SlideShare a Scribd company logo
1 of 2
Victor W. Wood II
11124 West Mariposa Dr. ~ Phoenix, AZ 85037~ C: 623-341-0376 ~ victor.wood@pepsico.com
MAINTENANCE PLANNER
Energetic, enthusiastic leader and communicator offering solid history of manufacturing experience. Recognized for
exemplary work ethic; exceptional industry and product knowledge; and in-depth expertise in troubleshooting, analysis,
optimization, and implementation of systems. Team-focused leader with proven success of empowering personnel to
identify root cause, implement countermeasures which deliver increased efficiencies.
TECHNICAL EXPERTISE
 TPM Methodologies  AIB/FDA/USDA Standards  Preventative Maintenance
 Autonomous Maintenance  OSHA Regulations  Equipment Installation
 Resource Conservation  Predictive Maintenance
 CMMS (EMAINT)(INFOR)
 Project Management
EMPLOYMENT HISTORY
PEPSICO – Pepsi Bottling Company (PBC) Division: Tolleson/Phoenix,AZ
Maintenance Planner – Tolleson/Phoenix, AZ (05/05/2012 – Present)
Optimized preventive maintenance tasks for improved utilization ofmechanics. Planned,scheduled and coordinated repairs of
facility/utility , Line 1 and 2 production equipmentin a 1.9 million square footfacility with minimal impactto production schedules.Team
builder for projects utilizing all assets ofpeople involved in the costsavings projects and dailyissues.Maintained and created monthly
and annual budgetplans within area of responsibility.
 Ultization of business applications such as CMMS,SAP, MS Office,etc.
 Increased team utilization from 40% avg to 84% avg
 Develop and implemented costsavings projects totaling $225M2014 YTD
Production Maintenance Mechanic LEVEL 3
Participated in focused improvement activities related to criticial KPI’s. BDA process implementation for Line 7, resulting in an 11.5%
reduction in BD. Provided technical leadership for the AM and PM Pillar integration with with specific focus on KPI improvement,
Defect Find & Fix, and Step 4 AM training. Improved the programs in Fanuc Robots to reduce the cycle times thus improving
efficiencies. Facilitated obtaining the proper tools and provided training to operators to supportAM Defect Find & Fix processes.
 Process improvementgroup team leader for AM Process
 Speed Balancing Line Systems reducing lag in Control / Mechanical systems increased producticityby 8%
 Assisted AM team to process /passing Step 1 AM audit
 AM Piller leader for Maintenance - developed process and procedures to train personel for Line 7
Production Maintenance Mechanic LEVEL 2
Responsible for providing technical information to the first AM process group to develop new skill setfor AM Step 1. Developed
training materials OPL’s and worked with supervisors to develop BDA System. Worked to help develop firstfind and fix defect tag
system and implementto Line 7 production. Mentored the second shiftmechanic on the AM process and how to teach processes.
 Reduced downtime on ¾ mile long conveyance bridge from 4.5% to 1% annually
 Maintained the building systems,such as plumbing,A.C., coolers,lighting, and fire systems and safetyprograms
Production Maintenance Mechanic LEVEL 1 (STARTED 04/30/2007)
Started with the corporation as an entry line mechanic and obtained NOCTILevel 1 certification within 3 months. Assisted in the
developmentofnew OPL’S. Line safety and operation. Machined new tooling for EOTS ( End Of Arm Tooling).
 Assisted in the construction and start up of Line 7 Fanuc Robotic Production
 Increased productiion startup from 32% TE to 68% TE in a six month period
 Engineered new and inovative ways to increase the prodoction of Line 7
 Learned , developed,and executed departmentNatural Work Team plan to increase OPS PM’s
BOURGET BIKE WORKS: Phoenix, AZ
Lead Technical Builder (2002-2007)
Started as an entry level mechanic to a process assemblyline to produce high-end motorcycles.Assisted in implication ofbetter
building and manufacturing processes to increase production while still producing a high-end product.
 Developed an internal parts ordering system for machine operations to use to reduce on-hand inventory
 Managed vendor stock with new numbering system reducing stock from $3.5MM to $1.3MM
 Increased line production 35% by installing a kitting program to establish organization process ofparts install
 Increased reliabilityby 47% in 1 year.
EDUCATION
CURRENTLY ENROLLED - SOUTHERN NEW HAMPSHIRE UNIVERSITY
BS - INDUSTRIAL ORGANIZATIONAL PSYCHOLOGY
MOTORCYCLE MECHANICS INSTITUTE; Phoenix, AZ
Master of Harley Davidson Technology
GPA: 3.6/4.0
ROLLA TECHNICAL INSTITUTE; Rolla, MO
Studies: Manufacturing Technology
 ROBOTICS
 BASIC A.C./ D.C
 HYDRAULICS
 INDUTRIAL MACHINING
 INDUSTRIAL CONVEYANCE
 INDUSTRIAL ELECTIC
 INDUSTRIAL CONVEYANCE PROCESSING
PEPSICO RECOGNITON PROGRAMS
 AMERICAN TRAINCOPLANNERCERTIFICATION
 TPM TRAINING
 TOP POSSEAWARDFOR AMTEAM
 BDA PROCESS TRAINED
 TRUE BLUE AWARD(COST REDUCTION)
 NOCTICERTIFIED 1-3
 MULTIPLE TEAM WORK AWARD
 FANUCROBOTIC CERTIFIED

More Related Content

What's hot (20)

Resume`
Resume`Resume`
Resume`
 
Naveesh Kapoor - resume
Naveesh Kapoor - resumeNaveesh Kapoor - resume
Naveesh Kapoor - resume
 
My cv 016
My cv 016My cv 016
My cv 016
 
Resume 2015
Resume 2015Resume 2015
Resume 2015
 
Chris Murray CV
Chris Murray CVChris Murray CV
Chris Murray CV
 
Anih Resume v16.01
Anih Resume v16.01Anih Resume v16.01
Anih Resume v16.01
 
CV 2 +2
CV 2 +2CV 2 +2
CV 2 +2
 
Lees cv september 2016
Lees cv september 2016Lees cv september 2016
Lees cv september 2016
 
Abd el nasser ibrahim CV
Abd el nasser ibrahim  CVAbd el nasser ibrahim  CV
Abd el nasser ibrahim CV
 
Final Resume 2015KR
Final Resume 2015KRFinal Resume 2015KR
Final Resume 2015KR
 
Marco resume.(3)
Marco resume.(3)Marco resume.(3)
Marco resume.(3)
 
Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015
 
Angelica Estrada Resume
Angelica Estrada ResumeAngelica Estrada Resume
Angelica Estrada Resume
 
Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1Resume Edgardo Rivera-Sueiro 2015-v1
Resume Edgardo Rivera-Sueiro 2015-v1
 
Viresh Jugali CV
Viresh Jugali CVViresh Jugali CV
Viresh Jugali CV
 
Ops info grp7 erp implementation ppt
Ops info grp7 erp implementation pptOps info grp7 erp implementation ppt
Ops info grp7 erp implementation ppt
 
Suresh Resume
Suresh ResumeSuresh Resume
Suresh Resume
 
STEVEN VANSKIVER resume
STEVEN VANSKIVER resumeSTEVEN VANSKIVER resume
STEVEN VANSKIVER resume
 
Mutsa CV current.01_20 PM,07-May-16
Mutsa CV current.01_20 PM,07-May-16Mutsa CV current.01_20 PM,07-May-16
Mutsa CV current.01_20 PM,07-May-16
 

Similar to Victor W docx resume 3 .2 v2

Resume, as of 4/2
Resume, as of 4/2Resume, as of 4/2
Resume, as of 4/2Jim Davis
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Logeais
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume FinalPhilips Pranesh
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016Randy Kent
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEPiyush Agarwal
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )Jehanzeb Hakim
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )Jehanzeb Hakim
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2John Setty
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011tbshaver
 
Mike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General ManagerMike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General ManagerMike Schomas
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Angel Rios
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng Craig Oeser
 

Similar to Victor W docx resume 3 .2 v2 (20)

Resume, as of 4/2
Resume, as of 4/2Resume, as of 4/2
Resume, as of 4/2
 
Kevin Resume 3-12-2016
Kevin Resume 3-12-2016Kevin Resume 3-12-2016
Kevin Resume 3-12-2016
 
Suresh cen
Suresh cenSuresh cen
Suresh cen
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume Final
 
William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016William Kent GLOBALFOUNDRIES 2016
William Kent GLOBALFOUNDRIES 2016
 
Resume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IEResume_Piyush Agarwal-DM-IE
Resume_Piyush Agarwal-DM-IE
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
John Setty Resume Rev2
John Setty Resume Rev2John Setty Resume Rev2
John Setty Resume Rev2
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
Asik Ali Battery Production and Maintenance
Asik Ali Battery Production and MaintenanceAsik Ali Battery Production and Maintenance
Asik Ali Battery Production and Maintenance
 
Bruce Shaver Operations 2011
Bruce Shaver   Operations 2011Bruce Shaver   Operations 2011
Bruce Shaver Operations 2011
 
Mike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General ManagerMike Schomas_Director_Vice_President_General Manager
Mike Schomas_Director_Vice_President_General Manager
 
Carl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 RevisedCarl Arens Resume 8_15 Revised
Carl Arens Resume 8_15 Revised
 
9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc9 May 2022 Tito Camps Resume (1) (4) (1).doc
9 May 2022 Tito Camps Resume (1) (4) (1).doc
 
Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1Resume_Mech Sourcing Enterprise Lead-R1
Resume_Mech Sourcing Enterprise Lead-R1
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
NPI operations eng
NPI operations eng NPI operations eng
NPI operations eng
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 

Victor W docx resume 3 .2 v2

  • 1. Victor W. Wood II 11124 West Mariposa Dr. ~ Phoenix, AZ 85037~ C: 623-341-0376 ~ victor.wood@pepsico.com MAINTENANCE PLANNER Energetic, enthusiastic leader and communicator offering solid history of manufacturing experience. Recognized for exemplary work ethic; exceptional industry and product knowledge; and in-depth expertise in troubleshooting, analysis, optimization, and implementation of systems. Team-focused leader with proven success of empowering personnel to identify root cause, implement countermeasures which deliver increased efficiencies. TECHNICAL EXPERTISE  TPM Methodologies  AIB/FDA/USDA Standards  Preventative Maintenance  Autonomous Maintenance  OSHA Regulations  Equipment Installation  Resource Conservation  Predictive Maintenance  CMMS (EMAINT)(INFOR)  Project Management EMPLOYMENT HISTORY PEPSICO – Pepsi Bottling Company (PBC) Division: Tolleson/Phoenix,AZ Maintenance Planner – Tolleson/Phoenix, AZ (05/05/2012 – Present) Optimized preventive maintenance tasks for improved utilization ofmechanics. Planned,scheduled and coordinated repairs of facility/utility , Line 1 and 2 production equipmentin a 1.9 million square footfacility with minimal impactto production schedules.Team builder for projects utilizing all assets ofpeople involved in the costsavings projects and dailyissues.Maintained and created monthly and annual budgetplans within area of responsibility.  Ultization of business applications such as CMMS,SAP, MS Office,etc.  Increased team utilization from 40% avg to 84% avg  Develop and implemented costsavings projects totaling $225M2014 YTD Production Maintenance Mechanic LEVEL 3 Participated in focused improvement activities related to criticial KPI’s. BDA process implementation for Line 7, resulting in an 11.5% reduction in BD. Provided technical leadership for the AM and PM Pillar integration with with specific focus on KPI improvement, Defect Find & Fix, and Step 4 AM training. Improved the programs in Fanuc Robots to reduce the cycle times thus improving efficiencies. Facilitated obtaining the proper tools and provided training to operators to supportAM Defect Find & Fix processes.  Process improvementgroup team leader for AM Process  Speed Balancing Line Systems reducing lag in Control / Mechanical systems increased producticityby 8%  Assisted AM team to process /passing Step 1 AM audit  AM Piller leader for Maintenance - developed process and procedures to train personel for Line 7 Production Maintenance Mechanic LEVEL 2 Responsible for providing technical information to the first AM process group to develop new skill setfor AM Step 1. Developed training materials OPL’s and worked with supervisors to develop BDA System. Worked to help develop firstfind and fix defect tag system and implementto Line 7 production. Mentored the second shiftmechanic on the AM process and how to teach processes.  Reduced downtime on ¾ mile long conveyance bridge from 4.5% to 1% annually  Maintained the building systems,such as plumbing,A.C., coolers,lighting, and fire systems and safetyprograms Production Maintenance Mechanic LEVEL 1 (STARTED 04/30/2007) Started with the corporation as an entry line mechanic and obtained NOCTILevel 1 certification within 3 months. Assisted in the developmentofnew OPL’S. Line safety and operation. Machined new tooling for EOTS ( End Of Arm Tooling).  Assisted in the construction and start up of Line 7 Fanuc Robotic Production  Increased productiion startup from 32% TE to 68% TE in a six month period  Engineered new and inovative ways to increase the prodoction of Line 7  Learned , developed,and executed departmentNatural Work Team plan to increase OPS PM’s BOURGET BIKE WORKS: Phoenix, AZ Lead Technical Builder (2002-2007) Started as an entry level mechanic to a process assemblyline to produce high-end motorcycles.Assisted in implication ofbetter building and manufacturing processes to increase production while still producing a high-end product.  Developed an internal parts ordering system for machine operations to use to reduce on-hand inventory  Managed vendor stock with new numbering system reducing stock from $3.5MM to $1.3MM  Increased line production 35% by installing a kitting program to establish organization process ofparts install  Increased reliabilityby 47% in 1 year.
  • 2. EDUCATION CURRENTLY ENROLLED - SOUTHERN NEW HAMPSHIRE UNIVERSITY BS - INDUSTRIAL ORGANIZATIONAL PSYCHOLOGY MOTORCYCLE MECHANICS INSTITUTE; Phoenix, AZ Master of Harley Davidson Technology GPA: 3.6/4.0 ROLLA TECHNICAL INSTITUTE; Rolla, MO Studies: Manufacturing Technology  ROBOTICS  BASIC A.C./ D.C  HYDRAULICS  INDUTRIAL MACHINING  INDUSTRIAL CONVEYANCE  INDUSTRIAL ELECTIC  INDUSTRIAL CONVEYANCE PROCESSING PEPSICO RECOGNITON PROGRAMS  AMERICAN TRAINCOPLANNERCERTIFICATION  TPM TRAINING  TOP POSSEAWARDFOR AMTEAM  BDA PROCESS TRAINED  TRUE BLUE AWARD(COST REDUCTION)  NOCTICERTIFIED 1-3  MULTIPLE TEAM WORK AWARD  FANUCROBOTIC CERTIFIED