SlideShare a Scribd company logo
1 of 3
CURRICULUM VITAE
Post Applied : H.T. CABLE JOINTER CUM SUPERVISOR
Name : ABDU RAHIMAN T.K
Father’s Name : MOHAMMED THAYYATHUM KADAVATH
Date of Birth : 31 – 12 – 1972
Nationality : Indian
Sex : Male
Religion : Islam
Marital Status : Married
Passport Details
Passport No. : J 1332397
Date of issue : 23 – 03– 2010
Date of expiry : 22 – 03– 2020
Place of Issue : KUWAIT
Present Address .SAMSUNG ENGINEERING ( KUMYANG)
WEST QURNA 2nd PHASE Project. BASRA.IRAQ.
.E-mail: Abdukdr.31@Gmail.com
Present Contact No. : +964-781-83-95002 ( Iraq )
Permanent Address : Beermanakandy House
Kodiyathour P.O
Mukkam (via)
Calicut Dist. 673602,Kerala, India.
Permanent Contact No. : + 91- 989-52-55899 (India)
+ 91- 954-49-40743 (India)
Educational Qualification:
Class Name Year School/ College / Institute Grade
S.S.L.C. 1988 BOARD EXAMINATION A
Pre Degree 1st
GROUP 1990 CALICUT UNIVERSITY A
Technical Education:
 Electrical Diploma course passed in Industrial Training Institute Calicut
 .Kerala State Electricity Board Training Course Passed
 Prompt Institute of Engineering Trade Test Holder.
 56 KV PFISTERER Medium voltage cable jointer certificate holder
 36 KV Raychem cable jointing testing certificate holder
 36 kv3M cold shrink Joints & Termination Certificate holder
 15 KV HT Cable Joining & Termination License Holder. (SCECO EAST), Ministry of
Saudi Arabia.
 15 KV Cable Joining & Termination License Holder in Kuwait National Petroleum
Corporation & KOC.
 Work permit supervising license holder LUK OIL Iraq Basra
Work permit supervising license holder in KNPC.
 Work permit supervising authorization card holder in K O C
 Raychem Heat Shrinkable Joints & Termination Certificate holder.
 Ministry of Electricity H.T Cable Jointer Certificate holder.
 Electrical Wireman License Holder in India.
 Light Motor Driving License Holder.
Experience: India : 3 years
Abroad : 16 years
Professional Experience
S. No. Period Organization Designation Nature of Work Specialization
1.
25 /03/1993
To
24 /03/1994
Kerala State
Electricity Board
H.T. 11KV and
Maintenance
Meter Testing
Transformer
Maintenance
Cable Termination cable
Jointing.
2.
03– 06 – 1994
To
15– 11 – 1995
Madhyamam Daily
News Paper
Calicut
Senior Industrial
Electrician
Transformer
Erection Termination
Electrical
Maintenance
Panel Wiring and Cable
Jointing
3.
21– 11 – 1995
To
10– 06 – 2001
Rak Arabia
International Saudi
Arabia.
Cable Jointer, Industrial
Electrician, Ministry
Work SCECO East
Saudi Arabia
Panel Erection
Transformer
Erection Sub-Station
Work
Substation switchgear
erection and cable
termination cable jointing
plot cable termination and
jointing L.T Cable 70 to
1200 Sq. mm cable
Termination and jointing up
to 15 K.V.
4
22– 11 – 2002
To
15 - 06 – 2003
Kharafi National
Company, Kuwait
Ministry work H.T Cable
Jointer
Shut Down Work of
Ministry of Electricity
Cable laying Cable jointing
Transformer erection cable
70 to 1200 mm2
Termination
20 – 11 2003 Al-Ahliea H.T Cable Jointer H.T Cable Cable Jointing &
5 to
18 – 6 -- 2007
Switchgear Co. Ltd.
Kuwait.
Ministry work Termination &
Jointing.
Termination, Panel &
Transformer erection up to
11 KV.
6
13 – 10 –2005
To
05 – 02 –2007
Al-Ahliea
Switchgear Co. Ltd.
Kuwait.
Under Contract Ministry
of Electricity, 11 (KV)
over head & under
ground Cable Jointing &
Termination.
Shut Down work of
Ministry of Electricity
Fault Clearance in
Emergency Section.
Cable laying Cable jointing
and Termination up to 11
KV Transformer erection,
Pilot Cable Termination &
Jointing, 3M Cold
shrinkable Joint &
Termination.
7.
01 – 03 –
2007
to
18-06-2007
Al-Ahliea
Switchgear Co. Ltd.
Kuwait.
Under contract Hyundai
Co. Ltd. (K.N.P.C) Up to
11 KV Cable Jointing &
Termination
Lead Cable
Termination &
Jointing in Refinery
Cable Jointing &
Termination of XLPE &
PILC Lead Insulated Cables
8
21/9/2007
to
25 – 7 – 2010
HYUNDAI HEAVY
INDUSTRIES Crude
export facilities
KOC
Project#27542
11 KV cable jointing &
termination
supervisor(KNPC&
K O C) ( REFINERY)
Electrical work,MICS
Cable termination,
Electrical
heat tracing
Work on crude oil
pipelines.(Refinery)
Cable jointing and
termination of XPLE & PILC
Lead insulated Cables.
Heat tracing work.& Fire
Alarm work.
9 9 – 01 – 2011
To
10-01-2012
S. K . Engineering
Bab Gas
Compression
project
33 KV cable termination
supervisor,
(GAS Plant)
33 KV XLPE Cable
heatshrinkable and
cold termination
Up to 630mm2
All Electrical works
Pfisterer plug in type
termination and right
angle cold termination in
33KV(RAYCHEM)
10 25-02-2012
TO
25-05-2013
S. K . Engineering
RUWAIS
REFAINERY
EXPANTION
PROJECT
HV CABLE
TERMINATOR
33 KV XLPE Cable
heatshrinkable and
cold termination
Up to 630mm2
All Electrical works
3M COLD
SHRINKABLE
TERMINATION&JOINTING
UP TO 33 KV
&ELASTIMOLD Dead
break right angle
termination
11 10-10 -2013
To
Till now
SAMSUNG
ENGINEERING.
nd
QURNA 2WEST
Phase
Iraq
H V cable terminator
(REFINERY) 33 KV XLPE Cable
heat shrinkable
and PFISTERER
Plug in type
termination.
All Electrical works
Pfisterer plug in type
termination and heat
shrinkable
termination,jointing in
single core &3 core
cables up to
33KV(RAYCHEM)
The above given details are true to best of my knowledge and belief
Thanking you,
Yours faithfully
ABDU RAHIMAN T.K

More Related Content

What's hot

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERsaravanan muthu
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CVAbdul Hakkim
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016RUKNUDDIN ALI
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CVAsif pasha
 
Electrical engineer 2 years of experience
Electrical engineer 2 years of experienceElectrical engineer 2 years of experience
Electrical engineer 2 years of experiencePathan Aslam
 
Danish CV Electrician
Danish CV ElectricianDanish CV Electrician
Danish CV ElectricianDANISH AKSAR
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance TechnicianMohammad Azim uddin
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CVHosam Elbanna
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisorshaikh haroon
 

What's hot (20)

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
ELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
 
TESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEERTESTING AND COMMISSIONING ENGINEER
TESTING AND COMMISSIONING ENGINEER
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Electrical Inspector CV
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
CV electrician
CV electricianCV electrician
CV electrician
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Electrical engineer 2 years of experience
Electrical engineer 2 years of experienceElectrical engineer 2 years of experience
Electrical engineer 2 years of experience
 
Danish CV Electrician
Danish CV ElectricianDanish CV Electrician
Danish CV Electrician
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 
Senior Electrical Engineer CV
Senior Electrical Engineer CVSenior Electrical Engineer CV
Senior Electrical Engineer CV
 
E&I inspector cv
E&I inspector cvE&I inspector cv
E&I inspector cv
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 

Viewers also liked

Shiju AGL New CV
Shiju  AGL New CVShiju  AGL New CV
Shiju AGL New CVShiju Reni
 
Top 8 bss engineer resume samples
Top 8 bss engineer resume samplesTop 8 bss engineer resume samples
Top 8 bss engineer resume samplesleoharris452
 
GHULAM ISHAQ CV (2)
GHULAM ISHAQ CV (2)GHULAM ISHAQ CV (2)
GHULAM ISHAQ CV (2)GHULAM ISHAQ
 
GHULAM ISHAQ CV Assistant engr,electrical technician
GHULAM ISHAQ CV  Assistant engr,electrical technicianGHULAM ISHAQ CV  Assistant engr,electrical technician
GHULAM ISHAQ CV Assistant engr,electrical technicianGHULAM ISHAQ
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years expParthsarathy vijayan
 
John Essex Resume
John Essex ResumeJohn Essex Resume
John Essex Resumejessex09
 
Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...
Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...
Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...Thorne & Derrick International
 
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...Thorne & Derrick International
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1Kiran Sasi
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cvsaryhasabadly
 
TEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of WorkTEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of WorkVolker Hirsch
 

Viewers also liked (19)

Debashis resume
Debashis resumeDebashis resume
Debashis resume
 
Shiju AGL New CV
Shiju  AGL New CVShiju  AGL New CV
Shiju AGL New CV
 
BSS Updated cv
BSS Updated cvBSS Updated cv
BSS Updated cv
 
Top 8 bss engineer resume samples
Top 8 bss engineer resume samplesTop 8 bss engineer resume samples
Top 8 bss engineer resume samples
 
Amir cv 1 a
Amir cv 1 aAmir cv 1 a
Amir cv 1 a
 
SHAHZAD AKBAR CV
SHAHZAD AKBAR CVSHAHZAD AKBAR CV
SHAHZAD AKBAR CV
 
GHULAM ISHAQ CV (2)
GHULAM ISHAQ CV (2)GHULAM ISHAQ CV (2)
GHULAM ISHAQ CV (2)
 
Mansoor Ali Resume
Mansoor Ali ResumeMansoor Ali Resume
Mansoor Ali Resume
 
ZIA CV
ZIA CVZIA CV
ZIA CV
 
GHULAM ISHAQ CV Assistant engr,electrical technician
GHULAM ISHAQ CV  Assistant engr,electrical technicianGHULAM ISHAQ CV  Assistant engr,electrical technician
GHULAM ISHAQ CV Assistant engr,electrical technician
 
noel cv
noel cvnoel cv
noel cv
 
1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp1 CV for instrument technician in 8 years exp
1 CV for instrument technician in 8 years exp
 
John Essex Resume
John Essex ResumeJohn Essex Resume
John Essex Resume
 
Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...
Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...
Pfisterer Cable Systems - Cable Fittings For High Voltage Networks - HV-CONN...
 
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
Pfisterer Cable Fittings 11kV 33kV 52kV - Pfisterer MV-CONNEX Inner Cone Plug...
 
CV of Kiran - Electrical Engineer 1
CV of Kiran -  Electrical Engineer 1CV of Kiran -  Electrical Engineer 1
CV of Kiran - Electrical Engineer 1
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
design electrical engineer cv
design electrical engineer cvdesign electrical engineer cv
design electrical engineer cv
 
TEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of WorkTEDx Manchester: AI & The Future of Work
TEDx Manchester: AI & The Future of Work
 

Similar to Abdurahiman.HV TERMINATOR-CURRICULUM VITAE (20)

Faizan cv (1)
Faizan cv (1)Faizan cv (1)
Faizan cv (1)
 
Faizan cv (1)
Faizan cv (1)Faizan cv (1)
Faizan cv (1)
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
mohd shahbaz elec tech
mohd shahbaz elec techmohd shahbaz elec tech
mohd shahbaz elec tech
 
Jiji sup
Jiji supJiji sup
Jiji sup
 
SAFIQUL-ALIN( Modified)
SAFIQUL-ALIN( Modified)SAFIQUL-ALIN( Modified)
SAFIQUL-ALIN( Modified)
 
Mohammad Shahbaz Mallick ELECTRICAL Technician
Mohammad Shahbaz Mallick ELECTRICAL TechnicianMohammad Shahbaz Mallick ELECTRICAL Technician
Mohammad Shahbaz Mallick ELECTRICAL Technician
 
jey new resume
jey new resumejey new resume
jey new resume
 
my Resume
my Resumemy Resume
my Resume
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
Vmp cv_ june` 2018
Vmp  cv_ june` 2018Vmp  cv_ june` 2018
Vmp cv_ june` 2018
 
greenid cv
greenid cvgreenid cv
greenid cv
 
Ejaz Rasheed 5
Ejaz Rasheed 5Ejaz Rasheed 5
Ejaz Rasheed 5
 
1 update resume for electrical engineer
1  update resume for electrical engineer1  update resume for electrical engineer
1 update resume for electrical engineer
 
C.v gaber a. elrazek
C.v   gaber a. elrazekC.v   gaber a. elrazek
C.v gaber a. elrazek
 
RESUME
RESUMERESUME
RESUME
 
Resume
ResumeResume
Resume
 
RESUME_for_Subramaniyan
RESUME_for_SubramaniyanRESUME_for_Subramaniyan
RESUME_for_Subramaniyan
 

Abdurahiman.HV TERMINATOR-CURRICULUM VITAE

  • 1. CURRICULUM VITAE Post Applied : H.T. CABLE JOINTER CUM SUPERVISOR Name : ABDU RAHIMAN T.K Father’s Name : MOHAMMED THAYYATHUM KADAVATH Date of Birth : 31 – 12 – 1972 Nationality : Indian Sex : Male Religion : Islam Marital Status : Married Passport Details Passport No. : J 1332397 Date of issue : 23 – 03– 2010 Date of expiry : 22 – 03– 2020 Place of Issue : KUWAIT Present Address .SAMSUNG ENGINEERING ( KUMYANG) WEST QURNA 2nd PHASE Project. BASRA.IRAQ. .E-mail: Abdukdr.31@Gmail.com Present Contact No. : +964-781-83-95002 ( Iraq ) Permanent Address : Beermanakandy House Kodiyathour P.O Mukkam (via) Calicut Dist. 673602,Kerala, India. Permanent Contact No. : + 91- 989-52-55899 (India) + 91- 954-49-40743 (India) Educational Qualification: Class Name Year School/ College / Institute Grade S.S.L.C. 1988 BOARD EXAMINATION A Pre Degree 1st GROUP 1990 CALICUT UNIVERSITY A Technical Education:  Electrical Diploma course passed in Industrial Training Institute Calicut  .Kerala State Electricity Board Training Course Passed  Prompt Institute of Engineering Trade Test Holder.  56 KV PFISTERER Medium voltage cable jointer certificate holder  36 KV Raychem cable jointing testing certificate holder  36 kv3M cold shrink Joints & Termination Certificate holder
  • 2.  15 KV HT Cable Joining & Termination License Holder. (SCECO EAST), Ministry of Saudi Arabia.  15 KV Cable Joining & Termination License Holder in Kuwait National Petroleum Corporation & KOC.  Work permit supervising license holder LUK OIL Iraq Basra Work permit supervising license holder in KNPC.  Work permit supervising authorization card holder in K O C  Raychem Heat Shrinkable Joints & Termination Certificate holder.  Ministry of Electricity H.T Cable Jointer Certificate holder.  Electrical Wireman License Holder in India.  Light Motor Driving License Holder. Experience: India : 3 years Abroad : 16 years Professional Experience S. No. Period Organization Designation Nature of Work Specialization 1. 25 /03/1993 To 24 /03/1994 Kerala State Electricity Board H.T. 11KV and Maintenance Meter Testing Transformer Maintenance Cable Termination cable Jointing. 2. 03– 06 – 1994 To 15– 11 – 1995 Madhyamam Daily News Paper Calicut Senior Industrial Electrician Transformer Erection Termination Electrical Maintenance Panel Wiring and Cable Jointing 3. 21– 11 – 1995 To 10– 06 – 2001 Rak Arabia International Saudi Arabia. Cable Jointer, Industrial Electrician, Ministry Work SCECO East Saudi Arabia Panel Erection Transformer Erection Sub-Station Work Substation switchgear erection and cable termination cable jointing plot cable termination and jointing L.T Cable 70 to 1200 Sq. mm cable Termination and jointing up to 15 K.V. 4 22– 11 – 2002 To 15 - 06 – 2003 Kharafi National Company, Kuwait Ministry work H.T Cable Jointer Shut Down Work of Ministry of Electricity Cable laying Cable jointing Transformer erection cable 70 to 1200 mm2 Termination 20 – 11 2003 Al-Ahliea H.T Cable Jointer H.T Cable Cable Jointing &
  • 3. 5 to 18 – 6 -- 2007 Switchgear Co. Ltd. Kuwait. Ministry work Termination & Jointing. Termination, Panel & Transformer erection up to 11 KV. 6 13 – 10 –2005 To 05 – 02 –2007 Al-Ahliea Switchgear Co. Ltd. Kuwait. Under Contract Ministry of Electricity, 11 (KV) over head & under ground Cable Jointing & Termination. Shut Down work of Ministry of Electricity Fault Clearance in Emergency Section. Cable laying Cable jointing and Termination up to 11 KV Transformer erection, Pilot Cable Termination & Jointing, 3M Cold shrinkable Joint & Termination. 7. 01 – 03 – 2007 to 18-06-2007 Al-Ahliea Switchgear Co. Ltd. Kuwait. Under contract Hyundai Co. Ltd. (K.N.P.C) Up to 11 KV Cable Jointing & Termination Lead Cable Termination & Jointing in Refinery Cable Jointing & Termination of XLPE & PILC Lead Insulated Cables 8 21/9/2007 to 25 – 7 – 2010 HYUNDAI HEAVY INDUSTRIES Crude export facilities KOC Project#27542 11 KV cable jointing & termination supervisor(KNPC& K O C) ( REFINERY) Electrical work,MICS Cable termination, Electrical heat tracing Work on crude oil pipelines.(Refinery) Cable jointing and termination of XPLE & PILC Lead insulated Cables. Heat tracing work.& Fire Alarm work. 9 9 – 01 – 2011 To 10-01-2012 S. K . Engineering Bab Gas Compression project 33 KV cable termination supervisor, (GAS Plant) 33 KV XLPE Cable heatshrinkable and cold termination Up to 630mm2 All Electrical works Pfisterer plug in type termination and right angle cold termination in 33KV(RAYCHEM) 10 25-02-2012 TO 25-05-2013 S. K . Engineering RUWAIS REFAINERY EXPANTION PROJECT HV CABLE TERMINATOR 33 KV XLPE Cable heatshrinkable and cold termination Up to 630mm2 All Electrical works 3M COLD SHRINKABLE TERMINATION&JOINTING UP TO 33 KV &ELASTIMOLD Dead break right angle termination 11 10-10 -2013 To Till now SAMSUNG ENGINEERING. nd QURNA 2WEST Phase Iraq H V cable terminator (REFINERY) 33 KV XLPE Cable heat shrinkable and PFISTERER Plug in type termination. All Electrical works Pfisterer plug in type termination and heat shrinkable termination,jointing in single core &3 core cables up to 33KV(RAYCHEM) The above given details are true to best of my knowledge and belief Thanking you, Yours faithfully ABDU RAHIMAN T.K