SlideShare a Scribd company logo
1 of 2
Heath Nijem P.Eng.
3255 Maidstone Lane, London, ON.N6P1V6 | (519) 652-6459 | hnijem@yahoo.com
Objective
Extensive experience in operations and manufacturing management. Passionate about safety,quality and
customer satisfaction. Record of improving efficiency,productivity and profitability by driving continuous
improvement and utilizing automation and process while focusing on core business metrics. Outstanding
interpersonal, motivational and presentational skills. Analytical, articulate and diligent with a strong
workethic.
Education
MASTERS OF SCIENCE | 1995 | BRADLEY UNIVERSITY
· Major: Manufacturing Engineering
· Thesis: Effectof system stiffness on frictionand wear
· GPA: 3.83 / 4.0
BACHELORS OF SCIENCE | 1990 | BRADLEY UNIVERSITY
· Major: ElectricalEngineering
· Option: Computer
Skills & Abilities
MANAGEMENT
· Managed major product launches while exceeding deadlines and coming under budget.
· Maintain department KPI in all metrics (Safety, people, responsiveness, cost and quality)
· Capital project management including justification and cost analysis.
· Major breakdown management that includes troubleshooting, immediate and long term
countermeasures and problem solving report (5-why’s).
COMMUNICATION
· Providedaily maintenance shift updates to both management and maintenance associates.
· Providecompliance training to all maintenance team members. Training includes lockout/tagout,
lifting and rigging, Arial platforms, confined space and CPR/First Aid.
· Communicate all safety alerts and engineering changes on daily basis.
· Speaker/presenter at 1994 SAE conference(http://papers.sae.org/941110/)
LEADERSHIP
· Result oriented style of leadership witha focuson the task at hand.
· Decisive, clear and to the point when dealing with difficultpersonnel or conflictsituations.
· Take the lead during breakdowns. This includes safety pre task planning, troubleshooting strategy and
repair of equipment.
Page 2
Experience
MAINTENANCE GROUP LEAD | GENERAL MOTORS | 2005-PRESENT
· Plan and schedule preventative and predictive maintenance work(weekly)
· Key contributor to successful 2009 vehicle launch program.
· Continuously improving process and automation to reduce line downtimes and improve quality.
· Plan and manage internal (maintenance) and external resources (contractors).
· Achievements include bottle neck identification and resolutions throughout the body shop, Pokeyoke
development on new lines and error proofing. Also worked on production flow,batching and
continuously finding ways to increase robotic cell speed.
MAINTENANCE, QUALITY AND ENGINEER | FORD MOTOR COMPANY | 1997-2005
· Worked in process engineering and was assigned responsibility of 50% of all lines in final assembly
whichincluded tool design and improvement. Station modifications and time study analysis to increase
operator efficiency withoutsacrificing safety, quality and cost. Ran a successful new vehicle model
launch that included workredistribution and AutoCAD redesign of most stations in trim area to reduce
head count. This also included the implementation of modifications and all tooling changes and new
engineering model part changes required for the new model.
· Worked in QC department and was responsible forthe quality of vendor parts and finding ways to
support vendor processes to improve fitand finish. Held vendors responsible forall defectiveparts and
ran sorting and part re-workcampaigns when defects were discovered.
· Assigned as final maintenance supervisor during the last 5 years at Ford. Was mainly the lead on all
major/minor breakdowns and recovery.Maintained maintenance budget and organized weekend work
and personnel to repair and improve automation and equipment as required. Also organized major
new equipment installations such as a new tire room and conveyancesystems.
INDUSTRIAL ENGINEER | ITW BUILDEX | 1993-1995
· Upgraded cut and mill equipment to incorporate a 3-axis positioning system and programmed each
part parameters so operator will pickthe part and machine willself-set. This increased part accuracy
and repeatability while reducing setup times and thus increasing machine up time.
· Responsible foroperator training program and development of training manual formachine setup and
maintenance procedures and guidelines.
· Developed AutoCAD layouts for the new warehouse.

More Related Content

What's hot

djn resume 2016 new
djn resume 2016 newdjn resume 2016 new
djn resume 2016 newDavid Noon
 
kabilanpj_resume 10
kabilanpj_resume 10kabilanpj_resume 10
kabilanpj_resume 10kabilan pj
 
AE in Manufacturing with 3.5 year Expe
AE in Manufacturing with 3.5 year ExpeAE in Manufacturing with 3.5 year Expe
AE in Manufacturing with 3.5 year ExpePraveen Mole
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
 
Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat
 
Nagaraja Hegde Projects
Nagaraja Hegde ProjectsNagaraja Hegde Projects
Nagaraja Hegde ProjectsNagaraja Hegde
 
Frederick r kelly
Frederick r kellyFrederick r kelly
Frederick r kellyfkelly21
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase ParrJase Parr
 
Brian Price Manufacturing
Brian Price ManufacturingBrian Price Manufacturing
Brian Price ManufacturingBrian Price
 
KiranKumaraCJSeniorproductionEngineer
KiranKumaraCJSeniorproductionEngineerKiranKumaraCJSeniorproductionEngineer
KiranKumaraCJSeniorproductionEngineerkiran kumar
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Essam Lotffy, PMP®, CCP®
 

What's hot (20)

djn resume 2016 new
djn resume 2016 newdjn resume 2016 new
djn resume 2016 new
 
CV Agapito Cardiel 26-8
CV Agapito Cardiel 26-8CV Agapito Cardiel 26-8
CV Agapito Cardiel 26-8
 
kabilanpj_resume 10
kabilanpj_resume 10kabilanpj_resume 10
kabilanpj_resume 10
 
Ravi 31.01.2017
Ravi 31.01.2017Ravi 31.01.2017
Ravi 31.01.2017
 
AE in Manufacturing with 3.5 year Expe
AE in Manufacturing with 3.5 year ExpeAE in Manufacturing with 3.5 year Expe
AE in Manufacturing with 3.5 year Expe
 
Francis semilla docs
Francis semilla docsFrancis semilla docs
Francis semilla docs
 
M.Pandey( New resume)
M.Pandey( New resume)M.Pandey( New resume)
M.Pandey( New resume)
 
CV_RRBARTE
CV_RRBARTECV_RRBARTE
CV_RRBARTE
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2
 
Nagaraja Hegde Projects
Nagaraja Hegde ProjectsNagaraja Hegde Projects
Nagaraja Hegde Projects
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Frederick r kelly
Frederick r kellyFrederick r kelly
Frederick r kelly
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase Parr
 
TEG(resume)
TEG(resume)TEG(resume)
TEG(resume)
 
Gurdayal Docs
Gurdayal DocsGurdayal Docs
Gurdayal Docs
 
Brian Price Manufacturing
Brian Price ManufacturingBrian Price Manufacturing
Brian Price Manufacturing
 
KiranKumaraCJSeniorproductionEngineer
KiranKumaraCJSeniorproductionEngineerKiranKumaraCJSeniorproductionEngineer
KiranKumaraCJSeniorproductionEngineer
 
Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...Labor productivity improvement in construction projects using wbs obs integra...
Labor productivity improvement in construction projects using wbs obs integra...
 
Rob VanBuren resume
Rob VanBuren resumeRob VanBuren resume
Rob VanBuren resume
 

Similar to Heath Nijem (20)

dapski042116
dapski042116dapski042116
dapski042116
 
C.V. William 15
C.V. William 15C.V. William 15
C.V. William 15
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
Christopher_Alfante_CV_170201
Christopher_Alfante_CV_170201Christopher_Alfante_CV_170201
Christopher_Alfante_CV_170201
 
Tom Mikols Resume
Tom Mikols ResumeTom Mikols Resume
Tom Mikols Resume
 
Satish.S -Resume.
Satish.S -Resume.Satish.S -Resume.
Satish.S -Resume.
 
Resume - Melissa Kaufman 7-26-16
Resume - Melissa Kaufman 7-26-16Resume - Melissa Kaufman 7-26-16
Resume - Melissa Kaufman 7-26-16
 
Rsume
RsumeRsume
Rsume
 
Resume Mm Brach Chronological 8.0
Resume   Mm Brach Chronological 8.0Resume   Mm Brach Chronological 8.0
Resume Mm Brach Chronological 8.0
 
resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015resume_Sid Persaud_Dec 9 2015
resume_Sid Persaud_Dec 9 2015
 
Chris Murray CV
Chris Murray CVChris Murray CV
Chris Murray CV
 
Resume # 9
Resume # 9Resume # 9
Resume # 9
 
Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
CV D. Maimbolwa
CV D. MaimbolwaCV D. Maimbolwa
CV D. Maimbolwa
 
arun
arunarun
arun
 
Todd's Resume
Todd's ResumeTodd's Resume
Todd's Resume
 
Ramasamy FM
Ramasamy FMRamasamy FM
Ramasamy FM
 
Nagendra_01_Nov_2015
Nagendra_01_Nov_2015Nagendra_01_Nov_2015
Nagendra_01_Nov_2015
 

Heath Nijem

  • 1. Heath Nijem P.Eng. 3255 Maidstone Lane, London, ON.N6P1V6 | (519) 652-6459 | hnijem@yahoo.com Objective Extensive experience in operations and manufacturing management. Passionate about safety,quality and customer satisfaction. Record of improving efficiency,productivity and profitability by driving continuous improvement and utilizing automation and process while focusing on core business metrics. Outstanding interpersonal, motivational and presentational skills. Analytical, articulate and diligent with a strong workethic. Education MASTERS OF SCIENCE | 1995 | BRADLEY UNIVERSITY · Major: Manufacturing Engineering · Thesis: Effectof system stiffness on frictionand wear · GPA: 3.83 / 4.0 BACHELORS OF SCIENCE | 1990 | BRADLEY UNIVERSITY · Major: ElectricalEngineering · Option: Computer Skills & Abilities MANAGEMENT · Managed major product launches while exceeding deadlines and coming under budget. · Maintain department KPI in all metrics (Safety, people, responsiveness, cost and quality) · Capital project management including justification and cost analysis. · Major breakdown management that includes troubleshooting, immediate and long term countermeasures and problem solving report (5-why’s). COMMUNICATION · Providedaily maintenance shift updates to both management and maintenance associates. · Providecompliance training to all maintenance team members. Training includes lockout/tagout, lifting and rigging, Arial platforms, confined space and CPR/First Aid. · Communicate all safety alerts and engineering changes on daily basis. · Speaker/presenter at 1994 SAE conference(http://papers.sae.org/941110/) LEADERSHIP · Result oriented style of leadership witha focuson the task at hand. · Decisive, clear and to the point when dealing with difficultpersonnel or conflictsituations. · Take the lead during breakdowns. This includes safety pre task planning, troubleshooting strategy and repair of equipment.
  • 2. Page 2 Experience MAINTENANCE GROUP LEAD | GENERAL MOTORS | 2005-PRESENT · Plan and schedule preventative and predictive maintenance work(weekly) · Key contributor to successful 2009 vehicle launch program. · Continuously improving process and automation to reduce line downtimes and improve quality. · Plan and manage internal (maintenance) and external resources (contractors). · Achievements include bottle neck identification and resolutions throughout the body shop, Pokeyoke development on new lines and error proofing. Also worked on production flow,batching and continuously finding ways to increase robotic cell speed. MAINTENANCE, QUALITY AND ENGINEER | FORD MOTOR COMPANY | 1997-2005 · Worked in process engineering and was assigned responsibility of 50% of all lines in final assembly whichincluded tool design and improvement. Station modifications and time study analysis to increase operator efficiency withoutsacrificing safety, quality and cost. Ran a successful new vehicle model launch that included workredistribution and AutoCAD redesign of most stations in trim area to reduce head count. This also included the implementation of modifications and all tooling changes and new engineering model part changes required for the new model. · Worked in QC department and was responsible forthe quality of vendor parts and finding ways to support vendor processes to improve fitand finish. Held vendors responsible forall defectiveparts and ran sorting and part re-workcampaigns when defects were discovered. · Assigned as final maintenance supervisor during the last 5 years at Ford. Was mainly the lead on all major/minor breakdowns and recovery.Maintained maintenance budget and organized weekend work and personnel to repair and improve automation and equipment as required. Also organized major new equipment installations such as a new tire room and conveyancesystems. INDUSTRIAL ENGINEER | ITW BUILDEX | 1993-1995 · Upgraded cut and mill equipment to incorporate a 3-axis positioning system and programmed each part parameters so operator will pickthe part and machine willself-set. This increased part accuracy and repeatability while reducing setup times and thus increasing machine up time. · Responsible foroperator training program and development of training manual formachine setup and maintenance procedures and guidelines. · Developed AutoCAD layouts for the new warehouse.