RISK ASSESSMENT RECORDING FORM
Location: Garden
Address: Paul Street/ Warrington
Date Assessment
Undertaken: 20/01/14
Assessment undertaken
By: Adrianna Czachor
Activity: Photo shoot For Cover 1
Situation
Review
Date: N/A
Signature
(1) Hazard Risk (2) Who might be harmed and how? (3) What controls exist to reduce
risk
(4) What action can be taken
to further reduce risk?
Tripping over twigs
When the camera and tripod, all set
up, there might be a risk of someone
tripping over a tripod, if not careful
1
2
The person who tripped over twigs
The person who tripped over a
tripod
Likelyhood-2
Make sure the bigger twigs(that
could possibly cause harm) are
removed from the area the photo
shoot is going to take place
Likelyhood-3
Make sure someone is always
standing near the camera and
makes sure that the hazard is
minimised to the smallest possible
amount of degree.
Be careful where you’re stepping
Only the person who taking the
pictures allowed near the camera,
this will minimize the risk of
someone tripping over a tripod or
camera.
1. List hazards something with the potential to cause harm here:
Seek to quantify the level of risk the likelihood of harm arising based on the number of persons affected, how often they are exposed to the hazard and the
severity of any consequence.
2. List groups of people who are especially at risk from the significant hazards which you have identified
3. List existing controls here or note where the information may be found
4. List the risks which are not adequately controlled and the action you will take. Have regard for the level of risk, the cost of any action and the benefit you expect to
gain.
(1) Hazard Risk (2) Who might be harmed and how? (3) What controls exist to reduce
risk
(5) What action can be taken
to further reduce risk?
RISK RATING
a SEVERITY b LIKELIHOOD c FINAL SCORE RATING: what needs to be done
5 Dying or being permanently disabled 5 Will almost certainly happen 16-25 Stop! Do not start activity again until risk is
controlled
4 Serious injury/long term illness 4 Highly likely to happen 10-15 High risk level, High priority. Take action
straight away to control the risk
3 Temporary disability/3 days off sick 3 Not so likely 6-9 Medium risk level. Tighten up controls and
make a plan to do something about risk
2 Will need medical attention 2 Even less likely 3-5 Fairly low risk level. Low priority but keep
possible action in mind
1 Minor injury eg. Bruise, graze 1 Unlikely to happen at all 1-2 Low or trivial risk. No further action
required.
SO: a x b = c
Action Required Responsible Person Date for Completion

More Related Content

What's hot

Risk assessment (house)
Risk assessment (house)Risk assessment (house)
Risk assessment (house)bc05093848
 
Risk assessment template (emma)
Risk assessment template (emma)Risk assessment template (emma)
Risk assessment template (emma)eh05057922
 
Risk assessment sankey valley
Risk assessment sankey valleyRisk assessment sankey valley
Risk assessment sankey valleyso05056454
 
Risk Assessment 3
Risk Assessment 3Risk Assessment 3
Risk Assessment 3brengeddes
 
Risk assesment grundy
Risk assesment grundyRisk assesment grundy
Risk assesment grundyLiamKirby1999
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1brengeddes
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2brengeddes
 
Risk assement of graffiti wall
Risk assement of graffiti wallRisk assement of graffiti wall
Risk assement of graffiti wallRhysMcLoughlin
 
Risk Based Approach
Risk Based ApproachRisk Based Approach
Risk Based ApproachGopala P.
 
Risk assessment (home)
Risk assessment (home)Risk assessment (home)
Risk assessment (home)bc05093848
 
Risk assessment 3
Risk assessment 3Risk assessment 3
Risk assessment 3Robbie35411
 
Risk assessment alley way
Risk assessment alley wayRisk assessment alley way
Risk assessment alley wayrobdoom
 

What's hot (15)

Risk assessment (house)
Risk assessment (house)Risk assessment (house)
Risk assessment (house)
 
Risk assessment template (emma)
Risk assessment template (emma)Risk assessment template (emma)
Risk assessment template (emma)
 
Risk assessment sankey valley
Risk assessment sankey valleyRisk assessment sankey valley
Risk assessment sankey valley
 
Risk Assessment 3
Risk Assessment 3Risk Assessment 3
Risk Assessment 3
 
Risk assessment courtyard
Risk assessment courtyardRisk assessment courtyard
Risk assessment courtyard
 
Risk assesment grundy
Risk assesment grundyRisk assesment grundy
Risk assesment grundy
 
Risk assessment 1
Risk assessment 1Risk assessment 1
Risk assessment 1
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
 
Risk assement of graffiti wall
Risk assement of graffiti wallRisk assement of graffiti wall
Risk assement of graffiti wall
 
Risk assessment Side Street
Risk assessment Side StreetRisk assessment Side Street
Risk assessment Side Street
 
Risk Based Approach
Risk Based ApproachRisk Based Approach
Risk Based Approach
 
Risk assessment (home)
Risk assessment (home)Risk assessment (home)
Risk assessment (home)
 
Risk assessment 3
Risk assessment 3Risk assessment 3
Risk assessment 3
 
Risk assessment alley way
Risk assessment alley wayRisk assessment alley way
Risk assessment alley way
 
Risk assessment
Risk assessment Risk assessment
Risk assessment
 

Viewers also liked

Acts history compressed
Acts history compressedActs history compressed
Acts history compressedDorothyCoe
 
Presentation rec agency-expo feb12
Presentation   rec agency-expo feb12Presentation   rec agency-expo feb12
Presentation rec agency-expo feb12Stephanie King
 
Educational institution closed
Educational institution closedEducational institution closed
Educational institution closedOzair Rahin
 
임베디드 시스템 –Atm 3차과제
임베디드 시스템 –Atm 3차과제임베디드 시스템 –Atm 3차과제
임베디드 시스템 –Atm 3차과제QoQofh
 
Q3 2014 Earnings Release Supplement
Q3 2014 Earnings Release SupplementQ3 2014 Earnings Release Supplement
Q3 2014 Earnings Release SupplementBarnes_Group
 
Short spreecast pp for january 27, 2014
Short spreecast pp for january 27, 2014Short spreecast pp for january 27, 2014
Short spreecast pp for january 27, 2014Tom Colquitt
 
Mel Fuller - Founder of three farm and Makers Place
Mel Fuller - Founder of three farm and Makers PlaceMel Fuller - Founder of three farm and Makers Place
Mel Fuller - Founder of three farm and Makers PlaceMelissa Fuller
 
Manual bwf22 241
Manual bwf22 241Manual bwf22 241
Manual bwf22 241mirosilvas
 
Generic pharmacy talk
Generic pharmacy talkGeneric pharmacy talk
Generic pharmacy talkJulia Purpera
 
Benson-Marshall-Matthew
Benson-Marshall-MatthewBenson-Marshall-Matthew
Benson-Marshall-MatthewOPUNITE
 
Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...
Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...
Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...IJREST
 
Semester a final review
Semester a final reviewSemester a final review
Semester a final reviewairkac
 
tahun 1 buku aktiviti Ms 28
tahun 1 buku aktiviti Ms 28tahun 1 buku aktiviti Ms 28
tahun 1 buku aktiviti Ms 28khoo0408
 
The Rotary Foundation Cadre of Technical Advisers 5 of 5
The Rotary Foundation Cadre of Technical Advisers 5 of 5The Rotary Foundation Cadre of Technical Advisers 5 of 5
The Rotary Foundation Cadre of Technical Advisers 5 of 5Rotary International
 
ASP.NET Session 6
ASP.NET Session 6ASP.NET Session 6
ASP.NET Session 6Sisir Ghosh
 
Iris/Retina Identification System
Iris/Retina Identification SystemIris/Retina Identification System
Iris/Retina Identification SystemNIMITA NELSON
 
Managed LinkedIn Services from The Conversion Company
Managed LinkedIn Services from The Conversion CompanyManaged LinkedIn Services from The Conversion Company
Managed LinkedIn Services from The Conversion CompanyThe Conversion Company LLC
 

Viewers also liked (20)

Acts history compressed
Acts history compressedActs history compressed
Acts history compressed
 
Presentation rec agency-expo feb12
Presentation   rec agency-expo feb12Presentation   rec agency-expo feb12
Presentation rec agency-expo feb12
 
Educational institution closed
Educational institution closedEducational institution closed
Educational institution closed
 
임베디드 시스템 –Atm 3차과제
임베디드 시스템 –Atm 3차과제임베디드 시스템 –Atm 3차과제
임베디드 시스템 –Atm 3차과제
 
Forever In Love
Forever In LoveForever In Love
Forever In Love
 
Q3 2014 Earnings Release Supplement
Q3 2014 Earnings Release SupplementQ3 2014 Earnings Release Supplement
Q3 2014 Earnings Release Supplement
 
Short spreecast pp for january 27, 2014
Short spreecast pp for january 27, 2014Short spreecast pp for january 27, 2014
Short spreecast pp for january 27, 2014
 
Oral report
Oral reportOral report
Oral report
 
Cs207 7
Cs207 7Cs207 7
Cs207 7
 
Mel Fuller - Founder of three farm and Makers Place
Mel Fuller - Founder of three farm and Makers PlaceMel Fuller - Founder of three farm and Makers Place
Mel Fuller - Founder of three farm and Makers Place
 
Manual bwf22 241
Manual bwf22 241Manual bwf22 241
Manual bwf22 241
 
Generic pharmacy talk
Generic pharmacy talkGeneric pharmacy talk
Generic pharmacy talk
 
Benson-Marshall-Matthew
Benson-Marshall-MatthewBenson-Marshall-Matthew
Benson-Marshall-Matthew
 
Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...
Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...
Application of Pharma Economic Evaluation Tools for Analysis of Medical Condi...
 
Semester a final review
Semester a final reviewSemester a final review
Semester a final review
 
tahun 1 buku aktiviti Ms 28
tahun 1 buku aktiviti Ms 28tahun 1 buku aktiviti Ms 28
tahun 1 buku aktiviti Ms 28
 
The Rotary Foundation Cadre of Technical Advisers 5 of 5
The Rotary Foundation Cadre of Technical Advisers 5 of 5The Rotary Foundation Cadre of Technical Advisers 5 of 5
The Rotary Foundation Cadre of Technical Advisers 5 of 5
 
ASP.NET Session 6
ASP.NET Session 6ASP.NET Session 6
ASP.NET Session 6
 
Iris/Retina Identification System
Iris/Retina Identification SystemIris/Retina Identification System
Iris/Retina Identification System
 
Managed LinkedIn Services from The Conversion Company
Managed LinkedIn Services from The Conversion CompanyManaged LinkedIn Services from The Conversion Company
Managed LinkedIn Services from The Conversion Company
 

Similar to Risk assemsnt 2

Risk assessment for sankey valley
Risk assessment for sankey valleyRisk assessment for sankey valley
Risk assessment for sankey valleyaczachor4
 
Risk assessment for golden square
Risk assessment for golden squareRisk assessment for golden square
Risk assessment for golden squareaczachor4
 
Risk assessmentmyhouse
Risk assessmentmyhouseRisk assessmentmyhouse
Risk assessmentmyhousezia_martinez
 
Risk assessmentpaul
Risk assessmentpaulRisk assessmentpaul
Risk assessmentpaulJames Davies
 
Risk assessmentpaul
Risk assessmentpaulRisk assessmentpaul
Risk assessmentpaulzia_martinez
 
Risk assessment brothers room
Risk assessment brothers roomRisk assessment brothers room
Risk assessment brothers roomSteff-chan96
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templateam05030056
 
classroom-risk-assessment
classroom-risk-assessmentclassroom-risk-assessment
classroom-risk-assessmentcb05066361
 
Risk assessment park
Risk assessment parkRisk assessment park
Risk assessment parkrobdoom
 
Risk assessment moutain
Risk assessment moutainRisk assessment moutain
Risk assessment moutainrobdoom
 
Risk assessment Warrington
Risk assessment WarringtonRisk assessment Warrington
Risk assessment WarringtonNeedhamJ1000
 
Risk assessment sankey bridges
Risk assessment sankey bridgesRisk assessment sankey bridges
Risk assessment sankey bridgesSteff-chan96
 
Risk assessment (field)
Risk assessment (field)Risk assessment (field)
Risk assessment (field)bc05093848
 
Risk assessment bewsey woods
Risk assessment bewsey woodsRisk assessment bewsey woods
Risk assessment bewsey woodsSteff-chan96
 
Risk assessment (hard court)
Risk assessment (hard court)Risk assessment (hard court)
Risk assessment (hard court)bc05093848
 
Risk assessment (field)
Risk assessment (field)Risk assessment (field)
Risk assessment (field)bc05093848
 

Similar to Risk assemsnt 2 (20)

Risk assessment for sankey valley
Risk assessment for sankey valleyRisk assessment for sankey valley
Risk assessment for sankey valley
 
Risk assessment for golden square
Risk assessment for golden squareRisk assessment for golden square
Risk assessment for golden square
 
Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk assessmentmyhouse
Risk assessmentmyhouseRisk assessmentmyhouse
Risk assessmentmyhouse
 
Risk assessmentpaul
Risk assessmentpaulRisk assessmentpaul
Risk assessmentpaul
 
Risk assessmentpaul
Risk assessmentpaulRisk assessmentpaul
Risk assessmentpaul
 
Risk assessment brothers room
Risk assessment brothers roomRisk assessment brothers room
Risk assessment brothers room
 
Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
classroom-risk-assessment
classroom-risk-assessmentclassroom-risk-assessment
classroom-risk-assessment
 
Risk assessment park
Risk assessment parkRisk assessment park
Risk assessment park
 
Risk assessment moutain
Risk assessment moutainRisk assessment moutain
Risk assessment moutain
 
Risk assessment Warrington
Risk assessment WarringtonRisk assessment Warrington
Risk assessment Warrington
 
Risk assessment sankey bridges
Risk assessment sankey bridgesRisk assessment sankey bridges
Risk assessment sankey bridges
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
 
Risk assessment (field)
Risk assessment (field)Risk assessment (field)
Risk assessment (field)
 
Risk assessment bewsey woods
Risk assessment bewsey woodsRisk assessment bewsey woods
Risk assessment bewsey woods
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment (hard court)
Risk assessment (hard court)Risk assessment (hard court)
Risk assessment (hard court)
 
Risk assessment 2
Risk assessment 2Risk assessment 2
Risk assessment 2
 
Risk assessment (field)
Risk assessment (field)Risk assessment (field)
Risk assessment (field)
 

More from aczachor

Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment templateaczachor
 
Media production risk_assessment
Media production risk_assessmentMedia production risk_assessment
Media production risk_assessmentaczachor
 
Second plan for the photoshoot
Second plan for the photoshootSecond plan for the photoshoot
Second plan for the photoshootaczachor
 
Cover 4 choose
Cover 4 chooseCover 4 choose
Cover 4 chooseaczachor
 
Cover 3 choose
Cover 3 chooseCover 3 choose
Cover 3 chooseaczachor
 
Cover 2 choose
Cover 2 chooseCover 2 choose
Cover 2 chooseaczachor
 
Cover 1 choose
Cover 1 chooseCover 1 choose
Cover 1 chooseaczachor
 
Contact sheet
Contact sheetContact sheet
Contact sheetaczachor
 
Word for cover 4
Word for cover 4Word for cover 4
Word for cover 4aczachor
 
Word for cover
Word for coverWord for cover
Word for coveraczachor
 
Word for cover 2
Word for cover 2Word for cover 2
Word for cover 2aczachor
 
Word for cover 1
Word for cover 1Word for cover 1
Word for cover 1aczachor
 
Introduction
IntroductionIntroduction
Introductionaczachor
 
Introduction
IntroductionIntroduction
Introductionaczachor
 
Introduction
IntroductionIntroduction
Introductionaczachor
 

More from aczachor (18)

Risk assessment template
Risk assessment templateRisk assessment template
Risk assessment template
 
Media production risk_assessment
Media production risk_assessmentMedia production risk_assessment
Media production risk_assessment
 
Second plan for the photoshoot
Second plan for the photoshootSecond plan for the photoshoot
Second plan for the photoshoot
 
Cover 4
Cover 4Cover 4
Cover 4
 
Cover 3
Cover 3Cover 3
Cover 3
 
Cover 4 choose
Cover 4 chooseCover 4 choose
Cover 4 choose
 
Cover 3 choose
Cover 3 chooseCover 3 choose
Cover 3 choose
 
Cover 2 choose
Cover 2 chooseCover 2 choose
Cover 2 choose
 
Cover 2
Cover 2Cover 2
Cover 2
 
Cover 1 choose
Cover 1 chooseCover 1 choose
Cover 1 choose
 
Contact sheet
Contact sheetContact sheet
Contact sheet
 
Word for cover 4
Word for cover 4Word for cover 4
Word for cover 4
 
Word for cover
Word for coverWord for cover
Word for cover
 
Word for cover 2
Word for cover 2Word for cover 2
Word for cover 2
 
Word for cover 1
Word for cover 1Word for cover 1
Word for cover 1
 
Introduction
IntroductionIntroduction
Introduction
 
Introduction
IntroductionIntroduction
Introduction
 
Introduction
IntroductionIntroduction
Introduction
 

Recently uploaded

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...anjaliyadav012327
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 

Recently uploaded (20)

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
JAPAN: ORGANISATION OF PMDA, PHARMACEUTICAL LAWS & REGULATIONS, TYPES OF REGI...
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 

Risk assemsnt 2

  • 1. RISK ASSESSMENT RECORDING FORM Location: Garden Address: Paul Street/ Warrington Date Assessment Undertaken: 20/01/14 Assessment undertaken By: Adrianna Czachor Activity: Photo shoot For Cover 1 Situation Review Date: N/A Signature (1) Hazard Risk (2) Who might be harmed and how? (3) What controls exist to reduce risk (4) What action can be taken to further reduce risk? Tripping over twigs When the camera and tripod, all set up, there might be a risk of someone tripping over a tripod, if not careful 1 2 The person who tripped over twigs The person who tripped over a tripod Likelyhood-2 Make sure the bigger twigs(that could possibly cause harm) are removed from the area the photo shoot is going to take place Likelyhood-3 Make sure someone is always standing near the camera and makes sure that the hazard is minimised to the smallest possible amount of degree. Be careful where you’re stepping Only the person who taking the pictures allowed near the camera, this will minimize the risk of someone tripping over a tripod or camera. 1. List hazards something with the potential to cause harm here: Seek to quantify the level of risk the likelihood of harm arising based on the number of persons affected, how often they are exposed to the hazard and the severity of any consequence. 2. List groups of people who are especially at risk from the significant hazards which you have identified 3. List existing controls here or note where the information may be found 4. List the risks which are not adequately controlled and the action you will take. Have regard for the level of risk, the cost of any action and the benefit you expect to gain.
  • 2. (1) Hazard Risk (2) Who might be harmed and how? (3) What controls exist to reduce risk (5) What action can be taken to further reduce risk? RISK RATING a SEVERITY b LIKELIHOOD c FINAL SCORE RATING: what needs to be done 5 Dying or being permanently disabled 5 Will almost certainly happen 16-25 Stop! Do not start activity again until risk is controlled 4 Serious injury/long term illness 4 Highly likely to happen 10-15 High risk level, High priority. Take action straight away to control the risk 3 Temporary disability/3 days off sick 3 Not so likely 6-9 Medium risk level. Tighten up controls and make a plan to do something about risk 2 Will need medical attention 2 Even less likely 3-5 Fairly low risk level. Low priority but keep possible action in mind 1 Minor injury eg. Bruise, graze 1 Unlikely to happen at all 1-2 Low or trivial risk. No further action required. SO: a x b = c Action Required Responsible Person Date for Completion