SlideShare a Scribd company logo
1 of 23
 WORKING OF SCBA
 SCBA CHECKING
 APPLICATONS
 CALCULATIONS
 DIFFERENCE
 CONCLUSION
 ABSTRACT
 INTRODUCTION
 SOLAS
REGULATION ON
SCBA
 PARTS OF SCBA
 SNAPS
 Safety is the very important factor on onboard ship. Still many
accidents are happening onboard due to fire. SCBA FOR CASUALITY
is a device which is used by one person during the inspection of fire
location.
 Our project is modifying the SCBA cylinder and face mask for the
usage of two persons during emergency while fighting the fire SCBA
FOR CASUALITY is the firefighting equipment. It is used during fire
accident on-board. Now a days safety is most important in ship. Still
now SCBA FOR CASUALITY is used by only one person. But in our
project we are modifying the cylinder and equipment of SCBA FOR
CASUALITY for the respiration of two persons. The present cylinder
onboard has the capacity time of 30minutes.
 So we want to increase the size of cylinder for 50 minutes. The warning
alarm will be set before the 15 minutes of emptying the cylinder.

 As we know SCBA is used by one person at a time but in advanced
 SCBA we are increasing the capacity of the Cylinder and attaching one
more
 outlet hose, reducing valve and face mask with previous one it is used only
 during the time of emergency by the suffocating person struggling during
the fire The user will be able to describe important aspects of safety and
demonstrate practical application as it pertains to emergency service
provider
 operations from memory, without assistance, to an accuracy of 70% and
the instructor's satisfaction. The user will be able to identify the basic
functions and uses of properly donning of self-contained breathing
apparatus.
 For ship between 500-2500 tons minimum two sets are
required.
 For ship between 2500-4000 tons minimum three sets are
required.
 For ship 4000 tons and above minimum four sets are required.
SOLAS:
1)As per SOLAS regulation 2/10.10
SCBA should not be crossed over 19kg and should not less than 200 litters
2) NFPA
NATIONAL FIRE PROTECTION AND ASSOCIATION
3) NIOSH
NATIONAL INSTITUTE OF OCCUPATIONAL SAFTY AND
HEALTH
FACEPIECE OR HOOD
 The North face piece assembly has a four-point adjustable
head harness. The face piece standard seal has a blended shape to
ensure a proper fit. A standard inner-mask oral/nasal cup reduces
dead-air space and CO2 buildup
 The North Air Hood is also available for users that prefer
to wear their own eyeglasses or may have facial hair that may
interfere with the sealing surface. The sealing surface of the hood
is around the neck, and there may not be any hair or jewelry
interfering with the neck seal. The North Air Hood is NIOSH
approved for entry into an IDLIH atmosphere .
 The Air Hood has a hard visor with a permanent anti-fog coating
that offers excellent vision, an inner oral/nasal cup to reduce
CO2 build-up, and adjustable side straps for a comfortable fit.
COMPACT DEMAND VALVE
(CDV)
 The patented Compact Demand
Valve regulator combines high flow
with allow profile to improve
mobility .
 The CDV exhalation valve greatly
reduces breathing resistance which
allows for longer duration of
cylinder use. The CDV is easily
docked into the face piece using a
threaded hand wheel. An optional
first breath CDV is also available.
FIRST STAGE PRESSURE REDUCER
 Air leaves the cylinder, passes through a sintered
bronze filter in the hand wheel assembly, and then
continues on to the first-stage pressure reducer where it is
reduced to approximately 125 psi.
 The reducer is a simple piston type that requires no
adjustment and incorporates an automatic, self-seat- ing
pressure relief valve to protect the downstream low-
pressure components. It is made of high quality
aluminum and is securely mounted to the cylinder.
 .
 The cylinder consists of atmospheric air of 200 bar, 2516 lit,
8.6cub.ft. When the cylinder valve 5 open 200 bar pressure
from cylinder is passed through reducing valve.
 In reducing valve the 200 bar pressure is reduced to 4 bar and
is passed through syphon tube to reach face mask as air comes
to the facemask.
 The pressure of air will be 1 bar which is atmosphere air
pressure, as we are connecting additional buddy breather with
help of non return ball valve which is three way. Buddy
breather can be connected during the time of emergency to
save the casualty without delay. This is simple working of
SCBA 40 lit air issued for I minute Training.
DUARATION CALCULATION= VOLLUME (in litters) * PRUSSURE ( in Bars) - 10
40 lit
(i,e) 40 is representing human being inhales 40 lit of air per
minute
(i,e) 10 is representing 10 min before alarm for safety
margin
ALLUMINIUM ALLOY LINER WITH CARBON FIBER STEEL
DUARATION CALCULATION = 6.8 * 300 -10 DUARATION CALCULATION = 6 * 300 -10
40 40
= 41minutes =35minutes
 
Fit Checks
Fit checks are to be conducted during
initial selection and training, and
puts on a respirator before entering a
contaminated atmosphere.
Negative Pressure Fit Check:
1. 1 Close off the respirator inlet or
inhalation valve, using the palm of the hand
over the opening
2. Gently inhale to create a slight vacuum in
an attempt to cause a partial inward
collapse of the face piece.
.
3. Maintain the vacuum inside the face
piece for at least 10 seconds.
4. If vacuum is not present rescuer
face piece seal and try again.
Positive Pressure Fit Check:
1. Close off exhalation valve and
exhale gently into the face piece.
2. The face fit is considered
satisfactory if a slight positive pressure
can be built up in side the face piece
 Inspect gauge for damage. Inspect cylinder for mechanical damage (cracks, dents,
gauges) or signs of heat or chemical damage "Guideline for Visual Inspection and at
Demand Valve 90 Requalification of Fiber Reinforced High Pressure Cylinders" for
all wrapped cylinders.)
 Check that hydrostatic test date on cylinder is current. Check that cylinder valve
threads are not damaged. Check that the valve body is not bent. Connect the CDV
to the FRONTIER face piece or hood by screwing the CDV hand wheel into the
hood or face piece. Make sure the manual red bypass knob is in the closed position,
i.e., fully turned clockwise. Open the cylinder valve slowly by turning the cylinder
valve knob counter-clockwise to the fully open position. Hold face piece tight to your
face.
 The whistle alarm should activate and then shut off. There should be no air flow
from the face piece. If air is flowing, check that bypass is closed. For the First
Breath CDV, inhale to activate airflow.
CONTENT STEEL (Single Cylinder) AALCF (Dual cylinders)
No. CYLINDER 1 2
WORKING (pr) 300 BAR 300 BAR
MAX (pr) 450 BAR 600 BAR
TESTED (pr) 600 BAR 950 BAR
LITTERS 1800 LIT 2030 LIT
WEIGHT (W.L) 10.8 KG 4.1 KG
( WITHOUT ) 5KG 3.9KG
TIMING 35 MIN 40.8+40.8=82MIN
PART
NUMBER
NORTH
CATALOG
NUMBER
PRESSURE
PSIG
MATERIAL
FREE
AIR
CAPACITY
NIOSH
RATED
DURATION
CYLINDER AND VALVE
CHARGED WEIGHT
HYDROSTATIC
INTERVEL
0.24.092
EN12245
HP
6500
ALLUMINIUM
ALLOY WITH
CORBON
FIBER 2400 LIT 40
8.818 LBS 8YEARS
0.24.037 9110301 LP 2216
AL 1287 LIT
30 15.9 LBS 5 YEARS
0.24..098 910302 HP 4500
HOOP ALLUMINIUM
1287LIT
30 15.9 LBS 3 YEARS
124002 910303
HP
4500
FULL CARBON
1287LIT 45 14.8 LBS 5 YEARS
 300 BAR working pressure
 Dual cylinder setup
 Dual hose setup (casualty +firefighting)
 70% Weight Reduced
 85% Volume Increased By Adding One Cylinder
 Enclosed space entry
 Fire fighting
 Casualty saving
 Hospital & Healthcare
 Under water diving Application
 Marine applications.
 Even the time of respiration for one person can be
increased. In this report, a design for SCBA FOR
CASUALITY, and the key functions, material used
,maintenance everything properly described. The
warning alarm will be set before the 15 minutes of
emptying the cylinder.
 This advanced self-contained breathing apparatus
consist of additional reducing valve demand valve
and mask, so, that while fighting the fire if a
person is suffocating, extra mask can be used to
save the person.
 Life can be saved
 Time can be saved
Scba 1234

More Related Content

What's hot

Ammonia Safety created by Salim Solanki
Ammonia Safety created by Salim SolankiAmmonia Safety created by Salim Solanki
Ammonia Safety created by Salim SolankiSalim Solanki
 
Gas cylinder safety
Gas cylinder safetyGas cylinder safety
Gas cylinder safetyAlvin Chew
 
ROPES AND KNOTS FOR FIRE AND RESCUE
ROPES AND KNOTS FOR FIRE AND RESCUEROPES AND KNOTS FOR FIRE AND RESCUE
ROPES AND KNOTS FOR FIRE AND RESCUEBruce Vincent
 
Chemical Safety in the Workplace
Chemical Safety in the WorkplaceChemical Safety in the Workplace
Chemical Safety in the WorkplaceAWARE-NS
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifWessam Atif
 
Hazardous energy isolation
Hazardous energy isolationHazardous energy isolation
Hazardous energy isolationPaul Buyink
 
Hazard Communication
Hazard Communication Hazard Communication
Hazard Communication Hvacmach
 
Safety in welding
Safety in weldingSafety in welding
Safety in weldingIlhamR222
 
Fire extinguisher training
Fire extinguisher trainingFire extinguisher training
Fire extinguisher traininghawkmedoo
 
Chemical Hazards Training Presentation
Chemical Hazards Training PresentationChemical Hazards Training Presentation
Chemical Hazards Training PresentationAhmed Moftah
 
Chemcial handling
 Chemcial handling Chemcial handling
Chemcial handlingReliance
 
Safety Data Sheet ( SDS )
Safety Data Sheet ( SDS ) Safety Data Sheet ( SDS )
Safety Data Sheet ( SDS ) Ahmad Thanin
 

What's hot (20)

Forklift safety
Forklift safetyForklift safety
Forklift safety
 
Ammonia Safety created by Salim Solanki
Ammonia Safety created by Salim SolankiAmmonia Safety created by Salim Solanki
Ammonia Safety created by Salim Solanki
 
Gas cylinder safety
Gas cylinder safetyGas cylinder safety
Gas cylinder safety
 
Hot Works Safety Training
Hot Works Safety TrainingHot Works Safety Training
Hot Works Safety Training
 
Work safe with grinder
Work safe with grinderWork safe with grinder
Work safe with grinder
 
ROPES AND KNOTS FOR FIRE AND RESCUE
ROPES AND KNOTS FOR FIRE AND RESCUEROPES AND KNOTS FOR FIRE AND RESCUE
ROPES AND KNOTS FOR FIRE AND RESCUE
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Lifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptxLifting & Rigging Safety.pptx
Lifting & Rigging Safety.pptx
 
Chemical Safety in the Workplace
Chemical Safety in the WorkplaceChemical Safety in the Workplace
Chemical Safety in the Workplace
 
Safety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam AtifSafety harness - fall protection - Wessam Atif
Safety harness - fall protection - Wessam Atif
 
Hazardous energy isolation
Hazardous energy isolationHazardous energy isolation
Hazardous energy isolation
 
Hazard Communication
Hazard Communication Hazard Communication
Hazard Communication
 
Msds training
Msds trainingMsds training
Msds training
 
Safety in welding
Safety in weldingSafety in welding
Safety in welding
 
Fire extinguisher training
Fire extinguisher trainingFire extinguisher training
Fire extinguisher training
 
Rigging Presentation
Rigging PresentationRigging Presentation
Rigging Presentation
 
Chemical Hazards Training Presentation
Chemical Hazards Training PresentationChemical Hazards Training Presentation
Chemical Hazards Training Presentation
 
Chemical safety
Chemical safety Chemical safety
Chemical safety
 
Chemcial handling
 Chemcial handling Chemcial handling
Chemcial handling
 
Safety Data Sheet ( SDS )
Safety Data Sheet ( SDS ) Safety Data Sheet ( SDS )
Safety Data Sheet ( SDS )
 

Similar to Scba 1234

Medical Gas Cylinders
 Medical Gas Cylinders Medical Gas Cylinders
Medical Gas CylindersSelva Kumar
 
Gas cutting welding1
Gas cutting  welding1Gas cutting  welding1
Gas cutting welding1soumenmakar
 
AIR_ENERGY_Hose&Coupler_Brochure_EMAIL
AIR_ENERGY_Hose&Coupler_Brochure_EMAILAIR_ENERGY_Hose&Coupler_Brochure_EMAIL
AIR_ENERGY_Hose&Coupler_Brochure_EMAILJarryd Lockhart
 
Medical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersMedical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersdrsauravdas1977
 
Murex arc-and-gas-cutting-and-welding-equipment-machines-removed
Murex arc-and-gas-cutting-and-welding-equipment-machines-removedMurex arc-and-gas-cutting-and-welding-equipment-machines-removed
Murex arc-and-gas-cutting-and-welding-equipment-machines-removedEngr.A.K.M Saiful Islam
 
car-bumper -final.pptx
car-bumper -final.pptxcar-bumper -final.pptx
car-bumper -final.pptxrishitbond
 
Instrument air package
Instrument air packageInstrument air package
Instrument air packageDipankar Maity
 
Oxygen MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECT
Oxygen  MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECTOxygen  MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECT
Oxygen MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECTDr.RMLIMS lucknow
 
Anaesthesia machine 2014 spmc
Anaesthesia machine 2014 spmcAnaesthesia machine 2014 spmc
Anaesthesia machine 2014 spmcDeepak Choudhary
 
Storage Tank Safety and Emissions Management
Storage Tank Safety and Emissions ManagementStorage Tank Safety and Emissions Management
Storage Tank Safety and Emissions ManagementАндрей Нечаев
 
NASA Preferred Reliability Practices Vacuum Seals Design Criteria
NASA Preferred Reliability Practices Vacuum Seals Design CriteriaNASA Preferred Reliability Practices Vacuum Seals Design Criteria
NASA Preferred Reliability Practices Vacuum Seals Design CriteriaBelilove Company-Engineers
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger Vibropac
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series Vibropac
 
Cashco - Reguladores de alta capacidade
Cashco -  Reguladores de alta capacidadeCashco -  Reguladores de alta capacidade
Cashco - Reguladores de alta capacidadeRenan Sehn Santos
 
Jay 5 bw
Jay 5 bwJay 5 bw
Jay 5 bwJeroxxx
 
Surface Preparation & Treatment
Surface Preparation & TreatmentSurface Preparation & Treatment
Surface Preparation & TreatmentAnsar Lawi
 
Fire extinguisher service; how it is done
Fire extinguisher service; how it is doneFire extinguisher service; how it is done
Fire extinguisher service; how it is doneUBONG EDET
 

Similar to Scba 1234 (20)

Medical Gas Cylinders
 Medical Gas Cylinders Medical Gas Cylinders
Medical Gas Cylinders
 
Gas cutting welding1
Gas cutting  welding1Gas cutting  welding1
Gas cutting welding1
 
AIR_ENERGY_Hose&Coupler_Brochure_EMAIL
AIR_ENERGY_Hose&Coupler_Brochure_EMAILAIR_ENERGY_Hose&Coupler_Brochure_EMAIL
AIR_ENERGY_Hose&Coupler_Brochure_EMAIL
 
Medical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylindersMedical gas supply.pipelines and cylinders
Medical gas supply.pipelines and cylinders
 
Murex arc-and-gas-cutting-and-welding-equipment-machines-removed
Murex arc-and-gas-cutting-and-welding-equipment-machines-removedMurex arc-and-gas-cutting-and-welding-equipment-machines-removed
Murex arc-and-gas-cutting-and-welding-equipment-machines-removed
 
car-bumper -final.pptx
car-bumper -final.pptxcar-bumper -final.pptx
car-bumper -final.pptx
 
Instrument air package
Instrument air packageInstrument air package
Instrument air package
 
Oxygen MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECT
Oxygen  MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECTOxygen  MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECT
Oxygen MANUFACTRE STORAGE PREPERATION AND CLINICAL ASPECT
 
Anaesthesia machine 2014 spmc
Anaesthesia machine 2014 spmcAnaesthesia machine 2014 spmc
Anaesthesia machine 2014 spmc
 
Co2
Co2Co2
Co2
 
Storage Tank Safety and Emissions Management
Storage Tank Safety and Emissions ManagementStorage Tank Safety and Emissions Management
Storage Tank Safety and Emissions Management
 
NASA Preferred Reliability Practices Vacuum Seals Design Criteria
NASA Preferred Reliability Practices Vacuum Seals Design CriteriaNASA Preferred Reliability Practices Vacuum Seals Design Criteria
NASA Preferred Reliability Practices Vacuum Seals Design Criteria
 
Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger   Catálogo Williams _ Vdual seal plunger
Catálogo Williams _ Vdual seal plunger
 
Catálogo Williams _ V series
Catálogo Williams _ V series Catálogo Williams _ V series
Catálogo Williams _ V series
 
Cashco - Reguladores de alta capacidade
Cashco -  Reguladores de alta capacidadeCashco -  Reguladores de alta capacidade
Cashco - Reguladores de alta capacidade
 
Jay 5 bw
Jay 5 bwJay 5 bw
Jay 5 bw
 
air driven engines
air driven enginesair driven engines
air driven engines
 
35 oxygen
35 oxygen35 oxygen
35 oxygen
 
Surface Preparation & Treatment
Surface Preparation & TreatmentSurface Preparation & Treatment
Surface Preparation & Treatment
 
Fire extinguisher service; how it is done
Fire extinguisher service; how it is doneFire extinguisher service; how it is done
Fire extinguisher service; how it is done
 

Recently uploaded

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Scba 1234

  • 1.
  • 2.  WORKING OF SCBA  SCBA CHECKING  APPLICATONS  CALCULATIONS  DIFFERENCE  CONCLUSION  ABSTRACT  INTRODUCTION  SOLAS REGULATION ON SCBA  PARTS OF SCBA  SNAPS
  • 3.  Safety is the very important factor on onboard ship. Still many accidents are happening onboard due to fire. SCBA FOR CASUALITY is a device which is used by one person during the inspection of fire location.  Our project is modifying the SCBA cylinder and face mask for the usage of two persons during emergency while fighting the fire SCBA FOR CASUALITY is the firefighting equipment. It is used during fire accident on-board. Now a days safety is most important in ship. Still now SCBA FOR CASUALITY is used by only one person. But in our project we are modifying the cylinder and equipment of SCBA FOR CASUALITY for the respiration of two persons. The present cylinder onboard has the capacity time of 30minutes.  So we want to increase the size of cylinder for 50 minutes. The warning alarm will be set before the 15 minutes of emptying the cylinder. 
  • 4.  As we know SCBA is used by one person at a time but in advanced  SCBA we are increasing the capacity of the Cylinder and attaching one more  outlet hose, reducing valve and face mask with previous one it is used only  during the time of emergency by the suffocating person struggling during the fire The user will be able to describe important aspects of safety and demonstrate practical application as it pertains to emergency service provider  operations from memory, without assistance, to an accuracy of 70% and the instructor's satisfaction. The user will be able to identify the basic functions and uses of properly donning of self-contained breathing apparatus.
  • 5.  For ship between 500-2500 tons minimum two sets are required.  For ship between 2500-4000 tons minimum three sets are required.  For ship 4000 tons and above minimum four sets are required.
  • 6. SOLAS: 1)As per SOLAS regulation 2/10.10 SCBA should not be crossed over 19kg and should not less than 200 litters 2) NFPA NATIONAL FIRE PROTECTION AND ASSOCIATION 3) NIOSH NATIONAL INSTITUTE OF OCCUPATIONAL SAFTY AND HEALTH
  • 7.
  • 8. FACEPIECE OR HOOD  The North face piece assembly has a four-point adjustable head harness. The face piece standard seal has a blended shape to ensure a proper fit. A standard inner-mask oral/nasal cup reduces dead-air space and CO2 buildup  The North Air Hood is also available for users that prefer to wear their own eyeglasses or may have facial hair that may interfere with the sealing surface. The sealing surface of the hood is around the neck, and there may not be any hair or jewelry interfering with the neck seal. The North Air Hood is NIOSH approved for entry into an IDLIH atmosphere .  The Air Hood has a hard visor with a permanent anti-fog coating that offers excellent vision, an inner oral/nasal cup to reduce CO2 build-up, and adjustable side straps for a comfortable fit.
  • 9. COMPACT DEMAND VALVE (CDV)  The patented Compact Demand Valve regulator combines high flow with allow profile to improve mobility .  The CDV exhalation valve greatly reduces breathing resistance which allows for longer duration of cylinder use. The CDV is easily docked into the face piece using a threaded hand wheel. An optional first breath CDV is also available.
  • 10. FIRST STAGE PRESSURE REDUCER  Air leaves the cylinder, passes through a sintered bronze filter in the hand wheel assembly, and then continues on to the first-stage pressure reducer where it is reduced to approximately 125 psi.  The reducer is a simple piston type that requires no adjustment and incorporates an automatic, self-seat- ing pressure relief valve to protect the downstream low- pressure components. It is made of high quality aluminum and is securely mounted to the cylinder.
  • 11.  .
  • 12.  The cylinder consists of atmospheric air of 200 bar, 2516 lit, 8.6cub.ft. When the cylinder valve 5 open 200 bar pressure from cylinder is passed through reducing valve.  In reducing valve the 200 bar pressure is reduced to 4 bar and is passed through syphon tube to reach face mask as air comes to the facemask.  The pressure of air will be 1 bar which is atmosphere air pressure, as we are connecting additional buddy breather with help of non return ball valve which is three way. Buddy breather can be connected during the time of emergency to save the casualty without delay. This is simple working of SCBA 40 lit air issued for I minute Training.
  • 13. DUARATION CALCULATION= VOLLUME (in litters) * PRUSSURE ( in Bars) - 10 40 lit (i,e) 40 is representing human being inhales 40 lit of air per minute (i,e) 10 is representing 10 min before alarm for safety margin
  • 14. ALLUMINIUM ALLOY LINER WITH CARBON FIBER STEEL DUARATION CALCULATION = 6.8 * 300 -10 DUARATION CALCULATION = 6 * 300 -10 40 40 = 41minutes =35minutes
  • 15.   Fit Checks Fit checks are to be conducted during initial selection and training, and puts on a respirator before entering a contaminated atmosphere. Negative Pressure Fit Check: 1. 1 Close off the respirator inlet or inhalation valve, using the palm of the hand over the opening 2. Gently inhale to create a slight vacuum in an attempt to cause a partial inward collapse of the face piece. .
  • 16. 3. Maintain the vacuum inside the face piece for at least 10 seconds. 4. If vacuum is not present rescuer face piece seal and try again. Positive Pressure Fit Check: 1. Close off exhalation valve and exhale gently into the face piece. 2. The face fit is considered satisfactory if a slight positive pressure can be built up in side the face piece
  • 17.  Inspect gauge for damage. Inspect cylinder for mechanical damage (cracks, dents, gauges) or signs of heat or chemical damage "Guideline for Visual Inspection and at Demand Valve 90 Requalification of Fiber Reinforced High Pressure Cylinders" for all wrapped cylinders.)  Check that hydrostatic test date on cylinder is current. Check that cylinder valve threads are not damaged. Check that the valve body is not bent. Connect the CDV to the FRONTIER face piece or hood by screwing the CDV hand wheel into the hood or face piece. Make sure the manual red bypass knob is in the closed position, i.e., fully turned clockwise. Open the cylinder valve slowly by turning the cylinder valve knob counter-clockwise to the fully open position. Hold face piece tight to your face.  The whistle alarm should activate and then shut off. There should be no air flow from the face piece. If air is flowing, check that bypass is closed. For the First Breath CDV, inhale to activate airflow.
  • 18. CONTENT STEEL (Single Cylinder) AALCF (Dual cylinders) No. CYLINDER 1 2 WORKING (pr) 300 BAR 300 BAR MAX (pr) 450 BAR 600 BAR TESTED (pr) 600 BAR 950 BAR LITTERS 1800 LIT 2030 LIT WEIGHT (W.L) 10.8 KG 4.1 KG ( WITHOUT ) 5KG 3.9KG TIMING 35 MIN 40.8+40.8=82MIN
  • 19. PART NUMBER NORTH CATALOG NUMBER PRESSURE PSIG MATERIAL FREE AIR CAPACITY NIOSH RATED DURATION CYLINDER AND VALVE CHARGED WEIGHT HYDROSTATIC INTERVEL 0.24.092 EN12245 HP 6500 ALLUMINIUM ALLOY WITH CORBON FIBER 2400 LIT 40 8.818 LBS 8YEARS 0.24.037 9110301 LP 2216 AL 1287 LIT 30 15.9 LBS 5 YEARS 0.24..098 910302 HP 4500 HOOP ALLUMINIUM 1287LIT 30 15.9 LBS 3 YEARS 124002 910303 HP 4500 FULL CARBON 1287LIT 45 14.8 LBS 5 YEARS
  • 20.  300 BAR working pressure  Dual cylinder setup  Dual hose setup (casualty +firefighting)  70% Weight Reduced  85% Volume Increased By Adding One Cylinder
  • 21.  Enclosed space entry  Fire fighting  Casualty saving  Hospital & Healthcare  Under water diving Application  Marine applications.
  • 22.  Even the time of respiration for one person can be increased. In this report, a design for SCBA FOR CASUALITY, and the key functions, material used ,maintenance everything properly described. The warning alarm will be set before the 15 minutes of emptying the cylinder.  This advanced self-contained breathing apparatus consist of additional reducing valve demand valve and mask, so, that while fighting the fire if a person is suffocating, extra mask can be used to save the person.  Life can be saved  Time can be saved