Riordan manufacturing is virtual company and in this case is used for purposes of demonstrations.Riordan is a manufacturing business.
The brief
The brief is to design a database system which will be used to coordinate and manage the main operations of Riordan manufacturer. In addition to managing all customer relationships, management reports will also be allowed to be reported .The main data will be managed by Microsoftspreads sheets as well as paper-based work.
Main issues of the current system
· Aspread sheet can be accessed by only one person at a time for editing. A system is needed where multiple users can edit and access theinformation at once.
· The current system does not have a security of data.
· There is a duplication of data in multiple systems and this leads to a lot of mistakes being made as well as giving a lot of work.
· The reports which are produced by the current system are not meaningful.
Solution
My system is a window based system of information management which uses.NET and SQL. For multi-user applications, these technologies are the most applicable (Dyanna Gregory, 2014); the system will provide the needs, security and an application which is easy to use
The key issues will be addresses as follows:
The database which is relational willensure access of the system by multiple users who can access the need records simultaneously. However same people will not be allowed to edit same document simultaneously.This will be enabled by a locking functionality which will ensure that only one person will edit the record while others can access other documents .
The system will integrate a windows authentication system to ensure security by means of private log-ins. This will ensure security. All paper based and the spread sheet systems will be integrated into a single system to ensure secure storage of the data. The accuracy of the data will be ensured through forms data entry validation.
Investment and cost
The cost and total investment required in this report will be a fixed cost of $10000+VAT based on the following development stages.
Approval……………………………………………………….…..$1500+VAT
ALPHA-1 version delivery………………………………………..…$3000+VAT
ALPHA-2 version delivery…………………………………………..$3000+VAT
BETA-version delivery………………………………………………$1500+VAT
Project completion……………………………………………..…….$1000+VAT
Software
The windows 2007 will be adequate and sufficient to provide a platform which will run the database. Since SQL server is usually installed on this, there will not be any additional investment required. A dedicated server will also be required so as to provide an optimum performance although this may be considered sometimes later as the project develops.
Hardware
The hardware requirement will constitute of severs, computers and the.
A Critique of the Proposed National Education Policy Reform
Running Head System Proposal .docx
1. Running Head: System Proposal
1
2
System Proposal
System proposal
Your name
University
System Proposal
Client
Riordan manufacturing is virtual company and in this case is
used for purposes of demonstrations.Riordan is a manufacturing
business.
The brief
The brief is to design a database system which will be used to
coordinate and manage the main operations of Riordan
manufacturer. In addition to managing all customer
relationships, management reports will also be allowed to be
2. reported .The main data will be managed by Microsoftspreads
sheets as well as paper-based work.
Main issues of the current system
· Aspread sheet can be accessed by only one person at a time for
editing. A system is needed where multiple users can edit and
access theinformation at once.
· The current system does not have a security of data.
· There is a duplication of data in multiple systems and this
leads to a lot of mistakes being made as well as giving a lot of
work.
· The reports which are produced by the current system are not
meaningful.
Solution
My system is a window based system of information
management which uses.NET and SQL. For multi-user
applications, these technologies are the most applicable
(Dyanna Gregory, 2014); the system will provide the needs,
security and an application which is easy to use
The key issues will be addresses as follows:
The database which is relational willensure access of the system
by multiple users who can access the need records
simultaneously. However same people will not be allowed to
edit same document simultaneously.This will be enabled by a
locking functionality which will ensure that only one person
will edit the record while others can access other documents .
3. The system will integrate a windows authentication system to
ensure security by means of private log-ins. This will ensure
security. All paper based and the spread sheet systems will be
integrated into a single system to ensure secure storage of the
data. The accuracy of the data will be ensured through forms
data entry validation.
Investment and cost
The cost and total investment required in this report will be a
fixed cost of $10000+VAT based on the following development
stages.
Approval……………………………………………………….…..$1
500+VAT
ALPHA-1 version
delivery………………………………………..…$3000+VAT
ALPHA-2 version
delivery…………………………………………..$3000+VAT
BETA-version
delivery………………………………………………$1500+VAT
Project
completion……………………………………………..…….$1000+
VAT
Software
The windows 2007 will be adequate and sufficient to provide a
platform which will run the database. Since SQL server is
usually installed on this, there will not be any additional
4. investment required. A dedicated server will also be required so
as to provide an optimum performance although this may be
considered sometimes later as the project develops.
Hardware
The hardware requirement will constitute of severs, computers
and the required peripherals and backup power systems.
Support
A support of 3 months will be provided but the company will
have an option of signing a lifetime development and
maintenance of the system. This will ensure a number of
benefits as well as response times which will be guaranteed.
The support contract will impose an additional cost of $200
+VAT per month.
Duration
The design,drawing, testing,development and approval are
estimated to take I5 weeks. However this will be based on the
client response and cooperation .This is also based on the
assumption that all the features of your requirements have been
presented to us. Any additional features presented at later time
will lead to additional project delay.
System functionality
Users
The system will allow a maximum of 15 users with 7 users
being allowed to edit and access data at the same time.However
this will be based on the assumption that all the users are IT
5. literate.
Access
A local area network will be used to allow the users to access
the system. For a shared data base application, the best
infrastructure will be a client-server-modelChristos
(Kalloniatis,1012). A VPN connection will run the system
happily although it may operate slowly based on VPN speed.
The system administrators will be able to handle all the data
while the supervisors will be only required to do editing, adding
and deleting data only. The end users will only be given a read
only access to some areas which will be specified.
Security
Windows authentication will handle the security matters of the
system. Windows log in will be used to authenticate the users.
Data entry and storage
Data normalization of the proposed system will be based on the
standards of the industry to ensure the most efficient storage of
data.
Volume
The system is anticipated to add 300-400 daily records. The
technologies which were proposed will ensure that this volume
is met on daily bases.
Configuration and installation
A routine based on windows installer will have to be built so as
enable the installation of the application and files support on
6. the personal computers of the clients. This will be possible to
be run based on a simple installation wizard.
Testing
Appropriate strategies of testing will be employed in all the
systems areas and peripherals. Testing sheets will have to be
created for personal testing and debugging procedures.
References
Christos Kalloniatis, 2012, Modern Information Systems, 3rd
Edition. New York.
7. Trina Chiasson, Dyanna Gregory, 2014, Data+Design,
Infoactive, 1st Edition.
Professional Resource List Assignment
Start your Professional Resource List Assignment by creating a
document with three columns.
In the first column, state the title of the link, in the second
column state the url of the link, and in the third column
describe what you can find at that website and why this
information is important.
See the example below: .
Title
Link
Description
Centers for Medicare and Medicaid
www.CMS.GOV
Government website with material used in billing and managing
Medicare and Medicaid programs. This information reflects the
most current information for Medicare and Medicaid programs.
Note: You have done Part A of this assignment previously.
Now, I need you to do only Part B. Please make sure you
properly address the provided instructions in the attached file.
Your work must be 100% original. I also attached here the
8. solution of Part A for your assistance.
IT paper
Part A:New System Proposal
Present a new system proposal for the Riordan manufacturing
organization. Riordan is a virtual organization. Write a paper of
minimum 2 pages that includes the following:
1. A full description of the new Information Technology (IT)
system that you will propose to the Riordan organization during
Week Nine of the course - Make sure that the four primary
functions of an IT system are evident in the system that you
propose.
2. A list of the system's components (software applications,
networks, hardware, internet-based technologies, databases) that
your system will include.
3. A discussion of business requirements driving the need for
the system - include a discussion of information used in
Riordan's current system and the problems that exist with
information flow.
Submit your assignment as a Word Document. Make sure to put
headings for topics provided in each bulleted point. Your paper
should follow APA format and be 100% original.
Part B:Flow Diagram and Business Process
Continue working on your Information Technology system
proposal; Write a paper of minimum 2 pages that includes the
following elements in a Word Document:
9. 1. An information flow diagram and any control elements
needed to ensure proper access to information for your proposed
system
2. A description of proposed business process changes for the
system along with flow diagrams
Submit your assignment as a Word Document. Make sure to put
headings for topics provided in each bulleted point. Your paper
should follow APA format and be 100% original.