Sheet2ScoresMaxActualComments1. Effort Estimate.
Estimate the effort necessary to complete the project. The
estimate should be in units of days or fractions of days. All
work to determine the effort should be shown. Provided
estimate55Included software development tasks in
estimate1010Broke down software development
tasks1010Included standard software development
phases1010Included project management tasks1010Broke down
project management tasks1010Included other tasks (e.g.,
training)1010Used method described in #4552. Assumptions:
Document the assumptions made to determine the effort
estimate in a list. 10103. Describe the method(s) used to
determine the effort estimate. 10104. Identify and describe the
advantages and disadvantages of the method(s)
used.10100100100Second submission90%90
Sheet3
Windshield Survey
Assignment Guidelines
A. Windshield Survey
The Windshield Survey is comprised of general qualitative
observations that give you a snapshot of the community that you
can capture as you drive/walk through the community. The
demographic data can be obtained online, through the public
library, county or township administration buildings. Please
address the following in a narrative format following APA
guidelines:
1. Geographical description
· Boundaries, geographical, political, or economic, how is it
seen.
· Housing an zoning
· Sign of decay
2. Health Resources
a. Type of services available: health department, private MD,
dentist, hospital clinic,
b. pharmacy, health promotion, mental health
c. School and occupational health services
d. Official and voluntary services
e. Self help and support groups
f. Service organizations, faith-based programs
g. Stores (grocery, retail, drug, dry cleaning, etc.
h. Transportation
3. Citizen safety and protective services
a. Police and fire
b. Shelters for victims of abuse
c. Others: neighborhood watch etc.
4. Services provided by senior citizens senior centers, meals on
wheels, transportation, day care, long term care.
a. Parks and recreational areas
5. Community welfare services beyond city/state aid as
provisions for emergency food, shelter and clothing.
Below please see the rubric that will be used to grade your
survey and due date instructions.
Assignment must be presented in an essay style using APA
format in the required Arial 12 font with minimum of 1000
words.
Project 1 – Estimating Project EffortLearning Objectives
This project has been designed to re-enforce the following
concepts of developing software solutions:
· Requirements Elicitation
· Requirements Analysis
· Functional Decomposition
· Task Identification
· Effort Estimating
In addition, students will be introduced to the reality of quickly
developing effort estimates with poor, incomplete and possibly
conflicting information. Scenario
The Project Management Institute (PMI) has invited your
company to respond to their Request for Proposal (RFP)
regarding the development of a Project Management System.
Their requirements are documented in “Project Management
System Requirements v3.docx.”
Before dedicating a lot of time and effort developing a proposal,
your company wants to determine a ballpark effort for the
project.
Your manager has requested that you review the customer’s
requirements and provide a “quick and dirty” effort estimate.
He will hold meetings to discuss how to develop the effort
estimate and the requirements.
You are encouraged to seek your manager’s advice is
developing the effort estimate.
NOTE: Your professor will take on the role of your manager.
Deliverables for Project 1
You shall submit via Canvas a document with the following
sections containing the information requested.
1. Effort Estimate
Estimate the effort necessary to complete the project. The
estimate should be in units of days or weeks. Work showing
how the effort estimate was determined is much more important
than the actual effort estimate. This work must be well
organized and clearly presented.
2. Assumptions
Identify and describe all assumptions made to determine the
effort estimate.
The assumptions section shall be formatted in a list and each
list element shall be described in a paragraph following the list
element.
3. Effort Estimating Method
Describe the method(s) used to determine the effort estimate.
If multiple methods were used, separate subsections should be
created for each method.
See the References section in this document for some estimating
techniques. Other estimating methods may be used. In either
case, the methods must be well described.
4. Advantages/Disadvantages
Identify and describe the advantages and disadvantages of the
method(s) used.
This section should be separated into two subsections – the first
for advantages of the methodology used to estimate the effort
and the second subsection for the disadvantages of the
methodology. If multiple methods are used, then separate
subsections should be created for each method and the
advantages and disadvantages be documented within these
subsections. References
1. Project Estimating Techniques.
Review Chapter 13 section 2 in your textbook “Essentials of
Software Engineering” by Frank Tsui, Orlando Karam and
Barbara Bernal. The following effort estimating techniques are
discussed in this chapter:
· COCOMO
· Function Point
· Simple OO
· Work Breakdown Structure
Your manager may have further insight into successful
estimating techniques.
2. RFP from PMI.
Carefully analyze the PMI’s RFP to determine the ballpark
effort estimate. This document is the single source of
information to determine the scope of the work to be performed.
Your manager may be able to clarify the requirements in this
document.
Grading
The score for the project shall be determined by how well and
how complete you address the four (4) deliverables of this
project as defined above (Effort Estimate, Assumptions, Effort
Estimating Method, Advantages/Disadvantages).
The following rubric will be used to grade the submissions for
Project 1.
Project 1 – Estimating Project Effort Page 1 of 2
Effort Estimates
COMP 380: Software Engineering
Estimating Process
Identify Requirements
Create High-Level Design
Break High-Level Design into smaller work packages
Map requirements to work packages
Create work packages for each development activity
(Requirements, Design, Implementation, Testing)
Add in work packages related to project management
Add in work packages of other activities
Create Effort Estimate for each work package
Requirements
Create Deliverable
Define attributes
Requirements satisfied by Deliverable
Tasks necessary to complete Deliverable
Save Deliverable
Retrieve Deliverable
Display Deliverable
AttributeUnique IdentifierNameDescriptionDue DateList of
RequirementsList of Tasks
Hight-Level Design
Graphical User Interface
Middle-Ware
Database
Work Break-down Structure
Estimating S/W Development Effort -
WBSPhaseComponentRequirementsDesignImplementationTestin
gTotalDeliverable Creation FormDeliverable Display
FormCreate DeliverableRetrieve DeliverableUpdate
DeliverableDelete DeliverableDisplay DeliverablesAssociate
Requirements to DeliverableRetrieve Requirements for
DeliverableUpdate Requirements for DeliverableUn-associate
Requirement to DeliverableAssociate Tasks to
DeliverableRetrieve Tasks for DeliverableUpdate Tasks for
DeliverableUn-associate Task to DeliverableGrand Total
Estimating S/W Dev. Effort -
COCOMOComponentSLOCDeliverable Creation
FormDeliverable Display FormCreate DeliverableRetrieve
DeliverableUpdate DeliverableDelete DeliverableDisplay
DeliverablesAssociate Requirements to DeliverableRetrieve
Requirements for DeliverableUpdate Requirements for
DeliverableUn-associate Requirement to DeliverableAssociate
Tasks to DeliverableRetrieve Tasks for DeliverableUpdate
Tasks for DeliverableUn-associate Task to DeliverableGrand
Total
Organic: Effort = [3.2 x (size)1.05] x PROD(f’s)
Semidetached: Effort = [3.2 x (size)1.12] x PROD(f’s)
Embedded: Effort = [3.2 x (size)1.20] x PROD(f’s)
Estimating S/W Dev. Effort - Function
PointsComponentTypeFunction PointsWeightTotalDeliverable
Creation FormDeliverable Display FormCreate
DeliverableRetrieve DeliverableUpdate DeliverableDelete
DeliverableDisplay DeliverablesAssociate Requirements to
DeliverableRetrieve Requirements for DeliverableUpdate
Requirements for DeliverableUn-associate Requirement to
DeliverableAssociate Tasks to DeliverableRetrieve Tasks for
DeliverableUpdate Tasks for DeliverableUn-associate Task to
DeliverableUnadjusted Function Points (UFP)
Total Complexity Factor (TCF) = 0.65 + [(0.01) x (sum of
technical complexity factors)]
Function Points = UFP x TCF
Effort = (Function Points) / (Function Points per Person-Month)
Estimating S/W Dev. Effort – Simplified
OOComponentClassesGUI WeightProductivityTotalDeliverable
Creation FormDeliverable Display FormCreate
DeliverableRetrieve DeliverableUpdate DeliverableDelete
DeliverableDisplay DeliverablesAssociate Requirements to
DeliverableRetrieve Requirements for DeliverableUpdate
Requirements for DeliverableUn-associate Requirement to
DeliverableAssociate Tasks to DeliverableRetrieve Tasks for
DeliverableUpdate Tasks for DeliverableUn-associate Task to
DeliverableGrand Total
Project Management
TasksInitiatingPlanningExecutingMonitoring and
ControllingClosingDevelop Project CharterDevelop Project
Management PlanDirect and Manage Project WorkMonitor &
Control Project WorkClose Project or PhaseIdentify
StakeholdersPlan Scope ManagementPerform Quality
AssurrancePerform Integrated Change ControlClose
ProcurementCollect RequirementsAcquire Project TeamControl
ScheduleDefine ScopeDevelop Project TeamControl
CostsCreate Work Breakdown StructureManage Project
TeamControl QualityPlan Cost ManagementManage
CommunicationsControl CommunicationsEstimate
CostsConduct ProcurementControl RisksDetermine
BudgetManage Stakeholder EngagementControl
ProcurementPlan Quality ManagementControl Stakeholder
EngagementPlan Human Resource ManagementPlan
Communications ManagementPlan Risk ManagementIdentify
RisksPerform Qualitative Risk AnalysisPerorm Quantitative
Risk AnalyissPlan Risk ResponsePlan Procurement
ManagementPlan Stakeholder Management
Other Tasks
Miscellaneous Software Development Tasks
High-Level Design
Training
Help System
Documentation
Integration (Component, Subsystem, System)
Integration Testing (Component, Subsystem, System)
Packaging
Delivery
Other Tasks
Meetings (internal and client)
Other Factors
Use of Libraries and existing code
Use of commercial products (e.g., DBMS)
Re-usability
Interactive Development Environments
Programming Language(s) used
Deliverables
A Deliverable is a tangible or intangible good or service
produced as a result of a project that is intended
to be delivered to the Custom er.
Project Managers must know the requirements satisfied by the
Deliverable , when each Deliverable is
scheduled to be delivered to the Customer and the Tasks
necessary to complete the deliverable .
The PMS shall provide a Project Manager with the capability to
create Deliverables and list the
Deliverables created. The PMS shall permit a Project Manager
to define the attributes listed
Deliverable
Requirement
Task
Deliverable
Requirement
Task
GUI
Deliverables
Tasks
Deliverable Input
Form
Deliverable List
Project
Management
System
Middleware
Database
Project Management System Requirements
Project Management Institute
Contents
Overview 3
Functional Requirements 3
Deliverables 3
Tasks 4
Issues 6
Action Items 7
Decisions 8
Resources 9
Risks 9
Requirements 10
Changes 10
Reference Documents 11
User Interface Requirements 11
Reporting Requirements 12
Non-Functional Requirements 13
Overview
The Project Management Institute (PMI) provides services
including the development of standards, research, education,
publication, networking-opportunities in local chapters, hosting
conferences and training seminars, and providing accreditation
in project management.
PMI honors project management excellence in various
categories, for example project professionals, organizations,
scholars, authors and continuing professional education
providers. As of 2015, the PMI has over 467,000 members in
204 countries. The Project Management Professional (PMP)
certification is recognized around the world,
Although other Project Management Systems already exist (e.g.,
Microsoft Project), they have insufficient capabilities to fully
support the activities of Project Managers. The PMI wants to
sponsor the development of an application for their member
PMPs to better support their job responsibilities than current
Project Management Systems. Functional Requirements
On a project, Project Managers must identify and track each of
the following:
· Deliverables
· Tasks
· Action Items
· Issues
· Decisions
· Resources
· Risks
· Requirements
· Changes
· Reference Documents
The PMS shall have the capability to permit a PMP to create
Deliverables, Tasks, Action Items, Issues, Decisions,
Resources, Risks, Requirements, Changes and Reference
Documents. Each of these high-level requirements is described
in further detail below.Deliverables
A Deliverable is a tangible or intangible good or service
produced as a result of a project that is intended to be delivered
to the Customer.
Project Managers must know the requirements satisfied by the
Deliverable, when each Deliverable is scheduled to be delivered
to the Customer and the Tasks necessary to complete the
deliverable.
The PMS shall provide a Project Manager with the capability to
create Deliverables and list the Deliverables created. The PMS
shall permit a Project Manager to define the attributes listed in
Table I for each Deliverable.
Deliverables: Attributes
Attribute
Description
Unique Identifier
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the Deliverable.
Description
A short description of the Deliverable.
Due Date
A date that identifies when the Deliverable must be completed
and delivered to the client.
List of Requirements
A list of the Names and Unique IDs of requirements associated
with the Deliverable.
List of Tasks
A list of the Names and Unique IDs of Tasks associated with
the Deliverable.
Tasks
A task is a piece of work in the overall project. All Tasks that
comprise the project must be completed for the successful
delivery of the project. Tasks are broken into smaller pieces
(i.e., decomposed) until, ideally, only one resource is assigned
to the task and the task will be completed in a relatively short
amount of time (e.g., between two (2) days and two (2) weeks).
Tasks that have been decomposed into smaller tasks are known
as Summary Tasks.
Project Managers must know when each Task is scheduled to
start, how much effort is required to complete the Task and
when the Task should be completed. Early in the project, the
Project Manager will need to determine what type of resource is
needed to perform the Task and later they will need to assign a
resource to the Task.
Tasks may be related to other Tasks. A Task that cannot be
started or completed before another Task is started or completed
is called a Dependent Task. A task may be dependent on more
than one task. There are four types of dependencies between
tasks. The most common is Finish to Start. That is, the
dependent task cannot start before the task it is dependent upon
is finished. The other dependency relationships are Start to
Start, Finish to Finish and Finish to Start. Once established, if
the completion date of a predecessor task changes then the start
and completion dates of all successor tasks may be affected.
A Milestone is a special type of task that has a completion date,
but has no duration and no resource assigned. A Milestone
represents a significant event or stage in the development of a
project. For example, a delivery to the client may be
represented in the schedule as a Milestone.
The PMS shall provide a Project Manager with the capability to
create Tasks, Summary Tasks and dependencies between Tasks.
The PMS shall permit a Project Manager to define the attributes
listed in Table II for each Task. The Project Manager must be
provided the capability to enter and update these values via a
form.
Tasks: Attributes
Attribute
Description
Unique Identifier
A numeric or alphanumeric string that is associated with each
Task. This Identifier must be unique across the entire system.
Name
An alphanumeric string to identify the Task.
Description
A short description of the Task.
Resource Assigned
The Resource assigned to complete the task. This Resource
should already exist within the PMS. If not, the Project
Manager shall be provided the capability to add the Resource.
Expected Start Date
The date the Task is expected to start.
Expected End Date
The date the Task is expected to be completed. If the Expected
Duration and the Expected Start Date have already been set, the
Expected End Date shall be calculated.
Expected Duration
The length of time the task is expected to take to complete. The
time between the “Expected Start Date” and the “Expected End
Date”. If the Expected Start Date and the Expected End Date
have already been set, the Expected Duration shall be
calculated.
Expected Effort
The effort the Task is expected to take to complete.
Actual Start Date
The date the Task is actually started.
Actual End Date
The date the Task is actually completed. If the Actual Duration
and the Actual Start Date have already been set, the Actual End
Date shall be calculated.
Actual Duration
The length of time the task is actually took to complete. The
time between the “Actual Start Date” and the “Actual End
Date”. If the Actual Start Date and the Actual End Date have
already been set, the Actual Duration shall be calculated.
Effort Completed
The effort actually expended so far on this Task.
Actual Effort
The actual final effort expended to complete this Task.
Percent Complete
This attribute may either be set by the Project Manager or
optionally calculated. If calculated, it is the Effort Completed
divided by the Expected Effort.
Predecessor Tasks
Tasks on which this task is dependent.
Successor Tasks
Tasks that are dependent on this task.
List of Issues
A list of the Names and Unique IDs of Issues associated with
the Task.
The PMS shall provide the capability to change a regular Task
to a Summary Task and a Summary Task to a regular Task. The
PMS shall provide the Project Manager with the capability to
group Tasks under a Summary Task and Summary Tasks and
other Tasks under Summary Tasks.
All Tasks, Summary Tasks and Milestone and their
interrelationships should be displayed graphically in a Gantt
Chart as well as in a tabular format. A Gantt chart is a type of
bar chart that graphically illustrates the start and finish dates of
the tasks and summary tasks, the dependencies between these
tasks. The PMS shall provide the Project Manager with the
capability to display other useful information about the tasks
(e.g., resource assigned, percent complete, etc.) on the Gantt
Chart. An example of a Gantt Chart is shown in Figure 1.
Gantt Chart ExampleIssues
An Issue is a concern, problem or an outstanding question that
prevents a Resource from completing a Task. As such, Issues
are associated with Task. More than one Issue can be
associated with a Task and sometimes an issue may affect
multiple tasks.
The PMS shall permit the Project Manager to create, update and
delete Issues. The PMS shall permit a Project Manager to
define the attributes listed in Table III for each Issue. The
Project Manager must be provided the capability to enter and
update these values via a form.
Issues: Attributes
Attribute
Description
Unique Identifier
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the deliverable.
Description
A short description of the deliverable.
Priority
The order in which this Issue should be resolved relative to
other issues. The defaults are: High, Medium and Low. The
PMS shall provide the capability for the Project Manager to add
or delete the values from the default list.
Severity
The impact of the Issue on the Task. The defaults are: Critical,
High, Medium, Low and Minor. The PMS shall provide the
capability for the Project Manager to add or delete the values
from the default list.
Date Raised
The date the Issue was first identified.
Date Assigned
The date the first Resource was assigned to an associated
Action Item.
Expected Completion Date
The date the Issue is expected to be resolved.
Actual Completion Date
The date all Action Items associated with this Issue are actually
completed and the Issue resolved.
Status
A value for the Issue’s status. The defaults are: Open, Closed,
In Progress, Hold, and Complete. The PMS shall provide the
capability for the Project Manager to add or delete the values
from the default list.
Status Description
Description of the Issue’s status as of the last update.
Update Date
Date of the last Status Description entered. The PMS shall
automatically generate this date when a Project Manager creates
a new Status Description.
List of Action Items
A list of the Names and Unique IDs of Action Items associated
with the Issue.
List of Decisions
A list of the Names and Unique IDs of Decisions associated
with the Issue.
Action Items
An Action Item is an activity that must be performed to
facilitate the resolution of an Issue. Unlike Tasks, Action Items
are not decomposed. Project Managers must know when each
Action Item should be completed and to whom it is assigned.
The PMS shall permit the Project Manager to create, update and
delete Action Items. The PMS shall permit a Project Manager
to define the attributes listed in Table IV.
Action Items: Attributes
Attribute
Description
Unique Identifier
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the Action Item.
Description
A short description of the Action Item.
Date Created
The date the Action Item was created.
Date Assigned
The date a Resource was assigned to the Action Item.
Resource Assigned
The Resource assigned to the Action Item.
Expected Completion Date
The date the Action Item is expected to be resolved.
Actual Completion Date
The date the Action Item is actually resolved.
Status
A value for the Action Item’s status. The defaults are: Open,
Closed, In Progress, Hold, and Complete. The PMS shall
provide the capability for the Project Manager to add or delete
the values from the default list.
Status Description
Description of the Action Item’s status as of the last update.
Update Date
Date of the last Status Description entered. The PMS shall
automatically generate this date when a Project Manager creates
a new Status Description.
The Project Manager must be provided the capability to enter
and update these values via a form. All Action Items should be
displayed in a tabular format. Decisions
A Decision is a conclusion reached by an individual or a group
charged with making the Decision. Like an Issue, a Decision or
lack thereof, will affect the successful completion of a Task.
As such, Decisions are associated with Task. More than one
Decision can be associated with a Task and sometimes a
Decision may affect multiple Tasks.
Project Managers must know each Decision that must be made
or has been made, who made the decision or who must make the
decision and when the decision was made or when it must be
made.
The PMS shall permit the Project Manager to create, update and
delete Decisions. The PMS shall permit a Project Manager to
define the attributes listed in Table V for each Decision. The
Project Manager must be provided the capability to enter and
update these values via a form.
Decisions: Attributes
Attribute
Description
Unique Identifier
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the deliverable.
Description
A short description of the deliverable.
Priority
The order in which this Decision should be worked relative to
other Decisions. The defaults are: High, Medium and Low.
The PMS shall provide the capability for the Project Manager to
add or delete the values from the default list.
Impact
The impact of the Decision on the Task. The defaults are:
Critical, High, Medium, Low and Minor. The PMS shall
provide the capability for the Project Manager to add or delete
the values from the default list.
Date Created
The date the Decision was first created.
Date Needed
The Date the Decision must be made otherwise the associated
Task and Project will be negatively impacted.
Date Made
The Date the Decision was made.
Decision Maker
The Resource assigned to make the Decision.
Expected Completion Date
The date the Action Item is expected to be resolved.
Actual Completion Date
The date the Action Item is actually resolved.
List of Meeting Notes
Notes on all meetings related to this Decision
Note Date
Date of the last Meeting Note entered. The PMS shall
automatically generate this date when a Project Manager creates
a new Meeting Note.
List of Reference Documents
A list of the Names and Unique IDs of Reference Documents
associated with the Issue.
Status
A value for the Action Item’s status. The defaults are: Open,
Closed, In Progress, Hold, and Complete. The PMS shall
provide the capability for the Project Manager to add or delete
the values from the default list.
Status Description
Description of the Action Item’s status as of the last update.
Update Date
Date of the last Status Description entered. The PMS shall
automatically generate this date when a Project Manager creates
a new Status Description.
The Project Manager must be provided the capability to enter
and update these values via a form. All Decisions should be
displayed in a tabular format. Resources
A Resource is person, employee or contractor that can be
assigned to a Task.
Project Managers must know the Resources available, the skills
of each Resource and the tasks assigned to a Resource.
The PMS shall permit the Project Manager to create, update and
delete Resources. The PMS shall permit a Project Manager to
define the attributes listed in Table V for each Resource. The
Project Manager must be provided the capability to enter and
update these values via a form.
Resources: Attributes
Attribute
Description
Unique ID
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the deliverable.
Title
The resource’s title
List of Skills
A list of skills currently possessed by the resource (e.g., Java,
UML, etc.). The skill level shall also be included.
Availability Calendar
A calendar that shows the dates and times that the resource is
currently available. All holidays, vacations and other non-
working hours would be blocked out on the Calendar.
Commitments to other projects would also be blocked out of the
availability calendar for the resource.
Pay Rate
The hourly rate for the ResourceRisks
A Risk is an uncertain event or condition that if it occurs, has a
positive or negative effect on the project. Risks may be
associated with one or more Deliverables or one or more Tasks.
Project Managers must know determine Risks to the project,
their probability of occurrence, the effect on the project if they
do occur, strategies to mitigate the occurrence of the risk and
tasks to perform should the risk occur.
The PMS shall permit the Project Manager to create, update and
delete Risks. The PMS shall permit a Project Manager to define
the attributes listed in Table VII for each Risks. The Project
Manager must be provided the capability to enter and update
these values via a form.
Risks: Attributes
Attribute
Description
Unique ID
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Category
The category of the risk. The defaults are: Schedule, Budget,
and Scope. The PMS shall provide the capability for the Project
Manager to add or delete the values from the default list.
Name
An alphanumeric string to identify the deliverable.
Probability
The probability that the risk may occur. Expressed as a
percentage.
Impact
If the Risk is realized, the expected impact on the project. The
defaults are: High, Medium and Low. The PMS shall provide
the capability for the Project Manager to add or delete the
values from the default list.
Mitigation
Plan(s) for preventing, avoiding or reducing the impact of the
risk.
Contingency
Plan(s) to implement in the event the risk is realized.
Risk Score
The Probability multiplied by the Impact. The Impact levels
must have associated numeric values.
Action By
Date when mitigation plans must be implemented.
List of Related Action Items
A list of the Names and Unique IDs of Action Items associated
with the Risk. Requirements
A Requirement is a capability, feature or attribute desired by
the Customer.
Project Managers must know each Requirement expressed in
some written form by the Customer, the source document for the
requirement, and location within the document of that
requirement. Requirements may be prioritized and may have
been requested or created by a specific Client representative.
Requirements are associated with Deliverables.
The PMS shall permit the Project Manager to create, update and
delete Requirements. The PMS shall permit a Project Manager
to define the attributes listed in Table VIII for each
Requirement. The Project Manager must be provided the
capability to enter and update these values via a form.
Requirements: Attributes
Attribute
Description
Unique ID
A numeric or alphanumeric string that is associated with each
Requirement. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the Requirement.
Requirement Text
The text of the requirement
Source Document
The name of the document that contains the requirement
Location in Source Document
The page and paragraph numbers where the requirement is
located within the document.
Client Reference
The reference to the Client’s source document for this
requirement. The reference shall include the page and
paragraph numbers for the requirement.
Deliverable
The Name and Unique ID of Deliverable associated with the
Requirement. Changes
A Change is an adjustment to the system requested by the
Customer. The adjustment may be to a Deliverable, a
requirement, some design element or the schedule.
Project Managers must know each Change that has be requested,
who requested the Change when the Change was requested, the
disposition of the Change and if approved, when it was
approved. Changes are likely to affect the schedule and the
budget for the project.
The PMS shall permit the Project Manager to create, update and
delete Changes. The PMS shall permit a Project Manager to
define the attributes listed in Table IX for each Change. The
Project Manager must be provided the capability to enter and
update these values via a form.
Changes: Attributes
Attribute
Description
Unique ID
A numeric or alphanumeric string that is associated with each
Deliverable. This Identifier must be unique across the entire
system.
Name
An alphanumeric string to identify the deliverable.
Date Requested
The date the Change was requested
Requestor
The name of the person or organization that requested the
Change.
Status
The status of the change. The defaults are: Open, Reviewing,
Denied, and Approved. The PMS shall provide the capability
for the Project Manager to add or delete the values from the
default list.
Update Date
Date of the last Status was changed. The PMS shall
automatically generate this date when a Project Manager
changes the Status.
Reference Documents
A Reference Document is any document, book, note, pamphlet,
notebook, webpage, on-line reference, etc. that provides
additional information related to Decisions, Requirements or
Changes.
Project Managers and others on the project utilize these
documents in understanding, defining, and implementing the
desired system.
The PMS shall permit the Project Manager to create, update and
delete Reference Documents. The PMS shall permit a Project
Manager to define the attributes listed in Table Xfor each
Reference Document. The Project Manager must be provided
the capability to enter and update these values via a form.
Reference Documents: Attributes
Attribute
Description
Unique ID
A numeric or alphanumeric string that is associated with each
Reference Document. This Identifier must be unique across the
entire system.
Name
An alphanumeric string to identify the Reference Document.
User Interface Requirements
The user interface shall comply with Microsoft standard look
and feel. The User Interface shall be intuitive for Project
Management Professionals.
Short-cut keys shall be provided for experienced users to
perform operations within the PMS.
On the Gantt chart, Task, Summary Tasks and Milestones shall
be clearly distinguishable from each other.
A Help system shall be available to explain the operation of
menus, menu items, dialogs, icons, tools, etc.
Capabilities shall be provided to sort or filter any information
provided in a tabular view (e.g., Deliverables, Tasks, Action
Items, etc.).
Filtering capabilities shall include the filtering by:
· Date (i.e., Due Date, Start Date and End Date)
· Resource
· Items past due
· Items coming due within a specified number of days
· Items scheduled to start within a specified number of days
· Critical Path
Sorting capabilities shall include sorting by:
· Due Date
· Start Date
· End Date
· Resource
· AlphabeticallyReporting Requirements
Besides managing the project, the Project Manager must also
report on the project to his management and to the client. To
achieve these goals, the Project Manager must extract
information from the PMS in reports. There are four (4) types
of Project Management reports:
1. Status Reports
These reports would typically be produced weekly or monthly
and provide information on whether the project is on track in
regards to budget and schedule in general and specifically
which tasks are behind schedule and/or over budget.
Critical Path analysis is essential in determining whether a
project is on schedule. The Critical Path is the sequence of
tasks that when their expected durations are added together
result in the longest overall duration of all possible paths in the
project. A path is a sequence of tasks in the project that are
connected via their dependency relationships.
Earned Value Analysis (EVA) is useful in determining whether
the project is on-schedule and within budget. EVA is an
industry standard method of measuring a project's progress at
any given point in time, forecasting its completion date and
final cost, and analyzing variances in the schedule and budget
as the project proceeds.
2. Risk Reports
A risk report is generally reviewed on a monthly basis and
provides information on all open risks on the project.
3. Board Executive Reports
These reports would be similar to Status and Risk Reports, but
be less detailed, limiting the information to a high-level view of
the project.
4. Resource Reports
A Resource Report examines which resources are performing
what tasks when. They are useful for ensuring that resources
are not either overloaded or unloaded as well as determining if
the resources are allocated for their most effective use (e.g., the
resource’s skill set best matches the characteristics of the
tasks).
Non-Functional Requirements
This section contains the Non-Functional requirements for the
PMS.
Non-Functional Requirements
Requirement Category
Requirement
Availability
The system shall be available during normal business hours in
whatever country it is being used and at least 4 hours before and
after normal business hours. The system shall be available on
week-ends and holidays as if they are normal business days.
Backup
Project files shall be saved automatically. Frequency of
backup shall be configurable.
Capacity
A project file shall be capable of storing at least 10,000 tasks,
10,000 Requirements, and 1,000 each of Deliverables, Action
Items, Issues, Decisions, Resources, Risks, Changes and
Reference Documents.
Response time
With the exception of Critical Path Analysis and report
generation, all responses to all user actions shall be completed
within one (1) second.
Robustness
The software shall not experience any catastrophic failures that
result in the loss of any data.
Safety
Security
Access to projects and project data shall be controlled via
current Microsoft login and password standards.
Software, tools, standards etc.
The software shall be designed and implemented to current
software industry standards.
Project Management System Requirements Page 1 of 13

More Related Content

Similar to Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx

Cmgt410
Cmgt410Cmgt410
Cmgt410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410joituy
 
Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)scorpissons123
 
Cmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagramCmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagramenininvin1980
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxcarolinef5
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxdonaldp2
 
Increasing the probability of program success
Increasing the probability of program successIncreasing the probability of program success
Increasing the probability of program successGlen Alleman
 
Define and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements ComposerDefine and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements ComposerAlan Kan
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Devry proj 586 final exam set 1 new
Devry proj 586 final exam set 1 newDevry proj 586 final exam set 1 new
Devry proj 586 final exam set 1 newuopassignment
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 

Similar to Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx (20)

Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)Cmgt 410 entire course (latest version of syllabus)
Cmgt 410 entire course (latest version of syllabus)
 
Unit 5
Unit   5Unit   5
Unit 5
 
Cmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagramCmgt 410 week 2 gantt chart diagram
Cmgt 410 week 2 gantt chart diagram
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
Increasing the probability of program success
Increasing the probability of program successIncreasing the probability of program success
Increasing the probability of program success
 
Define and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements ComposerDefine and Manage Requirements with IBM Rational Requirements Composer
Define and Manage Requirements with IBM Rational Requirements Composer
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Devry proj 586 final exam set 1 new
Devry proj 586 final exam set 1 newDevry proj 586 final exam set 1 new
Devry proj 586 final exam set 1 new
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 
Guide to Software Estimation
Guide to Software EstimationGuide to Software Estimation
Guide to Software Estimation
 
Cmgt 410 cmgt410
Cmgt 410 cmgt410Cmgt 410 cmgt410
Cmgt 410 cmgt410
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
project plan
project planproject plan
project plan
 
Pm0011 project planning and scheduling
Pm0011  project planning and schedulingPm0011  project planning and scheduling
Pm0011 project planning and scheduling
 

More from bjohn46

Sheet1Rate your skills using the following scaleChapter 1 You Ma.docx
Sheet1Rate your skills using the following scaleChapter 1 You Ma.docxSheet1Rate your skills using the following scaleChapter 1 You Ma.docx
Sheet1Rate your skills using the following scaleChapter 1 You Ma.docxbjohn46
 
Sheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docx
Sheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docxSheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docx
Sheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docxbjohn46
 
Sheet1project codeproject nameEmployeesQB280001Account Management .docx
Sheet1project codeproject nameEmployeesQB280001Account Management .docxSheet1project codeproject nameEmployeesQB280001Account Management .docx
Sheet1project codeproject nameEmployeesQB280001Account Management .docxbjohn46
 
Sheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docx
Sheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docxSheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docx
Sheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docxbjohn46
 
Sheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docx
Sheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docxSheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docx
Sheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docxbjohn46
 
Sheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docx
Sheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docxSheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docx
Sheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docxbjohn46
 
Sheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docx
Sheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docxSheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docx
Sheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docxbjohn46
 
Sheet1Pretax IncomeYang, Ziyun make sure to add back income t.docx
Sheet1Pretax IncomeYang, Ziyun make sure to add back income t.docxSheet1Pretax IncomeYang, Ziyun make sure to add back income t.docx
Sheet1Pretax IncomeYang, Ziyun make sure to add back income t.docxbjohn46
 
Sheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docx
Sheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docxSheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docx
Sheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docxbjohn46
 
Sheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docx
Sheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docxSheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docx
Sheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docxbjohn46
 
Sheet1Phase of Business Financal Management needsDebt FinancingEq.docx
Sheet1Phase of Business Financal Management needsDebt FinancingEq.docxSheet1Phase of Business Financal Management needsDebt FinancingEq.docx
Sheet1Phase of Business Financal Management needsDebt FinancingEq.docxbjohn46
 
Sheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docx
Sheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docxSheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docx
Sheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docxbjohn46
 
Sheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docx
Sheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docxSheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docx
Sheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docxbjohn46
 
Sheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docx
Sheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docxSheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docx
Sheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docxbjohn46
 
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docxSheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docxbjohn46
 
Sheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docx
Sheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docxSheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docx
Sheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docxbjohn46
 
Sheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docx
Sheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docxSheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docx
Sheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docxbjohn46
 
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docxSheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docxbjohn46
 
Sheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docx
Sheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docxSheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docx
Sheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docxbjohn46
 
Sheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docx
Sheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docxSheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docx
Sheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docxbjohn46
 

More from bjohn46 (20)

Sheet1Rate your skills using the following scaleChapter 1 You Ma.docx
Sheet1Rate your skills using the following scaleChapter 1 You Ma.docxSheet1Rate your skills using the following scaleChapter 1 You Ma.docx
Sheet1Rate your skills using the following scaleChapter 1 You Ma.docx
 
Sheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docx
Sheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docxSheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docx
Sheet1Quarter Sales PersonRegionQuarterly Sales31-MarSmithEast$750.docx
 
Sheet1project codeproject nameEmployeesQB280001Account Management .docx
Sheet1project codeproject nameEmployeesQB280001Account Management .docxSheet1project codeproject nameEmployeesQB280001Account Management .docx
Sheet1project codeproject nameEmployeesQB280001Account Management .docx
 
Sheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docx
Sheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docxSheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docx
Sheet1Quantity (miles of pipeline)Total CostTotal Fixed CostTotal .docx
 
Sheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docx
Sheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docxSheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docx
Sheet1Pro Forma Income StatementYear 1Year 2Year 3Year 4Year 5Visi.docx
 
Sheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docx
Sheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docxSheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docx
Sheet1PMGT 576 Assignment Rubric – Unit 8 Assignment20Is the Lean .docx
 
Sheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docx
Sheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docxSheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docx
Sheet1Presentation by Tony StudentSlide NumberSlide TitleSlide Tex.docx
 
Sheet1Pretax IncomeYang, Ziyun make sure to add back income t.docx
Sheet1Pretax IncomeYang, Ziyun make sure to add back income t.docxSheet1Pretax IncomeYang, Ziyun make sure to add back income t.docx
Sheet1Pretax IncomeYang, Ziyun make sure to add back income t.docx
 
Sheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docx
Sheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docxSheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docx
Sheet1PMGT 576 Assignment Rubric – Unit 7 Assignment20Are all of t.docx
 
Sheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docx
Sheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docxSheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docx
Sheet1Plan APlan BPro Forma Income Statement AccountsEBIT700100013.docx
 
Sheet1Phase of Business Financal Management needsDebt FinancingEq.docx
Sheet1Phase of Business Financal Management needsDebt FinancingEq.docxSheet1Phase of Business Financal Management needsDebt FinancingEq.docx
Sheet1Phase of Business Financal Management needsDebt FinancingEq.docx
 
Sheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docx
Sheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docxSheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docx
Sheet1PeriodEngine Failures(a) 4-period moving average(b) weighted.docx
 
Sheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docx
Sheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docxSheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docx
Sheet1Participant#Verbal Label Condition (Smashed or Hit)Age Condi.docx
 
Sheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docx
Sheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docxSheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docx
Sheet1No.Strengths (3)Weaknesses (2)Recommendations (2)Evidence (u.docx
 
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docxSheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
Sheet1Moisture content analysis final resultsGroupValue of m3 (g)A.docx
 
Sheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docx
Sheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docxSheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docx
Sheet1ManhattanBrooklynQueensThe BronxStaten IslandEducationMarita.docx
 
Sheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docx
Sheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docxSheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docx
Sheet1Learning Solultions NameVersion NumberMediumTypeLessonSc.docx
 
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docxSheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
Sheet1LMH10090H80M70L605040302010NumberRisk NameFull Risk CostRisk.docx
 
Sheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docx
Sheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docxSheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docx
Sheet1Item Price# of ItemsTotal PriceCups$1.896$11.34Plates$1.506$.docx
 
Sheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docx
Sheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docxSheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docx
Sheet1In_OutAustralian_CityInternational_CityAirlineRoutePort_Coun.docx
 

Recently uploaded

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 

Recently uploaded (20)

The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 

Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the e.docx

  • 1. Sheet2ScoresMaxActualComments1. Effort Estimate. Estimate the effort necessary to complete the project. The estimate should be in units of days or fractions of days. All work to determine the effort should be shown. Provided estimate55Included software development tasks in estimate1010Broke down software development tasks1010Included standard software development phases1010Included project management tasks1010Broke down project management tasks1010Included other tasks (e.g., training)1010Used method described in #4552. Assumptions: Document the assumptions made to determine the effort estimate in a list. 10103. Describe the method(s) used to determine the effort estimate. 10104. Identify and describe the advantages and disadvantages of the method(s) used.10100100100Second submission90%90 Sheet3 Windshield Survey Assignment Guidelines A. Windshield Survey The Windshield Survey is comprised of general qualitative observations that give you a snapshot of the community that you can capture as you drive/walk through the community. The demographic data can be obtained online, through the public library, county or township administration buildings. Please address the following in a narrative format following APA guidelines:
  • 2. 1. Geographical description · Boundaries, geographical, political, or economic, how is it seen. · Housing an zoning · Sign of decay 2. Health Resources a. Type of services available: health department, private MD, dentist, hospital clinic, b. pharmacy, health promotion, mental health c. School and occupational health services d. Official and voluntary services e. Self help and support groups f. Service organizations, faith-based programs g. Stores (grocery, retail, drug, dry cleaning, etc. h. Transportation 3. Citizen safety and protective services a. Police and fire b. Shelters for victims of abuse c. Others: neighborhood watch etc. 4. Services provided by senior citizens senior centers, meals on wheels, transportation, day care, long term care. a. Parks and recreational areas 5. Community welfare services beyond city/state aid as provisions for emergency food, shelter and clothing.
  • 3. Below please see the rubric that will be used to grade your survey and due date instructions. Assignment must be presented in an essay style using APA format in the required Arial 12 font with minimum of 1000 words. Project 1 – Estimating Project EffortLearning Objectives This project has been designed to re-enforce the following concepts of developing software solutions: · Requirements Elicitation · Requirements Analysis · Functional Decomposition · Task Identification · Effort Estimating In addition, students will be introduced to the reality of quickly developing effort estimates with poor, incomplete and possibly conflicting information. Scenario The Project Management Institute (PMI) has invited your company to respond to their Request for Proposal (RFP) regarding the development of a Project Management System. Their requirements are documented in “Project Management System Requirements v3.docx.” Before dedicating a lot of time and effort developing a proposal, your company wants to determine a ballpark effort for the project. Your manager has requested that you review the customer’s requirements and provide a “quick and dirty” effort estimate. He will hold meetings to discuss how to develop the effort estimate and the requirements. You are encouraged to seek your manager’s advice is
  • 4. developing the effort estimate. NOTE: Your professor will take on the role of your manager. Deliverables for Project 1 You shall submit via Canvas a document with the following sections containing the information requested. 1. Effort Estimate Estimate the effort necessary to complete the project. The estimate should be in units of days or weeks. Work showing how the effort estimate was determined is much more important than the actual effort estimate. This work must be well organized and clearly presented. 2. Assumptions Identify and describe all assumptions made to determine the effort estimate. The assumptions section shall be formatted in a list and each list element shall be described in a paragraph following the list element. 3. Effort Estimating Method Describe the method(s) used to determine the effort estimate. If multiple methods were used, separate subsections should be created for each method. See the References section in this document for some estimating techniques. Other estimating methods may be used. In either case, the methods must be well described. 4. Advantages/Disadvantages Identify and describe the advantages and disadvantages of the method(s) used. This section should be separated into two subsections – the first for advantages of the methodology used to estimate the effort and the second subsection for the disadvantages of the methodology. If multiple methods are used, then separate subsections should be created for each method and the advantages and disadvantages be documented within these subsections. References 1. Project Estimating Techniques.
  • 5. Review Chapter 13 section 2 in your textbook “Essentials of Software Engineering” by Frank Tsui, Orlando Karam and Barbara Bernal. The following effort estimating techniques are discussed in this chapter: · COCOMO · Function Point · Simple OO · Work Breakdown Structure Your manager may have further insight into successful estimating techniques. 2. RFP from PMI. Carefully analyze the PMI’s RFP to determine the ballpark effort estimate. This document is the single source of information to determine the scope of the work to be performed. Your manager may be able to clarify the requirements in this document. Grading The score for the project shall be determined by how well and how complete you address the four (4) deliverables of this project as defined above (Effort Estimate, Assumptions, Effort Estimating Method, Advantages/Disadvantages). The following rubric will be used to grade the submissions for Project 1. Project 1 – Estimating Project Effort Page 1 of 2 Effort Estimates COMP 380: Software Engineering Estimating Process Identify Requirements
  • 6. Create High-Level Design Break High-Level Design into smaller work packages Map requirements to work packages Create work packages for each development activity (Requirements, Design, Implementation, Testing) Add in work packages related to project management Add in work packages of other activities Create Effort Estimate for each work package Requirements Create Deliverable Define attributes Requirements satisfied by Deliverable Tasks necessary to complete Deliverable Save Deliverable Retrieve Deliverable Display Deliverable AttributeUnique IdentifierNameDescriptionDue DateList of RequirementsList of Tasks Hight-Level Design Graphical User Interface Middle-Ware Database
  • 7. Work Break-down Structure Estimating S/W Development Effort - WBSPhaseComponentRequirementsDesignImplementationTestin gTotalDeliverable Creation FormDeliverable Display FormCreate DeliverableRetrieve DeliverableUpdate DeliverableDelete DeliverableDisplay DeliverablesAssociate Requirements to DeliverableRetrieve Requirements for DeliverableUpdate Requirements for DeliverableUn-associate Requirement to DeliverableAssociate Tasks to DeliverableRetrieve Tasks for DeliverableUpdate Tasks for DeliverableUn-associate Task to DeliverableGrand Total Estimating S/W Dev. Effort - COCOMOComponentSLOCDeliverable Creation FormDeliverable Display FormCreate DeliverableRetrieve DeliverableUpdate DeliverableDelete DeliverableDisplay DeliverablesAssociate Requirements to DeliverableRetrieve Requirements for DeliverableUpdate Requirements for DeliverableUn-associate Requirement to DeliverableAssociate Tasks to DeliverableRetrieve Tasks for DeliverableUpdate Tasks for DeliverableUn-associate Task to DeliverableGrand Total Organic: Effort = [3.2 x (size)1.05] x PROD(f’s) Semidetached: Effort = [3.2 x (size)1.12] x PROD(f’s) Embedded: Effort = [3.2 x (size)1.20] x PROD(f’s)
  • 8. Estimating S/W Dev. Effort - Function PointsComponentTypeFunction PointsWeightTotalDeliverable Creation FormDeliverable Display FormCreate DeliverableRetrieve DeliverableUpdate DeliverableDelete DeliverableDisplay DeliverablesAssociate Requirements to DeliverableRetrieve Requirements for DeliverableUpdate Requirements for DeliverableUn-associate Requirement to DeliverableAssociate Tasks to DeliverableRetrieve Tasks for DeliverableUpdate Tasks for DeliverableUn-associate Task to DeliverableUnadjusted Function Points (UFP) Total Complexity Factor (TCF) = 0.65 + [(0.01) x (sum of technical complexity factors)] Function Points = UFP x TCF Effort = (Function Points) / (Function Points per Person-Month) Estimating S/W Dev. Effort – Simplified OOComponentClassesGUI WeightProductivityTotalDeliverable Creation FormDeliverable Display FormCreate DeliverableRetrieve DeliverableUpdate DeliverableDelete DeliverableDisplay DeliverablesAssociate Requirements to DeliverableRetrieve Requirements for DeliverableUpdate Requirements for DeliverableUn-associate Requirement to DeliverableAssociate Tasks to DeliverableRetrieve Tasks for DeliverableUpdate Tasks for DeliverableUn-associate Task to DeliverableGrand Total Project Management
  • 9. TasksInitiatingPlanningExecutingMonitoring and ControllingClosingDevelop Project CharterDevelop Project Management PlanDirect and Manage Project WorkMonitor & Control Project WorkClose Project or PhaseIdentify StakeholdersPlan Scope ManagementPerform Quality AssurrancePerform Integrated Change ControlClose ProcurementCollect RequirementsAcquire Project TeamControl ScheduleDefine ScopeDevelop Project TeamControl CostsCreate Work Breakdown StructureManage Project TeamControl QualityPlan Cost ManagementManage CommunicationsControl CommunicationsEstimate CostsConduct ProcurementControl RisksDetermine BudgetManage Stakeholder EngagementControl ProcurementPlan Quality ManagementControl Stakeholder EngagementPlan Human Resource ManagementPlan Communications ManagementPlan Risk ManagementIdentify RisksPerform Qualitative Risk AnalysisPerorm Quantitative Risk AnalyissPlan Risk ResponsePlan Procurement ManagementPlan Stakeholder Management Other Tasks Miscellaneous Software Development Tasks High-Level Design Training Help System Documentation Integration (Component, Subsystem, System) Integration Testing (Component, Subsystem, System) Packaging Delivery Other Tasks Meetings (internal and client)
  • 10. Other Factors Use of Libraries and existing code Use of commercial products (e.g., DBMS) Re-usability Interactive Development Environments Programming Language(s) used Deliverables A Deliverable is a tangible or intangible good or service produced as a result of a project that is intended to be delivered to the Custom er. Project Managers must know the requirements satisfied by the Deliverable , when each Deliverable is scheduled to be delivered to the Customer and the Tasks necessary to complete the deliverable . The PMS shall provide a Project Manager with the capability to create Deliverables and list the Deliverables created. The PMS shall permit a Project Manager to define the attributes listed Deliverable Requirement Task Deliverable Requirement Task GUI Deliverables Tasks Deliverable Input Form Deliverable List
  • 11. Project Management System Middleware Database Project Management System Requirements Project Management Institute Contents Overview 3 Functional Requirements 3 Deliverables 3 Tasks 4 Issues 6 Action Items 7 Decisions 8 Resources 9 Risks 9 Requirements 10 Changes 10 Reference Documents 11 User Interface Requirements 11 Reporting Requirements 12 Non-Functional Requirements 13 Overview
  • 12. The Project Management Institute (PMI) provides services including the development of standards, research, education, publication, networking-opportunities in local chapters, hosting conferences and training seminars, and providing accreditation in project management. PMI honors project management excellence in various categories, for example project professionals, organizations, scholars, authors and continuing professional education providers. As of 2015, the PMI has over 467,000 members in 204 countries. The Project Management Professional (PMP) certification is recognized around the world, Although other Project Management Systems already exist (e.g., Microsoft Project), they have insufficient capabilities to fully support the activities of Project Managers. The PMI wants to sponsor the development of an application for their member PMPs to better support their job responsibilities than current Project Management Systems. Functional Requirements On a project, Project Managers must identify and track each of the following: · Deliverables · Tasks · Action Items · Issues · Decisions · Resources · Risks · Requirements · Changes · Reference Documents The PMS shall have the capability to permit a PMP to create Deliverables, Tasks, Action Items, Issues, Decisions, Resources, Risks, Requirements, Changes and Reference Documents. Each of these high-level requirements is described in further detail below.Deliverables A Deliverable is a tangible or intangible good or service produced as a result of a project that is intended to be delivered
  • 13. to the Customer. Project Managers must know the requirements satisfied by the Deliverable, when each Deliverable is scheduled to be delivered to the Customer and the Tasks necessary to complete the deliverable. The PMS shall provide a Project Manager with the capability to create Deliverables and list the Deliverables created. The PMS shall permit a Project Manager to define the attributes listed in Table I for each Deliverable. Deliverables: Attributes Attribute Description Unique Identifier A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the Deliverable. Description A short description of the Deliverable. Due Date A date that identifies when the Deliverable must be completed and delivered to the client. List of Requirements A list of the Names and Unique IDs of requirements associated with the Deliverable. List of Tasks A list of the Names and Unique IDs of Tasks associated with the Deliverable. Tasks A task is a piece of work in the overall project. All Tasks that comprise the project must be completed for the successful delivery of the project. Tasks are broken into smaller pieces (i.e., decomposed) until, ideally, only one resource is assigned to the task and the task will be completed in a relatively short amount of time (e.g., between two (2) days and two (2) weeks).
  • 14. Tasks that have been decomposed into smaller tasks are known as Summary Tasks. Project Managers must know when each Task is scheduled to start, how much effort is required to complete the Task and when the Task should be completed. Early in the project, the Project Manager will need to determine what type of resource is needed to perform the Task and later they will need to assign a resource to the Task. Tasks may be related to other Tasks. A Task that cannot be started or completed before another Task is started or completed is called a Dependent Task. A task may be dependent on more than one task. There are four types of dependencies between tasks. The most common is Finish to Start. That is, the dependent task cannot start before the task it is dependent upon is finished. The other dependency relationships are Start to Start, Finish to Finish and Finish to Start. Once established, if the completion date of a predecessor task changes then the start and completion dates of all successor tasks may be affected. A Milestone is a special type of task that has a completion date, but has no duration and no resource assigned. A Milestone represents a significant event or stage in the development of a project. For example, a delivery to the client may be represented in the schedule as a Milestone. The PMS shall provide a Project Manager with the capability to create Tasks, Summary Tasks and dependencies between Tasks. The PMS shall permit a Project Manager to define the attributes listed in Table II for each Task. The Project Manager must be provided the capability to enter and update these values via a form. Tasks: Attributes Attribute Description Unique Identifier A numeric or alphanumeric string that is associated with each Task. This Identifier must be unique across the entire system. Name
  • 15. An alphanumeric string to identify the Task. Description A short description of the Task. Resource Assigned The Resource assigned to complete the task. This Resource should already exist within the PMS. If not, the Project Manager shall be provided the capability to add the Resource. Expected Start Date The date the Task is expected to start. Expected End Date The date the Task is expected to be completed. If the Expected Duration and the Expected Start Date have already been set, the Expected End Date shall be calculated. Expected Duration The length of time the task is expected to take to complete. The time between the “Expected Start Date” and the “Expected End Date”. If the Expected Start Date and the Expected End Date have already been set, the Expected Duration shall be calculated. Expected Effort The effort the Task is expected to take to complete. Actual Start Date The date the Task is actually started. Actual End Date The date the Task is actually completed. If the Actual Duration and the Actual Start Date have already been set, the Actual End Date shall be calculated. Actual Duration The length of time the task is actually took to complete. The time between the “Actual Start Date” and the “Actual End Date”. If the Actual Start Date and the Actual End Date have already been set, the Actual Duration shall be calculated. Effort Completed The effort actually expended so far on this Task. Actual Effort The actual final effort expended to complete this Task.
  • 16. Percent Complete This attribute may either be set by the Project Manager or optionally calculated. If calculated, it is the Effort Completed divided by the Expected Effort. Predecessor Tasks Tasks on which this task is dependent. Successor Tasks Tasks that are dependent on this task. List of Issues A list of the Names and Unique IDs of Issues associated with the Task. The PMS shall provide the capability to change a regular Task to a Summary Task and a Summary Task to a regular Task. The PMS shall provide the Project Manager with the capability to group Tasks under a Summary Task and Summary Tasks and other Tasks under Summary Tasks. All Tasks, Summary Tasks and Milestone and their interrelationships should be displayed graphically in a Gantt Chart as well as in a tabular format. A Gantt chart is a type of bar chart that graphically illustrates the start and finish dates of the tasks and summary tasks, the dependencies between these tasks. The PMS shall provide the Project Manager with the capability to display other useful information about the tasks (e.g., resource assigned, percent complete, etc.) on the Gantt Chart. An example of a Gantt Chart is shown in Figure 1. Gantt Chart ExampleIssues An Issue is a concern, problem or an outstanding question that prevents a Resource from completing a Task. As such, Issues are associated with Task. More than one Issue can be associated with a Task and sometimes an issue may affect multiple tasks. The PMS shall permit the Project Manager to create, update and delete Issues. The PMS shall permit a Project Manager to define the attributes listed in Table III for each Issue. The Project Manager must be provided the capability to enter and
  • 17. update these values via a form. Issues: Attributes Attribute Description Unique Identifier A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the deliverable. Description A short description of the deliverable. Priority The order in which this Issue should be resolved relative to other issues. The defaults are: High, Medium and Low. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Severity The impact of the Issue on the Task. The defaults are: Critical, High, Medium, Low and Minor. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Date Raised The date the Issue was first identified. Date Assigned The date the first Resource was assigned to an associated Action Item. Expected Completion Date The date the Issue is expected to be resolved. Actual Completion Date The date all Action Items associated with this Issue are actually completed and the Issue resolved. Status A value for the Issue’s status. The defaults are: Open, Closed, In Progress, Hold, and Complete. The PMS shall provide the capability for the Project Manager to add or delete the values
  • 18. from the default list. Status Description Description of the Issue’s status as of the last update. Update Date Date of the last Status Description entered. The PMS shall automatically generate this date when a Project Manager creates a new Status Description. List of Action Items A list of the Names and Unique IDs of Action Items associated with the Issue. List of Decisions A list of the Names and Unique IDs of Decisions associated with the Issue. Action Items An Action Item is an activity that must be performed to facilitate the resolution of an Issue. Unlike Tasks, Action Items are not decomposed. Project Managers must know when each Action Item should be completed and to whom it is assigned. The PMS shall permit the Project Manager to create, update and delete Action Items. The PMS shall permit a Project Manager to define the attributes listed in Table IV. Action Items: Attributes Attribute Description Unique Identifier A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the Action Item. Description A short description of the Action Item. Date Created The date the Action Item was created. Date Assigned The date a Resource was assigned to the Action Item.
  • 19. Resource Assigned The Resource assigned to the Action Item. Expected Completion Date The date the Action Item is expected to be resolved. Actual Completion Date The date the Action Item is actually resolved. Status A value for the Action Item’s status. The defaults are: Open, Closed, In Progress, Hold, and Complete. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Status Description Description of the Action Item’s status as of the last update. Update Date Date of the last Status Description entered. The PMS shall automatically generate this date when a Project Manager creates a new Status Description. The Project Manager must be provided the capability to enter and update these values via a form. All Action Items should be displayed in a tabular format. Decisions A Decision is a conclusion reached by an individual or a group charged with making the Decision. Like an Issue, a Decision or lack thereof, will affect the successful completion of a Task. As such, Decisions are associated with Task. More than one Decision can be associated with a Task and sometimes a Decision may affect multiple Tasks. Project Managers must know each Decision that must be made or has been made, who made the decision or who must make the decision and when the decision was made or when it must be made. The PMS shall permit the Project Manager to create, update and delete Decisions. The PMS shall permit a Project Manager to define the attributes listed in Table V for each Decision. The Project Manager must be provided the capability to enter and update these values via a form. Decisions: Attributes
  • 20. Attribute Description Unique Identifier A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the deliverable. Description A short description of the deliverable. Priority The order in which this Decision should be worked relative to other Decisions. The defaults are: High, Medium and Low. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Impact The impact of the Decision on the Task. The defaults are: Critical, High, Medium, Low and Minor. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Date Created The date the Decision was first created. Date Needed The Date the Decision must be made otherwise the associated Task and Project will be negatively impacted. Date Made The Date the Decision was made. Decision Maker The Resource assigned to make the Decision. Expected Completion Date The date the Action Item is expected to be resolved. Actual Completion Date The date the Action Item is actually resolved. List of Meeting Notes Notes on all meetings related to this Decision Note Date
  • 21. Date of the last Meeting Note entered. The PMS shall automatically generate this date when a Project Manager creates a new Meeting Note. List of Reference Documents A list of the Names and Unique IDs of Reference Documents associated with the Issue. Status A value for the Action Item’s status. The defaults are: Open, Closed, In Progress, Hold, and Complete. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Status Description Description of the Action Item’s status as of the last update. Update Date Date of the last Status Description entered. The PMS shall automatically generate this date when a Project Manager creates a new Status Description. The Project Manager must be provided the capability to enter and update these values via a form. All Decisions should be displayed in a tabular format. Resources A Resource is person, employee or contractor that can be assigned to a Task. Project Managers must know the Resources available, the skills of each Resource and the tasks assigned to a Resource. The PMS shall permit the Project Manager to create, update and delete Resources. The PMS shall permit a Project Manager to define the attributes listed in Table V for each Resource. The Project Manager must be provided the capability to enter and update these values via a form. Resources: Attributes Attribute Description Unique ID A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system.
  • 22. Name An alphanumeric string to identify the deliverable. Title The resource’s title List of Skills A list of skills currently possessed by the resource (e.g., Java, UML, etc.). The skill level shall also be included. Availability Calendar A calendar that shows the dates and times that the resource is currently available. All holidays, vacations and other non- working hours would be blocked out on the Calendar. Commitments to other projects would also be blocked out of the availability calendar for the resource. Pay Rate The hourly rate for the ResourceRisks A Risk is an uncertain event or condition that if it occurs, has a positive or negative effect on the project. Risks may be associated with one or more Deliverables or one or more Tasks. Project Managers must know determine Risks to the project, their probability of occurrence, the effect on the project if they do occur, strategies to mitigate the occurrence of the risk and tasks to perform should the risk occur. The PMS shall permit the Project Manager to create, update and delete Risks. The PMS shall permit a Project Manager to define the attributes listed in Table VII for each Risks. The Project Manager must be provided the capability to enter and update these values via a form. Risks: Attributes Attribute Description Unique ID A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system. Category The category of the risk. The defaults are: Schedule, Budget,
  • 23. and Scope. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Name An alphanumeric string to identify the deliverable. Probability The probability that the risk may occur. Expressed as a percentage. Impact If the Risk is realized, the expected impact on the project. The defaults are: High, Medium and Low. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Mitigation Plan(s) for preventing, avoiding or reducing the impact of the risk. Contingency Plan(s) to implement in the event the risk is realized. Risk Score The Probability multiplied by the Impact. The Impact levels must have associated numeric values. Action By Date when mitigation plans must be implemented. List of Related Action Items A list of the Names and Unique IDs of Action Items associated with the Risk. Requirements A Requirement is a capability, feature or attribute desired by the Customer. Project Managers must know each Requirement expressed in some written form by the Customer, the source document for the requirement, and location within the document of that requirement. Requirements may be prioritized and may have been requested or created by a specific Client representative. Requirements are associated with Deliverables. The PMS shall permit the Project Manager to create, update and delete Requirements. The PMS shall permit a Project Manager to define the attributes listed in Table VIII for each
  • 24. Requirement. The Project Manager must be provided the capability to enter and update these values via a form. Requirements: Attributes Attribute Description Unique ID A numeric or alphanumeric string that is associated with each Requirement. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the Requirement. Requirement Text The text of the requirement Source Document The name of the document that contains the requirement Location in Source Document The page and paragraph numbers where the requirement is located within the document. Client Reference The reference to the Client’s source document for this requirement. The reference shall include the page and paragraph numbers for the requirement. Deliverable The Name and Unique ID of Deliverable associated with the Requirement. Changes A Change is an adjustment to the system requested by the Customer. The adjustment may be to a Deliverable, a requirement, some design element or the schedule. Project Managers must know each Change that has be requested, who requested the Change when the Change was requested, the disposition of the Change and if approved, when it was approved. Changes are likely to affect the schedule and the budget for the project. The PMS shall permit the Project Manager to create, update and delete Changes. The PMS shall permit a Project Manager to define the attributes listed in Table IX for each Change. The
  • 25. Project Manager must be provided the capability to enter and update these values via a form. Changes: Attributes Attribute Description Unique ID A numeric or alphanumeric string that is associated with each Deliverable. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the deliverable. Date Requested The date the Change was requested Requestor The name of the person or organization that requested the Change. Status The status of the change. The defaults are: Open, Reviewing, Denied, and Approved. The PMS shall provide the capability for the Project Manager to add or delete the values from the default list. Update Date Date of the last Status was changed. The PMS shall automatically generate this date when a Project Manager changes the Status. Reference Documents A Reference Document is any document, book, note, pamphlet, notebook, webpage, on-line reference, etc. that provides additional information related to Decisions, Requirements or Changes. Project Managers and others on the project utilize these documents in understanding, defining, and implementing the desired system. The PMS shall permit the Project Manager to create, update and delete Reference Documents. The PMS shall permit a Project Manager to define the attributes listed in Table Xfor each
  • 26. Reference Document. The Project Manager must be provided the capability to enter and update these values via a form. Reference Documents: Attributes Attribute Description Unique ID A numeric or alphanumeric string that is associated with each Reference Document. This Identifier must be unique across the entire system. Name An alphanumeric string to identify the Reference Document. User Interface Requirements The user interface shall comply with Microsoft standard look and feel. The User Interface shall be intuitive for Project Management Professionals. Short-cut keys shall be provided for experienced users to perform operations within the PMS. On the Gantt chart, Task, Summary Tasks and Milestones shall be clearly distinguishable from each other. A Help system shall be available to explain the operation of menus, menu items, dialogs, icons, tools, etc. Capabilities shall be provided to sort or filter any information provided in a tabular view (e.g., Deliverables, Tasks, Action Items, etc.). Filtering capabilities shall include the filtering by: · Date (i.e., Due Date, Start Date and End Date) · Resource · Items past due · Items coming due within a specified number of days · Items scheduled to start within a specified number of days · Critical Path Sorting capabilities shall include sorting by: · Due Date · Start Date · End Date · Resource
  • 27. · AlphabeticallyReporting Requirements Besides managing the project, the Project Manager must also report on the project to his management and to the client. To achieve these goals, the Project Manager must extract information from the PMS in reports. There are four (4) types of Project Management reports: 1. Status Reports These reports would typically be produced weekly or monthly and provide information on whether the project is on track in regards to budget and schedule in general and specifically which tasks are behind schedule and/or over budget. Critical Path analysis is essential in determining whether a project is on schedule. The Critical Path is the sequence of tasks that when their expected durations are added together result in the longest overall duration of all possible paths in the project. A path is a sequence of tasks in the project that are connected via their dependency relationships. Earned Value Analysis (EVA) is useful in determining whether the project is on-schedule and within budget. EVA is an industry standard method of measuring a project's progress at any given point in time, forecasting its completion date and final cost, and analyzing variances in the schedule and budget as the project proceeds. 2. Risk Reports A risk report is generally reviewed on a monthly basis and provides information on all open risks on the project. 3. Board Executive Reports These reports would be similar to Status and Risk Reports, but be less detailed, limiting the information to a high-level view of the project. 4. Resource Reports A Resource Report examines which resources are performing what tasks when. They are useful for ensuring that resources are not either overloaded or unloaded as well as determining if the resources are allocated for their most effective use (e.g., the resource’s skill set best matches the characteristics of the
  • 28. tasks). Non-Functional Requirements This section contains the Non-Functional requirements for the PMS. Non-Functional Requirements Requirement Category Requirement Availability The system shall be available during normal business hours in whatever country it is being used and at least 4 hours before and after normal business hours. The system shall be available on week-ends and holidays as if they are normal business days. Backup Project files shall be saved automatically. Frequency of backup shall be configurable. Capacity A project file shall be capable of storing at least 10,000 tasks, 10,000 Requirements, and 1,000 each of Deliverables, Action Items, Issues, Decisions, Resources, Risks, Changes and Reference Documents. Response time With the exception of Critical Path Analysis and report generation, all responses to all user actions shall be completed within one (1) second. Robustness The software shall not experience any catastrophic failures that result in the loss of any data. Safety Security Access to projects and project data shall be controlled via current Microsoft login and password standards. Software, tools, standards etc. The software shall be designed and implemented to current software industry standards.
  • 29. Project Management System Requirements Page 1 of 13