This document outlines important documents and procedures for a survey, including an intimation letter to distribute, a meter change report (MCR) to fill out completely and have consumers sign, and procedures for providing an earth leakage (EL) notice if an EL issue is detected during a meter installation or site visit. The MCR must be neat, have all data filled in without overwriting or cutting, and include the contractor's stamp. An EL notice gives consumers 7 days to address any EL issues found before further action.