put it forward for the second Check-out. BIM4T It is based on an iterative process in 4 steps: Check-in, Check-out, Estimate, Sign-off web: archetypes.design | email: projects@archetypes.design
  • 16. BIM4T It is based on an iterative process in 4 steps: Check-in, Check-out, Estimate, Sign-off When the model is right, so it is the project and it remains to check the budget with Estimate ● Bill of Quantity saving 98% of time normally required with traditional methods ● Max accuracy in measurement and no computing mistakes ● Integration with standard Price books, market information, quotation ● Flexibility in organising the information to simplify cost analysis Checking the budget at early stages, before issuing for tender, gives the opportunity of value engineering the project and optimise the budget. web: archetypes.design | email: projects@archetypes.design
  • 17. BIM4T It is based on an iterative process in 4 steps: Check-in, Check-out,, Estimate, Sign-off When both design and cost are right, the project is ready for Sign-off and moves to the next stage. Now it’s possible to proceed with tender, or negotiate the price with the Contractor, or start the works if BIM4T is part of a Design & Build contract. web: archetypes.design | email: projects@archetypes.design
  • 18. BIM4T Who & Why 1. Architects and Project Managers> Check and coordinated all the design packages to avoid re-design during execution. 2. Interior Designers > integration and coordination of Interior design with other AEC packages. 3. Private clients > Consistency among offers, transparency of costs, clarity of contents. 4. Developers > Avoiding last minute changes, delays, increase of cost, profit loss. 5. Investors > de-risking investment, reducing uncertainty of cost and time, finance planning based on reliable information. 6. Contractors > check buildability of the project, completeness of design information, avoiding litigation and waste of time. 7. All the stakeholders > upgrading to full project engineering, standard and interactive package for construction, Smart Site Management, Smart Building Servicing and Maintenance. web: archetypes.design | email: projects@archetypes.design
  • 19. Construction Modelling allows to build the building virtually on the screen, including all the components, solving all the issues before starting on site. BIM4T Why it works. web: archetypes.design | email: projects@archetypes.design
  • 20. 1 All the components, materials, fixture and fittings are modelled: that way every detail is tested, all information checked, and each components is counted in the estimate. Three advantages of Construction Modelling web: archetypes.design | email: projects@archetypes.design
  • 21. 2 Checking buildability of the project, planning stage of works, temporary measures, Health & Safety risks, managing overlapping works. Three advantages of Construction Modelling web: archetypes.design | email: projects@archetypes.design
  • 22. 3 “clash detection” to find clashing points and to coordinate components, service penetration planned in time to avoid re-work, re-design, and delays. Three advantages of Construction Modelling web: archetypes.design | email: projects@archetypes.design
  • 23. Consistency and clarity. The Construction Model is a graphic representation of the project. The Estimate Model represents the project analytically. Both are always synchronised. web: archetypes.design | email: projects@archetypes.design
  • 24. Flexibility. Quantity information Quality, specs, price Cost management Maximum flexibility in data management, bespoke organisation of information to simplify cost analysis along with client’s requirements and complexity of the project. Time management web: archetypes.design | email: projects@archetypes.design
  • 25. The Bill of quantity is generated automatically from the model with no mistakes. Crossing this data with agreed pricing information, the estimate can be obtained in a matter of seconds. Exactness and speed. web: archetypes.design | email: projects@archetypes.design
  • 26. Talent wins games, but teamwork and intelligence win championships. Michael Jordan BIM4T Facts, statistic & Conclusions web: archetypes.design | email: projects@archetypes.design
  • 27. FROM THIS... ❖ Along with Peter Caplehorn, Construction Product Association, “Currently we draw every project 2.5 times and construct it 1.5 times” ❖ Inaccuracy in the tender package is accountable for a difference up to + 50% from initial contract cost and actual cost at closure. ❖ Design mistakes and lack of coordination are accountable for 40- 50% of increased cost. ❖ 25-30 % of increased cost are consequence of initial mispricing the project. ❖ Lack of clarity in the construction package leads to clients changes of mind during construction with + 20% cost on average. … TO THAT ❖ The UK government expects cost savings up to 20% thanks to BIM and process optimisation. ❖ It has been reported a return on investment of 10:1 by applying Construction Modelling (CM). ❖ Where CM is applied just to MEP component, analysis of case studies has proved savings as much as 10.2 % in project time and 7.2 % in project cost. ❖ If CM is applied to the whole construction (not just MEP) time and cost savings are likely to be around 20% web: archetypes.design | email: projects@archetypes.design
  • 28. STATISTIC ❖ 67% of professionals think that BIM is just for larger organisations and big projects. ❖ The Office for National Statistics reported that in 2018 in the Construction Industry there were around 295,000 (90.6%) Small firms (turnover up to 1M turnover), around 30,000 (9%) Medium size firm (turnover from 1M to 30M) and just 0.4% are Big firms (turnover over 30M) ❖ Just 69% of professionals use BIM (most of them are big firm over 51+ employees) ❖ Just 36% of small (up to 15 employees) and medium size firm (15-50 employees) use BIM ❖ 75% of BIM users use it just to create 3D models. ❖ Just 29% of BIM users coordinate the 3D model with Specs ❖ Just 15% of users use BIM on 100% of projects ❖ Just 46% use BIM across all stages ❖ In 72% of cases BIM is only used in the design stages (28% goes beyond) ❖ 67% of professionals think that BIM is just for larger organisations ❖ Just in 29% of cases BIM information are passed to who is responsible of the management of the building ❖ 33% of works which have been developed with BIM are Residential development. ❖ 90% of investors, developers, clients and designers are currently not exploiting the potential of BIM because of the false belief that BIM is only for big projects. web: archetypes.design | email: projects@archetypes.design
  • 29. SINCE: 1. Implementing BIM and Construction Modelling can potentially bring savings up to 20% of the Construction Cost BUT: 1. professionals working with small/medium residential firm using BIM in all their residential projects are just 1.8% of the total and just 0.5% of firms can offer offer BIM integrated services as we do. WE CAN STATE THAT: 1. There will be years before professionals and operators in the AEC industry will be ready to fully implement BIM bringing benefits to all projects. HENCE: 1. BIM4T is a VERY unique package of service free from all the common mistakes typically affecting the Tender package. IN CONCLUSION 1. BIM4T, regardless the form of contract/tender, ensures that the project is buildable, the information is complete and accurate, measurements are rights, price are transparent and, eventually, the cost is fair. 2. BIM4T makes immediately available all the benefit of BIM for your projects 3. BIM4T allows saving money, avoiding waste of time, and preserving the quality of all your projects. web: archetypes.design | email: projects@archetypes.design
  • 30. Talent wins games, but teamwork and intelligence win championships. Michael Jordan BIM4T Teamwork is the K-factor. web: archetypes.design | email: projects@archetypes.design
  • 31. Carlo Bughi March (hons) and chartered Architect Founder and Director at Archetypes Design Ltd With 20 years international experience as Project Architect and Design Manager, Carlo’s portfolio includes residential, mixed use, commercial and urban development, educational, small and big scale projects up to 40M, high end and energy efficient buildings. Passionate about technology, innovation and process optimisation, Carlo has been professor at the University of Ferrara (Italy) teaching Building Information Modeling (BIM) for 7 years (2007-2014). Pietro Massai PhD Architect, BIM Manager With an International PhD in Architecture and Urban Planning, after 10 years of research and teaching at University of Ferrara, Italy, Pietro worked in India, Italy and the UK as Architect and BIM developer, manager and coordinator. His Maharaja Gaj Singh II City Research Centre for the protection and restoration of Jodhpur’s old city is one of the earliest projects in the world exploiting BIM technologies for heritage projects. Managing and coordinating BIM processes for projects up to 20M, he developed systems to optimize site monitoring, progress of work, integrated digital survey, As-Built information, Smart Maintenance Service. Pietro started his collaboration with Avalon in 2019. web: archetypes.design | email: projects@archetypes.design BIM4T Developed by:
  • 32. BIM4T BIM, actually. web: archetypes.design | email: projects@archetypes.design