SlideShare a Scribd company logo
1 of 5
Download to read offline
Mick Leso – Structural Option
2006 Penn State AE Senior Thesis
COST ANALYSIS AND SCHEDULING RESPONSES
Mick Leso – Structural Option
2006 Penn State AE Senior Thesis
COST ANALYSIS 53
A cost analysis for the concrete truss system attained from R.S. Means output data
located in CostWorks, specified values for a location roughly about Greensboro, NC. The
estimated results located in the following charts include the cost of the raw concrete, placing,
reinforcement, and formwork required to build this structure. The total lengths of each
member, out of ETABS, were utilized to calculate to the cubic yardage of concrete.
2005 Costs for Greensboro, NC RS Means (Concrete Truss)
Members Type # CY L (ft) Unit Materials Labor Equipment Total $
10"x12" Beam Beam 146 1238.80 40137.03 C.Y. 205 176 40 448 $554,981.16
12"x16" Beam Beam 137 2509.63 50820.00 C.Y. 205 176 40 448 $1,124,314.07
24"x24" Beam Beam 24 1130.67 7632.00 C.Y. 205 176 40 448 $506,538.67
12"x12" Column Brace 4 29.92 807.82 C.Y. 205 176 40 448 $13,403.88
24"x40" Truss Brace 18 2851.71 11549.44 C.Y. 205 176 40 448 $1,277,567.46
12"x12" Column Column 109 734.48 19831.08 C.Y. 435 320 72 854 $627,249.72
16" Circ. Col. Column 12 2040.33 2192.16 C.Y. 127 27.5 23 201 $410,106.86
30"x36" Column Column 6 304.47 1096.08 C.Y. 490 183 41 726 $221,042.80
$4,735,204.61
2005 Costs for Greensboro, NC RS Means (Concrete Truss)
Area Sections Volume Unit Materials Labor Equipment Total $
Concrete Slabs 1612.00 C.Y. 183 134 37 354 $570,648.00
Shear Walls 96.21 8' ht. 123 50.5 11.25 184.75 $17,774.80
* Includes Placing, formwork, reinforcement, and concrete $588,422.80
Total Structural Cost: $5,323,627
The results show a structural cost in excess of $5,000,000; a large quantity for a building
originally estimated at $14,000,000. A rough, square-footage approximation showed the
concrete system to have a total cost of $15,854,430, 33.6% of which is structural.
For comparison, the original steel frame’s estimated cost was obtained using R.S. Means
values also. It indicates a total structural price of over $1.5 million, roughly 11% of the total
building cost. Ten percent is a reasonable overall value for a structural system in a mixed use,
institutional building located on a college campus. The concrete truss structure would
increase the price of the superstructure 350%, and ultimately make construction time longer.
With concrete, all the prep-work must be completed before the raw mixture can be delivered
to the site. This entails setting up formwork and laying out reinforcement for all the members
that will be poured throughout the day; which is extremely significant over the length of the
cantilever, where excessive formwork, temporary bracing, a mass of reinforcement bars, and
numerous safety precautions lead to slowed construction time. The R.S. Means data was
assumed for maximum reinforcing in the north building, since two 24”x24” girders, two 24”x40”
braces, one 10”x12” beam, and 30”x36” columns from above and below, all meeting at one
Mick Leso – Structural Option
2006 Penn State AE Senior Thesis
COST ANALYSIS 54
splice location. To counteract that, formwork was assumed to be reused four times.
Since the preassembled steel frame members can be delivered by flatbed and
fastened using bolted shear connections, the principal steel structure can be erected very
quickly. The major issue in the steel frame would be welding; with shear studs to be attached
with metal decking to beams, the moment connections in the south building, and any
remaining brace members that require weld connections.
Structural $1,533,664
Non-Structural
$12,466,336
Structural
$5,323,627
Non-Structural
$10,530,803
$0
$2
$4
$6
$8
$10
$12
$14
$16
$inmillions
Steel Concrete
Structural Cost per Total Cost
2005 RS Means Costs for Greensboro, NC (Steel Braced Frame – Original Design)
Area Section Units Area/Volume Unit Materials Labor Equipment Total $
Concrete Slabs yd
3
797.36 C.Y. 163 123 34 320 $255,155.52
Metal Deck (flrs) ft
2
41885.00 S.F. 6.65 0.75 0.06 7.46 $312,462.10
Metal Deck (roof) ft
2
22115.00 S.F. 6.05 0.71 0.06 6.82 $150,824.30
Shear Walls yd
3
82.80 8' ht. 123 50.5 11.25 184.75 $15,297.30
* Includes Placing, formwork, reinforcement, and concrete $733,739.22
Total Structural Cost: $1,533,664.10
2005 RS Means Costs for Greensboro, NC (Steel Braced Frame – Original Design)
Accessories # Unit Bare Mat. Bare Labor Bare Equip. Total $
Bolts 6580 Ea. 0.23 1.77 2 $13,160.00
Shear Studs 11500 Ea. 0.34 0.5 0.24 1.08 $12,420.00
$25,580.00
Mick Leso – Structural Option
2006 Penn State AE Senior Thesis
COST ANALYSIS 55
2005 RS Means Costs for Greensboro, NC (Steel Braced Frame – Original Design)
Members Type # L (ft) Unit Materials Labor Equipment Total $
10K1 Beam 1 10.00 L.F. 3.21 2.09 1.24 6.54 $65.40
12K1 Beam 6 87.89 L.F. 3.15 1.67 0.99 5.81 $510.66
14K1 Beam 1 20.00 L.F. 3.77 1.67 0.99 6.43 $128.60
28K8 Beam 21 840.00 L.F. 7.85 1.05 0.62 9.52 $7,996.80
30K7 Beam 3 127.50 L.F. 8.15 1.05 0.62 9.82 $1,252.05
30K9 Beam 21 892.50 L.F. 8.15 1.05 0.62 9.82 $8,764.35
HSS4X4X1/4 Beam 8 23.32 12' L.F. 127 27.5 23 177.5 $345.00
HSS8X8X1/4 Beam 65 916.09 14' L.F. 450 32 26.5 508.5 $33,273.54
W8X10 Beam 21 244.29 L.F. 8.5 2.68 2.2 13.38 $3,268.54
W8X15 Beam 1 10.00 L.F. 12.75 2.68 2.2 17.63 $176.30
W10X12 Beam 27 235.40 L.F. 10.2 2.68 2.2 15.08 $3,549.81
W10X22 Beam 14 118.84 L.F. 18.5 2.68 2.2 23.38 $2,778.46
W12X14 Beam 48 490.72 L.F. 11.9 1.82 1.51 15.23 $7,473.70
W12X19 Beam 7 93.00 L.F. 11.9 1.82 1.51 15.23 $1,416.39
W12X22 Beam 1 15.00 L.F. 18.5 1.82 1.51 21.83 $327.45
W12X65 Beam 1 24.57 L.F. 49.5 2.14 1.76 53.4 $1,311.82
W14X22 Beam 50 829.17 L.F. 22 1.62 1.34 24.96 $20,696.00
W14X34 Beam 62 632.50 L.F. 28.5 1.99 1.64 32.13 $20,322.23
W14X43 Beam 3 57.00 L.F. 36.5 1.99 1.64 40.13 $2,287.41
W14X90 Beam 6 212.00 L.F. 76 2.17 1.78 79.95 $16,949.40
W14X211 Beam 28 424.00 L.F. 102 2.23 1.83 106.06 $44,969.44
W16X26 Beam 13 211.15 L.F. 22 1.61 1.33 24.94 $5,266.18
W16X31 Beam 16 375.60 L.F. 26.5 1.78 1.47 29.75 $11,174.10
W18X35 Beam 1 30.00 L.F. 29.5 2.43 1.46 33.39 $1,001.70
W18X40 Beam 11 325.00 L.F. 34 2.43 1.46 37.89 $12,314.25
W21X44 Beam 172 5632.47 L.F. 37.5 2.19 1.32 41.01 $230,987.44
W21X50 Beam 20 455.00 L.F. 42.5 2.19 1.32 46.01 $20,934.55
W21X55 Beam 1 40.00 L.F. 42.5 2.19 1.32 46.01 $1,840.40
W21X57 Beam 1 40.75 L.F. 42.5 2.19 1.32 46.01 $1,874.91
W21X62 Beam 4 165.00 L.F. 52.5 2.25 1.36 56.11 $9,258.15
W21X73 Beam 1 42.50 L.F. 57.5 2.25 1.36 61.11 $2,597.18
W24X55 Beam 17 190.00 L.F. 46.5 2.1 1.27 49.87 $9,475.30
W24X62 Beam 3 100.00 L.F. 52.5 2.1 1.27 55.87 $5,587.00
W24X68 Beam 5 165.00 L.F. 57.5 2.1 1.27 60.87 $10,043.55
W24X76 Beam 16 480.00 L.F. 64.5 2.1 1.27 67.87 $32,577.60
W27X84 Beam 5 140.00 L.F. 71.5 1.96 1.18 74.64 $10,449.60
W30X99 Beam 1 30.00 L.F. 84 1.94 1.17 87.11 $2,613.30
W30X108 Beam 2 50.00 L.F. 91.5 1.94 1.17 94.61 $4,730.50
W33X118 Beam 3 105.00 L.F. 100 1.98 1.2 103.18 $10,833.90
HSS6X6X1/2 Brace 38 807.05 12' L.F. 208 30 24.5 262.5 $17,654.32
W14X43 Brace 43 764.87 L.F. 36.5 1.99 1.64 40.13 $30,694.11
W14X90 Brace 11 198.07 L.F. 76 2.17 1.78 79.95 $15,835.49
10" dia. PIPE Column 39 593.71 16' L.F. 675 33.5 27.5 736 $27,310.66
HSS8X8X1/4 Column 3 41.62 14' L.F. 450 32 26.5 508.5 $1,511.70
HSS8X8X1/2 Column 2 27.07 14' L.F. 450 32 26.5 508.5 $983.22
W8X24 Column 2 27.07 L.F. 26.5 1.49 1.23 29.22 $790.99
W8X40 Column 5 72.74 L.F. 26.5 1.49 1.23 29.22 $2,125.46
W8X48 Column 4 54.14 L.F. 40.5 1.56 1.28 43.34 $2,346.43
W10X33 Column 23 367.02 L.F. 38.5 1.56 1.28 41.34 $15,172.61
W10X49 Column 5 72.74 L.F. 38.5 1.56 1.28 41.34 $3,007.07
W12X53 Column 3 45.67 L.F. 42.5 1.56 1.28 45.34 $2,070.68
W12X65 Column 32 483.77 L.F. 42.5 1.56 1.28 45.34 $21,934.13
W12X96 Column 14 209.75 L.F. 73.5 1.63 1.35 76.48 $16,041.68
W14X43 Column 45 634.40 L.F. 62.5 1.63 1.35 65.48 $41,540.51
W14X132 Column 6 91.34 L.F. 149 1.76 1.45 152.21 $13,902.86
$774,344.88
Mick Leso – Structural Option
2006 Penn State AE Senior Thesis
COST ANALYSIS 56

More Related Content

Similar to 12 cost

American insert-flange-catalog
American insert-flange-catalogAmerican insert-flange-catalog
American insert-flange-catalogChiragShah127
 
AGE Price-English1
AGE Price-English1AGE Price-English1
AGE Price-English1mehran nouri
 
concrete filled steel tube structure.pptx
concrete filled steel tube structure.pptxconcrete filled steel tube structure.pptx
concrete filled steel tube structure.pptxURVESHKUMARPATEL1
 
V3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-propertiesV3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-propertiestecnidibujos
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentationKifayath Chowdhury
 
Mc cormick x6 t4i lwb (2014 ) - rp76 - x6.460 tractor service repair manual
Mc cormick x6 t4i lwb (2014  ) - rp76 - x6.460 tractor service repair manualMc cormick x6 t4i lwb (2014  ) - rp76 - x6.460 tractor service repair manual
Mc cormick x6 t4i lwb (2014 ) - rp76 - x6.460 tractor service repair manualfjskkesmdmm
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileZiad Salem
 
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)eisa chegini
 
ELEVATOR SLAB 28 NOV - SUB.pdf
ELEVATOR SLAB 28 NOV - SUB.pdfELEVATOR SLAB 28 NOV - SUB.pdf
ELEVATOR SLAB 28 NOV - SUB.pdfpatthan feroz khan
 
Pipe fitting . in forged fitting manufatuers, supplier, dealer in mumbai ,in...
Pipe fitting . in forged fitting manufatuers, supplier, dealer in  mumbai ,in...Pipe fitting . in forged fitting manufatuers, supplier, dealer in  mumbai ,in...
Pipe fitting . in forged fitting manufatuers, supplier, dealer in mumbai ,in...DivyaDarshanMetallic
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete PresentationJosue Campos
 
Design of a Gear Reducer for a Tractor
Design of a Gear Reducer for a TractorDesign of a Gear Reducer for a Tractor
Design of a Gear Reducer for a Tractorfodork6
 
Hss dimensions steeltubeinstitute
Hss dimensions steeltubeinstituteHss dimensions steeltubeinstitute
Hss dimensions steeltubeinstitutetecnidibujos
 
steel detailer
steel detailersteel detailer
steel detailerBahzad5
 
FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...
FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...
FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...Sadia Mitu
 

Similar to 12 cost (20)

American insert-flange-catalog
American insert-flange-catalogAmerican insert-flange-catalog
American insert-flange-catalog
 
Steel code book
Steel code bookSteel code book
Steel code book
 
AGE Price-English1
AGE Price-English1AGE Price-English1
AGE Price-English1
 
GP Report
GP ReportGP Report
GP Report
 
concrete filled steel tube structure.pptx
concrete filled steel tube structure.pptxconcrete filled steel tube structure.pptx
concrete filled steel tube structure.pptx
 
V3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-propertiesV3 astm-a1085 dimensions-section-properties
V3 astm-a1085 dimensions-section-properties
 
Lines Drawing
Lines DrawingLines Drawing
Lines Drawing
 
Ship design project Final presentation
Ship design project Final presentationShip design project Final presentation
Ship design project Final presentation
 
Mc cormick x6 t4i lwb (2014 ) - rp76 - x6.460 tractor service repair manual
Mc cormick x6 t4i lwb (2014  ) - rp76 - x6.460 tractor service repair manualMc cormick x6 t4i lwb (2014  ) - rp76 - x6.460 tractor service repair manual
Mc cormick x6 t4i lwb (2014 ) - rp76 - x6.460 tractor service repair manual
 
A_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good fileA_MukherjeePresn for engineers good file
A_MukherjeePresn for engineers good file
 
Pavement Standards
Pavement StandardsPavement Standards
Pavement Standards
 
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
Seun Sambath-ACI 318-05 Mathcad in Concrete Structures (2010)
 
ELEVATOR SLAB 28 NOV - SUB.pdf
ELEVATOR SLAB 28 NOV - SUB.pdfELEVATOR SLAB 28 NOV - SUB.pdf
ELEVATOR SLAB 28 NOV - SUB.pdf
 
Gltc OM facility Bid Tabulation
Gltc OM facility Bid TabulationGltc OM facility Bid Tabulation
Gltc OM facility Bid Tabulation
 
Pipe fitting . in forged fitting manufatuers, supplier, dealer in mumbai ,in...
Pipe fitting . in forged fitting manufatuers, supplier, dealer in  mumbai ,in...Pipe fitting . in forged fitting manufatuers, supplier, dealer in  mumbai ,in...
Pipe fitting . in forged fitting manufatuers, supplier, dealer in mumbai ,in...
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
Design of a Gear Reducer for a Tractor
Design of a Gear Reducer for a TractorDesign of a Gear Reducer for a Tractor
Design of a Gear Reducer for a Tractor
 
Hss dimensions steeltubeinstitute
Hss dimensions steeltubeinstituteHss dimensions steeltubeinstitute
Hss dimensions steeltubeinstitute
 
steel detailer
steel detailersteel detailer
steel detailer
 
FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...
FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...
FINITE ELEMENT MODELING, ANALYSIS AND VALIDATION OF THE FLEXURAL CAPACITY OF ...
 

More from Johneey Deep

Astm a325 & a490 bolts & nuts
Astm a325 & a490 bolts & nutsAstm a325 & a490 bolts & nuts
Astm a325 & a490 bolts & nutsJohneey Deep
 
Bolt length calculation tekla user assistance
Bolt length calculation   tekla user assistanceBolt length calculation   tekla user assistance
Bolt length calculation tekla user assistanceJohneey Deep
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacitiesJohneey Deep
 

More from Johneey Deep (6)

714
714714
714
 
Astm a325 & a490 bolts & nuts
Astm a325 & a490 bolts & nutsAstm a325 & a490 bolts & nuts
Astm a325 & a490 bolts & nuts
 
Bolt length calculation tekla user assistance
Bolt length calculation   tekla user assistanceBolt length calculation   tekla user assistance
Bolt length calculation tekla user assistance
 
Bolt and weld_capacities
Bolt and weld_capacitiesBolt and weld_capacities
Bolt and weld_capacities
 
2000v04 economy
2000v04 economy2000v04 economy
2000v04 economy
 
Aess guide
Aess guideAess guide
Aess guide
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 

12 cost

  • 1. Mick Leso – Structural Option 2006 Penn State AE Senior Thesis COST ANALYSIS AND SCHEDULING RESPONSES
  • 2. Mick Leso – Structural Option 2006 Penn State AE Senior Thesis COST ANALYSIS 53 A cost analysis for the concrete truss system attained from R.S. Means output data located in CostWorks, specified values for a location roughly about Greensboro, NC. The estimated results located in the following charts include the cost of the raw concrete, placing, reinforcement, and formwork required to build this structure. The total lengths of each member, out of ETABS, were utilized to calculate to the cubic yardage of concrete. 2005 Costs for Greensboro, NC RS Means (Concrete Truss) Members Type # CY L (ft) Unit Materials Labor Equipment Total $ 10"x12" Beam Beam 146 1238.80 40137.03 C.Y. 205 176 40 448 $554,981.16 12"x16" Beam Beam 137 2509.63 50820.00 C.Y. 205 176 40 448 $1,124,314.07 24"x24" Beam Beam 24 1130.67 7632.00 C.Y. 205 176 40 448 $506,538.67 12"x12" Column Brace 4 29.92 807.82 C.Y. 205 176 40 448 $13,403.88 24"x40" Truss Brace 18 2851.71 11549.44 C.Y. 205 176 40 448 $1,277,567.46 12"x12" Column Column 109 734.48 19831.08 C.Y. 435 320 72 854 $627,249.72 16" Circ. Col. Column 12 2040.33 2192.16 C.Y. 127 27.5 23 201 $410,106.86 30"x36" Column Column 6 304.47 1096.08 C.Y. 490 183 41 726 $221,042.80 $4,735,204.61 2005 Costs for Greensboro, NC RS Means (Concrete Truss) Area Sections Volume Unit Materials Labor Equipment Total $ Concrete Slabs 1612.00 C.Y. 183 134 37 354 $570,648.00 Shear Walls 96.21 8' ht. 123 50.5 11.25 184.75 $17,774.80 * Includes Placing, formwork, reinforcement, and concrete $588,422.80 Total Structural Cost: $5,323,627 The results show a structural cost in excess of $5,000,000; a large quantity for a building originally estimated at $14,000,000. A rough, square-footage approximation showed the concrete system to have a total cost of $15,854,430, 33.6% of which is structural. For comparison, the original steel frame’s estimated cost was obtained using R.S. Means values also. It indicates a total structural price of over $1.5 million, roughly 11% of the total building cost. Ten percent is a reasonable overall value for a structural system in a mixed use, institutional building located on a college campus. The concrete truss structure would increase the price of the superstructure 350%, and ultimately make construction time longer. With concrete, all the prep-work must be completed before the raw mixture can be delivered to the site. This entails setting up formwork and laying out reinforcement for all the members that will be poured throughout the day; which is extremely significant over the length of the cantilever, where excessive formwork, temporary bracing, a mass of reinforcement bars, and numerous safety precautions lead to slowed construction time. The R.S. Means data was assumed for maximum reinforcing in the north building, since two 24”x24” girders, two 24”x40” braces, one 10”x12” beam, and 30”x36” columns from above and below, all meeting at one
  • 3. Mick Leso – Structural Option 2006 Penn State AE Senior Thesis COST ANALYSIS 54 splice location. To counteract that, formwork was assumed to be reused four times. Since the preassembled steel frame members can be delivered by flatbed and fastened using bolted shear connections, the principal steel structure can be erected very quickly. The major issue in the steel frame would be welding; with shear studs to be attached with metal decking to beams, the moment connections in the south building, and any remaining brace members that require weld connections. Structural $1,533,664 Non-Structural $12,466,336 Structural $5,323,627 Non-Structural $10,530,803 $0 $2 $4 $6 $8 $10 $12 $14 $16 $inmillions Steel Concrete Structural Cost per Total Cost 2005 RS Means Costs for Greensboro, NC (Steel Braced Frame – Original Design) Area Section Units Area/Volume Unit Materials Labor Equipment Total $ Concrete Slabs yd 3 797.36 C.Y. 163 123 34 320 $255,155.52 Metal Deck (flrs) ft 2 41885.00 S.F. 6.65 0.75 0.06 7.46 $312,462.10 Metal Deck (roof) ft 2 22115.00 S.F. 6.05 0.71 0.06 6.82 $150,824.30 Shear Walls yd 3 82.80 8' ht. 123 50.5 11.25 184.75 $15,297.30 * Includes Placing, formwork, reinforcement, and concrete $733,739.22 Total Structural Cost: $1,533,664.10 2005 RS Means Costs for Greensboro, NC (Steel Braced Frame – Original Design) Accessories # Unit Bare Mat. Bare Labor Bare Equip. Total $ Bolts 6580 Ea. 0.23 1.77 2 $13,160.00 Shear Studs 11500 Ea. 0.34 0.5 0.24 1.08 $12,420.00 $25,580.00
  • 4. Mick Leso – Structural Option 2006 Penn State AE Senior Thesis COST ANALYSIS 55 2005 RS Means Costs for Greensboro, NC (Steel Braced Frame – Original Design) Members Type # L (ft) Unit Materials Labor Equipment Total $ 10K1 Beam 1 10.00 L.F. 3.21 2.09 1.24 6.54 $65.40 12K1 Beam 6 87.89 L.F. 3.15 1.67 0.99 5.81 $510.66 14K1 Beam 1 20.00 L.F. 3.77 1.67 0.99 6.43 $128.60 28K8 Beam 21 840.00 L.F. 7.85 1.05 0.62 9.52 $7,996.80 30K7 Beam 3 127.50 L.F. 8.15 1.05 0.62 9.82 $1,252.05 30K9 Beam 21 892.50 L.F. 8.15 1.05 0.62 9.82 $8,764.35 HSS4X4X1/4 Beam 8 23.32 12' L.F. 127 27.5 23 177.5 $345.00 HSS8X8X1/4 Beam 65 916.09 14' L.F. 450 32 26.5 508.5 $33,273.54 W8X10 Beam 21 244.29 L.F. 8.5 2.68 2.2 13.38 $3,268.54 W8X15 Beam 1 10.00 L.F. 12.75 2.68 2.2 17.63 $176.30 W10X12 Beam 27 235.40 L.F. 10.2 2.68 2.2 15.08 $3,549.81 W10X22 Beam 14 118.84 L.F. 18.5 2.68 2.2 23.38 $2,778.46 W12X14 Beam 48 490.72 L.F. 11.9 1.82 1.51 15.23 $7,473.70 W12X19 Beam 7 93.00 L.F. 11.9 1.82 1.51 15.23 $1,416.39 W12X22 Beam 1 15.00 L.F. 18.5 1.82 1.51 21.83 $327.45 W12X65 Beam 1 24.57 L.F. 49.5 2.14 1.76 53.4 $1,311.82 W14X22 Beam 50 829.17 L.F. 22 1.62 1.34 24.96 $20,696.00 W14X34 Beam 62 632.50 L.F. 28.5 1.99 1.64 32.13 $20,322.23 W14X43 Beam 3 57.00 L.F. 36.5 1.99 1.64 40.13 $2,287.41 W14X90 Beam 6 212.00 L.F. 76 2.17 1.78 79.95 $16,949.40 W14X211 Beam 28 424.00 L.F. 102 2.23 1.83 106.06 $44,969.44 W16X26 Beam 13 211.15 L.F. 22 1.61 1.33 24.94 $5,266.18 W16X31 Beam 16 375.60 L.F. 26.5 1.78 1.47 29.75 $11,174.10 W18X35 Beam 1 30.00 L.F. 29.5 2.43 1.46 33.39 $1,001.70 W18X40 Beam 11 325.00 L.F. 34 2.43 1.46 37.89 $12,314.25 W21X44 Beam 172 5632.47 L.F. 37.5 2.19 1.32 41.01 $230,987.44 W21X50 Beam 20 455.00 L.F. 42.5 2.19 1.32 46.01 $20,934.55 W21X55 Beam 1 40.00 L.F. 42.5 2.19 1.32 46.01 $1,840.40 W21X57 Beam 1 40.75 L.F. 42.5 2.19 1.32 46.01 $1,874.91 W21X62 Beam 4 165.00 L.F. 52.5 2.25 1.36 56.11 $9,258.15 W21X73 Beam 1 42.50 L.F. 57.5 2.25 1.36 61.11 $2,597.18 W24X55 Beam 17 190.00 L.F. 46.5 2.1 1.27 49.87 $9,475.30 W24X62 Beam 3 100.00 L.F. 52.5 2.1 1.27 55.87 $5,587.00 W24X68 Beam 5 165.00 L.F. 57.5 2.1 1.27 60.87 $10,043.55 W24X76 Beam 16 480.00 L.F. 64.5 2.1 1.27 67.87 $32,577.60 W27X84 Beam 5 140.00 L.F. 71.5 1.96 1.18 74.64 $10,449.60 W30X99 Beam 1 30.00 L.F. 84 1.94 1.17 87.11 $2,613.30 W30X108 Beam 2 50.00 L.F. 91.5 1.94 1.17 94.61 $4,730.50 W33X118 Beam 3 105.00 L.F. 100 1.98 1.2 103.18 $10,833.90 HSS6X6X1/2 Brace 38 807.05 12' L.F. 208 30 24.5 262.5 $17,654.32 W14X43 Brace 43 764.87 L.F. 36.5 1.99 1.64 40.13 $30,694.11 W14X90 Brace 11 198.07 L.F. 76 2.17 1.78 79.95 $15,835.49 10" dia. PIPE Column 39 593.71 16' L.F. 675 33.5 27.5 736 $27,310.66 HSS8X8X1/4 Column 3 41.62 14' L.F. 450 32 26.5 508.5 $1,511.70 HSS8X8X1/2 Column 2 27.07 14' L.F. 450 32 26.5 508.5 $983.22 W8X24 Column 2 27.07 L.F. 26.5 1.49 1.23 29.22 $790.99 W8X40 Column 5 72.74 L.F. 26.5 1.49 1.23 29.22 $2,125.46 W8X48 Column 4 54.14 L.F. 40.5 1.56 1.28 43.34 $2,346.43 W10X33 Column 23 367.02 L.F. 38.5 1.56 1.28 41.34 $15,172.61 W10X49 Column 5 72.74 L.F. 38.5 1.56 1.28 41.34 $3,007.07 W12X53 Column 3 45.67 L.F. 42.5 1.56 1.28 45.34 $2,070.68 W12X65 Column 32 483.77 L.F. 42.5 1.56 1.28 45.34 $21,934.13 W12X96 Column 14 209.75 L.F. 73.5 1.63 1.35 76.48 $16,041.68 W14X43 Column 45 634.40 L.F. 62.5 1.63 1.35 65.48 $41,540.51 W14X132 Column 6 91.34 L.F. 149 1.76 1.45 152.21 $13,902.86 $774,344.88
  • 5. Mick Leso – Structural Option 2006 Penn State AE Senior Thesis COST ANALYSIS 56