1. CURRICULUM VITAE
Post Applied : H.T. CABLE JOINTER CUM SUPERVISOR
Name : ABDU RAHIMAN T.K
Father’s Name : MOHAMMED THAYYATHUM KADAVATH
Date of Birth : 31 – 12 – 1972
Nationality : Indian
Sex : Male
Religion : Islam
Marital Status : Married
Passport Details
Passport No. : J 1332397
Date of issue : 23 – 03– 2010
Date of expiry : 22 – 03– 2020
Place of Issue : KUWAIT
Present Address .SAMSUNG ENGINEERING ( KUMYANG)
WEST QURNA 2nd PHASE Project. BASRA.IRAQ.
.E-mail: Abdukdr.31@Gmail.com
Present Contact No. : +964-781-83-95002 ( Iraq )
Permanent Address : Beermanakandy House
Kodiyathour P.O
Mukkam (via)
Calicut Dist. 673602,Kerala, India.
Permanent Contact No. : + 91- 989-52-55899 (India)
+ 91- 954-49-40743 (India)
Educational Qualification:
Class Name Year School/ College / Institute Grade
S.S.L.C. 1988 BOARD EXAMINATION A
Pre Degree 1st
GROUP 1990 CALICUT UNIVERSITY A
Technical Education:
Electrical Diploma course passed in Industrial Training Institute Calicut
.Kerala State Electricity Board Training Course Passed
Prompt Institute of Engineering Trade Test Holder.
56 KV PFISTERER Medium voltage cable jointer certificate holder
36 KV Raychem cable jointing testing certificate holder
36 kv3M cold shrink Joints & Termination Certificate holder
2. 15 KV HT Cable Joining & Termination License Holder. (SCECO EAST), Ministry of
Saudi Arabia.
15 KV Cable Joining & Termination License Holder in Kuwait National Petroleum
Corporation & KOC.
Work permit supervising license holder LUK OIL Iraq Basra
Work permit supervising license holder in KNPC.
Work permit supervising authorization card holder in K O C
Raychem Heat Shrinkable Joints & Termination Certificate holder.
Ministry of Electricity H.T Cable Jointer Certificate holder.
Electrical Wireman License Holder in India.
Light Motor Driving License Holder.
Experience: India : 3 years
Abroad : 16 years
Professional Experience
S. No. Period Organization Designation Nature of Work Specialization
1.
25 /03/1993
To
24 /03/1994
Kerala State
Electricity Board
H.T. 11KV and
Maintenance
Meter Testing
Transformer
Maintenance
Cable Termination cable
Jointing.
2.
03– 06 – 1994
To
15– 11 – 1995
Madhyamam Daily
News Paper
Calicut
Senior Industrial
Electrician
Transformer
Erection Termination
Electrical
Maintenance
Panel Wiring and Cable
Jointing
3.
21– 11 – 1995
To
10– 06 – 2001
Rak Arabia
International Saudi
Arabia.
Cable Jointer, Industrial
Electrician, Ministry
Work SCECO East
Saudi Arabia
Panel Erection
Transformer
Erection Sub-Station
Work
Substation switchgear
erection and cable
termination cable jointing
plot cable termination and
jointing L.T Cable 70 to
1200 Sq. mm cable
Termination and jointing up
to 15 K.V.
4
22– 11 – 2002
To
15 - 06 – 2003
Kharafi National
Company, Kuwait
Ministry work H.T Cable
Jointer
Shut Down Work of
Ministry of Electricity
Cable laying Cable jointing
Transformer erection cable
70 to 1200 mm2
Termination
20 – 11 2003 Al-Ahliea H.T Cable Jointer H.T Cable Cable Jointing &
3. 5 to
18 – 6 -- 2007
Switchgear Co. Ltd.
Kuwait.
Ministry work Termination &
Jointing.
Termination, Panel &
Transformer erection up to
11 KV.
6
13 – 10 –2005
To
05 – 02 –2007
Al-Ahliea
Switchgear Co. Ltd.
Kuwait.
Under Contract Ministry
of Electricity, 11 (KV)
over head & under
ground Cable Jointing &
Termination.
Shut Down work of
Ministry of Electricity
Fault Clearance in
Emergency Section.
Cable laying Cable jointing
and Termination up to 11
KV Transformer erection,
Pilot Cable Termination &
Jointing, 3M Cold
shrinkable Joint &
Termination.
7.
01 – 03 –
2007
to
18-06-2007
Al-Ahliea
Switchgear Co. Ltd.
Kuwait.
Under contract Hyundai
Co. Ltd. (K.N.P.C) Up to
11 KV Cable Jointing &
Termination
Lead Cable
Termination &
Jointing in Refinery
Cable Jointing &
Termination of XLPE &
PILC Lead Insulated Cables
8
21/9/2007
to
25 – 7 – 2010
HYUNDAI HEAVY
INDUSTRIES Crude
export facilities
KOC
Project#27542
11 KV cable jointing &
termination
supervisor(KNPC&
K O C) ( REFINERY)
Electrical work,MICS
Cable termination,
Electrical
heat tracing
Work on crude oil
pipelines.(Refinery)
Cable jointing and
termination of XPLE & PILC
Lead insulated Cables.
Heat tracing work.& Fire
Alarm work.
9 9 – 01 – 2011
To
10-01-2012
S. K . Engineering
Bab Gas
Compression
project
33 KV cable termination
supervisor,
(GAS Plant)
33 KV XLPE Cable
heatshrinkable and
cold termination
Up to 630mm2
All Electrical works
Pfisterer plug in type
termination and right
angle cold termination in
33KV(RAYCHEM)
10 25-02-2012
TO
25-05-2013
S. K . Engineering
RUWAIS
REFAINERY
EXPANTION
PROJECT
HV CABLE
TERMINATOR
33 KV XLPE Cable
heatshrinkable and
cold termination
Up to 630mm2
All Electrical works
3M COLD
SHRINKABLE
TERMINATION&JOINTING
UP TO 33 KV
&ELASTIMOLD Dead
break right angle
termination
11 10-10 -2013
To
Till now
SAMSUNG
ENGINEERING.
nd
QURNA 2WEST
Phase
Iraq
H V cable terminator
(REFINERY) 33 KV XLPE Cable
heat shrinkable
and PFISTERER
Plug in type
termination.
All Electrical works
Pfisterer plug in type
termination and heat
shrinkable
termination,jointing in
single core &3 core
cables up to
33KV(RAYCHEM)
The above given details are true to best of my knowledge and belief
Thanking you,
Yours faithfully
ABDU RAHIMAN T.K