2. This is a manageable project that you could do yourself, provided you have the tools and
adequate experience. However, hiring a professional will obviously provide the best results
as they have the necessary tools and skills.
4. Here are the steps to successfully install laminate
flooring over concrete.
5. Step 1: Acclimatize the
Floorboards
Store the laminate floorboards in the room in which they will be installed for at least three
days before you start.
6. This allows the material to adjust to the temperature and humidity level.
7. Step 2: Prepare the
Subfloor
Make sure the surface of the concrete is level, cured, clean and completely dry before
starting the installation.