1. Eskom Holdings SOC Ltd Reg No 2002/01527/06
Dear Allister
APPOINTMENT AS SHIFT COACH AND FINAL ASSESSMENT PANEL
MEMBER FOR NQF LEVEL 4
It is a pleasure to inform you that you have been appointed as a Coach and a
Final Assessment Panel member for Gourikwa Power Station.
The appointment is in line with the requirements and responsibilities listed in the
Generation Operator Assessment, Authorisation and Moderation Procedure
240-46314619 Clause 3.1.2.1
Your appointment is for the qualifications listed below.
The specific areas are stipulated in the Specialization Profile Training Matrix for Peaking
Power Stations.
Gourikwa Power Station Area of Specialization
Coach (Individual
Learning Facilitator)
Assessment
Panel Member
Electrical Network Control NQF 4
Yours sincerely
Chris Barnard
--------------------------------------
OPERATION & MAINTENANCE MANAGER GOURIKWA POWER STATION
Accepted: _______________________________ ___________________________
Allister Buys Date
Peaking Generation
Rosenpark 15 Pasita Street Bellville Po Box 3487 Tygervalley 7536 SA
Tel +27 21 941 5808 Fax +27 21 914 3131 www.eskom.co.za
Mr. Allister Buys Date:
Controller Technical 22 September 2015
Gourikwa Power Station
N2 Highway (Next to Petro SA) Enquiries:
Mosselbay Leon Viljoen
6510 Tel +27 44 6063400