SlideShare a Scribd company logo
1 of 5
To get this material Click this link 
https://bitly.com/12Bq3Dq 
This file comprises CMGT 410 Week 2 Gantt Chart Diagram 
General Questions - General General Questions 
CMGT/410 NEW UPDATED COURSE 
CMGT/410 Week 1 Individual Assignment 
Consider the following scenario: 
You have been hired by a large company with branch offices 
around the country to assist with rollout of a new 
companywide compliance system. While initially the focus 
was on implementation of the technology, it was found that 
success will require at least 10 hours of training for all 
managers across the country on both the use of the new 
platform as well as a host of new compliance policies being 
introduced. Of the options discussed, it was generally agreed 
than the training should be hands-on and conducted in 
person at a central location. This will obviously require 
getting organizational buy in as not all managers are going to 
be willing to commit to taking time out from their normal 
responsibilities just for some training. In addition, such large 
scale centralized training has not been done before by this 
company; therefore, the CEO wants feedback from 
participants to evaluate the effectiveness of any training 
sessions. As a result, your manager has given you the 
responsibility to develop an outline for a proposed project 
that would meet this upcoming need. 
Submit a 2- to 3-page memo that does the following:
Names the project 
Briefly describes the project 
Identifies potential stakeholders directly or indirectly 
involved 
Specifies the overall objective and any outcomes for this 
project 
Details how success will be evaluated 
Highlights what is needed to ascertain the measurable 
organizational value (MOV) of this project. 
You will need to make some assumptions (it is even 
encouraged) but the assumptions must be documented. 
Week 1 DQ1 
Carton et al (2008) describe what they consider a 
“successful” enterprise resource planning (ERP) 
implementation. What aspects of the project made it 
“successful” in their definition? Would your organization 
describe this as successful? Why or why not? 
Week 1 DQ2 
Based on the article by Anantatmula (2010), why is the 
project manager so critical to the success of the project? 
CMGT/410 Week 2 Individual Assignment 
You have been tasked with the project of organizing a 
company offsite 2-day training session in which people are 
brought in from different parts of the country. 
This entails everything from preparation, accommodations, 
and facilities. 
Submit a 2- to 3-page executive memo summarizing the 
project's objective, any scoping boundaries used to define 
the project, and relevant facts about the tasks or resources. 
Identify all related tasks and resources needed to complete 
this project.
Highlight or specify any measurable deliverables relating to 
your project. 
Attach a task list with assigned resources from a Microsoft® 
Project file that supports what you have outlined in your 
memo. 
Week 2 DQ1 
Analyze the techniques discussed in the Guldemond et al. 
article (2008), and propose how you would apply them to 
your own skill set as a Project Manager. 
Week 2 DQ2 
In their 2009 article, Turner et al. describe the relatively low 
implementation rate of Gantt chart, CPM diagrams, etc. in 
projects. Does your organization use these tools? How does 
this data compare to the implementation of these tools in 
your organization? Why? 
CMGT/410 Week 3 Individual Assignment 
The project for the company offsite 2-day training session has 
been given a preliminary go-ahead. However a budget needs 
to be submitted for approval. 
Write a 2- to 3-page memo explaining the financial 
implications of your project that does the following: 
Adds costs estimates to your resources (both labor and 
material) – Refer to websites like the United States 
Department of Labor for estimates. 
Adds estimates for all task duration and sequencing of tasks 
(including precedence relations) 
Summarizes any relevant facts about the project duration, 
number or type of resources, critical task sequencing, and 
how duration estimates were arrived at 
Highlights if there are any milestones for your project Include 
a Microsoft® Project Gantt chart, as an attachment, showing
the WBS of tasks (with dependencies) and task sequences, 
along with any budget or cost reports to support your memo. 
CMGT/410 Week 3 Learning Team Assignment 
This is the core of any project plan used to communicate 
what tasks are needed and the order of sequence to be done 
to meet deadlines and deliverables. 
At a minimum the section will contain the following: 
Business requirements document (BRD) that provides 
additional details regarding the expectations (such as user, 
system, and functional) that must be met for achieving goals 
of the project 
Work breakdown structure (WBS) showing discrete work 
tasks and grouped hierarchically that helps to organize and 
define the total work scope of the project 
Write 3 to 4 pages on your findings 
Week 3 DQ1 
In Hurley’s 2009 article, what type of costs should project 
managers be tracking to get an accurate total cost? Why is it 
critical to track these costs? 
Week 3 DQ2 
Why is cost and quality management so important to know 
how to successfully apply in project management? What are 
the potential consequences of a project manager not 
knowing these two valuable tools? 
CMGT/410 Week 4 Individual Assignment 
The company offsite 2-day training session project is about 
ready to enter the execution phase. However, management 
has a history of being surprised with projects that finished 
over-budget, did not adhere to the timeline, evinced waste of 
resources, or did not meet expectations. 
Address your strategy for the following in a 2- to 3-page
memo to gain their confidence in your project management 
abilities: 
Analyze and report unplanned changes 
Evaluate project quality 
Procedures you plan to implement for handling change 
control issues 
How you plan to communicate whether the project is 
meeting any stated performance and quality objectives 
CMGT/410 Week 4 Learning Team Assignment 
The allocation and cost of resources need to be carefully 
monitored if a project is to be delivered on-time and on-budget. 
At a minimum this section will contain the following: 
Allocation of resources to project tasks (both labor and 
material) 
Cost estimates for project resources 
Gantt diagram showing duration estimates for all tasks and 
their sequencing (including precedence relations) and 
highlighting any critical path(s) arising from task 
dependencies ultimately determining the minimal duration 
of a project 
In addition summarize any relevant facts about the project 
duration, number or type of resources, critical task 
sequencing, or how duration estimates were arrived at, and 
any financial implications (for example, budget or cost 
reports of the project as well) 
Develop a baseline for your project plan so that all future 
variances are captured. 
Write 3 to 4 pages on your findings. 
Just need highlighted part compl... 
https://bitly.com/12Bq3Dq

More Related Content

What's hot

Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project ReportRISHABHSIINGH
 
CONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORTCONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORTDivyang Choudhary
 
Project Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualProject Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualKemppe
 
Program Management Office Services
Program Management Office ServicesProgram Management Office Services
Program Management Office ServicesGlen Alleman
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cmPrasad Reddy
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aForbes Chanakira
 
Project Management Notes 3
Project Management Notes 3Project Management Notes 3
Project Management Notes 3Golam Bitonsir
 
Project Plan template
Project Plan templateProject Plan template
Project Plan templateDemand Metric
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementSHAZEBALIKHAN1
 
Conveyor belt project
Conveyor belt projectConveyor belt project
Conveyor belt projectSamehTeleb
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingSHAZEBALIKHAN1
 

What's hot (12)

Conveyor Belt Project Report
Conveyor Belt Project ReportConveyor Belt Project Report
Conveyor Belt Project Report
 
CONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORTCONVEYOR BELT PROJECT REPORT
CONVEYOR BELT PROJECT REPORT
 
Project Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions ManualProject Management The Managerial Process 5th Edition Larson Solutions Manual
Project Management The Managerial Process 5th Edition Larson Solutions Manual
 
Program Management Office Services
Program Management Office ServicesProgram Management Office Services
Program Management Office Services
 
Project manager project-plan-template-cm
Project manager project-plan-template-cmProject manager project-plan-template-cm
Project manager project-plan-template-cm
 
Pmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_aPmp t09 project_execution_plan_rev_a
Pmp t09 project_execution_plan_rev_a
 
Project Management Notes 3
Project Management Notes 3Project Management Notes 3
Project Management Notes 3
 
Project control
Project controlProject control
Project control
 
Project Plan template
Project Plan templateProject Plan template
Project Plan template
 
My 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project ManagementMy 5 Learnings of Waterfall Project Management
My 5 Learnings of Waterfall Project Management
 
Conveyor belt project
Conveyor belt projectConveyor belt project
Conveyor belt project
 
Construction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential BuildingConstruction Project Schedule Example- Residential Building
Construction Project Schedule Example- Residential Building
 

Similar to Cmgt 410 week 2 gantt chart diagram

Cmgt410
Cmgt410Cmgt410
Cmgt410joituy
 
Cmgt410
Cmgt410Cmgt410
Cmgt410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410joituy
 
Cmgt410
Cmgt410Cmgt410
Cmgt4107Fase1
 
Cmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire classCmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire classLaynevine
 
Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxdanhaley45372
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.comUOPCourseHelp
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your CruzIbarra161
 
PM Session 4
PM Session 4PM Session 4
PM Session 4dmdk12
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningAmr E. Mohamed
 

Similar to Cmgt 410 week 2 gantt chart diagram (20)

Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire classCmgt 410 ver.13 entire class
Cmgt 410 ver.13 entire class
 
Performance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docxPerformance Report Grading GuidePM582 r42Individual Assig.docx
Performance Report Grading GuidePM582 r42Individual Assig.docx
 
Cpmgt 305 cpmgt305
Cpmgt 305 cpmgt305Cpmgt 305 cpmgt305
Cpmgt 305 cpmgt305
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
 
Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your Course ProjectPart 1 – Building Your Project PlanYou and your
Course ProjectPart 1 – Building Your Project PlanYou and your
 
Ch23
Ch23Ch23
Ch23
 
PM Session 4
PM Session 4PM Session 4
PM Session 4
 
SE_Lec 12_ Project Planning
SE_Lec 12_ Project PlanningSE_Lec 12_ Project Planning
SE_Lec 12_ Project Planning
 
MIS Project management
MIS Project managementMIS Project management
MIS Project management
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 

Cmgt 410 week 2 gantt chart diagram

  • 1. To get this material Click this link https://bitly.com/12Bq3Dq This file comprises CMGT 410 Week 2 Gantt Chart Diagram General Questions - General General Questions CMGT/410 NEW UPDATED COURSE CMGT/410 Week 1 Individual Assignment Consider the following scenario: You have been hired by a large company with branch offices around the country to assist with rollout of a new companywide compliance system. While initially the focus was on implementation of the technology, it was found that success will require at least 10 hours of training for all managers across the country on both the use of the new platform as well as a host of new compliance policies being introduced. Of the options discussed, it was generally agreed than the training should be hands-on and conducted in person at a central location. This will obviously require getting organizational buy in as not all managers are going to be willing to commit to taking time out from their normal responsibilities just for some training. In addition, such large scale centralized training has not been done before by this company; therefore, the CEO wants feedback from participants to evaluate the effectiveness of any training sessions. As a result, your manager has given you the responsibility to develop an outline for a proposed project that would meet this upcoming need. Submit a 2- to 3-page memo that does the following:
  • 2. Names the project Briefly describes the project Identifies potential stakeholders directly or indirectly involved Specifies the overall objective and any outcomes for this project Details how success will be evaluated Highlights what is needed to ascertain the measurable organizational value (MOV) of this project. You will need to make some assumptions (it is even encouraged) but the assumptions must be documented. Week 1 DQ1 Carton et al (2008) describe what they consider a “successful” enterprise resource planning (ERP) implementation. What aspects of the project made it “successful” in their definition? Would your organization describe this as successful? Why or why not? Week 1 DQ2 Based on the article by Anantatmula (2010), why is the project manager so critical to the success of the project? CMGT/410 Week 2 Individual Assignment You have been tasked with the project of organizing a company offsite 2-day training session in which people are brought in from different parts of the country. This entails everything from preparation, accommodations, and facilities. Submit a 2- to 3-page executive memo summarizing the project's objective, any scoping boundaries used to define the project, and relevant facts about the tasks or resources. Identify all related tasks and resources needed to complete this project.
  • 3. Highlight or specify any measurable deliverables relating to your project. Attach a task list with assigned resources from a Microsoft® Project file that supports what you have outlined in your memo. Week 2 DQ1 Analyze the techniques discussed in the Guldemond et al. article (2008), and propose how you would apply them to your own skill set as a Project Manager. Week 2 DQ2 In their 2009 article, Turner et al. describe the relatively low implementation rate of Gantt chart, CPM diagrams, etc. in projects. Does your organization use these tools? How does this data compare to the implementation of these tools in your organization? Why? CMGT/410 Week 3 Individual Assignment The project for the company offsite 2-day training session has been given a preliminary go-ahead. However a budget needs to be submitted for approval. Write a 2- to 3-page memo explaining the financial implications of your project that does the following: Adds costs estimates to your resources (both labor and material) – Refer to websites like the United States Department of Labor for estimates. Adds estimates for all task duration and sequencing of tasks (including precedence relations) Summarizes any relevant facts about the project duration, number or type of resources, critical task sequencing, and how duration estimates were arrived at Highlights if there are any milestones for your project Include a Microsoft® Project Gantt chart, as an attachment, showing
  • 4. the WBS of tasks (with dependencies) and task sequences, along with any budget or cost reports to support your memo. CMGT/410 Week 3 Learning Team Assignment This is the core of any project plan used to communicate what tasks are needed and the order of sequence to be done to meet deadlines and deliverables. At a minimum the section will contain the following: Business requirements document (BRD) that provides additional details regarding the expectations (such as user, system, and functional) that must be met for achieving goals of the project Work breakdown structure (WBS) showing discrete work tasks and grouped hierarchically that helps to organize and define the total work scope of the project Write 3 to 4 pages on your findings Week 3 DQ1 In Hurley’s 2009 article, what type of costs should project managers be tracking to get an accurate total cost? Why is it critical to track these costs? Week 3 DQ2 Why is cost and quality management so important to know how to successfully apply in project management? What are the potential consequences of a project manager not knowing these two valuable tools? CMGT/410 Week 4 Individual Assignment The company offsite 2-day training session project is about ready to enter the execution phase. However, management has a history of being surprised with projects that finished over-budget, did not adhere to the timeline, evinced waste of resources, or did not meet expectations. Address your strategy for the following in a 2- to 3-page
  • 5. memo to gain their confidence in your project management abilities: Analyze and report unplanned changes Evaluate project quality Procedures you plan to implement for handling change control issues How you plan to communicate whether the project is meeting any stated performance and quality objectives CMGT/410 Week 4 Learning Team Assignment The allocation and cost of resources need to be carefully monitored if a project is to be delivered on-time and on-budget. At a minimum this section will contain the following: Allocation of resources to project tasks (both labor and material) Cost estimates for project resources Gantt diagram showing duration estimates for all tasks and their sequencing (including precedence relations) and highlighting any critical path(s) arising from task dependencies ultimately determining the minimal duration of a project In addition summarize any relevant facts about the project duration, number or type of resources, critical task sequencing, or how duration estimates were arrived at, and any financial implications (for example, budget or cost reports of the project as well) Develop a baseline for your project plan so that all future variances are captured. Write 3 to 4 pages on your findings. Just need highlighted part compl... https://bitly.com/12Bq3Dq