SlideShare a Scribd company logo
1 of 22
Download to read offline
OPS 571 Final Exam Guide (April, 2019)
FOR MORE CLASSES VISIT
www.ops571genius.com
In Hau Lee's uncertainty framework classify supply chains, a supply
chain for functional products with a stable supply process is called
which of the following? Responsive Agile Efficient Risk hedging
Forward looking If annual demand is 12,000 units, annual holding cost
is $15 per unit, and setup cost per order is $25, which of the following is
the EOQ lot size? 1,000 1,200 200 300 2,000 Matching the production
rate the order rate by hiring and laying off employees as the order rate
varies is which of the following pure production planning strategies?
Minimizing inven ry Stable workforce, variable work hours Level Chase
Meeting demand Given a prior forecast demand value of 1,100, a related
actual demand value of 1,000, and a smoothing constant alpha of 0.3,
what is the exponential smoothing forecast value rev:
04_28_2014_QC_48598 1,130 970 1,000 1,070 1,030 Which of the
following is not a problem definition ol from the operations consulting
ol kit? Five forces model Gap analysis Cus mer surveys Issue trees
Computer simulation A company must perform a maintenance project
consisting of seven activities. The activities, their predecessors, and their
respective time estimates are presented here: Using CPM, what is the
latest finish time for the last activity in this project (i.e., the tal time
complete the project)? 12 days 11 days 10 days 13 days 9 days An
activity where the parts that go in each unit of a product are periodically
removed from inven ry and accounted for based on the number of units
produced is called which of the following? Frozen window Kanban
Backflush Level schedule Group technology According the theory of
constraints, which of the following is a kind of time that makes up the
cycle time in production? Quality time Research time Break time Just-
in-time Idle time Which of the following is a priority rule used
schedule the sequence of jobs in a production operation? Parts on hand
first First on hand first Last-come, first-served Longest slack time first
Last complaint first Using the fixed-order-quantity model, which of the
following is the tal ordering cost of inven ry given an annual demand of
36,000 units, a cost per order of $80, and a holding cost per unit per year
of $4? $2,267 $849 $1,200 $1,889 $2,400 Which of the following is a
perpetual system for inven ry management? The wheel of inven ry First-
in-first-out Fixed-time period P model Fixed-order quantity Which of
the following address elimination of waste under lean production?
Outsourced housekeeping Backflush Quality at the source Bot m-round
management Info-matic warehouse networks Which of the following is a
reason that there are disparities between a firm's learning curve rate and
that of its industry? Learning curves don't reflect organizational learning.
There may be procedural differences in the manner that different firms
collect and report data. Companies don't always report sensitive data
outside agencies accurately. The starting points for different firms were
different. The cumulative number of units produced is different. For
which of the following should we use an X-bar chart based on sample
means moni r process quality? Grades in a freshman "pass/fail" course
Number of units with missing operations Tire pressures in an au
assembly plant Vehicles passing emissions inspection Computer
software errors Which of the following are the three major components
of a queuing system? rev: 02_17_2017_QC_CS-79354 The number of
cus mers the system serves, the number of steps in the service system,
and how quickly cus mers exit the system The number of servers, the
service speed, and the waiting line The number of cus mers and how
they arrive, how cus mers exit the system, and the service system The
service speed, the queue discipline, and the waiting line The source
population, how cus mers exit the system, and the queuing discipline
Which of the following basic types of process structures is one in which
equipment or work processes are arranged according the progressive
steps by which the product is made? Assembly line Continuous process
Work center Project Manufacturing cell Which of the following is one of
the three contrasting approaches delivering on-site service? Production-
line approach Quality approach Professional approach S ck market
approach Retail approach Which of the following is a measure of
operations and supply management efficiency used by Wall Street?
Current ratio Receivable turnover Financial leverage Earnings per share
growth Dividend payout ratio When a company seeks match the
benefits of a successful position while maintaining its existing position
in offering cus mers a variety of differing services, what is this process
called? Inter-functional analysis Order qualifying Order winning
Straddling Operations capability analysis Which of the following is a tal
measure of productivity? Output/(Labor + Capital + Energy)
Output/Labor All of these Output/Materials Output/Inputs In the service-
system design matrix, a face- -face tal cus mization service encounter is
expected have which of the following? Low degree of cus mer/server
contact None of these Low production efficiency High production
efficiency Low sales opportunity We would expect see in a
manufacturing cell layout which of the following? None of these Long
production setup times Large teams who collectively do a small part of a
finished product A small team of workers who turn out complete units of
work More in-process inven ry Which of the following is a major fac r
that distinguishes service design and development from manufacturing
design and development? Capacity decisions are much more critical in
manufacturing operations. Manufacturing is far more capital intensive
than services. The service process and service product can be developed
independently. The service package has the same legal protection
available manufactured goods. The service package is the major output
of the development process. The cus mer order decoupling point
determines the position of what in the supply chain? Orders
Transportation facilities Inven ry Cus mers Manufacturing facilities
Machine breakdown and repair in a 12-machine fac ry having one repair
mechanic would develop which type of queuing system line structure
concerning machine breakdowns? Single channel, single phase None of
these Multichannel, single phase Single channel, multiphase
Multichannel, multiphase Assume the service rate for a queue in a truck-
loading operation is 2 trucks per hour. Using the infinite queuing notion
for the models presented in the textbook, which of the following is the
average service time? 0.25 hour 0.5 hour 2 hours 1 hour None of these
An assumption of learning curve theory is which of the following? Unit
time will decrease at a decreasing rate. Unit time will hold constant. Unit
time will increase at an increasing rate. Unit time will increase at a
decreasing rate. Unit time will decrease at an increasing rate. The unit
improvement fac r for a 60 percent learning curve at 25 units is 0.0933.
The first and second timings of a person doing a job are 5 minutes and 3
minutes respectively. Which of the following is the learning-adjusted
time estimate for unit number 25? 0.0933 minute 9.33 minutes 3 minutes
4.665 minutes 0.4665 minute For which of the following should we use
a p-chart moni r process quality? Letter grades on a final examination
Temperature of entrees in a restaurant Weight errors in cans of soup
Errors in the length of a pencil Defective electrical switches You have
been called in as a consultant set up a Kanban control system. The first
thing do is determine the number of Kanban card sets needed. Your
research shows that the expected demand during lead time for a
particular component is 150 per hour. You estimate the safety s ck
should be set at 25 percent of the demand during lead time. The te trays
used as containers can hold 8 units of s ck, and the lead time it takes
replenish an order is 2 hours. Which of the following is the number of
Kanban card sets necessary support this situation? 94 68 42 47 89
Which of the following is a fixed-order-quantity inven ry model? P
model Periodic replenishment model The ABC model Economic order
quantity model Cycle counting model Using the fixed-order-quantity
model, which of the following is the tal ordering cost of inven ry given
an annual demand of 36,000 units, a cost per order of $80, and a holding
cost per unit per year of $4? $1,889 $2,267 $849 $2,400 $1,200 Assume
there are five jobs (i.e., A, B, C, D, and E) that need be sequenced in a
production schedule. The remaining operating time necessary for
completion of job A is 4 days (i.e., job A will take 4 more days
complete), B will take 7 days, C will take 8 days, D will take 2 days, and
E will take 5 days. Which job should be scheduled first if you use the
SOT priority rule for job sequencing? E B C D A Which of the
following is a "focusing step" of Dr. Eli Goldratt's theory of constraints?
Reinforce system constraints. If you have no system constraints, make
some. Identify system constraints. Reduce system constraints. Support
system constraints In implementing a lean production system you should
work with suppliers do which of the following? Make frequent
deliveries. Calculate lead times. Achieve bot m-round management.
Freeze windows. Use quality circles. For an activity in a CPM analysis,
the early finish time is 20 and the late finish time is 20. Which of the
following statements is true? The slack for this activity is 20. The
activity's late start must happen before its early start. The activity is on
the critical path. The duration of this task is 20. The duration of this task
is zero. You have been placed in charge of a large project. Shortened
communication lines are required ensure quick resolution of problems
as they arise. You recognize that the project is going take a lot of time
and require a lot of team pride, motivation, and commitment by all
members. Which project management structure should you use in this
situation? Pure project PERT Task force Functional project Matrix
project Which of the following is not a principle of reengineering?
Capture information many times, at the source and where it is
interpreted. Treat geographically dispersed resources as though they
were centralized. Merge information processing work in the work that
produces the information. Link parallel activities instead of integrating
their results. Organize around outcomes not tasks. Which of the
following forecasting methodologies is considered a qualitative
forecasting technique? Simple moving average Market research
Exponential smoothing Linear regression Multiple regression A
company wants generate a forecast for unit demand for year 2014 using
exponential smoothing. The actual demand in year 2013 was 120. The
forecast demand in year 2013 was 110. Using these data and a
smoothing constant alpha of 0.1, which of the following is the resulting
year 2014 forecast value? 111 100 114 120 110 Maintaining a stable
workforce working at a constant output rate while shortages and
surpluses are absorbed by fluctuating inven ry levels, order backlogs,
and allowing lost sales is which of the following production planning
strategies? Full employment Stable workforce, variable work hours Skill
maintenance Level Chase What are two of the main objectives of ERP?
Transaction processing and logistic optimizing Resource tracking and
master schedule planning Product tracking and cus mer invoicing
Transaction processing and decision support If the best operating level
of a piece of equipment is at a rate of 400 units per hour and the actual
output during an hour is 300 units, which of the following is the capacity
cushion? 133 percent 25 percent 100 units per hour 125 percent 75
percent Under the lot-for-lot (L4L) lot sizing technique as used in MRP,
we would expect which of the following? A consistent lag of supply
behind demand Minimized carrying costs Minimized setup costs
Minimized quality problems A just-in-time management philosophy A
product tree can do which of the following? Help compute component
usage. Reduce product scrap. Reduce regular time labor. Locate raw
material supplies. Reduce labor overtime. Very few products are moved
without at least part of their journey being by which mode of
transportation? Rail Highway Pipeline Water Air In Hau Lee's
uncertainty framework classify supply chains, a supply chain for
innovative products with an evolving supply process is called which of
the following? Responsive Efficient Agile Risk hedging Forward
looking 1. Which of the following is a measure of operations and supply
management efficiency used by Wall Street? Dividend payout ratio
Receivable turnover Current ratio Financial leverage Earnings per share
growth 2. An activity-system map is which of the following? A diagram
that shows how a company's strategy is delivered cus mers A timeline
displaying major planned events A network guide route airlines A
facility layout schematic noting what is done where A listing of
activities that make up a project 3. Which of the following is a tal
measure of productivity? Output/Materials Output/Labor Output/(Labor
+ Capital + Energy) All of these Output/Inputs 4. Which of the
following approaches service design is characterized by having the cus
mer take a greater role in the production of the service? Quality
approach Self-service approach Production-line approach Do-it-yourself
approach Personal-attention approach 5. Which of the following basic
types of production layout formats is one that has similar equipment or
functions are grouped gether? Workcenter layout Production line layout
Group technology layout Manufacturing cell layout Assembly line
layout 6. Which of the following is a characteristic that can be used
guide the design of service systems? Services are all similar. Services
cannot be inven ried. Services businesses are inherently entrepreneurial.
Even service businesses have internal services. Quality work means
quality service. 7. An advantage of a make- -s ck process is which of the
following? All units of output are unique. It features rapid delivery of a
standard product. It combines the best features of other processes. It
responds directly cus mer orders. It allows the firm avoid inven ry
costs. 8. Getting an au graph from a famous person might involve
standing in which type of queuing line structure? Single channel, single
phase None of these Single channel, multiphase Multichannel,
multiphase Multichannel, single phase 9. For an infinite queuing
situation, if the arrival rate for loading trucks is 5 trucks per hour, what
is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour
None of these 10. An assumption of learning curve theory is which of
the following? Organizational learning is not included in learning
theory. The time required do a task will vary randomly each time the
task is repeated. Unit time will decrease at an increasing rate. Learning
will not be transferred from one worker the next. The reduction in unit
time will follow a predictable pattern. 11. A company's production
process has an 80 percent learning curve rate. The process has produced
1,000 units date. A process refinement is estimated allow a future
learning curve rate for the identical product of 75 percent. However, the
initial unit made using the new process will take the same amount of
time as the initial unit produced using the old process. At what point,
using the new process, will the production rate exceed the production
rate achieved by the old process? Before the 100th unit Before the 120th
unit Before the 80th unit Before the 50th unit Before the 250th unit 12.
For which of the following should we use a p-chart moni r process
quality? Grades in a freshman "pass/fail" course Temperatures in a
classroom The dimensions of brick entering a kiln The weight of fluid in
a container Lengths of boards cut in a mill 13. You have been called in
as a consultant set up a Kanban control system. The first thing do is
determine the number of Kanban card sets needed. Your research shows
that the expected demand during lead time for a particular component is
150 per hour. You estimate the safety s ck should be set at 25 percent of
the demand during lead time. The te trays used as containers can hold 8
units of s ck, and the lead time it takes replenish an order is 2 hours.
Which of the following is the number of Kanban card sets necessary
support this situation? 42 68 89 47 94 14. Which of the following is a
fixed-time-period inven ry model? Just-in-time model The EOQ model
Periodic system model The Q model The least cost method 15. A
company is planning for its financing needs and uses the basic fixed-
order-quantity inven ry model. Which of the following is the tal cost
(TC) of the inven ry given an annual demand of 10,000, setup cost of
$32, a holding cost per unit per year of $4, an EOQ of 400 units, and a
cost per unit of inven ry of $150? None of these $1,501,600 $1,498,200
$499,313 $500,687 A.$1,501,600 Q = 400. Average Inven ry = Q/2 =
200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual
set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit =
10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 =
$1,501,600. 16. Which of the following is a principle of work center
scheduling? Reschedule every day. Once started, a job can and should be
finished even if unavoidably interrupted. Assign the first worker all of
the days that require staffing. Achieve certainty in standards and
routings. Give work centers less do then their maximum. 17. Which of
the following is a "focusing step" of Dr. Eli Goldratt's theory of
constraints? Identify system constraints. Support system constraints. If
you have no system constraints, make some. Reduce system constraints.
Reinforce system constraints. 18. In designing a lean production facility
layout, a designer should do which of the following? Locate flexible
workstations offline. Balance capacity using job shop analysis. Design
for work flow balance. Always keep operations on a single floor of the
fac ry. Link operations through a push system. 19. A simple project
listing of five activities and their respective time estimates are presented
here: Using CPM, which activities make up the critical path? None of
these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must
perform a maintenance project consisting of seven activities. The
activities, their predecessors, and their respective time estimates are
presented here: Using CPM, which activities make up the critical path?
A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21.
Which of the following is not a problem definition ol from the
operations consulting ol kit? Issue trees Five forces model Computer
simulation Cus mer surveys Gap analysis 22. Which of the following is
not one of the basic types of forecasting? Simulation Causal
relationships Qualitative Time series analysis Force field analysis 23. A
company has actual unit demand for three consecutive years of 124, 126,
and 135. The respective forecasts for the same three years are 120, 120,
and 130. Which of the following is the resulting MAD value that can be
computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) +
(126 - 120) + (135 - 130)]/3 = 15/3 = 5. 24. From an operational
perspective, yield management is most effective under which of the
following circumstances? Inven ry is perishable. The firm doing yield
management is very profitable. Demand cannot be segmented by cus
mer. Fixed costs are low, and variable costs are high. The cus mer is a
"captive" of the system. 25. What is transaction processing? The
decision support system used efficiently handle multiple transactions
The movement of paperwork through a system using a decision tree The
scheduling of machinery minimize time and scrap The posting and
tracking of the detailed activities of a business 26. If the actual output of
a piece of equipment during an hour is 500 units and its best operating
level is at a rate of 400 units per hour, which of the following is the
capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the
following is an input the master production schedule (MPS)? Planned
order schedules The bill of materials The aggregate plan The exception
report Inven ry records file 28. Which of the following is considered a
primary report in an MRP system? Cycle counting reports Performance
reports Planned order schedules Planning reports Exception reports 29.
The centroid method for plant location uses which of the following data?
Probabilities and payoffs Correlation matrix of existing facilities
Volume of goods be shipped between existing points Inbound
transportation costs Transport times between facilities 30. In Hau Lee's
uncertainty framework classify supply chains, a supply chain for
functional products with an evolving supply process is called which of
the following? Responsive Forward looking Efficient Risk hedging
Agile
==============================================
OPS 571 Final Exam Guide (New, 2019)
FOR MORE CLASSES VISIT
www.ops571genius.com
In Hau Lee's uncertainty framework classify supply chains, a supply
chain for functional products with a stable supply process is called
which of the following? Responsive Agile Efficient Risk hedging
Forward looking If annual demand is 12,000 units, annual holding cost
is $15 per unit, and setup cost per order is $25, which of the following is
the EOQ lot size? 1,000 1,200 200 300 2,000 Matching the production
rate the order rate by hiring and laying off employees as the order rate
varies is which of the following pure production planning strategies?
Minimizing inven ry Stable workforce, variable work hours Level Chase
Meeting demand Given a prior forecast demand value of 1,100, a related
actual demand value of 1,000, and a smoothing constant alpha of 0.3,
what is the exponential smoothing forecast value rev:
04_28_2014_QC_48598 1,130 970 1,000 1,070 1,030 Which of the
following is not a problem definition ol from the operations consulting
ol kit? Five forces model Gap analysis Cus mer surveys Issue trees
Computer simulation A company must perform a maintenance project
consisting of seven activities. The activities, their predecessors, and their
respective time estimates are presented here: Using CPM, what is the
latest finish time for the last activity in this project (i.e., the tal time
complete the project)? 12 days 11 days 10 days 13 days 9 days An
activity where the parts that go in each unit of a product are periodically
removed from inven ry and accounted for based on the number of units
produced is called which of the following? Frozen window Kanban
Backflush Level schedule Group technology According the theory of
constraints, which of the following is a kind of time that makes up the
cycle time in production? Quality time Research time Break time Just-
in-time Idle time Which of the following is a priority rule used
schedule the sequence of jobs in a production operation? Parts on hand
first First on hand first Last-come, first-served Longest slack time first
Last complaint first Using the fixed-order-quantity model, which of the
following is the tal ordering cost of inven ry given an annual demand of
36,000 units, a cost per order of $80, and a holding cost per unit per year
of $4? $2,267 $849 $1,200 $1,889 $2,400 Which of the following is a
perpetual system for inven ry management? The wheel of inven ry First-
in-first-out Fixed-time period P model Fixed-order quantity Which of
the following address elimination of waste under lean production?
Outsourced housekeeping Backflush Quality at the source Bot m-round
management Info-matic warehouse networks Which of the following is a
reason that there are disparities between a firm's learning curve rate and
that of its industry? Learning curves don't reflect organizational learning.
There may be procedural differences in the manner that different firms
collect and report data. Companies don't always report sensitive data
outside agencies accurately. The starting points for different firms were
different. The cumulative number of units produced is different. For
which of the following should we use an X-bar chart based on sample
means moni r process quality? Grades in a freshman "pass/fail" course
Number of units with missing operations Tire pressures in an au
assembly plant Vehicles passing emissions inspection Computer
software errors Which of the following are the three major components
of a queuing system? rev: 02_17_2017_QC_CS-79354 The number of
cus mers the system serves, the number of steps in the service system,
and how quickly cus mers exit the system The number of servers, the
service speed, and the waiting line The number of cus mers and how
they arrive, how cus mers exit the system, and the service system The
service speed, the queue discipline, and the waiting line The source
population, how cus mers exit the system, and the queuing discipline
Which of the following basic types of process structures is one in which
equipment or work processes are arranged according the progressive
steps by which the product is made? Assembly line Continuous process
Work center Project Manufacturing cell Which of the following is one of
the three contrasting approaches delivering on-site service? Production-
line approach Quality approach Professional approach S ck market
approach Retail approach Which of the following is a measure of
operations and supply management efficiency used by Wall Street?
Current ratio Receivable turnover Financial leverage Earnings per share
growth Dividend payout ratio When a company seeks match the
benefits of a successful position while maintaining its existing position
in offering cus mers a variety of differing services, what is this process
called? Inter-functional analysis Order qualifying Order winning
Straddling Operations capability analysis Which of the following is a tal
measure of productivity? Output/(Labor + Capital + Energy)
Output/Labor All of these Output/Materials Output/Inputs In the service-
system design matrix, a face- -face tal cus mization service encounter is
expected have which of the following? Low degree of cus mer/server
contact None of these Low production efficiency High production
efficiency Low sales opportunity We would expect see in a
manufacturing cell layout which of the following? None of these Long
production setup times Large teams who collectively do a small part of a
finished product A small team of workers who turn out complete units of
work More in-process inven ry Which of the following is a major fac r
that distinguishes service design and development from manufacturing
design and development? Capacity decisions are much more critical in
manufacturing operations. Manufacturing is far more capital intensive
than services. The service process and service product can be developed
independently. The service package has the same legal protection
available manufactured goods. The service package is the major output
of the development process. The cus mer order decoupling point
determines the position of what in the supply chain? Orders
Transportation facilities Inven ry Cus mers Manufacturing facilities
Machine breakdown and repair in a 12-machine fac ry having one repair
mechanic would develop which type of queuing system line structure
concerning machine breakdowns? Single channel, single phase None of
these Multichannel, single phase Single channel, multiphase
Multichannel, multiphase Assume the service rate for a queue in a truck-
loading operation is 2 trucks per hour. Using the infinite queuing notion
for the models presented in the textbook, which of the following is the
average service time? 0.25 hour 0.5 hour 2 hours 1 hour None of these
An assumption of learning curve theory is which of the following? Unit
time will decrease at a decreasing rate. Unit time will hold constant. Unit
time will increase at an increasing rate. Unit time will increase at a
decreasing rate. Unit time will decrease at an increasing rate. The unit
improvement fac r for a 60 percent learning curve at 25 units is 0.0933.
The first and second timings of a person doing a job are 5 minutes and 3
minutes respectively. Which of the following is the learning-adjusted
time estimate for unit number 25? 0.0933 minute 9.33 minutes 3 minutes
4.665 minutes 0.4665 minute For which of the following should we use
a p-chart moni r process quality? Letter grades on a final examination
Temperature of entrees in a restaurant Weight errors in cans of soup
Errors in the length of a pencil Defective electrical switches You have
been called in as a consultant set up a Kanban control system. The first
thing do is determine the number of Kanban card sets needed. Your
research shows that the expected demand during lead time for a
particular component is 150 per hour. You estimate the safety s ck
should be set at 25 percent of the demand during lead time. The te trays
used as containers can hold 8 units of s ck, and the lead time it takes
replenish an order is 2 hours. Which of the following is the number of
Kanban card sets necessary support this situation? 94 68 42 47 89
Which of the following is a fixed-order-quantity inven ry model? P
model Periodic replenishment model The ABC model Economic order
quantity model Cycle counting model Using the fixed-order-quantity
model, which of the following is the tal ordering cost of inven ry given
an annual demand of 36,000 units, a cost per order of $80, and a holding
cost per unit per year of $4? $1,889 $2,267 $849 $2,400 $1,200 Assume
there are five jobs (i.e., A, B, C, D, and E) that need be sequenced in a
production schedule. The remaining operating time necessary for
completion of job A is 4 days (i.e., job A will take 4 more days
complete), B will take 7 days, C will take 8 days, D will take 2 days, and
E will take 5 days. Which job should be scheduled first if you use the
SOT priority rule for job sequencing? E B C D A Which of the
following is a "focusing step" of Dr. Eli Goldratt's theory of constraints?
Reinforce system constraints. If you have no system constraints, make
some. Identify system constraints. Reduce system constraints. Support
system constraints In implementing a lean production system you should
work with suppliers do which of the following? Make frequent
deliveries. Calculate lead times. Achieve bot m-round management.
Freeze windows. Use quality circles. For an activity in a CPM analysis,
the early finish time is 20 and the late finish time is 20. Which of the
following statements is true? The slack for this activity is 20. The
activity's late start must happen before its early start. The activity is on
the critical path. The duration of this task is 20. The duration of this task
is zero. You have been placed in charge of a large project. Shortened
communication lines are required ensure quick resolution of problems
as they arise. You recognize that the project is going take a lot of time
and require a lot of team pride, motivation, and commitment by all
members. Which project management structure should you use in this
situation? Pure project PERT Task force Functional project Matrix
project Which of the following is not a principle of reengineering?
Capture information many times, at the source and where it is
interpreted. Treat geographically dispersed resources as though they
were centralized. Merge information processing work in the work that
produces the information. Link parallel activities instead of integrating
their results. Organize around outcomes not tasks. Which of the
following forecasting methodologies is considered a qualitative
forecasting technique? Simple moving average Market research
Exponential smoothing Linear regression Multiple regression A
company wants generate a forecast for unit demand for year 2014 using
exponential smoothing. The actual demand in year 2013 was 120. The
forecast demand in year 2013 was 110. Using these data and a
smoothing constant alpha of 0.1, which of the following is the resulting
year 2014 forecast value? 111 100 114 120 110 Maintaining a stable
workforce working at a constant output rate while shortages and
surpluses are absorbed by fluctuating inven ry levels, order backlogs,
and allowing lost sales is which of the following production planning
strategies? Full employment Stable workforce, variable work hours Skill
maintenance Level Chase What are two of the main objectives of ERP?
Transaction processing and logistic optimizing Resource tracking and
master schedule planning Product tracking and cus mer invoicing
Transaction processing and decision support If the best operating level
of a piece of equipment is at a rate of 400 units per hour and the actual
output during an hour is 300 units, which of the following is the capacity
cushion? 133 percent 25 percent 100 units per hour 125 percent 75
percent Under the lot-for-lot (L4L) lot sizing technique as used in MRP,
we would expect which of the following? A consistent lag of supply
behind demand Minimized carrying costs Minimized setup costs
Minimized quality problems A just-in-time management philosophy A
product tree can do which of the following? Help compute component
usage. Reduce product scrap. Reduce regular time labor. Locate raw
material supplies. Reduce labor overtime. Very few products are moved
without at least part of their journey being by which mode of
transportation? Rail Highway Pipeline Water Air In Hau Lee's
uncertainty framework classify supply chains, a supply chain for
innovative products with an evolving supply process is called which of
the following? Responsive Efficient Agile Risk hedging Forward
looking 1. Which of the following is a measure of operations and supply
management efficiency used by Wall Street? Dividend payout ratio
Receivable turnover Current ratio Financial leverage Earnings per share
growth 2. An activity-system map is which of the following? A diagram
that shows how a company's strategy is delivered cus mers A timeline
displaying major planned events A network guide route airlines A
facility layout schematic noting what is done where A listing of
activities that make up a project 3. Which of the following is a tal
measure of productivity? Output/Materials Output/Labor Output/(Labor
+ Capital + Energy) All of these Output/Inputs 4. Which of the
following approaches service design is characterized by having the cus
mer take a greater role in the production of the service? Quality
approach Self-service approach Production-line approach Do-it-yourself
approach Personal-attention approach 5. Which of the following basic
types of production layout formats is one that has similar equipment or
functions are grouped gether? Workcenter layout Production line layout
Group technology layout Manufacturing cell layout Assembly line
layout 6. Which of the following is a characteristic that can be used
guide the design of service systems? Services are all similar. Services
cannot be inven ried. Services businesses are inherently entrepreneurial.
Even service businesses have internal services. Quality work means
quality service. 7. An advantage of a make- -s ck process is which of the
following? All units of output are unique. It features rapid delivery of a
standard product. It combines the best features of other processes. It
responds directly cus mer orders. It allows the firm avoid inven ry
costs. 8. Getting an au graph from a famous person might involve
standing in which type of queuing line structure? Single channel, single
phase None of these Single channel, multiphase Multichannel,
multiphase Multichannel, single phase 9. For an infinite queuing
situation, if the arrival rate for loading trucks is 5 trucks per hour, what
is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour
None of these 10. An assumption of learning curve theory is which of
the following? Organizational learning is not included in learning
theory. The time required do a task will vary randomly each time the
task is repeated. Unit time will decrease at an increasing rate. Learning
will not be transferred from one worker the next. The reduction in unit
time will follow a predictable pattern. 11. A company's production
process has an 80 percent learning curve rate. The process has produced
1,000 units date. A process refinement is estimated allow a future
learning curve rate for the identical product of 75 percent. However, the
initial unit made using the new process will take the same amount of
time as the initial unit produced using the old process. At what point,
using the new process, will the production rate exceed the production
rate achieved by the old process? Before the 100th unit Before the 120th
unit Before the 80th unit Before the 50th unit Before the 250th unit 12.
For which of the following should we use a p-chart moni r process
quality? Grades in a freshman "pass/fail" course Temperatures in a
classroom The dimensions of brick entering a kiln The weight of fluid in
a container Lengths of boards cut in a mill 13. You have been called in
as a consultant set up a Kanban control system. The first thing do is
determine the number of Kanban card sets needed. Your research shows
that the expected demand during lead time for a particular component is
150 per hour. You estimate the safety s ck should be set at 25 percent of
the demand during lead time. The te trays used as containers can hold 8
units of s ck, and the lead time it takes replenish an order is 2 hours.
Which of the following is the number of Kanban card sets necessary
support this situation? 42 68 89 47 94 14. Which of the following is a
fixed-time-period inven ry model? Just-in-time model The EOQ model
Periodic system model The Q model The least cost method 15. A
company is planning for its financing needs and uses the basic fixed-
order-quantity inven ry model. Which of the following is the tal cost
(TC) of the inven ry given an annual demand of 10,000, setup cost of
$32, a holding cost per unit per year of $4, an EOQ of 400 units, and a
cost per unit of inven ry of $150? None of these $1,501,600 $1,498,200
$499,313 $500,687 A.$1,501,600 Q = 400. Average Inven ry = Q/2 =
200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual
set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit =
10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 =
$1,501,600. 16. Which of the following is a principle of work center
scheduling? Reschedule every day. Once started, a job can and should be
finished even if unavoidably interrupted. Assign the first worker all of
the days that require staffing. Achieve certainty in standards and
routings. Give work centers less do then their maximum. 17. Which of
the following is a "focusing step" of Dr. Eli Goldratt's theory of
constraints? Identify system constraints. Support system constraints. If
you have no system constraints, make some. Reduce system constraints.
Reinforce system constraints. 18. In designing a lean production facility
layout, a designer should do which of the following? Locate flexible
workstations offline. Balance capacity using job shop analysis. Design
for work flow balance. Always keep operations on a single floor of the
fac ry. Link operations through a push system. 19. A simple project
listing of five activities and their respective time estimates are presented
here: Using CPM, which activities make up the critical path? None of
these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must
perform a maintenance project consisting of seven activities. The
activities, their predecessors, and their respective time estimates are
presented here: Using CPM, which activities make up the critical path?
A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21.
Which of the following is not a problem definition ol from the
operations consulting ol kit? Issue trees Five forces model Computer
simulation Cus mer surveys Gap analysis 22. Which of the following is
not one of the basic types of forecasting? Simulation Causal
relationships Qualitative Time series analysis Force field analysis 23. A
company has actual unit demand for three consecutive years of 124, 126,
and 135. The respective forecasts for the same three years are 120, 120,
and 130. Which of the following is the resulting MAD value that can be
computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) +
(126 - 120) + (135 - 130)]/3 = 15/3 = 5. 24. From an operational
perspective, yield management is most effective under which of the
following circumstances? Inven ry is perishable. The firm doing yield
management is very profitable. Demand cannot be segmented by cus
mer. Fixed costs are low, and variable costs are high. The cus mer is a
"captive" of the system. 25. What is transaction processing? The
decision support system used efficiently handle multiple transactions
The movement of paperwork through a system using a decision tree The
scheduling of machinery minimize time and scrap The posting and
tracking of the detailed activities of a business 26. If the actual output of
a piece of equipment during an hour is 500 units and its best operating
level is at a rate of 400 units per hour, which of the following is the
capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the
following is an input the master production schedule (MPS)? Planned
order schedules The bill of materials The aggregate plan The exception
report Inven ry records file 28. Which of the following is considered a
primary report in an MRP system? Cycle counting reports Performance
reports Planned order schedules Planning reports Exception reports 29.
The centroid method for plant location uses which of the following data?
Probabilities and payoffs Correlation matrix of existing facilities
Volume of goods be shipped between existing points Inbound
transportation costs Transport times between facilities 30. In Hau Lee's
uncertainty framework classify supply chains, a supply chain for
functional products with an evolving supply process is called which of
the following? Responsive Forward looking Efficient Risk hedging
Agile
==============================================

More Related Content

What's hot

Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean productionهشام جملة
 
Which of the following is not a problem definition tool
Which of the following is not a problem definition toolWhich of the following is not a problem definition tool
Which of the following is not a problem definition tooljohann11374
 
UOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.comUOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.comthomashard90
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingjohann11370
 
Improving OHS & Productivity of RMG Industries By Analyzing Various KPIs
Improving OHS & Productivity of RMG Industries By Analyzing Various  KPIsImproving OHS & Productivity of RMG Industries By Analyzing Various  KPIs
Improving OHS & Productivity of RMG Industries By Analyzing Various KPIsKarina Islam
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situationjohann11370
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...johann11379
 
Managing the operations function
Managing the operations functionManaging the operations function
Managing the operations functionteacherTLE
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturingshahroze11
 
Manufacturing operations and service operations
Manufacturing operations and service operationsManufacturing operations and service operations
Manufacturing operations and service operationsuday lakhani
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6smadhan0711
 
Paper id 24201491
Paper id 24201491Paper id 24201491
Paper id 24201491IJRAT
 
460 operations - 4.6
460   operations - 4.6460   operations - 4.6
460 operations - 4.6Kyle Bakken
 

What's hot (19)

Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Just in time (jit) and lean production
Just in time (jit) and lean productionJust in time (jit) and lean production
Just in time (jit) and lean production
 
Which of the following is not a problem definition tool
Which of the following is not a problem definition toolWhich of the following is not a problem definition tool
Which of the following is not a problem definition tool
 
UOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.comUOPOPS571 Lessons in Excellence--uopops571.com
UOPOPS571 Lessons in Excellence--uopops571.com
 
An assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the followingAn assumption of learning curve theory is which of the following
An assumption of learning curve theory is which of the following
 
Improving OHS & Productivity of RMG Industries By Analyzing Various KPIs
Improving OHS & Productivity of RMG Industries By Analyzing Various  KPIsImproving OHS & Productivity of RMG Industries By Analyzing Various  KPIs
Improving OHS & Productivity of RMG Industries By Analyzing Various KPIs
 
For an infinite queuing situation
For an infinite queuing situationFor an infinite queuing situation
For an infinite queuing situation
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
Just in time
Just in timeJust in time
Just in time
 
Managing the operations function
Managing the operations functionManaging the operations function
Managing the operations function
 
Just in Time and Lean Manufacturing
Just in Time and Lean ManufacturingJust in Time and Lean Manufacturing
Just in Time and Lean Manufacturing
 
Manufacturing operations and service operations
Manufacturing operations and service operationsManufacturing operations and service operations
Manufacturing operations and service operations
 
PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)PPT ON Just in time technique (JIT)
PPT ON Just in time technique (JIT)
 
Just In Time (JIT)
Just In Time (JIT)Just In Time (JIT)
Just In Time (JIT)
 
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh AroraIntroduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
Introduction of Flow Management in Manufacturing - ADDVALUE - Nilesh Arora
 
Lean manufacturing & 6s
Lean manufacturing & 6sLean manufacturing & 6s
Lean manufacturing & 6s
 
Just in Time Technique
Just in Time TechniqueJust in Time Technique
Just in Time Technique
 
Paper id 24201491
Paper id 24201491Paper id 24201491
Paper id 24201491
 
460 operations - 4.6
460   operations - 4.6460   operations - 4.6
460 operations - 4.6
 

Similar to OPS 571 GENIUS You can do it--ops571genius.com

OPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.comOPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.comdonaldzs17
 
OPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...comOPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...comdonaldzs25
 
OPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comOPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comdonaldzs45
 
A company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsA company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsjohann11369
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...johann11371
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consistingjohann11369
 
A simple project listing of five activities and their respective time
A simple project listing of five activities and their respective timeA simple project listing of five activities and their respective time
A simple project listing of five activities and their respective timejohann11370
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsjohann11371
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processingjohann11372
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipmentjohann11371
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comclaric212
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)johann11374
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)beauti123157
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivityramuaa129
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...ramuaa129
 
UOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.comUOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.commyrealit
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingjohann11370
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)michaelkelinger2
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...ramuq12345
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...ramuaa128
 

Similar to OPS 571 GENIUS You can do it--ops571genius.com (20)

OPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.comOPS 571 Massive Success / snaptutorial.com
OPS 571 Massive Success / snaptutorial.com
 
OPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...comOPS 571 Massive Success / snaptutorial...com
OPS 571 Massive Success / snaptutorial...com
 
OPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.comOPS 571 Effective Communication - snaptutorial.com
OPS 571 Effective Communication - snaptutorial.com
 
A company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive yearsA company has actual unit demand for three consecutive years
A company has actual unit demand for three consecutive years
 
From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...From an operational perspective, yield management is most effective under whi...
From an operational perspective, yield management is most effective under whi...
 
A company must perform a maintenance project consisting
A company must perform a maintenance project consistingA company must perform a maintenance project consisting
A company must perform a maintenance project consisting
 
A simple project listing of five activities and their respective time
A simple project listing of five activities and their respective timeA simple project listing of five activities and their respective time
A simple project listing of five activities and their respective time
 
In hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chainsIn hau lee's uncertainty framework to classify supply chains
In hau lee's uncertainty framework to classify supply chains
 
What is transaction processing
What is transaction processingWhat is transaction processing
What is transaction processing
 
If the actual output of a piece of equipment
If the actual output of a piece of equipmentIf the actual output of a piece of equipment
If the actual output of a piece of equipment
 
OPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.comOPS 571 HELP Redefined Education--ops571help.com
OPS 571 HELP Redefined Education--ops571help.com
 
Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)Which of the following is an input to the master production schedule (mps)
Which of the following is an input to the master production schedule (mps)
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Which of the following is a total measure of productivity
Which of the following is a total measure of productivityWhich of the following is a total measure of productivity
Which of the following is a total measure of productivity
 
Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...Which of the following is a measure of operations and supply management effic...
Which of the following is a measure of operations and supply management effic...
 
UOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.comUOPOPS 571 Expect Success /uopops571.com
UOPOPS 571 Expect Success /uopops571.com
 
An advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the followingAn advantage of a make to-stock process is which of the following
An advantage of a make to-stock process is which of the following
 
Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)Ops 571 final exam guide (new, 2018)
Ops 571 final exam guide (new, 2018)
 
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...Ops 571 final exam guide (new, 2018) which of the following is a principle of...
Ops 571 final exam guide (new, 2018) which of the following is a principle of...
 
Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...Which of the following basic types of production layout formats is one that h...
Which of the following basic types of production layout formats is one that h...
 

Recently uploaded

Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jisc
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptxJoelynRubio1
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use CasesTechSoup
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxJisc
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxJisc
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxmarlenawright1
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSAnaAcapella
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxPooja Bhuva
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsSandeep D Chaudhary
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsNbelano25
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningMarc Dusseiller Dusjagr
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17Celine George
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxakanksha16arora
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfPondicherry University
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfstareducators107
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxDr. Ravikiran H M Gowda
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...EADTU
 

Recently uploaded (20)

Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx21st_Century_Skills_Framework_Final_Presentation_2.pptx
21st_Century_Skills_Framework_Final_Presentation_2.pptx
 
Introduction to TechSoup’s Digital Marketing Services and Use Cases
Introduction to TechSoup’s Digital Marketing  Services and Use CasesIntroduction to TechSoup’s Digital Marketing  Services and Use Cases
Introduction to TechSoup’s Digital Marketing Services and Use Cases
 
OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...OS-operating systems- ch05 (CPU Scheduling) ...
OS-operating systems- ch05 (CPU Scheduling) ...
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Wellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptxWellbeing inclusion and digital dystopias.pptx
Wellbeing inclusion and digital dystopias.pptx
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPSSpellings Wk 4 and Wk 5 for Grade 4 at CAPS
Spellings Wk 4 and Wk 5 for Grade 4 at CAPS
 
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptxOn_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
On_Translating_a_Tamil_Poem_by_A_K_Ramanujan.pptx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
Tatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf artsTatlong Kwento ni Lola basyang-1.pdf arts
Tatlong Kwento ni Lola basyang-1.pdf arts
 
dusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learningdusjagr & nano talk on open tools for agriculture research and learning
dusjagr & nano talk on open tools for agriculture research and learning
 
How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17How to Add a Tool Tip to a Field in Odoo 17
How to Add a Tool Tip to a Field in Odoo 17
 
PANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptxPANDITA RAMABAI- Indian political thought GENDER.pptx
PANDITA RAMABAI- Indian political thought GENDER.pptx
 
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdfFICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
FICTIONAL SALESMAN/SALESMAN SNSW 2024.pdf
 
Simple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdfSimple, Complex, and Compound Sentences Exercises.pdf
Simple, Complex, and Compound Sentences Exercises.pdf
 
REMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptxREMIFENTANIL: An Ultra short acting opioid.pptx
REMIFENTANIL: An Ultra short acting opioid.pptx
 
VAMOS CUIDAR DO NOSSO PLANETA! .
VAMOS CUIDAR DO NOSSO PLANETA!                    .VAMOS CUIDAR DO NOSSO PLANETA!                    .
VAMOS CUIDAR DO NOSSO PLANETA! .
 
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
Transparency, Recognition and the role of eSealing - Ildiko Mazar and Koen No...
 

OPS 571 GENIUS You can do it--ops571genius.com

  • 1. OPS 571 Final Exam Guide (April, 2019) FOR MORE CLASSES VISIT www.ops571genius.com In Hau Lee's uncertainty framework classify supply chains, a supply chain for functional products with a stable supply process is called which of the following? Responsive Agile Efficient Risk hedging Forward looking If annual demand is 12,000 units, annual holding cost is $15 per unit, and setup cost per order is $25, which of the following is the EOQ lot size? 1,000 1,200 200 300 2,000 Matching the production rate the order rate by hiring and laying off employees as the order rate varies is which of the following pure production planning strategies? Minimizing inven ry Stable workforce, variable work hours Level Chase Meeting demand Given a prior forecast demand value of 1,100, a related actual demand value of 1,000, and a smoothing constant alpha of 0.3, what is the exponential smoothing forecast value rev: 04_28_2014_QC_48598 1,130 970 1,000 1,070 1,030 Which of the following is not a problem definition ol from the operations consulting ol kit? Five forces model Gap analysis Cus mer surveys Issue trees Computer simulation A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, what is the latest finish time for the last activity in this project (i.e., the tal time complete the project)? 12 days 11 days 10 days 13 days 9 days An activity where the parts that go in each unit of a product are periodically removed from inven ry and accounted for based on the number of units
  • 2. produced is called which of the following? Frozen window Kanban Backflush Level schedule Group technology According the theory of constraints, which of the following is a kind of time that makes up the cycle time in production? Quality time Research time Break time Just- in-time Idle time Which of the following is a priority rule used schedule the sequence of jobs in a production operation? Parts on hand first First on hand first Last-come, first-served Longest slack time first Last complaint first Using the fixed-order-quantity model, which of the following is the tal ordering cost of inven ry given an annual demand of 36,000 units, a cost per order of $80, and a holding cost per unit per year of $4? $2,267 $849 $1,200 $1,889 $2,400 Which of the following is a perpetual system for inven ry management? The wheel of inven ry First- in-first-out Fixed-time period P model Fixed-order quantity Which of the following address elimination of waste under lean production? Outsourced housekeeping Backflush Quality at the source Bot m-round management Info-matic warehouse networks Which of the following is a reason that there are disparities between a firm's learning curve rate and that of its industry? Learning curves don't reflect organizational learning. There may be procedural differences in the manner that different firms collect and report data. Companies don't always report sensitive data outside agencies accurately. The starting points for different firms were different. The cumulative number of units produced is different. For which of the following should we use an X-bar chart based on sample means moni r process quality? Grades in a freshman "pass/fail" course Number of units with missing operations Tire pressures in an au assembly plant Vehicles passing emissions inspection Computer software errors Which of the following are the three major components of a queuing system? rev: 02_17_2017_QC_CS-79354 The number of cus mers the system serves, the number of steps in the service system, and how quickly cus mers exit the system The number of servers, the
  • 3. service speed, and the waiting line The number of cus mers and how they arrive, how cus mers exit the system, and the service system The service speed, the queue discipline, and the waiting line The source population, how cus mers exit the system, and the queuing discipline Which of the following basic types of process structures is one in which equipment or work processes are arranged according the progressive steps by which the product is made? Assembly line Continuous process Work center Project Manufacturing cell Which of the following is one of the three contrasting approaches delivering on-site service? Production- line approach Quality approach Professional approach S ck market approach Retail approach Which of the following is a measure of operations and supply management efficiency used by Wall Street? Current ratio Receivable turnover Financial leverage Earnings per share growth Dividend payout ratio When a company seeks match the benefits of a successful position while maintaining its existing position in offering cus mers a variety of differing services, what is this process called? Inter-functional analysis Order qualifying Order winning Straddling Operations capability analysis Which of the following is a tal measure of productivity? Output/(Labor + Capital + Energy) Output/Labor All of these Output/Materials Output/Inputs In the service- system design matrix, a face- -face tal cus mization service encounter is expected have which of the following? Low degree of cus mer/server contact None of these Low production efficiency High production efficiency Low sales opportunity We would expect see in a manufacturing cell layout which of the following? None of these Long production setup times Large teams who collectively do a small part of a finished product A small team of workers who turn out complete units of work More in-process inven ry Which of the following is a major fac r that distinguishes service design and development from manufacturing design and development? Capacity decisions are much more critical in
  • 4. manufacturing operations. Manufacturing is far more capital intensive than services. The service process and service product can be developed independently. The service package has the same legal protection available manufactured goods. The service package is the major output of the development process. The cus mer order decoupling point determines the position of what in the supply chain? Orders Transportation facilities Inven ry Cus mers Manufacturing facilities Machine breakdown and repair in a 12-machine fac ry having one repair mechanic would develop which type of queuing system line structure concerning machine breakdowns? Single channel, single phase None of these Multichannel, single phase Single channel, multiphase Multichannel, multiphase Assume the service rate for a queue in a truck- loading operation is 2 trucks per hour. Using the infinite queuing notion for the models presented in the textbook, which of the following is the average service time? 0.25 hour 0.5 hour 2 hours 1 hour None of these An assumption of learning curve theory is which of the following? Unit time will decrease at a decreasing rate. Unit time will hold constant. Unit time will increase at an increasing rate. Unit time will increase at a decreasing rate. Unit time will decrease at an increasing rate. The unit improvement fac r for a 60 percent learning curve at 25 units is 0.0933. The first and second timings of a person doing a job are 5 minutes and 3 minutes respectively. Which of the following is the learning-adjusted time estimate for unit number 25? 0.0933 minute 9.33 minutes 3 minutes 4.665 minutes 0.4665 minute For which of the following should we use a p-chart moni r process quality? Letter grades on a final examination Temperature of entrees in a restaurant Weight errors in cans of soup Errors in the length of a pencil Defective electrical switches You have been called in as a consultant set up a Kanban control system. The first thing do is determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a
  • 5. particular component is 150 per hour. You estimate the safety s ck should be set at 25 percent of the demand during lead time. The te trays used as containers can hold 8 units of s ck, and the lead time it takes replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary support this situation? 94 68 42 47 89 Which of the following is a fixed-order-quantity inven ry model? P model Periodic replenishment model The ABC model Economic order quantity model Cycle counting model Using the fixed-order-quantity model, which of the following is the tal ordering cost of inven ry given an annual demand of 36,000 units, a cost per order of $80, and a holding cost per unit per year of $4? $1,889 $2,267 $849 $2,400 $1,200 Assume there are five jobs (i.e., A, B, C, D, and E) that need be sequenced in a production schedule. The remaining operating time necessary for completion of job A is 4 days (i.e., job A will take 4 more days complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days. Which job should be scheduled first if you use the SOT priority rule for job sequencing? E B C D A Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Reinforce system constraints. If you have no system constraints, make some. Identify system constraints. Reduce system constraints. Support system constraints In implementing a lean production system you should work with suppliers do which of the following? Make frequent deliveries. Calculate lead times. Achieve bot m-round management. Freeze windows. Use quality circles. For an activity in a CPM analysis, the early finish time is 20 and the late finish time is 20. Which of the following statements is true? The slack for this activity is 20. The activity's late start must happen before its early start. The activity is on the critical path. The duration of this task is 20. The duration of this task is zero. You have been placed in charge of a large project. Shortened communication lines are required ensure quick resolution of problems
  • 6. as they arise. You recognize that the project is going take a lot of time and require a lot of team pride, motivation, and commitment by all members. Which project management structure should you use in this situation? Pure project PERT Task force Functional project Matrix project Which of the following is not a principle of reengineering? Capture information many times, at the source and where it is interpreted. Treat geographically dispersed resources as though they were centralized. Merge information processing work in the work that produces the information. Link parallel activities instead of integrating their results. Organize around outcomes not tasks. Which of the following forecasting methodologies is considered a qualitative forecasting technique? Simple moving average Market research Exponential smoothing Linear regression Multiple regression A company wants generate a forecast for unit demand for year 2014 using exponential smoothing. The actual demand in year 2013 was 120. The forecast demand in year 2013 was 110. Using these data and a smoothing constant alpha of 0.1, which of the following is the resulting year 2014 forecast value? 111 100 114 120 110 Maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inven ry levels, order backlogs, and allowing lost sales is which of the following production planning strategies? Full employment Stable workforce, variable work hours Skill maintenance Level Chase What are two of the main objectives of ERP? Transaction processing and logistic optimizing Resource tracking and master schedule planning Product tracking and cus mer invoicing Transaction processing and decision support If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion? 133 percent 25 percent 100 units per hour 125 percent 75 percent Under the lot-for-lot (L4L) lot sizing technique as used in MRP,
  • 7. we would expect which of the following? A consistent lag of supply behind demand Minimized carrying costs Minimized setup costs Minimized quality problems A just-in-time management philosophy A product tree can do which of the following? Help compute component usage. Reduce product scrap. Reduce regular time labor. Locate raw material supplies. Reduce labor overtime. Very few products are moved without at least part of their journey being by which mode of transportation? Rail Highway Pipeline Water Air In Hau Lee's uncertainty framework classify supply chains, a supply chain for innovative products with an evolving supply process is called which of the following? Responsive Efficient Agile Risk hedging Forward looking 1. Which of the following is a measure of operations and supply management efficiency used by Wall Street? Dividend payout ratio Receivable turnover Current ratio Financial leverage Earnings per share growth 2. An activity-system map is which of the following? A diagram that shows how a company's strategy is delivered cus mers A timeline displaying major planned events A network guide route airlines A facility layout schematic noting what is done where A listing of activities that make up a project 3. Which of the following is a tal measure of productivity? Output/Materials Output/Labor Output/(Labor + Capital + Energy) All of these Output/Inputs 4. Which of the following approaches service design is characterized by having the cus mer take a greater role in the production of the service? Quality approach Self-service approach Production-line approach Do-it-yourself approach Personal-attention approach 5. Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped gether? Workcenter layout Production line layout Group technology layout Manufacturing cell layout Assembly line layout 6. Which of the following is a characteristic that can be used guide the design of service systems? Services are all similar. Services
  • 8. cannot be inven ried. Services businesses are inherently entrepreneurial. Even service businesses have internal services. Quality work means quality service. 7. An advantage of a make- -s ck process is which of the following? All units of output are unique. It features rapid delivery of a standard product. It combines the best features of other processes. It responds directly cus mer orders. It allows the firm avoid inven ry costs. 8. Getting an au graph from a famous person might involve standing in which type of queuing line structure? Single channel, single phase None of these Single channel, multiphase Multichannel, multiphase Multichannel, single phase 9. For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour None of these 10. An assumption of learning curve theory is which of the following? Organizational learning is not included in learning theory. The time required do a task will vary randomly each time the task is repeated. Unit time will decrease at an increasing rate. Learning will not be transferred from one worker the next. The reduction in unit time will follow a predictable pattern. 11. A company's production process has an 80 percent learning curve rate. The process has produced 1,000 units date. A process refinement is estimated allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process? Before the 100th unit Before the 120th unit Before the 80th unit Before the 50th unit Before the 250th unit 12. For which of the following should we use a p-chart moni r process quality? Grades in a freshman "pass/fail" course Temperatures in a classroom The dimensions of brick entering a kiln The weight of fluid in a container Lengths of boards cut in a mill 13. You have been called in
  • 9. as a consultant set up a Kanban control system. The first thing do is determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety s ck should be set at 25 percent of the demand during lead time. The te trays used as containers can hold 8 units of s ck, and the lead time it takes replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary support this situation? 42 68 89 47 94 14. Which of the following is a fixed-time-period inven ry model? Just-in-time model The EOQ model Periodic system model The Q model The least cost method 15. A company is planning for its financing needs and uses the basic fixed- order-quantity inven ry model. Which of the following is the tal cost (TC) of the inven ry given an annual demand of 10,000, setup cost of $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inven ry of $150? None of these $1,501,600 $1,498,200 $499,313 $500,687 A.$1,501,600 Q = 400. Average Inven ry = Q/2 = 200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 = $1,501,600. 16. Which of the following is a principle of work center scheduling? Reschedule every day. Once started, a job can and should be finished even if unavoidably interrupted. Assign the first worker all of the days that require staffing. Achieve certainty in standards and routings. Give work centers less do then their maximum. 17. Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Identify system constraints. Support system constraints. If you have no system constraints, make some. Reduce system constraints. Reinforce system constraints. 18. In designing a lean production facility layout, a designer should do which of the following? Locate flexible workstations offline. Balance capacity using job shop analysis. Design
  • 10. for work flow balance. Always keep operations on a single floor of the fac ry. Link operations through a push system. 19. A simple project listing of five activities and their respective time estimates are presented here: Using CPM, which activities make up the critical path? None of these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, which activities make up the critical path? A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21. Which of the following is not a problem definition ol from the operations consulting ol kit? Issue trees Five forces model Computer simulation Cus mer surveys Gap analysis 22. Which of the following is not one of the basic types of forecasting? Simulation Causal relationships Qualitative Time series analysis Force field analysis 23. A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5. 24. From an operational perspective, yield management is most effective under which of the following circumstances? Inven ry is perishable. The firm doing yield management is very profitable. Demand cannot be segmented by cus mer. Fixed costs are low, and variable costs are high. The cus mer is a "captive" of the system. 25. What is transaction processing? The decision support system used efficiently handle multiple transactions The movement of paperwork through a system using a decision tree The scheduling of machinery minimize time and scrap The posting and tracking of the detailed activities of a business 26. If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the
  • 11. capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the following is an input the master production schedule (MPS)? Planned order schedules The bill of materials The aggregate plan The exception report Inven ry records file 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods be shipped between existing points Inbound transportation costs Transport times between facilities 30. In Hau Lee's uncertainty framework classify supply chains, a supply chain for functional products with an evolving supply process is called which of the following? Responsive Forward looking Efficient Risk hedging Agile ============================================== OPS 571 Final Exam Guide (New, 2019) FOR MORE CLASSES VISIT www.ops571genius.com In Hau Lee's uncertainty framework classify supply chains, a supply chain for functional products with a stable supply process is called which of the following? Responsive Agile Efficient Risk hedging Forward looking If annual demand is 12,000 units, annual holding cost is $15 per unit, and setup cost per order is $25, which of the following is
  • 12. the EOQ lot size? 1,000 1,200 200 300 2,000 Matching the production rate the order rate by hiring and laying off employees as the order rate varies is which of the following pure production planning strategies? Minimizing inven ry Stable workforce, variable work hours Level Chase Meeting demand Given a prior forecast demand value of 1,100, a related actual demand value of 1,000, and a smoothing constant alpha of 0.3, what is the exponential smoothing forecast value rev: 04_28_2014_QC_48598 1,130 970 1,000 1,070 1,030 Which of the following is not a problem definition ol from the operations consulting ol kit? Five forces model Gap analysis Cus mer surveys Issue trees Computer simulation A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, what is the latest finish time for the last activity in this project (i.e., the tal time complete the project)? 12 days 11 days 10 days 13 days 9 days An activity where the parts that go in each unit of a product are periodically removed from inven ry and accounted for based on the number of units produced is called which of the following? Frozen window Kanban Backflush Level schedule Group technology According the theory of constraints, which of the following is a kind of time that makes up the cycle time in production? Quality time Research time Break time Just- in-time Idle time Which of the following is a priority rule used schedule the sequence of jobs in a production operation? Parts on hand first First on hand first Last-come, first-served Longest slack time first Last complaint first Using the fixed-order-quantity model, which of the following is the tal ordering cost of inven ry given an annual demand of 36,000 units, a cost per order of $80, and a holding cost per unit per year of $4? $2,267 $849 $1,200 $1,889 $2,400 Which of the following is a perpetual system for inven ry management? The wheel of inven ry First- in-first-out Fixed-time period P model Fixed-order quantity Which of
  • 13. the following address elimination of waste under lean production? Outsourced housekeeping Backflush Quality at the source Bot m-round management Info-matic warehouse networks Which of the following is a reason that there are disparities between a firm's learning curve rate and that of its industry? Learning curves don't reflect organizational learning. There may be procedural differences in the manner that different firms collect and report data. Companies don't always report sensitive data outside agencies accurately. The starting points for different firms were different. The cumulative number of units produced is different. For which of the following should we use an X-bar chart based on sample means moni r process quality? Grades in a freshman "pass/fail" course Number of units with missing operations Tire pressures in an au assembly plant Vehicles passing emissions inspection Computer software errors Which of the following are the three major components of a queuing system? rev: 02_17_2017_QC_CS-79354 The number of cus mers the system serves, the number of steps in the service system, and how quickly cus mers exit the system The number of servers, the service speed, and the waiting line The number of cus mers and how they arrive, how cus mers exit the system, and the service system The service speed, the queue discipline, and the waiting line The source population, how cus mers exit the system, and the queuing discipline Which of the following basic types of process structures is one in which equipment or work processes are arranged according the progressive steps by which the product is made? Assembly line Continuous process Work center Project Manufacturing cell Which of the following is one of the three contrasting approaches delivering on-site service? Production- line approach Quality approach Professional approach S ck market approach Retail approach Which of the following is a measure of operations and supply management efficiency used by Wall Street? Current ratio Receivable turnover Financial leverage Earnings per share
  • 14. growth Dividend payout ratio When a company seeks match the benefits of a successful position while maintaining its existing position in offering cus mers a variety of differing services, what is this process called? Inter-functional analysis Order qualifying Order winning Straddling Operations capability analysis Which of the following is a tal measure of productivity? Output/(Labor + Capital + Energy) Output/Labor All of these Output/Materials Output/Inputs In the service- system design matrix, a face- -face tal cus mization service encounter is expected have which of the following? Low degree of cus mer/server contact None of these Low production efficiency High production efficiency Low sales opportunity We would expect see in a manufacturing cell layout which of the following? None of these Long production setup times Large teams who collectively do a small part of a finished product A small team of workers who turn out complete units of work More in-process inven ry Which of the following is a major fac r that distinguishes service design and development from manufacturing design and development? Capacity decisions are much more critical in manufacturing operations. Manufacturing is far more capital intensive than services. The service process and service product can be developed independently. The service package has the same legal protection available manufactured goods. The service package is the major output of the development process. The cus mer order decoupling point determines the position of what in the supply chain? Orders Transportation facilities Inven ry Cus mers Manufacturing facilities Machine breakdown and repair in a 12-machine fac ry having one repair mechanic would develop which type of queuing system line structure concerning machine breakdowns? Single channel, single phase None of these Multichannel, single phase Single channel, multiphase Multichannel, multiphase Assume the service rate for a queue in a truck- loading operation is 2 trucks per hour. Using the infinite queuing notion
  • 15. for the models presented in the textbook, which of the following is the average service time? 0.25 hour 0.5 hour 2 hours 1 hour None of these An assumption of learning curve theory is which of the following? Unit time will decrease at a decreasing rate. Unit time will hold constant. Unit time will increase at an increasing rate. Unit time will increase at a decreasing rate. Unit time will decrease at an increasing rate. The unit improvement fac r for a 60 percent learning curve at 25 units is 0.0933. The first and second timings of a person doing a job are 5 minutes and 3 minutes respectively. Which of the following is the learning-adjusted time estimate for unit number 25? 0.0933 minute 9.33 minutes 3 minutes 4.665 minutes 0.4665 minute For which of the following should we use a p-chart moni r process quality? Letter grades on a final examination Temperature of entrees in a restaurant Weight errors in cans of soup Errors in the length of a pencil Defective electrical switches You have been called in as a consultant set up a Kanban control system. The first thing do is determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety s ck should be set at 25 percent of the demand during lead time. The te trays used as containers can hold 8 units of s ck, and the lead time it takes replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary support this situation? 94 68 42 47 89 Which of the following is a fixed-order-quantity inven ry model? P model Periodic replenishment model The ABC model Economic order quantity model Cycle counting model Using the fixed-order-quantity model, which of the following is the tal ordering cost of inven ry given an annual demand of 36,000 units, a cost per order of $80, and a holding cost per unit per year of $4? $1,889 $2,267 $849 $2,400 $1,200 Assume there are five jobs (i.e., A, B, C, D, and E) that need be sequenced in a production schedule. The remaining operating time necessary for
  • 16. completion of job A is 4 days (i.e., job A will take 4 more days complete), B will take 7 days, C will take 8 days, D will take 2 days, and E will take 5 days. Which job should be scheduled first if you use the SOT priority rule for job sequencing? E B C D A Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Reinforce system constraints. If you have no system constraints, make some. Identify system constraints. Reduce system constraints. Support system constraints In implementing a lean production system you should work with suppliers do which of the following? Make frequent deliveries. Calculate lead times. Achieve bot m-round management. Freeze windows. Use quality circles. For an activity in a CPM analysis, the early finish time is 20 and the late finish time is 20. Which of the following statements is true? The slack for this activity is 20. The activity's late start must happen before its early start. The activity is on the critical path. The duration of this task is 20. The duration of this task is zero. You have been placed in charge of a large project. Shortened communication lines are required ensure quick resolution of problems as they arise. You recognize that the project is going take a lot of time and require a lot of team pride, motivation, and commitment by all members. Which project management structure should you use in this situation? Pure project PERT Task force Functional project Matrix project Which of the following is not a principle of reengineering? Capture information many times, at the source and where it is interpreted. Treat geographically dispersed resources as though they were centralized. Merge information processing work in the work that produces the information. Link parallel activities instead of integrating their results. Organize around outcomes not tasks. Which of the following forecasting methodologies is considered a qualitative forecasting technique? Simple moving average Market research Exponential smoothing Linear regression Multiple regression A
  • 17. company wants generate a forecast for unit demand for year 2014 using exponential smoothing. The actual demand in year 2013 was 120. The forecast demand in year 2013 was 110. Using these data and a smoothing constant alpha of 0.1, which of the following is the resulting year 2014 forecast value? 111 100 114 120 110 Maintaining a stable workforce working at a constant output rate while shortages and surpluses are absorbed by fluctuating inven ry levels, order backlogs, and allowing lost sales is which of the following production planning strategies? Full employment Stable workforce, variable work hours Skill maintenance Level Chase What are two of the main objectives of ERP? Transaction processing and logistic optimizing Resource tracking and master schedule planning Product tracking and cus mer invoicing Transaction processing and decision support If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion? 133 percent 25 percent 100 units per hour 125 percent 75 percent Under the lot-for-lot (L4L) lot sizing technique as used in MRP, we would expect which of the following? A consistent lag of supply behind demand Minimized carrying costs Minimized setup costs Minimized quality problems A just-in-time management philosophy A product tree can do which of the following? Help compute component usage. Reduce product scrap. Reduce regular time labor. Locate raw material supplies. Reduce labor overtime. Very few products are moved without at least part of their journey being by which mode of transportation? Rail Highway Pipeline Water Air In Hau Lee's uncertainty framework classify supply chains, a supply chain for innovative products with an evolving supply process is called which of the following? Responsive Efficient Agile Risk hedging Forward looking 1. Which of the following is a measure of operations and supply management efficiency used by Wall Street? Dividend payout ratio
  • 18. Receivable turnover Current ratio Financial leverage Earnings per share growth 2. An activity-system map is which of the following? A diagram that shows how a company's strategy is delivered cus mers A timeline displaying major planned events A network guide route airlines A facility layout schematic noting what is done where A listing of activities that make up a project 3. Which of the following is a tal measure of productivity? Output/Materials Output/Labor Output/(Labor + Capital + Energy) All of these Output/Inputs 4. Which of the following approaches service design is characterized by having the cus mer take a greater role in the production of the service? Quality approach Self-service approach Production-line approach Do-it-yourself approach Personal-attention approach 5. Which of the following basic types of production layout formats is one that has similar equipment or functions are grouped gether? Workcenter layout Production line layout Group technology layout Manufacturing cell layout Assembly line layout 6. Which of the following is a characteristic that can be used guide the design of service systems? Services are all similar. Services cannot be inven ried. Services businesses are inherently entrepreneurial. Even service businesses have internal services. Quality work means quality service. 7. An advantage of a make- -s ck process is which of the following? All units of output are unique. It features rapid delivery of a standard product. It combines the best features of other processes. It responds directly cus mer orders. It allows the firm avoid inven ry costs. 8. Getting an au graph from a famous person might involve standing in which type of queuing line structure? Single channel, single phase None of these Single channel, multiphase Multichannel, multiphase Multichannel, single phase 9. For an infinite queuing situation, if the arrival rate for loading trucks is 5 trucks per hour, what is the mean time between arrivals? 2.5 hours 5 hours 0.2 hour 0.1 hour None of these 10. An assumption of learning curve theory is which of
  • 19. the following? Organizational learning is not included in learning theory. The time required do a task will vary randomly each time the task is repeated. Unit time will decrease at an increasing rate. Learning will not be transferred from one worker the next. The reduction in unit time will follow a predictable pattern. 11. A company's production process has an 80 percent learning curve rate. The process has produced 1,000 units date. A process refinement is estimated allow a future learning curve rate for the identical product of 75 percent. However, the initial unit made using the new process will take the same amount of time as the initial unit produced using the old process. At what point, using the new process, will the production rate exceed the production rate achieved by the old process? Before the 100th unit Before the 120th unit Before the 80th unit Before the 50th unit Before the 250th unit 12. For which of the following should we use a p-chart moni r process quality? Grades in a freshman "pass/fail" course Temperatures in a classroom The dimensions of brick entering a kiln The weight of fluid in a container Lengths of boards cut in a mill 13. You have been called in as a consultant set up a Kanban control system. The first thing do is determine the number of Kanban card sets needed. Your research shows that the expected demand during lead time for a particular component is 150 per hour. You estimate the safety s ck should be set at 25 percent of the demand during lead time. The te trays used as containers can hold 8 units of s ck, and the lead time it takes replenish an order is 2 hours. Which of the following is the number of Kanban card sets necessary support this situation? 42 68 89 47 94 14. Which of the following is a fixed-time-period inven ry model? Just-in-time model The EOQ model Periodic system model The Q model The least cost method 15. A company is planning for its financing needs and uses the basic fixed- order-quantity inven ry model. Which of the following is the tal cost (TC) of the inven ry given an annual demand of 10,000, setup cost of
  • 20. $32, a holding cost per unit per year of $4, an EOQ of 400 units, and a cost per unit of inven ry of $150? None of these $1,501,600 $1,498,200 $499,313 $500,687 A.$1,501,600 Q = 400. Average Inven ry = Q/2 = 200. Holding cost/year = $4. Thus, annual holding cost = $800. Annual set-up cost = 10,000/400 = 25 x $32 = 800. Demand x cost per unit = 10,000 x $150 = 1,500,000. Hence, TC = $1,500,000 + 800 + 800 = $1,501,600. 16. Which of the following is a principle of work center scheduling? Reschedule every day. Once started, a job can and should be finished even if unavoidably interrupted. Assign the first worker all of the days that require staffing. Achieve certainty in standards and routings. Give work centers less do then their maximum. 17. Which of the following is a "focusing step" of Dr. Eli Goldratt's theory of constraints? Identify system constraints. Support system constraints. If you have no system constraints, make some. Reduce system constraints. Reinforce system constraints. 18. In designing a lean production facility layout, a designer should do which of the following? Locate flexible workstations offline. Balance capacity using job shop analysis. Design for work flow balance. Always keep operations on a single floor of the fac ry. Link operations through a push system. 19. A simple project listing of five activities and their respective time estimates are presented here: Using CPM, which activities make up the critical path? None of these A, B, D, E A, D, E A, C, B, D, E A, C, D, E 20. A company must perform a maintenance project consisting of seven activities. The activities, their predecessors, and their respective time estimates are presented here: Using CPM, which activities make up the critical path? A, C, B, F, E None of these A, B, D, F, G A, C, E, F, G A, D, E 21. Which of the following is not a problem definition ol from the operations consulting ol kit? Issue trees Five forces model Computer simulation Cus mer surveys Gap analysis 22. Which of the following is not one of the basic types of forecasting? Simulation Causal
  • 21. relationships Qualitative Time series analysis Force field analysis 23. A company has actual unit demand for three consecutive years of 124, 126, and 135. The respective forecasts for the same three years are 120, 120, and 130. Which of the following is the resulting MAD value that can be computed from these data? 3 1 15 123 5 C MAD = ABS[(124 - 120) + (126 - 120) + (135 - 130)]/3 = 15/3 = 5. 24. From an operational perspective, yield management is most effective under which of the following circumstances? Inven ry is perishable. The firm doing yield management is very profitable. Demand cannot be segmented by cus mer. Fixed costs are low, and variable costs are high. The cus mer is a "captive" of the system. 25. What is transaction processing? The decision support system used efficiently handle multiple transactions The movement of paperwork through a system using a decision tree The scheduling of machinery minimize time and scrap The posting and tracking of the detailed activities of a business 26. If the actual output of a piece of equipment during an hour is 500 units and its best operating level is at a rate of 400 units per hour, which of the following is the capacity utilization rate? 0.75 1.00 1.25 1.33 100 27. Which of the following is an input the master production schedule (MPS)? Planned order schedules The bill of materials The aggregate plan The exception report Inven ry records file 28. Which of the following is considered a primary report in an MRP system? Cycle counting reports Performance reports Planned order schedules Planning reports Exception reports 29. The centroid method for plant location uses which of the following data? Probabilities and payoffs Correlation matrix of existing facilities Volume of goods be shipped between existing points Inbound transportation costs Transport times between facilities 30. In Hau Lee's uncertainty framework classify supply chains, a supply chain for functional products with an evolving supply process is called which of
  • 22. the following? Responsive Forward looking Efficient Risk hedging Agile ==============================================