Introduction to
Construction Management
Presentation By: Aditi K. Shah
Content
▪ Importance of machineries in construction

▪ Classification of Construction Equipment
▪ Plants & Equipment used in construction
▪ Factors affecting selection of construction equipment
▪ Financial aspects related to construction equipments
▪ Discounted present worth analysis
▪ Depreciation
▪ Cost of owning and operating construction equipment

▪ Economic life of construction equipment
▪ Equipment replacement policy
The importance of machineries for
construction
▪ Work can be completed fast.

▪ Cost of project is reduced.
▪ Less number of laborers required.
▪ Excavation work can be carried out rapidly by using Power
shovel, Dragline etc.
▪ Output is higher
▪ Transportation of construction materials can be done easily by using
Trucks, Wagons, Dumpers etc.
▪ Heavy loads can be lifted with the help of Tower crane, Elevator etc.
The importance of machineries for
construction (contd.)
▪ Better quality in construction is obtained by using construction
equipments.
▪ E.g.: canal lining, concrete spreading, compaction & finishing are
carried out by lining machine.
▪ Finishing & rolling of bituminous roads is not possible without
Rollers.
Power Shovel
Dragline
Dumper
Tower
Crane
Lining
Machine
Concrete
Mixer
Bulldozer
Scrapper
Air
compressor
Belt
Conveyor
Classification of Construction
Equipment(according to work cycle)
1. Intermittent Type:

a. Bulldozers
b. Scrappers
c. Power Shovels
d. Concrete Mixers

e. Dragline

2. Continuous Flow Type: a. Air Compressors
b. Belt Conveyors

3. Mixed Type:

a. Motor Graders
Classification of Construction
Equipment(according to nature of Automation)
1. Manually Operated Equipment

2. Semi-Automatic Equipment
3. Fully Automatic Equipment
Classification of Construction
Equipment(according to Standardization of machine)
1. Standard Equipment

2. Special Equipment
Difference B/w Standard and Special
Equipments
Standard Equipment

Special Equipment

▪

Commonly used in all projects

▪

Used only in special cases

▪

Manufactured commonly & easily available from
dealer

▪

Manufactured as per requirements, special order
has to be placed

▪

Initial investment is low

▪

Initial investment is high

▪

Resale price is high

▪

Resale price is low

▪

Delivery is easy & fast

▪

Delivery is difficult & delayed

▪

Repairs and spare parts are easily found

▪

Repairs and spare parts are difficult to find

▪

Disposal is easy

▪

Disposal is difficult

▪

Unit cost of production is less

▪

Unit cost of production is high

▪

Rent is low and reasonable

▪

Rent is high and unreasonable

▪

E.g. Canal Trimmer

▪

E.g. Belt Conveyor
Plants & Equipments used in Construction
▪ Equipment for Excavation
▪ Earthmoving equipment
▪ Hauling equipment
▪ Hoisting equipment
▪ Conveying equipment
▪ Pile driving equipment
▪ Drilling equipment

▪ Equipment for production of
aggregate
▪ Plant for grouting and guniting
▪ Machineries for bituminous road
▪ Machineries for concrete works
▪ Dredging equipment
Equipment
for
Excavation
Earthmoving
Equipment
Hauling
Equipment
Hoisting
Equipment
Conveying
Equipment
Pumping
Equipment
Compacting
equipment
Pile Driving
Equipment
Drilling
Equipment
Equipment for
production of
Aggregate
Grouting
Guniting
Machinery for
Bituminous Road
Dredging
Equipment
Factors affecting the selection of
Construction Equipment
1. Use of standard equipments

2. Size of equipment
3. Uniformity of type
4. Country of origin

5. Initial cost of equipment
6. Availability of spare parts
7. Unit cost of production

8. Operating facility
9. Suitability for future
Financial aspects related to
construction equipments
▪ How to arrange finance

Sources of
equipment

▪ Whether to buy or hire
Long term

Short term

Buy

Down
payment

On loans
mobilized

Lease

Payment in
installments

Time lease

Leasing with
option to buy
later
Direct purchase
Advantages

Disadvantages

▪ Equipment is always
economically operated

▪ If equipment becomes obsolete, it is
useless

▪ It receives better care &
maintenance

▪ Large sums involved remain blocked

▪ It can be available and used at
any time

▪ Tendency to perform work as per
available equipment
▪ Disposal is difficult
▪ Equipment may be used beyond its
economic life
▪ Equipment may remain in idle
condition for some time
Hiring (advantages)
▪ Little care is required for maintenance and storage
▪ Desired equipment is available in working order at short
notice
▪ Investment costs can be diverted to other better purposes
▪ No fear of obsolescence of equipment, full advantage is
taken by contractor of the improved technical aspects of
equipment

▪ If found useful, equipment can be bought later
Examples- Purchase/ Hire

▪ The original cost of bulldozer power shovel is
Rs. 4 lacs & its salvage value is 8% of the
original cost. The bulldozer is use for 1200
hours/year and its life is 4 years. The hiring
charges for the bulldozer incl. maintenance &
repairs is Rs. 20000/month. Suggest whether
the bulldozer should be purchased or hired.
Solution: (on the board)
Discounted Present Worth Analysis
▪ It involves calculating the present value of all
amounts involved in all the alternatives to
determine the present worth of the proposed
alternatives.
▪ Decision problems may be of two types:
a. Revenue dominated cash flow diagram
b. Cost dominated cash flow diagram
What is Inflow and Outflow:
(a) Revenue Profit dominated cash flow
diagram:
▪ In this type of cash flow diagram, the revenue, profit, salvage
value, etc. (inflows) will be assigned a (+ve) sign while costs
(outflows) will be assigned.
▪ Finally, the alternative having the maximum present worth amount
should be selected as the best alternative.
(b) Cost dominated cash flow diagram:
▪ In this type of diagram, the cost(outflows) will be assigned with (+ve)
sign and revenue, profit, salvage value(all inflows) etc. will be
assigned with (-ve) sign.
▪ Finally, the alternative having the minimum present worth amount
should be selected as the best alternative.
Depreciation
▪ It is the gradual loss in the value of the property due to its
use, life, wear, tear and decay.

▪ It is dependent on its original condition, quality of
maintenance & mode of use.
▪ Usually a % of depreciation per annum is allowed, which
gradually increases with time
▪ Present value of property
= Initial cost - Total amount of depreciation
Types of depreciation
a) Physical depreciation
1. wear and tear from operation
2. action of time and other elements

b) Functional depreciation
1. inadequacy or suppression
2. obsolescence
Methods of Calculating Depreciation:
1. Straight Line method
2. Constant Percentage method
3. Sinking Fund method

4. Sum of Digits method
5. Service Output method
Straight Line method
Assumption: Property loses its value by the same amount every year.
Therefore, Annual Depreciation= Annual Decrease in property value
where, D= Annual Depreciation

C= Original Cost
Depreciation of property after m years:

S= Scrap Value
n , m= life in years

Therefore, Book value after m years:
Constant Percentage method
▪ Assumption: Property will lose its value by a constant percentage of its
value at the beginning of every year.

Where, p= % rate of annual Depreciation
S= Scrap value
C= Original cost

n= life in years
▪ If any age of property is m years, the value of property after m years:
Sinking Fund method
▪ Assumption: depreciation of the property = the annual sinking fund
+ interest on the sinking fund for that year

▪ If I is the rate of interest, the annual sinking fund installment(p) to
accumulate 1 Rs in m years:
▪ If I is the rate of interest, and 1 Rs is deposited every year, total
sinking fund accumulated at the end of n years:
▪ Rate of depreciation in n years:
Factors affecting Cost of Owning &
operating Equipment:
▪ Cost of the equipment to the owner

▪ Demand of the equipment at the end of its useful life
▪ Number of hours it is used per year
▪ Number of years it is used
▪ Severity of conditions under which it is used
▪ State of maintenance and repairs
Costs to be considered for owning and
operating equipment:
▪ Depreciation Cost
▪ Investment Cost

(Average investment=

)

▪ Maintenance and repair Cost
▪ Operation Cost (Repair charges, Depreciation on tyres and
tubes, Labour Charges, Fuel Charges, Operators and
maintenance crew charges, Miscellaneous Supplies)
▪ Down time Cost
▪ Obsolescence Cost
▪ Replacement Costs
Numerical
For construction Equipment following information is available.
Initial cost of acquisition = Rs 6500000
Cost of tyre sets

= Rs 350000, replaced after every 4500 hours

Cost of lubricants, minor
Repairs and maintenance = Rs 1100/hour
Estimated life

= 13500 hours of operation

Estimated salvage value = 15% of initial cost
Estimated usage of equipment= 1500 hours/year
If MARR is 20% per year, Estimate minimum hourly rental charges for
equipment
Economic life of Construction
Equipments:
Equipment should be replaced under following circumstances:
1. Depreciation
2. Downtime
3. Inadequacy
4. Normal Deterioration
Equipment Replacement Policy:
A firm has to face three type of decisions:
1.

The replacement of equipment as it wears out

2.

The equipment required for expansion

3.

The replacement of old technology by new

Equipment is replaced before its estimated life to:
▪

Reduce production cost

▪

Reduce fatigue

▪

Raise quality

▪

Increase output

▪

Secure greater convenience, safety and reliability
What not to consider while selecting an
equipment:
For Equipment in Use

▪ Original Cost
▪ Money already spent on repairs and maintenance
▪ Unrealistic book value
For New Equipment
▪ Any savings not clearly assessable
▪ Overhead charges
Thank you

More Related Content

What's hot

Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line methodmalang1214
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Managementsrinivas2036
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYINGlizwi nyandu
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction CostingManish Kandpal
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety ManagementGAURAV. H .TANDON
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDAshwiniChaudhari13
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil EngineeringKailash Chander
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-ContractsNikhil Kumar
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costingJanak Mehta
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
construction equipments
construction equipmentsconstruction equipments
construction equipmentssakshi_1609
 

What's hot (20)

Lec 9 center line method
Lec 9 center line methodLec 9 center line method
Lec 9 center line method
 
Construction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project ManagementConstruction planning - Construction Technology and Project Management
Construction planning - Construction Technology and Project Management
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
PPT on Construction Costing
PPT on Construction CostingPPT on Construction Costing
PPT on Construction Costing
 
Demolition of buildings
Demolition of buildingsDemolition of buildings
Demolition of buildings
 
Estimating & Costing - I
Estimating & Costing - IEstimating & Costing - I
Estimating & Costing - I
 
Construction Safety Management
Construction Safety ManagementConstruction Safety Management
Construction Safety Management
 
District schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWDDistrict schedule rates (DSR), specification of items of work as per PWD
District schedule rates (DSR), specification of items of work as per PWD
 
Valuation part of Building
Valuation part of Building Valuation part of Building
Valuation part of Building
 
Approximate estimate
Approximate estimateApproximate estimate
Approximate estimate
 
Valuation(1)
Valuation(1)Valuation(1)
Valuation(1)
 
Types of estimates
Types of estimatesTypes of estimates
Types of estimates
 
Valuation in Civil Engineering
Valuation in Civil EngineeringValuation in Civil Engineering
Valuation in Civil Engineering
 
civil engineering-Contracts
civil engineering-Contractscivil engineering-Contracts
civil engineering-Contracts
 
Terminology used in estimating and costing
Terminology used in estimating and costingTerminology used in estimating and costing
Terminology used in estimating and costing
 
Tender
TenderTender
Tender
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
construction equipments
construction equipmentsconstruction equipments
construction equipments
 

Similar to Introduction to construction management

9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU
9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU
9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTUVATSAL PATEL
 
Equipment management
Equipment managementEquipment management
Equipment managementKHUSHBU SHAH
 
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic conceptsConstruction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic conceptsWaleed Liaqat
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh2cd
 
Mechanised construction
Mechanised constructionMechanised construction
Mechanised constructionMANUJ sinh
 
Sheet Metal Part Costing
Sheet Metal Part CostingSheet Metal Part Costing
Sheet Metal Part Costingsidhant68
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrcnarayanch1979
 
Analyis of Rate MODULE VI October 2022.pptx
Analyis of Rate  MODULE VI October 2022.pptxAnalyis of Rate  MODULE VI October 2022.pptx
Analyis of Rate MODULE VI October 2022.pptxrekhat26
 
Accounting Lec#9.pptx
Accounting Lec#9.pptxAccounting Lec#9.pptx
Accounting Lec#9.pptxRabikaKhan2
 
cme-161001164236.pdf
cme-161001164236.pdfcme-161001164236.pdf
cme-161001164236.pdfAtulBorse3
 
DEPRECIATION.pptx
DEPRECIATION.pptxDEPRECIATION.pptx
DEPRECIATION.pptxAnneAlyas
 
Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&bParam Saxena
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionSarbesh Mishra
 
Piston ring kuldeep agrawal
Piston ring  kuldeep agrawalPiston ring  kuldeep agrawal
Piston ring kuldeep agrawalANIKET KULKARNI
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxmegha desai
 

Similar to Introduction to construction management (20)

9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU
9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU
9.INTRODUCTION TO CONSTRUCTION MANAGEMENT (ACE) GTU
 
Equipment management
Equipment managementEquipment management
Equipment management
 
Chapter 9 introduction to construction equipments
Chapter  9 introduction to construction equipmentsChapter  9 introduction to construction equipments
Chapter 9 introduction to construction equipments
 
Construction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic conceptsConstruction machinery - Associated costs and basic concepts
Construction machinery - Associated costs and basic concepts
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh
 
Mechanised construction
Mechanised constructionMechanised construction
Mechanised construction
 
Sheet Metal Part Costing
Sheet Metal Part CostingSheet Metal Part Costing
Sheet Metal Part Costing
 
Rate analysis brief
Rate analysis briefRate analysis brief
Rate analysis brief
 
Construction equipment need and factors-nrc
Construction equipment need and factors-nrcConstruction equipment need and factors-nrc
Construction equipment need and factors-nrc
 
Rate analysis vansheika
Rate analysis   vansheikaRate analysis   vansheika
Rate analysis vansheika
 
Analyis of Rate MODULE VI October 2022.pptx
Analyis of Rate  MODULE VI October 2022.pptxAnalyis of Rate  MODULE VI October 2022.pptx
Analyis of Rate MODULE VI October 2022.pptx
 
Accounting Lec#9.pptx
Accounting Lec#9.pptxAccounting Lec#9.pptx
Accounting Lec#9.pptx
 
UNIT 2.pptx
UNIT 2.pptxUNIT 2.pptx
UNIT 2.pptx
 
cme-161001164236.pdf
cme-161001164236.pdfcme-161001164236.pdf
cme-161001164236.pdf
 
DEPRECIATION.pptx
DEPRECIATION.pptxDEPRECIATION.pptx
DEPRECIATION.pptx
 
Project study report c&b
Project  study report c&bProject  study report c&b
Project study report c&b
 
EAR and CAR Insurance in Construction
EAR and CAR Insurance in ConstructionEAR and CAR Insurance in Construction
EAR and CAR Insurance in Construction
 
CPM 1 .pdf
CPM 1 .pdfCPM 1 .pdf
CPM 1 .pdf
 
Piston ring kuldeep agrawal
Piston ring  kuldeep agrawalPiston ring  kuldeep agrawal
Piston ring kuldeep agrawal
 
CL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptxCL 380_Unit-1 (1).pptx
CL 380_Unit-1 (1).pptx
 

More from Aditi Shah

Construction Material: Lime
Construction Material: LimeConstruction Material: Lime
Construction Material: LimeAditi Shah
 
The most important skill-Communication
The most important skill-CommunicationThe most important skill-Communication
The most important skill-CommunicationAditi Shah
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi ShahAditi Shah
 
Drainage system
Drainage systemDrainage system
Drainage systemAditi Shah
 

More from Aditi Shah (6)

Construction Material: Lime
Construction Material: LimeConstruction Material: Lime
Construction Material: Lime
 
The most important skill-Communication
The most important skill-CommunicationThe most important skill-Communication
The most important skill-Communication
 
Railway Signalling by Aditi Shah
Railway Signalling by Aditi ShahRailway Signalling by Aditi Shah
Railway Signalling by Aditi Shah
 
Flooring
FlooringFlooring
Flooring
 
Chandigarh
ChandigarhChandigarh
Chandigarh
 
Drainage system
Drainage systemDrainage system
Drainage system
 

Recently uploaded

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfchloefrazer622
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 

Recently uploaded (20)

Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Disha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdfDisha NEET Physics Guide for classes 11 and 12.pdf
Disha NEET Physics Guide for classes 11 and 12.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 

Introduction to construction management

  • 2. Content ▪ Importance of machineries in construction ▪ Classification of Construction Equipment ▪ Plants & Equipment used in construction ▪ Factors affecting selection of construction equipment ▪ Financial aspects related to construction equipments ▪ Discounted present worth analysis ▪ Depreciation ▪ Cost of owning and operating construction equipment ▪ Economic life of construction equipment ▪ Equipment replacement policy
  • 3. The importance of machineries for construction ▪ Work can be completed fast. ▪ Cost of project is reduced. ▪ Less number of laborers required. ▪ Excavation work can be carried out rapidly by using Power shovel, Dragline etc. ▪ Output is higher ▪ Transportation of construction materials can be done easily by using Trucks, Wagons, Dumpers etc. ▪ Heavy loads can be lifted with the help of Tower crane, Elevator etc.
  • 4. The importance of machineries for construction (contd.) ▪ Better quality in construction is obtained by using construction equipments. ▪ E.g.: canal lining, concrete spreading, compaction & finishing are carried out by lining machine. ▪ Finishing & rolling of bituminous roads is not possible without Rollers.
  • 15. Classification of Construction Equipment(according to work cycle) 1. Intermittent Type: a. Bulldozers b. Scrappers c. Power Shovels d. Concrete Mixers e. Dragline 2. Continuous Flow Type: a. Air Compressors b. Belt Conveyors 3. Mixed Type: a. Motor Graders
  • 16. Classification of Construction Equipment(according to nature of Automation) 1. Manually Operated Equipment 2. Semi-Automatic Equipment 3. Fully Automatic Equipment
  • 17. Classification of Construction Equipment(according to Standardization of machine) 1. Standard Equipment 2. Special Equipment
  • 18. Difference B/w Standard and Special Equipments Standard Equipment Special Equipment ▪ Commonly used in all projects ▪ Used only in special cases ▪ Manufactured commonly & easily available from dealer ▪ Manufactured as per requirements, special order has to be placed ▪ Initial investment is low ▪ Initial investment is high ▪ Resale price is high ▪ Resale price is low ▪ Delivery is easy & fast ▪ Delivery is difficult & delayed ▪ Repairs and spare parts are easily found ▪ Repairs and spare parts are difficult to find ▪ Disposal is easy ▪ Disposal is difficult ▪ Unit cost of production is less ▪ Unit cost of production is high ▪ Rent is low and reasonable ▪ Rent is high and unreasonable ▪ E.g. Canal Trimmer ▪ E.g. Belt Conveyor
  • 19. Plants & Equipments used in Construction ▪ Equipment for Excavation ▪ Earthmoving equipment ▪ Hauling equipment ▪ Hoisting equipment ▪ Conveying equipment ▪ Pile driving equipment ▪ Drilling equipment ▪ Equipment for production of aggregate ▪ Plant for grouting and guniting ▪ Machineries for bituminous road ▪ Machineries for concrete works ▪ Dredging equipment
  • 34. Factors affecting the selection of Construction Equipment 1. Use of standard equipments 2. Size of equipment 3. Uniformity of type 4. Country of origin 5. Initial cost of equipment 6. Availability of spare parts 7. Unit cost of production 8. Operating facility 9. Suitability for future
  • 35. Financial aspects related to construction equipments ▪ How to arrange finance Sources of equipment ▪ Whether to buy or hire Long term Short term Buy Down payment On loans mobilized Lease Payment in installments Time lease Leasing with option to buy later
  • 36. Direct purchase Advantages Disadvantages ▪ Equipment is always economically operated ▪ If equipment becomes obsolete, it is useless ▪ It receives better care & maintenance ▪ Large sums involved remain blocked ▪ It can be available and used at any time ▪ Tendency to perform work as per available equipment ▪ Disposal is difficult ▪ Equipment may be used beyond its economic life ▪ Equipment may remain in idle condition for some time
  • 37. Hiring (advantages) ▪ Little care is required for maintenance and storage ▪ Desired equipment is available in working order at short notice ▪ Investment costs can be diverted to other better purposes ▪ No fear of obsolescence of equipment, full advantage is taken by contractor of the improved technical aspects of equipment ▪ If found useful, equipment can be bought later
  • 38. Examples- Purchase/ Hire ▪ The original cost of bulldozer power shovel is Rs. 4 lacs & its salvage value is 8% of the original cost. The bulldozer is use for 1200 hours/year and its life is 4 years. The hiring charges for the bulldozer incl. maintenance & repairs is Rs. 20000/month. Suggest whether the bulldozer should be purchased or hired. Solution: (on the board)
  • 39. Discounted Present Worth Analysis ▪ It involves calculating the present value of all amounts involved in all the alternatives to determine the present worth of the proposed alternatives. ▪ Decision problems may be of two types: a. Revenue dominated cash flow diagram b. Cost dominated cash flow diagram
  • 40. What is Inflow and Outflow:
  • 41. (a) Revenue Profit dominated cash flow diagram: ▪ In this type of cash flow diagram, the revenue, profit, salvage value, etc. (inflows) will be assigned a (+ve) sign while costs (outflows) will be assigned. ▪ Finally, the alternative having the maximum present worth amount should be selected as the best alternative.
  • 42. (b) Cost dominated cash flow diagram: ▪ In this type of diagram, the cost(outflows) will be assigned with (+ve) sign and revenue, profit, salvage value(all inflows) etc. will be assigned with (-ve) sign. ▪ Finally, the alternative having the minimum present worth amount should be selected as the best alternative.
  • 43. Depreciation ▪ It is the gradual loss in the value of the property due to its use, life, wear, tear and decay. ▪ It is dependent on its original condition, quality of maintenance & mode of use. ▪ Usually a % of depreciation per annum is allowed, which gradually increases with time ▪ Present value of property = Initial cost - Total amount of depreciation
  • 44. Types of depreciation a) Physical depreciation 1. wear and tear from operation 2. action of time and other elements b) Functional depreciation 1. inadequacy or suppression 2. obsolescence
  • 45. Methods of Calculating Depreciation: 1. Straight Line method 2. Constant Percentage method 3. Sinking Fund method 4. Sum of Digits method 5. Service Output method
  • 46. Straight Line method Assumption: Property loses its value by the same amount every year. Therefore, Annual Depreciation= Annual Decrease in property value where, D= Annual Depreciation C= Original Cost Depreciation of property after m years: S= Scrap Value n , m= life in years Therefore, Book value after m years:
  • 47. Constant Percentage method ▪ Assumption: Property will lose its value by a constant percentage of its value at the beginning of every year. Where, p= % rate of annual Depreciation S= Scrap value C= Original cost n= life in years ▪ If any age of property is m years, the value of property after m years:
  • 48. Sinking Fund method ▪ Assumption: depreciation of the property = the annual sinking fund + interest on the sinking fund for that year ▪ If I is the rate of interest, the annual sinking fund installment(p) to accumulate 1 Rs in m years: ▪ If I is the rate of interest, and 1 Rs is deposited every year, total sinking fund accumulated at the end of n years: ▪ Rate of depreciation in n years:
  • 49. Factors affecting Cost of Owning & operating Equipment: ▪ Cost of the equipment to the owner ▪ Demand of the equipment at the end of its useful life ▪ Number of hours it is used per year ▪ Number of years it is used ▪ Severity of conditions under which it is used ▪ State of maintenance and repairs
  • 50. Costs to be considered for owning and operating equipment: ▪ Depreciation Cost ▪ Investment Cost (Average investment= ) ▪ Maintenance and repair Cost ▪ Operation Cost (Repair charges, Depreciation on tyres and tubes, Labour Charges, Fuel Charges, Operators and maintenance crew charges, Miscellaneous Supplies) ▪ Down time Cost ▪ Obsolescence Cost ▪ Replacement Costs
  • 51. Numerical For construction Equipment following information is available. Initial cost of acquisition = Rs 6500000 Cost of tyre sets = Rs 350000, replaced after every 4500 hours Cost of lubricants, minor Repairs and maintenance = Rs 1100/hour Estimated life = 13500 hours of operation Estimated salvage value = 15% of initial cost Estimated usage of equipment= 1500 hours/year If MARR is 20% per year, Estimate minimum hourly rental charges for equipment
  • 52. Economic life of Construction Equipments: Equipment should be replaced under following circumstances: 1. Depreciation 2. Downtime 3. Inadequacy 4. Normal Deterioration
  • 53. Equipment Replacement Policy: A firm has to face three type of decisions: 1. The replacement of equipment as it wears out 2. The equipment required for expansion 3. The replacement of old technology by new Equipment is replaced before its estimated life to: ▪ Reduce production cost ▪ Reduce fatigue ▪ Raise quality ▪ Increase output ▪ Secure greater convenience, safety and reliability
  • 54. What not to consider while selecting an equipment: For Equipment in Use ▪ Original Cost ▪ Money already spent on repairs and maintenance ▪ Unrealistic book value For New Equipment ▪ Any savings not clearly assessable ▪ Overhead charges