SlideShare a Scribd company logo
1 of 3
Youssef Shawky
Page 1 of 4
Youssef Shawky
Zeon 17- 6 Oct. City
Cairo-Egypt
Tel.: +201224991990
youssifshawky445@gmail.com
Production Leader Professional
Production Leader Professional with 20+ years of progressive accomplishments in leading
production lines teams through IWS system, various areas in Product Supply, RTT mentality, Pillar
management, Building Team capability, expert in loss elimination tools.
Core competence:
 Leading people to achieve site targets and growth people.
 Eliminates Breakdowns through Maintenance strategy systems.
 Improve the Lines reliability through coaching peopleby enabling them using AM - PM tools.
 IWS systems and ability to develop all new standards.
 Professional in using the loss elimination tools which’s save the company money and eliminate all
supply chain losses.
 Supporting all Fem Care sites in different Countries in order to improve their capabilities and lines
reliability ( German – Turkey – China – Saudi – Italy )
Professional Experience:
1. Fem Care line leader @ Procter & Gamble Egypt…( 2007-Present)
 Leading the implementation of the IWS systems to improve the production results.
 Coaching /Train all operators across all production systems (AM, PM,…etc).
 Develop the equipment standard and increased the operator’s capability.
 Leading the infrastructure to support the ongoing use of the new systems.
 Doing health check and monthly assessment on all IWS systems.
 Managing the (Work process improvement) pillar across the Dep.
 Expert in using the loss elimination tools and building this capability for all Operators.
Key Achievements
 Improving the Daily operation meeting according to IWS systems which’s led to
(Unplanned stop reduction by > 50%, unplanned down time less than 4%, improves
and sustains the production reliability to be more than 85%).
 Improve the operation equipments to be at basic condition to find out the root
cause of the issues which’s helps to reduce the stops and eliminates all losses.
 Leading Line LCC1 & LCC7 to achieve benchmark across LCC Plat form.
 Leading Technology transfer Team to install all LCC Lines.
 Saved around 0.5 $MM through leading the WPI pillar as it’s one of loss elimination
tools across the site.
 Eliminated 50 contractors across the department via using the WPI methodology.
 Saved around 1200 hours saving through simplify our work processes using the WPI
tool.
Youssef Shawky
Page 2 of 4
 Improve the production reliability by 3.5 % through change over time reduction
across the department.
2. Fem Care Process Leader @ P&G Egypt (Oct.2004-Jul.2008)
 Coaching /Train all operators across all production systems (AM, PM,…etc).
 Leading process Line IW to achieve reliability
 Leading all new develop project on line & maintain ,
Key Achievements during the assignment
 Pass AM step 1-2 -3
 Improve the line reliability to be 88% vs, 84%.
 Scrap reduction from 2.2% to 1.2%.
 Pass ISU-VSU for all projects.
 Develop & maintain stops reduction system for line.
 Pass AM step 2-3- 4
 Improve Fem Care productivity through eliminated 78 contractors in this period.
 Saved around 67 $M cost reduction of contractors cost.
 Create and maintain changeover system.
 Develop & maintain Shift after c/o 80 % PR.
 Develop and maintain vc system for process per module.
 Create process control strategy.
 Contamination Sources are identified and eliminated.
 Availability- P.R is monitored and improved.
 Visual Control Standards has been evaluated and established the equipment.
3. Fem Care Mechanical Leader (from Nov.2002- Oct.2004):
 Leading Maintenance strategy systems.
 Improve the Lines reliability through coaching peopleby enabling them using PM tools.
Key Achievements during the assignment
 Eliminates Breakdowns through Maintenance strategy system
 Build strong capable team in all of the critical areas in Operation departments.
4. Other Assignments:
 1998-2002 Fem Care line team leader ;
 Best team Leader across the site.
 Best shift across the department.
 Operational training on T17& IW Line line in Cairo
 1995-1998 where house forklift workshop leader :
 Leading Maintenance strategy systems.
 Handling the PM. (prevent maintenance).
 Make all trouble shooting for those machines.
 Eliminates Breakdowns through Maintenance strategy system
 Highlight of Qualifications:
 Leadership skills, planning, team worker, performance under pressure, People and
Communication Skills, presentation & analytical skills, Maximizing Creative & Logical Thinking,
Train the trainer, Leadership and Delegation, Time management, High performance organization.
 Team Effectiveness, Effective Meeting
 Health Safety & Environment leadership training,
 P&G QA Standards & Fundamentals of Total Quality Management.
 Laboratory Core Skills, Industrial Hygiene & Safety.
 RTT methodology (qualified on all 9 RTT DMS’s),
Youssef Shawky
Page 3 of 4
 Qualified as Fem care RCO DMS’s owner
 Technical skills on Fem care lines.
 Loss elimination tools (UPS & WPI system). (Unified problemsolving/Work process improvement)
 AM steps.
 Education:
 1994 Mechanical Diploma. (Advancedtechnical institute for 2 years ).
 LANGUAGES:
o Arabic: Mother Tongue.
o English: Clear & efficient Written & Oral Communication.
o Excellent Computer Skills: Excel, Word, power point,
Professional Developments:
QUALIFIED TRAINER FOR:
 SUPPLY CHAIN.
o IWS SYSTEMS (10PILLARS) & RUN TO TARGET METHODOLOGY.
o DAILY MANAGEMENT SYSTEMS(DMSIMPLEMENTATION).
o LOSS ANALYSIS.
o VALUE STREAM MAPPING.
o LOSS ELIMINATION TOOLS (WPI & UPS).
o FOCUSED IMPROVEMENT TOOLS.( ROOT CAUSE ANALYSISAND WHY-WHY ANALYSIS).
o AM STEPS.
o PM STEPS
OTHER SKILLS & TRAININGS :
 TIME MANAGEMENT
 INDUSTRIAL SAFETY FOR LEADERSHIP TEAM.
 SUCCESS DRIVERS FOR LEADERSHIP
 SITUATIONAL LEADERSHIP AND MANAGING LOW PERFORMERS.
 PEOPLE SUPPORTING PEOPLE – DIVERSITY HANDLING-
 COACHING FOR REMOTE TEAMS
PersonalInformation:
 Birth: April 9th, 1971 in Cairo, Egypt
 Nationality: Egyptian
 Marital Status: Married

More Related Content

What's hot

Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
Sushil Anand
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
smumbahelp
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
Chris Baichoo
 

What's hot (20)

TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2) TPM Total Productive Maintenance for Quarry Plant(2)
TPM Total Productive Maintenance for Quarry Plant(2)
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
TPM_sample
TPM_sampleTPM_sample
TPM_sample
 
UniSim® Operations
UniSim® OperationsUniSim® Operations
UniSim® Operations
 
Total productive maintenance (tpm)
Total productive maintenance (tpm)Total productive maintenance (tpm)
Total productive maintenance (tpm)
 
Tpm ppt
Tpm pptTpm ppt
Tpm ppt
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
 
Advoco First Vehicles Services case_study
Advoco First Vehicles Services case_studyAdvoco First Vehicles Services case_study
Advoco First Vehicles Services case_study
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
Tpm basic
Tpm basicTpm basic
Tpm basic
 
Tpm 02
Tpm 02Tpm 02
Tpm 02
 
Aghil Jith
Aghil JithAghil Jith
Aghil Jith
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
 
Tpm
TpmTpm
Tpm
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Tpm principles and concepts
Tpm principles and conceptsTpm principles and concepts
Tpm principles and concepts
 
What is total productive maintenance?
What is total productive maintenance?What is total productive maintenance?
What is total productive maintenance?
 
Presentation on tpm
Presentation on tpmPresentation on tpm
Presentation on tpm
 
Sakthi 0615
Sakthi 0615Sakthi 0615
Sakthi 0615
 
7 Reasons to Justify an Operator Training Simulator
7 Reasons to Justify an Operator Training Simulator7 Reasons to Justify an Operator Training Simulator
7 Reasons to Justify an Operator Training Simulator
 

Similar to Youssef's CV Oct.15

Kiran Talele Resume 2017
Kiran Talele Resume 2017Kiran Talele Resume 2017
Kiran Talele Resume 2017
Kiran Talele
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
Kevin Logeais
 
Resume of SureshKumar_V1
Resume of SureshKumar_V1Resume of SureshKumar_V1
Resume of SureshKumar_V1
suresh kumar v
 
Larry Hortillano Barong
Larry Hortillano BarongLarry Hortillano Barong
Larry Hortillano Barong
Larry Barong
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
jacques Kouadio
 
Victor W docx resume 3 .2 v2
Victor W docx resume 3 .2 v2Victor W docx resume 3 .2 v2
Victor W docx resume 3 .2 v2
Vic Wood
 
Resume, as of 4/2
Resume, as of 4/2Resume, as of 4/2
Resume, as of 4/2
Jim Davis
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
Carl Arens
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
Luis Navarro
 

Similar to Youssef's CV Oct.15 (20)

TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Kiran Talele Resume 2017
Kiran Talele Resume 2017Kiran Talele Resume 2017
Kiran Talele Resume 2017
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Suresh cen
Suresh cenSuresh cen
Suresh cen
 
Heath Nijem
Heath NijemHeath Nijem
Heath Nijem
 
Resume
ResumeResume
Resume
 
Manish Gujarathi - Copy
Manish Gujarathi  - CopyManish Gujarathi  - Copy
Manish Gujarathi - Copy
 
Resume of SureshKumar_V1
Resume of SureshKumar_V1Resume of SureshKumar_V1
Resume of SureshKumar_V1
 
TPM Activity
TPM ActivityTPM Activity
TPM Activity
 
Rsume
RsumeRsume
Rsume
 
Larry Hortillano Barong
Larry Hortillano BarongLarry Hortillano Barong
Larry Hortillano Barong
 
Cv jacques kouadio cv
Cv jacques  kouadio   cvCv jacques  kouadio   cv
Cv jacques kouadio cv
 
Victor W docx resume 3 .2 v2
Victor W docx resume 3 .2 v2Victor W docx resume 3 .2 v2
Victor W docx resume 3 .2 v2
 
PBS Resume
PBS ResumePBS Resume
PBS Resume
 
Resume, as of 4/2
Resume, as of 4/2Resume, as of 4/2
Resume, as of 4/2
 
Kanagavalli Kumar - Profile
Kanagavalli Kumar - ProfileKanagavalli Kumar - Profile
Kanagavalli Kumar - Profile
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
Luis Navarro Resume
Luis Navarro ResumeLuis Navarro Resume
Luis Navarro Resume
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 

Youssef's CV Oct.15

  • 1. Youssef Shawky Page 1 of 4 Youssef Shawky Zeon 17- 6 Oct. City Cairo-Egypt Tel.: +201224991990 youssifshawky445@gmail.com Production Leader Professional Production Leader Professional with 20+ years of progressive accomplishments in leading production lines teams through IWS system, various areas in Product Supply, RTT mentality, Pillar management, Building Team capability, expert in loss elimination tools. Core competence:  Leading people to achieve site targets and growth people.  Eliminates Breakdowns through Maintenance strategy systems.  Improve the Lines reliability through coaching peopleby enabling them using AM - PM tools.  IWS systems and ability to develop all new standards.  Professional in using the loss elimination tools which’s save the company money and eliminate all supply chain losses.  Supporting all Fem Care sites in different Countries in order to improve their capabilities and lines reliability ( German – Turkey – China – Saudi – Italy ) Professional Experience: 1. Fem Care line leader @ Procter & Gamble Egypt…( 2007-Present)  Leading the implementation of the IWS systems to improve the production results.  Coaching /Train all operators across all production systems (AM, PM,…etc).  Develop the equipment standard and increased the operator’s capability.  Leading the infrastructure to support the ongoing use of the new systems.  Doing health check and monthly assessment on all IWS systems.  Managing the (Work process improvement) pillar across the Dep.  Expert in using the loss elimination tools and building this capability for all Operators. Key Achievements  Improving the Daily operation meeting according to IWS systems which’s led to (Unplanned stop reduction by > 50%, unplanned down time less than 4%, improves and sustains the production reliability to be more than 85%).  Improve the operation equipments to be at basic condition to find out the root cause of the issues which’s helps to reduce the stops and eliminates all losses.  Leading Line LCC1 & LCC7 to achieve benchmark across LCC Plat form.  Leading Technology transfer Team to install all LCC Lines.  Saved around 0.5 $MM through leading the WPI pillar as it’s one of loss elimination tools across the site.  Eliminated 50 contractors across the department via using the WPI methodology.  Saved around 1200 hours saving through simplify our work processes using the WPI tool.
  • 2. Youssef Shawky Page 2 of 4  Improve the production reliability by 3.5 % through change over time reduction across the department. 2. Fem Care Process Leader @ P&G Egypt (Oct.2004-Jul.2008)  Coaching /Train all operators across all production systems (AM, PM,…etc).  Leading process Line IW to achieve reliability  Leading all new develop project on line & maintain , Key Achievements during the assignment  Pass AM step 1-2 -3  Improve the line reliability to be 88% vs, 84%.  Scrap reduction from 2.2% to 1.2%.  Pass ISU-VSU for all projects.  Develop & maintain stops reduction system for line.  Pass AM step 2-3- 4  Improve Fem Care productivity through eliminated 78 contractors in this period.  Saved around 67 $M cost reduction of contractors cost.  Create and maintain changeover system.  Develop & maintain Shift after c/o 80 % PR.  Develop and maintain vc system for process per module.  Create process control strategy.  Contamination Sources are identified and eliminated.  Availability- P.R is monitored and improved.  Visual Control Standards has been evaluated and established the equipment. 3. Fem Care Mechanical Leader (from Nov.2002- Oct.2004):  Leading Maintenance strategy systems.  Improve the Lines reliability through coaching peopleby enabling them using PM tools. Key Achievements during the assignment  Eliminates Breakdowns through Maintenance strategy system  Build strong capable team in all of the critical areas in Operation departments. 4. Other Assignments:  1998-2002 Fem Care line team leader ;  Best team Leader across the site.  Best shift across the department.  Operational training on T17& IW Line line in Cairo  1995-1998 where house forklift workshop leader :  Leading Maintenance strategy systems.  Handling the PM. (prevent maintenance).  Make all trouble shooting for those machines.  Eliminates Breakdowns through Maintenance strategy system  Highlight of Qualifications:  Leadership skills, planning, team worker, performance under pressure, People and Communication Skills, presentation & analytical skills, Maximizing Creative & Logical Thinking, Train the trainer, Leadership and Delegation, Time management, High performance organization.  Team Effectiveness, Effective Meeting  Health Safety & Environment leadership training,  P&G QA Standards & Fundamentals of Total Quality Management.  Laboratory Core Skills, Industrial Hygiene & Safety.  RTT methodology (qualified on all 9 RTT DMS’s),
  • 3. Youssef Shawky Page 3 of 4  Qualified as Fem care RCO DMS’s owner  Technical skills on Fem care lines.  Loss elimination tools (UPS & WPI system). (Unified problemsolving/Work process improvement)  AM steps.  Education:  1994 Mechanical Diploma. (Advancedtechnical institute for 2 years ).  LANGUAGES: o Arabic: Mother Tongue. o English: Clear & efficient Written & Oral Communication. o Excellent Computer Skills: Excel, Word, power point, Professional Developments: QUALIFIED TRAINER FOR:  SUPPLY CHAIN. o IWS SYSTEMS (10PILLARS) & RUN TO TARGET METHODOLOGY. o DAILY MANAGEMENT SYSTEMS(DMSIMPLEMENTATION). o LOSS ANALYSIS. o VALUE STREAM MAPPING. o LOSS ELIMINATION TOOLS (WPI & UPS). o FOCUSED IMPROVEMENT TOOLS.( ROOT CAUSE ANALYSISAND WHY-WHY ANALYSIS). o AM STEPS. o PM STEPS OTHER SKILLS & TRAININGS :  TIME MANAGEMENT  INDUSTRIAL SAFETY FOR LEADERSHIP TEAM.  SUCCESS DRIVERS FOR LEADERSHIP  SITUATIONAL LEADERSHIP AND MANAGING LOW PERFORMERS.  PEOPLE SUPPORTING PEOPLE – DIVERSITY HANDLING-  COACHING FOR REMOTE TEAMS PersonalInformation:  Birth: April 9th, 1971 in Cairo, Egypt  Nationality: Egyptian  Marital Status: Married