More Related Content Similar to How To Install Silver Vapor 3-in-1 Flooring Underlayment (20) How To Install Silver Vapor 3-in-1 Flooring Underlayment2. Make it a DIY Project and save on your floor
installation cost
4. You may need: Enough vapor 3-in-1, Flooring, broom &
dust pan, tape, scissors/utility knife
5. Step 1: Get cleaning! Subfloor should
be clean and free of dirt.
6. Step 2: Subfloor check – subfloor should be in good
condition without damages
7. Step 3: Fix Subfloor – subfloor needs
fixing if: It is sloping, has excessive
gabs, cracks or any areas with
moisture.
8. Step 4: Time to get started – roll out vapor
underlayment with the silver side facing down.
11. Step 6: Cut your measured section with a utility knife
12. Step 7: You may add tape to temporally hold underlayment in
place
14. Cross stack your flooring – make sure to
acclimate your flooring at least 48 hours before
the installation
15. Step 9: Start your new roll – repeat step 4 and start
your next roll
17. Step 11: Combine edges - butt edges together
making sure to overlap only the silver film
21. Connect with us : www.bestlaminate.com /
Facebook.com/Bestlaminate /
Twitter.com/Bestlaminate
www.Bestlaminate.com
Facebook.com/Bestlaminate
Twitter.com/Bestlaminate
Editor's Notes How To Install Silver Vapor 3-in-1 Flooring Underlayment Make it a DIY Project and save on your floor installation cost Fact: Laying down underlayment is 10% of your installation cost You may need: Enough vapor 3-in-1, Flooring, broom & dust pan, tape, scissors/utility knife Step 1: Get cleaning! Subfloor should be clean and free of dirt. Step 2: Subfloor check – subfloor should be in good condition without damages Step 3: Fix Subfloor – subfloor needs fixing if: It is sloping, has excessive gabs, cracks or any areas with moisture. Step 4: Time to get started – roll out vapor underlayment with the silver side facing down. Quick hint: Overlapping film should be towards open room & Tape strip next to wall Step 5: Install Parallel to the wall Step 6: Cut your measured section with a utility knife Step 7: You may add tape to temporally hold underlayment in place Step 8: Install flooring on the underlayment section already installed Cross stack your flooring – make sure to acclimate your flooring at least 48 hours before the installation Step 9: Start your new roll – repeat step 4 and start your next roll Step 10: Measure and Pre-cut next section Step 11: Combine edges - butt edges together making sure to overlap only the silver film Step 12: Remove adhesive layer and stick to underlament Step 13: Use additional tape to secure rows if needed Step 14: Continue Installation according to manufacturers instructions Connect with us : www.bestlaminate.com / Facebook.com/Bestlaminate / Twitter.com/Bestlaminate