SlideShare a Scribd company logo
1 of 8
Download to read offline
Building Information
Modelling
the future of our industry
Building Information
Modelling
Building Information Modeling is the future of our industry.
Zeidler Partnership Architects participates in project delivery with leading building
owners, consultants, and builders who are aware that we can all work better to-
gether using Building Information Modeling [BIM]. BIM is the core software tool
that enables integrated projects by providing the framework for collaboration on
many of the largest new projects in the world.
BIM is a central project database tool that provides valuable information through-
out the entire building process - design, construction document tender, construc-
tion, and building management. This leads to improved quality and better control
of project costs, through design, fabrication, construction, and operation. We are
already seeing these benefits on several of our major new projects – EnCana,
Calgary City Centre, and Minto.
Integrated Project Delivery [IPD] is an increasingly common project delivery ap-
proach that integrates project leaders, business structures, systems and practices
into a collaborative process. IPD participants all contribute their talents and in-
sights to the project in order to collaboratively optimize value to the owner, reduce
waste, and maximize project efficiency throughout the entire building life-cycle.
Integrated projects are remarkable for their exceptionally effective collaboration
among the primary participants - owner, architect, and contractor.
Zeidler believes that working with BIM improves the quality of our work in ways
that provide real benefits for the whole project team. Canadian and American con-
structors, with the same goal of quality-control, have started to use the same pre-
construction data modeling process. They call it “Virtual Design and Construction”,
because they can design and construct a virtual project to discover all its details
before they build the real thing. There is increasing evidence that the architecture,
engineering and construction community is converging on Building Information
Modeling – which is the same as the American Virtual Design and Construction -
because of the common benefits integrated project delivery brings to every mem-
ber of the team.
BIM first starts to add value to our projects with 3-D design visualization. Because
our model is fully 3-D, we can quickly look at virtually any part. While the design
model is still developing, we can permit key people to have read-access to the cur-
rent design, so they can ask timely questions. The constructor may query the BIM
design model remotely over the Internet, or the architect can extract and email a
3-D design to the client for quick feedback.
EnCana is one of the tallest and largest projects in Canada.
The scope of this landmark project called for ultra fast-track
documents and a design-assist process.
In comparison with Foster’s DD hand-over, Zeidler’s•	
EnCana building information model contributed extremely
detailed plans that show high accuracy in the critical
relationship between the continuously varying structural
Diagrid and the placement of both modular mullions and
mechanical systems.
ZPA extracted area calculations, BOMA diagrams and•	
other customized spreadsheets from the EnCana BIM
model while tracking the current design changes.
The speed and scope of the EnCana project required the•	
overlap of building information modelling and traditional
2-D CAD detailing. Below grade, our model enabled us to
handle the as-built conditions that typically flow from the
fast-track process.
Going forward, we expect to link our building informa-•	
tion model with all engineering systems, most importantly
structural and mechanical. BIM readily provides us
access to link to various processes such as computa-
tional fluid dynamic modelling for air systems and fire &
life-safety.
Ultimately we expect to link BIM and Facilities Manage-•	
ment and develop a full life-cycle commitment to our
projects.
David Jefferies, Principal
In the early pre-construction phase, we can begin to extract quanti-
ties from the model, and count every type of object. For example, how
many interior doors will we have to install or how much will the carpet
cost for the open office area? Intensified planning in the early stages of
the project increases efficiencies and savings during the construction
effort. In addition, our BIM can provide more detailed data to manage
risk, estimate cost, run sun-wind-energy calculations, and evaluate
LEED performance. One key use of BIM in the IPD process is coordi-
nating building systems. For example, virtual clash detection between
steel structure and mechanical ducts avoids the risk of actually con-
structing a costly solution for an interference problem.
Now let us consider how a building project resembles a virtual living
organism. During its development and throughout the project life-cy-
cle, the integrated project team contributes work and materials to the
building, and maintains and operates the building for the benefit of
its inhabitants. One primary rule of BIM is that anyone who requests
data from the model must promptly return their finished data in order
to update the model. For example, a constructor who would request
data to fabricate wall panels, may decide to place 3 panels per bay
instead of two, and then should return the resulting fabrication data to
be checked in order to update the model. Throughout the design and
construction process, each contributor should benefit from a recipro-
cal exchange with the integrated project model. ZPA believes we can
all work together to develop and sustain the BIM.
Many people who own and operate buildings currently use or plan to
use a Facilities Management system. We can actually link your current
FM system into our BIM. Suppose we need to replace a window, a
desk, a pump or a light fixture. Now we have the opportunity to dis-
cover the object in its surroundings. By simply incorporating the ob-
ject’s tag into our BIM, we may link the owner’s Facilities Management
system to our BIM to show the exact location of any object, as built.
By sustaining our BIM database throughout the project life-cycle we
have the opportunity to link all possible as-built data into the project
BIM.
Our team’s goal is to improve our project’s quality while reducing risks
and contingency costs. Could we sustain BIM throughout the entire
project life-cycle?
Zeidler Partnership Architects says “Yes, and we invite you to do so
with us.”
In 2002, Minto Midtown was the first large scale
project in our office to use Building Information
Modelling. As we expanded its use through
the design process we discovered many advan-
tages.
Project knowledge increased through•	
design focused modelling.
Our BIM model provided virtually unlimited•	
visualization.
We improved our design coordination with•	
consultants.
Graphic building information greatly•	
enhanced client communication.
Accelerated decision making gave us•	
better control of project costs.
The ability to generate sun/shadow studies•	
on horizontal and vertical surfaces read-
ily provided key information to both the
municipality and client.
Gerald Stein, Partner
The Calgary City Centre project is an example of taking a project from
the earliest design feasibility and massing studies through schematics
and beyond. In particular, BIM provides great flexibility through the early
design investigation processes. This included:
Creating architectural concept studies from hand sketches to•	
massing and detail renderings for multiple design concepts.
Multiple massing and feasibility studies using simple block dia-•	
grams. Accurate area calculations extracted from these informed
the decision making process.
Development of chosen design options including updated area•	
calculations for multiple scenarios.
Phasing plans, and shadow studies for planning permissions.•	
By continually keeping our BIM model current, we were able to produce
detailed design studies. For example, our BIM model allowed us to
study how our panel system could generate multiple facade options.
At the same time, we were producing marketing material and tracking
areas resulting from design changes.
BIM provides the consistency of project information throughout the de-
sign study period that allows for more precise area calculations as well
as coordinated plan and section information. Therefore we have better
cost estimating information.
The future will no doubt lead to direct to digital manufacturing informa-
tion transfer.
Vaidila Banelis, Partner
315 Queen Street West
Toronto, Ontario
Canada M5V 2X2
T 416 596 8300
F 416 596 1408
Link to more BIM information:
http://www2/zeidlerpartnership.com/articles/2008-07-10_ZPA_BIM_links
ZEIDLER PARTNERSHIP ARCHITECTS
TORONTO . CALGARY . VANCOUVER . VICTORIA . WEST PALM BEACH . LONDON . BERLIN . BEIJING
Calgary
Zeidler Partnership Architects
255 - 17th Avenue SW, Suite 200
Calgary, Alberta
Canada T2S 2T8
T 403 663 0125
F 403 266 6168
Florida
Zeidler Partnership Architects Inc.
105 South Narcissus Ave., Suite 310
West Palm Beach, Florida
USA 33401
T 561 832 9110
F 561 832 8876
Vancouver
Zeidler Partnership Architects
#620-1500 West Georgia Street
Vancoouver, British Columbia
Canada V6G 2Z6
T 604 662 3002
F 604 662 3040
London
Zeidler Partnership/UK
111 Cannon Street, 6th Floor
London, U.K.
EC4N 5AR
T 44 20 7626 4400
F 44 20 7626 5500
Victoria
Zeidler Partnership Architects
536 Broughton Street, 2nd Floor
Victoria, British Columbia
Canada V8W 1C6
T 250 388 9494
F 250 388 9495
Berlin
Zeidler Partnership/Architekten
Bergstaße 67
10115 Berlin
Deutschland
T 0049 30 89 34510
F 0049 30 89 35216
Edmonton
Zeidler | ACI Architects in Joint Venture
17723 103 Avenue
Edmonton, Alberta
Canada T5S 1N8
T 780 486 6440
F 780 486 6401
Beijing
Zeidler Architects Consulting Co. Ltd.
Room 1201, Tower 1 China Central
Place (CCP) Office Bldg
No. 81, Jianguo Lu Chaoyang
District, Beijing
P. R. China 100025
T 8610 84539828
F 8610 84539838
Alan Munn
Senior Partner
David Jefferies
Principal
Gerald Stein
Partner
Tonino Ottaviani
Associate
Vaidila Banelis
Partner
Ian Fairlie
Director of IT

More Related Content

What's hot

CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...bimservicesindia1
 
Bringing together World of BIM and World of Products
Bringing together World of BIM and World of ProductsBringing together World of BIM and World of Products
Bringing together World of BIM and World of ProductsSkyBIM
 
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)Bram Mommers
 
The Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowThe Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowUnited-BIM
 
Bim implementation
Bim implementationBim implementation
Bim implementationOmar Selim
 
Totten presidio presentation feb 20 2015 pdf
Totten presidio presentation feb 20 2015 pdfTotten presidio presentation feb 20 2015 pdf
Totten presidio presentation feb 20 2015 pdfMichael P Totten
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM ImplementationUnited-BIM
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMBe2camp Admin
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering LLC U.S.
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction ManagementMd Manzoor Akhtar
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...Jad DELLEL
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling reportKiran Birdi
 

What's hot (19)

Application of BIM
Application of BIMApplication of BIM
Application of BIM
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...BIM: What kind of information is modeled in Parametric Building Information M...
BIM: What kind of information is modeled in Parametric Building Information M...
 
How BIM Enhances the Design Process
How BIM Enhances the Design ProcessHow BIM Enhances the Design Process
How BIM Enhances the Design Process
 
Bringing together World of BIM and World of Products
Bringing together World of BIM and World of ProductsBringing together World of BIM and World of Products
Bringing together World of BIM and World of Products
 
Building Information Model
Building Information ModelBuilding Information Model
Building Information Model
 
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
0006-EUBIM-MGT-05-ARCADIS BIM White paper (English)
 
The Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should KnowThe Ultimate Glossary of BIM Terms You Should Know
The Ultimate Glossary of BIM Terms You Should Know
 
Bim implementation
Bim implementationBim implementation
Bim implementation
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
Totten presidio presentation feb 20 2015 pdf
Totten presidio presentation feb 20 2015 pdfTotten presidio presentation feb 20 2015 pdf
Totten presidio presentation feb 20 2015 pdf
 
5 Benefits of BIM Implementation
5 Benefits of BIM Implementation5 Benefits of BIM Implementation
5 Benefits of BIM Implementation
 
Vico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIMVico Software: 4D and 5D perspectives on BIM
Vico Software: 4D and 5D perspectives on BIM
 
Introduction to Building Information Modeling
Introduction to Building Information Modeling Introduction to Building Information Modeling
Introduction to Building Information Modeling
 
BIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling ServicesBIM Engineering U.S., L.L.C. - BIM Modeling Services
BIM Engineering U.S., L.L.C. - BIM Modeling Services
 
Bim in Construction Management
Bim in Construction ManagementBim in Construction Management
Bim in Construction Management
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
Generative Design 101 for Architecture, Engineering & Construction by Jad Del...
 
Building information modelling report
Building information modelling reportBuilding information modelling report
Building information modelling report
 

Viewers also liked

The power of worship and praise
The power of worship and praiseThe power of worship and praise
The power of worship and praiseACTS238 Believer
 
Información general tema 1
Información general tema 1Información general tema 1
Información general tema 1Marisol Segura
 
How to manage or edit list or library permission on share point online
How to manage or edit list or library permission on share point onlineHow to manage or edit list or library permission on share point online
How to manage or edit list or library permission on share point onlinePrashant Kumar Singh
 
BTECH PROVISIONAL
BTECH PROVISIONALBTECH PROVISIONAL
BTECH PROVISIONALManoj Yadav
 
Orden multipolar en el siglo xxi
Orden multipolar en el siglo xxiOrden multipolar en el siglo xxi
Orden multipolar en el siglo xxiRodolfo Puigross
 
Fracturas pediatricas de la extremidad superior
Fracturas pediatricas de la extremidad superiorFracturas pediatricas de la extremidad superior
Fracturas pediatricas de la extremidad superiorBrenda Yabr
 
ترجمة ابن تيمية ـ للإمام الذهبي
ترجمة ابن تيمية ـ للإمام الذهبيترجمة ابن تيمية ـ للإمام الذهبي
ترجمة ابن تيمية ـ للإمام الذهبيOm Muktar
 
Modern methods of insulation in buildings
Modern methods of insulation in buildingsModern methods of insulation in buildings
Modern methods of insulation in buildingsAhmed E. Sakr
 

Viewers also liked (18)

Bang qc giua duong
Bang qc giua duongBang qc giua duong
Bang qc giua duong
 
The power of worship and praise
The power of worship and praiseThe power of worship and praise
The power of worship and praise
 
CWEMFPresentation_Bonnie
CWEMFPresentation_BonnieCWEMFPresentation_Bonnie
CWEMFPresentation_Bonnie
 
Ingeborg Phillipsen og Thomas Tram Pedersen - vi søger en alsidig medarbejder
Ingeborg Phillipsen og Thomas Tram Pedersen -  vi søger en alsidig medarbejderIngeborg Phillipsen og Thomas Tram Pedersen -  vi søger en alsidig medarbejder
Ingeborg Phillipsen og Thomas Tram Pedersen - vi søger en alsidig medarbejder
 
CAPRI ITALIA
CAPRI ITALIACAPRI ITALIA
CAPRI ITALIA
 
Información general tema 1
Información general tema 1Información general tema 1
Información general tema 1
 
How to manage or edit list or library permission on share point online
How to manage or edit list or library permission on share point onlineHow to manage or edit list or library permission on share point online
How to manage or edit list or library permission on share point online
 
BTECH PROVISIONAL
BTECH PROVISIONALBTECH PROVISIONAL
BTECH PROVISIONAL
 
Orden multipolar en el siglo xxi
Orden multipolar en el siglo xxiOrden multipolar en el siglo xxi
Orden multipolar en el siglo xxi
 
Dr Pauline Kerr Reference
Dr Pauline Kerr ReferenceDr Pauline Kerr Reference
Dr Pauline Kerr Reference
 
Piccadilly Circus
Piccadilly CircusPiccadilly Circus
Piccadilly Circus
 
43 katrine ipsenkj+ªr_sanddal
43 katrine ipsenkj+ªr_sanddal43 katrine ipsenkj+ªr_sanddal
43 katrine ipsenkj+ªr_sanddal
 
80 thomas bertelsen _m+ñrup kirke 2008-2015
80 thomas bertelsen _m+ñrup kirke 2008-201580 thomas bertelsen _m+ñrup kirke 2008-2015
80 thomas bertelsen _m+ñrup kirke 2008-2015
 
Fracturas pediatricas de la extremidad superior
Fracturas pediatricas de la extremidad superiorFracturas pediatricas de la extremidad superior
Fracturas pediatricas de la extremidad superior
 
Swine flu.
Swine flu.Swine flu.
Swine flu.
 
Envases Tetrapack
Envases TetrapackEnvases Tetrapack
Envases Tetrapack
 
ترجمة ابن تيمية ـ للإمام الذهبي
ترجمة ابن تيمية ـ للإمام الذهبيترجمة ابن تيمية ـ للإمام الذهبي
ترجمة ابن تيمية ـ للإمام الذهبي
 
Modern methods of insulation in buildings
Modern methods of insulation in buildingsModern methods of insulation in buildings
Modern methods of insulation in buildings
 

Similar to Zeidler_BIM_Brochure_08

How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsCAD Outsourcing
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsTawwabKhan4
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionVeetil Digital Service
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
THE RISE OF BIM AND DIGITAL TRANSFORMATION IN ARCHITECTURE.pdf
THE RISE  OF  BIM AND DIGITAL TRANSFORMATION  IN   ARCHITECTURE.pdfTHE RISE  OF  BIM AND DIGITAL TRANSFORMATION  IN   ARCHITECTURE.pdf
THE RISE OF BIM AND DIGITAL TRANSFORMATION IN ARCHITECTURE.pdfKarpagam Architecture
 
BIM for Infrastructure
BIM for InfrastructureBIM for Infrastructure
BIM for InfrastructureAnkit Singhai
 
5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdf5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdfPratap Dhopte
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfVincentPoon15
 
Optimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYCOptimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYCModulus Consulting
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architectsArpitGautam20
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bimkarim ead
 
Hcse provide benefits of bim
Hcse provide benefits of bimHcse provide benefits of bim
Hcse provide benefits of bimhcseonline
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?MarsBIM1
 
BIM - A New Concept in Practice
BIM - A New Concept in PracticeBIM - A New Concept in Practice
BIM - A New Concept in Practicerondellaria
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Rob Madill
 
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfLearn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfnibtedu
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwaresRuchy Lakhani
 
The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry Agon Coordination
 

Similar to Zeidler_BIM_Brochure_08 (20)

Bim
BimBim
Bim
 
How building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projectsHow building information modeling (BIM) functions in construction projects
How building information modeling (BIM) functions in construction projects
 
The Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction ProjectsThe Role of BIM in Modern Construction Projects
The Role of BIM in Modern Construction Projects
 
Implementing Building Information Modelling in Construction
Implementing Building Information Modelling in ConstructionImplementing Building Information Modelling in Construction
Implementing Building Information Modelling in Construction
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
THE RISE OF BIM AND DIGITAL TRANSFORMATION IN ARCHITECTURE.pdf
THE RISE  OF  BIM AND DIGITAL TRANSFORMATION  IN   ARCHITECTURE.pdfTHE RISE  OF  BIM AND DIGITAL TRANSFORMATION  IN   ARCHITECTURE.pdf
THE RISE OF BIM AND DIGITAL TRANSFORMATION IN ARCHITECTURE.pdf
 
BIM for Infrastructure
BIM for InfrastructureBIM for Infrastructure
BIM for Infrastructure
 
5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdf5 Powers of BIM that can change the face of a Renovation Project (2).pdf
5 Powers of BIM that can change the face of a Renovation Project (2).pdf
 
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdfFrom 3D to 6D Managing the Information Labyrinth of BIM.pdf
From 3D to 6D Managing the Information Labyrinth of BIM.pdf
 
Optimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYCOptimizing Building Performance through BIM Consulting in NYC
Optimizing Building Performance through BIM Consulting in NYC
 
5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects5 reasons why bim adoption is important for architects
5 reasons why bim adoption is important for architects
 
New solutions of bim
New solutions of bimNew solutions of bim
New solutions of bim
 
Hcse provide benefits of bim
Hcse provide benefits of bimHcse provide benefits of bim
Hcse provide benefits of bim
 
How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?How BIM can Impact Structural Engineerings?
How BIM can Impact Structural Engineerings?
 
BIM - A New Concept in Practice
BIM - A New Concept in PracticeBIM - A New Concept in Practice
BIM - A New Concept in Practice
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdfLearn why Architects or Architecture students should embrace BIM-Compressed.pdf
Learn why Architects or Architecture students should embrace BIM-Compressed.pdf
 
BIM and other softwares
BIM and other softwaresBIM and other softwares
BIM and other softwares
 
The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry The top 3 benefits of bim in the construction industry
The top 3 benefits of bim in the construction industry
 

Zeidler_BIM_Brochure_08

  • 1. Building Information Modelling the future of our industry Building Information Modelling
  • 2. Building Information Modeling is the future of our industry. Zeidler Partnership Architects participates in project delivery with leading building owners, consultants, and builders who are aware that we can all work better to- gether using Building Information Modeling [BIM]. BIM is the core software tool that enables integrated projects by providing the framework for collaboration on many of the largest new projects in the world. BIM is a central project database tool that provides valuable information through- out the entire building process - design, construction document tender, construc- tion, and building management. This leads to improved quality and better control of project costs, through design, fabrication, construction, and operation. We are already seeing these benefits on several of our major new projects – EnCana, Calgary City Centre, and Minto. Integrated Project Delivery [IPD] is an increasingly common project delivery ap- proach that integrates project leaders, business structures, systems and practices into a collaborative process. IPD participants all contribute their talents and in- sights to the project in order to collaboratively optimize value to the owner, reduce waste, and maximize project efficiency throughout the entire building life-cycle. Integrated projects are remarkable for their exceptionally effective collaboration among the primary participants - owner, architect, and contractor. Zeidler believes that working with BIM improves the quality of our work in ways that provide real benefits for the whole project team. Canadian and American con- structors, with the same goal of quality-control, have started to use the same pre- construction data modeling process. They call it “Virtual Design and Construction”, because they can design and construct a virtual project to discover all its details before they build the real thing. There is increasing evidence that the architecture, engineering and construction community is converging on Building Information Modeling – which is the same as the American Virtual Design and Construction - because of the common benefits integrated project delivery brings to every mem- ber of the team. BIM first starts to add value to our projects with 3-D design visualization. Because our model is fully 3-D, we can quickly look at virtually any part. While the design model is still developing, we can permit key people to have read-access to the cur- rent design, so they can ask timely questions. The constructor may query the BIM design model remotely over the Internet, or the architect can extract and email a 3-D design to the client for quick feedback.
  • 3. EnCana is one of the tallest and largest projects in Canada. The scope of this landmark project called for ultra fast-track documents and a design-assist process. In comparison with Foster’s DD hand-over, Zeidler’s• EnCana building information model contributed extremely detailed plans that show high accuracy in the critical relationship between the continuously varying structural Diagrid and the placement of both modular mullions and mechanical systems. ZPA extracted area calculations, BOMA diagrams and• other customized spreadsheets from the EnCana BIM model while tracking the current design changes. The speed and scope of the EnCana project required the• overlap of building information modelling and traditional 2-D CAD detailing. Below grade, our model enabled us to handle the as-built conditions that typically flow from the fast-track process. Going forward, we expect to link our building informa-• tion model with all engineering systems, most importantly structural and mechanical. BIM readily provides us access to link to various processes such as computa- tional fluid dynamic modelling for air systems and fire & life-safety. Ultimately we expect to link BIM and Facilities Manage-• ment and develop a full life-cycle commitment to our projects. David Jefferies, Principal
  • 4. In the early pre-construction phase, we can begin to extract quanti- ties from the model, and count every type of object. For example, how many interior doors will we have to install or how much will the carpet cost for the open office area? Intensified planning in the early stages of the project increases efficiencies and savings during the construction effort. In addition, our BIM can provide more detailed data to manage risk, estimate cost, run sun-wind-energy calculations, and evaluate LEED performance. One key use of BIM in the IPD process is coordi- nating building systems. For example, virtual clash detection between steel structure and mechanical ducts avoids the risk of actually con- structing a costly solution for an interference problem. Now let us consider how a building project resembles a virtual living organism. During its development and throughout the project life-cy- cle, the integrated project team contributes work and materials to the building, and maintains and operates the building for the benefit of its inhabitants. One primary rule of BIM is that anyone who requests data from the model must promptly return their finished data in order to update the model. For example, a constructor who would request data to fabricate wall panels, may decide to place 3 panels per bay instead of two, and then should return the resulting fabrication data to be checked in order to update the model. Throughout the design and construction process, each contributor should benefit from a recipro- cal exchange with the integrated project model. ZPA believes we can all work together to develop and sustain the BIM. Many people who own and operate buildings currently use or plan to use a Facilities Management system. We can actually link your current FM system into our BIM. Suppose we need to replace a window, a desk, a pump or a light fixture. Now we have the opportunity to dis- cover the object in its surroundings. By simply incorporating the ob- ject’s tag into our BIM, we may link the owner’s Facilities Management system to our BIM to show the exact location of any object, as built. By sustaining our BIM database throughout the project life-cycle we have the opportunity to link all possible as-built data into the project BIM. Our team’s goal is to improve our project’s quality while reducing risks and contingency costs. Could we sustain BIM throughout the entire project life-cycle? Zeidler Partnership Architects says “Yes, and we invite you to do so with us.”
  • 5. In 2002, Minto Midtown was the first large scale project in our office to use Building Information Modelling. As we expanded its use through the design process we discovered many advan- tages. Project knowledge increased through• design focused modelling. Our BIM model provided virtually unlimited• visualization. We improved our design coordination with• consultants. Graphic building information greatly• enhanced client communication. Accelerated decision making gave us• better control of project costs. The ability to generate sun/shadow studies• on horizontal and vertical surfaces read- ily provided key information to both the municipality and client. Gerald Stein, Partner
  • 6.
  • 7. The Calgary City Centre project is an example of taking a project from the earliest design feasibility and massing studies through schematics and beyond. In particular, BIM provides great flexibility through the early design investigation processes. This included: Creating architectural concept studies from hand sketches to• massing and detail renderings for multiple design concepts. Multiple massing and feasibility studies using simple block dia-• grams. Accurate area calculations extracted from these informed the decision making process. Development of chosen design options including updated area• calculations for multiple scenarios. Phasing plans, and shadow studies for planning permissions.• By continually keeping our BIM model current, we were able to produce detailed design studies. For example, our BIM model allowed us to study how our panel system could generate multiple facade options. At the same time, we were producing marketing material and tracking areas resulting from design changes. BIM provides the consistency of project information throughout the de- sign study period that allows for more precise area calculations as well as coordinated plan and section information. Therefore we have better cost estimating information. The future will no doubt lead to direct to digital manufacturing informa- tion transfer. Vaidila Banelis, Partner
  • 8. 315 Queen Street West Toronto, Ontario Canada M5V 2X2 T 416 596 8300 F 416 596 1408 Link to more BIM information: http://www2/zeidlerpartnership.com/articles/2008-07-10_ZPA_BIM_links ZEIDLER PARTNERSHIP ARCHITECTS TORONTO . CALGARY . VANCOUVER . VICTORIA . WEST PALM BEACH . LONDON . BERLIN . BEIJING Calgary Zeidler Partnership Architects 255 - 17th Avenue SW, Suite 200 Calgary, Alberta Canada T2S 2T8 T 403 663 0125 F 403 266 6168 Florida Zeidler Partnership Architects Inc. 105 South Narcissus Ave., Suite 310 West Palm Beach, Florida USA 33401 T 561 832 9110 F 561 832 8876 Vancouver Zeidler Partnership Architects #620-1500 West Georgia Street Vancoouver, British Columbia Canada V6G 2Z6 T 604 662 3002 F 604 662 3040 London Zeidler Partnership/UK 111 Cannon Street, 6th Floor London, U.K. EC4N 5AR T 44 20 7626 4400 F 44 20 7626 5500 Victoria Zeidler Partnership Architects 536 Broughton Street, 2nd Floor Victoria, British Columbia Canada V8W 1C6 T 250 388 9494 F 250 388 9495 Berlin Zeidler Partnership/Architekten Bergstaße 67 10115 Berlin Deutschland T 0049 30 89 34510 F 0049 30 89 35216 Edmonton Zeidler | ACI Architects in Joint Venture 17723 103 Avenue Edmonton, Alberta Canada T5S 1N8 T 780 486 6440 F 780 486 6401 Beijing Zeidler Architects Consulting Co. Ltd. Room 1201, Tower 1 China Central Place (CCP) Office Bldg No. 81, Jianguo Lu Chaoyang District, Beijing P. R. China 100025 T 8610 84539828 F 8610 84539838 Alan Munn Senior Partner David Jefferies Principal Gerald Stein Partner Tonino Ottaviani Associate Vaidila Banelis Partner Ian Fairlie Director of IT