DISCLAIMER : System Plus Consulting provides cost studies based on its knowledge of the manufacturing and selling prices of electronic components and systems. The given values are realistic estimates which do not
bind System Plus Consulting nor the manufacturers quoted in the report. System Plus Consulting is in no case responsible for the consequences related to the use which is made of the contents of this report. The
quoted trademarks are property of their owners.
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 1
Electronic Costing & Technology Experts
www.systemplus.fr
21 rue la Nouë Bras de Fer
44200 Nantes – France Phone : +33 (0) 240 180 916 email : info@systemplus.fr
February 2015 - Version 1 - Written by Sylvain Hallereau
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 2
Glossary
1. Overview / Introduction 4
– Executive Summary
– Reverse Costing Methodology
2. Company Profile 7
3. CAS120M12BM2 Characteristics 9
4. Physical Analysis 13
– Synthesis of the Physical Analysis
4.1 Package analysis
– View and dimensions and marking
– Housing
– Base Plate Cross-Section
– DBC Cross-Section
4.2 MOSFET Analysis
– Dimension
– Gate Supply Line and Guard Ring
– Trench Gate Cross-Section
– Revelation
– CREE 1 gen vs 2 gen
4.3 Z-Rec Diode Analysis
– Dimension
– Guard Ring
– Revelation
5. Manufacturing Process Flow 86
– Overview
– MOSFET and Diode Process Flow
– Description of the Wafer Fabrication Units
– MOSFET Process Flow
– Diode Process Flow
– Package Process Flow
6. Cost Analysis 103
– Synthesis of the Cost Analysis
– Main Steps of Economic Analysis
– Yields Explanation
6.1 Cost Analysis MOSFET
– Wafer Cost Hypothesis
– MOSFET Wafer Cost
– Breakdown per process step
– MOSFET Probe Cost
– MOSFET Die cost
6.2 Cost Analysis Diode
6.3 Cost Analysis CAS120M12BM2
– Assessing BOM
– DBC Cost
– CAS120M12BM2 Module Cost
– Yield Synthesis
7. Estimated Manufacturer Price Analysis 132
– Manufacturers ratios
– Estimated manufacturer Price
Contact
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 3
• This full reverse costing study has been conducted to provide insight on technology data,
manufacturing cost and selling price of the CREE CAS120M12BM2.
• The CAS120M12BM2 from CREE is a new generation SiC MOSFET high-voltage power module.
With a breakdown voltage of 1200V for a current of 138A at 90°C, the module is optimized for:
• Induction Heating
• Solar and Wind Inverters,
• DC/DC Converters,
• Line Regen Drives,
• BatteryChargers.
• The CAS120M12BM2 is an all Silicon Carbide Half-Bridge Module with new C2M SiC MOSFET and
Z-Rec Diode from CREE. The module is designed and manufactured by CREE.
• The CAS120M12BM2 offers a very low on-resistance (13 mΩ) and a higher operating temperature
(up to 150 °C) in a 62mm x 106mm x 30mm package.
• A comparison between the second generation and the first is performed in this report.
• The manufacturing of the SiC MOSFET and Z-rec Diode are realized by CREE in its 100mm wafer
foundry in Durham, NC, USA. We estimate that the assembly module and final test (Back-end) are
realized by Powerex and are assumed to take place in the USA.
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 4
Package:
 Dimensions: 106mm x62mm x30 mm
 Number of Pins: 3- screw pin
 Half bridge power module
Module
package
Diode
SiC MOSFET
Diode:
 Dimensions: XX x XXmm2
 Electrical Connection: 300 µm Al wire bonding
 Placement in the package: soldered on DBC
MOSFET:
 Dimension: XX x XX mm2
 Electrical Connection: 300 µm Al wire bonding
 Placement in the package: soldered on DBC.
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 5
• Die dimensions: XXmm x XXmm
• Thickness: XXµm (the substrate is thinned)
• 4 wire bonds
• No die markings
• Drain contact at die bottom
gate pad
source pads
Polyimide on
the periphery
Passivation layer
Cross-Section : SEM view
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 6
FTIR spectrum of polyimide
Si-O
The Si-O peak is from the
underlying silicon oxide.
The FTIR spectrum was taken in
reflection.
MOSFET gate : SEM view
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 7
• Die dimensions: XXmm x XXmm
• 2 wire bonds
• No die markings
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 8
00 00 0
Implantations
•SiO2 deposition
•Pattern SiO2
•P well implantation
Implantations
•SiO2 deposition
•Pattern SiO2
•N+ source
implantation
Implantations
•XX
•XX
•XX
Drawing not to Scale
N+ Source implantation
00 00 000
0
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 9
• The front-end cost ranges from $xx to $xx
according to yield variations.
• The high cost of the wafer explain the portion
of the manufacturing cost is due to yield
losses in the cost.
• The manufacturing yield is between xx% and
xx% in 2014
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 10
• The assembled module cost is estimated between $XX and $XX according to the yield.
• The DBC cost accounts for XX% of the cost .
• The copper base plate cost account for XX% of the cost.
•The added value cost is $XX
• The scrap cost (medium yield, XX%) is the total of all the losses during the assembly and the test.
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 11
• The Component cost ranges from $xx to $xx
according to yield variations.
• The SiC Dies manufacturing represents xx% of
the component cost.
• The packaging represents xx% of the
component cost.
• Final test and yield losses account for xx% of
the component cost.
CREE – CAS120M12BM2
Return to TOC
© 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 12
Reverse costing analysis represents the best cost/price evaluation given the publically available data, and estimates
completed by industry experts.
Given the hypothesis presented in this analysis, the major sources of correction would lead to a +/- 10% correction on the
manufacturing cost (if all parameters are cumulated).
These results are open for discussion. We can reevaluate this circuit with your information. Please contact us:
• Consulting and Specific Analysis
– North America: Steve LaFerriere, Director of Northern America Business Development, Yole Inc.
Email: laferriere@yole.fr
– Japan: Yutaka Katano, General Manager, Yole Japan & President, Yole K.K.
Email: katano@yole.fr
– RoW: Jean-Christophe Eloy, President & CEO, Yole Développement
Email: eloy@yole.fr
• Report business
– North America: Steve LaFerriere, Director of Northern America Business Development, Yole Inc.
Email: laferriere@yole.fr
– Europe: Fayçal El Khamassi, Headquarter Sales Coordination & Customer Service
Email: khamassi@yole.fr
– Japan & Asia: Takashi Onozawa, Sales Asia & General Manager, Yole K.K.
Email: onozawa@yole.fr
– Korea: Hailey Yang, Business Development Manager, Korean Office
Email: yang@yole.fr
• Financial services
– Jean-Christophe Eloy, CEO & President
Email: eloy@yole.fr
• General
– Email: info@yole.fr
The CAS120M12BM2 from CREE Semiconductor is a power module of 2
transistors with a breakdown voltage of 1200V for a current of 138A (90°C),
an ultra low on-resistance (13mΩ), a fast switching speed and a fast reverse
recovery.
The CAS120M12BM2 integrates 12 2nd generation high-voltage SiC (Silicon
Carbide) power MOSFET dies with a current of 23A (90°C) for 10 sq mm,
and 24x Z-Rec diode of 4.8 sq mm are integrated in the power module. The
Z-Rec diode is a mix between a Schottky and junction barrier diode.
The second generation MOSFET has a new gate design, a more
sophisticated ohmic contact and a thinner substrate. The comparison
between the 2 generations is developed in the report.
System Plus Consulting is publishing a reverse costing report on this
module. Based on a complete teardown analysis, the report provides an
estimation of the production cost of the CAS120M12BM2 package, SiC
MOSFET Transistor and Schottky Barrier Diode.
Distributed by Performed by
TABLE OF CONTENTS
CREE 1200V SiC Module
2nd Generation SiC MOSFET with Z-Rec Diode SiC
REVERSE COSTING ANALYSIS
REPORT BY
COMPLETE TEARDOWN WITH:
• Detailed photos and identification
• Comparison between the first and
second generation MOSFET die.
• Manufacturing process flow of
MOSFET and Diode
• In-depth economical analysis
• Manufacturing cost breakdown
• Selling price estimation
CREE 1200V SiC Module
136 pages
February 2015
Pdf file
Xls file
PRICE :
Full report: EUR 3,490
1. Overview / Introduction
2. Companies Profile
– CREE Profile
3. CAS120M12BM2 Characteristics
– CAS120M12BM2 Characteristics
4. CAS120M12BM2 Physical Analysis
– Physical Analysis Methodology
– Package Views & Dimensions
MOSFET
– Die View, Dimensions & Marking
– Guard Ring
– Cross-Section Gate
– Substrate and Epitaxy Layers, Backside
– MOSFET Characteristics
– Comparison First and Second Generation
Diode
– Die View, Dimensions & Marking
– Guard Ring, Cross-Section
– Substrate and Epitaxy Layers
– Backside
– Diode Characteristics
5. Manufacturing Process Flow
– Global Overview
– MOSFET Front end Unit, Tests Unit
– Transistor Process Flow
– Diode Front end Unit, Process Flow
– Diode Process Flow
– Power Module Process Flow
6. Cost Analysis
– Synthesis of the cost analysis
– Main steps of economic analysis
MOSFET
– Yields Hypotheses
– MOSFET Epitaxy Cost
– MOSFET Front-End Cost
– MOSFET Wafer Cost
– MOSFET Cost per process steps
– MOSFET : Back-End : Probe and
Diode
CAS120M12BM2
– Package & Final Test
7. Price Estimation
Contact
In 3 years, the performance/cost ratio of SiC MOSFET has been multiplied by 3.
ORDER FORM
SHIP TO
*For price in dollars please use the day’s exchange rate *All reports are delivered electronically in pdf format *For French customer, add 20 % for VAT
 Full Reverse Costing report: EUR 3,490*
ABOUT SYSTEM PLUS CONSULTING
Distributed by Performed by
BILLING CONTACT
Name (Mr/Ms/Dr/Pr):
......................................................................................
Job Title:
......................................................................................
Company:
......................................................................................
Address:
......................................................................................
City: State:
......................................................................................
Postcode/Zip:
......................................................................................
Country*:
......................................................................................
*VAT ID Number for EU members:
......................................................................................
Tel:
......................................................................................
Email:
.....................................................................................
Date:
.......................................................................................
Signature :
......................................................................................
Name: ...................................................................
Email:.....................................................................
Phone:....................................................................
ABOUT YOLE DEVELOPPEMENT
On line on Yole website:
http://www.i-micronews.com/reports/
Credit Card:
 Visa  Mastercard  Amex
Name of the Card Holder:
Credit Card Number:
Card Verification Value (3 last digits except AMEX: 4 last digits) :
Expiration date:
By bank transfer:
BANK INFO: HSBC, 1 place de la Bourse, F-69002 Lyon, France,
Bank code : 30056, Branch code : 00170
Account No : 0170 200 1565 87,
SWIFT or BIC code : CCFRFRPP,
IBAN : FR76 3005 6001 7001 7020 0156 587
Return order by:
• FAX: +33 (0)472 83 01 83
• MAIL: YOLE DEVELOPPEMENT,
75 Cours Emile Zola, F - 69100 Lyon - Villeurbanne
Contact:
David Jourdan, jourdan@yole.fr, Tel: +33 (0)472 83 01 90
(1) Our Terms and Conditions of Sale are available www.yole.fr/Terms_and_Conditions_of_Sale.aspx
The present document is valid 12 months after its publishing date: 1th February 2015.
.
Beginning in 1998 with Yole Développement, we have grown to become a group of companies providing market research, technology
analysis, strategy consulting, media in addition to finance services. With a solid focus on emerging applications using silicon and/or
micro manufacturing Yole Développement group has expanded to include more than 40 associates worldwide covering MEMS,
Microfluidics & Medical, Advanced Packaging, Compound Semiconductors, Power Electronics, LED, and Photovoltaic. The group
supports companies, investors and R&D organizations worldwide to help them understand markets and follow technology trends to
develop their business.
CUSTOM STUDIES
• Market data, market research &
marketing analysis
• Technology analysis
• Reverse engineering & reverse
costing
• Strategy consulting
• Corporate Finance Advisory (M&A
and fund raising)
MEDIA
• Critical news, Bi-weekly: Micronews, the
magazine
• In-depth analysis & Quarterly Technology
Magazines: MEMS Trends– 3D Packaging – PV
Manufacturing – iLED – Power Dev'
• Online disruptive technologies website: www.i-
micronews.com
• Exclusive Webcasts
• Live event with Market Briefings
TECHNOLOGY & MARKET
REPORTS
• Collection of reports
• Players & market databases
• Manufacturing cost simulation tools
• Component reverse engineering &
costing analysis
More information on www.yole.fr
Please process my order for “CREE CAS120M12BM2 SiC Module” Reverse Costing Report
PAYMENT
TERMS AND CONDITIONS OF SALES
Definitions: “Acceptance”: Action by which the Buyer accepts the terms and conditions of sale in their entirety. It is done by ticking the box “I accept the conditions”.
“Buyer”: Any business user (i.e. any person acting in the course of its business activities, for its business needs) entering into the following general conditions to the exclusion of consumers acting in their
personal interests.
“Contracting Parties” or “Parties”: The Seller on the one hand and the Buyer on the other hand.
“Intellectual Property Rights” (“IPR”) means any rights held by the Seller in its Products, including any patents, trademarks, registered models, designs, copyrights, inventions, commercial secrets and know-
how, technical information, company or trading names and any other intellectual property rights or similar in any part of the world, notwithstanding the fact that they have been registered or not and including
any pending registration of one of the above mentioned rights.
“License”: For the reports and databases, 3 different licenses are proposed. The buyer has to choose one license: 1. Single user license: the purchaser is the sole authorized user of the report 2. Multi-user,
single site license: the report can be used by various users provided that the report is only use within the same company at same post address 3. Multi-user, multi-site license: the report can be used by
various users within the same company or group and its subsidiaries (more than 50% share) at a global scale.
“Products”: Depending on the purchase order, reports or database on MEMS, CSC, Optics/MOEMS, Nano, bio… to be bought either on a unit basis or as an annual subscription. (i.e. subscription for a period
of 12 calendar months). The annual subscription to a package (i.e. a global discount based on the number of reports that the Buyer orders or accesses via the service, a global search service on line on I-
micronews and a consulting approach), is defined in the order. Reports are established in PowerPoint and delivered on a PDF format and the database may include Excel files.
“Seller”: Based in Lyon (France headquarters), Yole Développement is a market research and business development consultancy company, facilitating market access for advanced technology industrial
projects. With more than 18 consultants, Yole works worldwide with the key industrial companies, R&D institutes and investors to help them understand the markets and technology trends.
1. Scope
1.1 The Contracting Parties undertake to observe the following general conditions when agreed by the Buyer and the Seller. ANY ADDITIONAL, DIFFERENT, OR CONFLICTING TERMS AND CONDITIONS
IN ANY OTHER DOCUMENTS ISSUED BY THE BUYER AT ANY TIME ARE HEREBY OBJECTED TO BY THE SELLER, SHALL BE WHOLLY INAPPLICABLE TO ANY SALE MADE HEREUNDER AND
SHALL NOT BE BINDING IN ANY WAY ON THE SELLER.
1.2 This agreement becomes valid and enforceable between the Contracting Parties after clear and non-equivocal consent by any duly authorised person representing the Buyer. For these purposes,
the Buyer accepts these conditions of sales when ticking the box “I accept the conditions”. This results in acceptance by the Buyer.
1.3 Orders are deemed to be accepted only upon written acceptance and confirmation by the Seller, within [7 days] from the date of order, to be sent either by email or to the Buyer’s address. In the absence
of any confirmation in writing, orders shall be deemed to have been accepted.
2. Mailing of the Products
2.1 Products are sent by email to the Buyer:
- within [1] month from the order for Products already released; or
- within a reasonable time for Products ordered prior to their effective release. In this case, the Seller shall use its best endeavours to inform the Buyer of an indicative release date and the evolution of the
work in progress.
2.2 Some weeks prior to the release date the Seller can propose a pre-release discount to the Buyer
The Seller shall by no means be responsible for any delay in respect of article 2.2 above, and including incases where a new event or access to new contradictory information would require for the analyst
extra time to compute or compare the data in order to enable the Seller to deliver a high quality Products.
2.3 The mailing of the Product will occur only upon payment by the Buyer, in accordance with the conditions contained in article 3.
2.4. The mailing is operated through electronic meanseither by email via the sales department or automatically online via an email/password. If the Product’s electronic delivery format is defective, the Seller
undertakes to replace it at no charge to the Buyer provided that it is informed of the defective formatting within 90 days from the date of the original download or receipt of the Product.
2.4 The person receiving the Products on behalf of the Buyer shall immediately verify the quality of the Products and their conformity to the order. Any claim for apparent defects or for non-conformity
shall be sent in writing to the Seller within 8 days of receipt of the Products. For this purpose, the Buyer agrees to produce sufficient evidence of such defects. .
2.5 No return of Products shall be accepted without prior information to the Seller, even in case of delayed delivery. Any Product returned to the Seller without providing prior information to the Seller as
required under article 2.5 shall remain at the Buyer’s risk.
3. Price, invoicing and payment
3.1 Prices are given in the orders corresponding to each Product sold on a unit basis or corresponding to annual subscriptions. They are expressed to be inclusive of all taxes. The prices may be reevaluated
from time to time. The effective price is deemed to be the one applicable at the time of the order.
3.2 Yole may offer a pre release discount for the companies willing to acquire in the future the specific report and agreeing on the fact that the report may be release later than the anticipated release date. In
exchange to this uncertainty, the company will get a discount that can vary from 15% to 10%.
3.3 Payments due by the Buyer shall be sent by cheque payable to Yole Développement, credit card or by electronic transfer to the following account:
HSBC, 1 place de la Bourse 69002 Lyon France Bank code: 30056 Branch code: 200 1565 87BIC or SWIFT c00170 Account n°: 0170 ode: CCFRFRPP IBAN: FR76 3005 6001 7001 7020 0156 587
To ensure the payments, the Seller reserves the right to request down payments from the Buyer. In this case, the need of down payments will be mentioned on the order.
3.3 Payment is due by the Buyer to the Seller within 30 days from invoice date, except in the case of a particular written agreement. If the Buyer fails to pay within this time and fails to contact the Seller, the
latter shall be entitled to invoice interest in arrears based on the annual rate Refi of the «BCE» + 7 points, in accordance with article L. 441-6 of the French Commercial Code.
3.4 In the event of termination of the contract, or of misconduct, during the contract, the Seller will have the right to invoice at the stage in progress, and to take legal action for damages.
4. Liabilities
4.1The Buyer or any other individual or legal person acting on its behalf, being a business user buying the Products for its business activities, shall be solely responsible for choosing the Products and for the
use and interpretations he makes of the documents it purchases, of the results he obtains, and of the advice and acts it deduces thereof.
4.2 The Seller shall only be liable for (i) direct and (ii) foreseeable pecuniary loss, caused by the Products or arising from a material breach of this agreement
4.3 In no event shall the Seller be liable for:
a) damages of any kind, including without limitation, incidental or consequential damages (including, but not limited to, damages for loss of profits, business interruption and loss of programs or information)
arising out of the use of or inability to use the Seller’s website or the Products, or any information provided on the website, or in the Products;
b) any claim attributable to errors, omissions or other inaccuracies in the Product or interpretations thereof.
4.4All the information contained in the Products has been obtained from sources believed to be reliable. The Seller does not warrant the accuracy, completeness adequacy or reliability of such information,
which cannot be guaranteed to be free from errors.
4.5 All the Products that the Seller sells may, upon prior notice to the Buyer from time to time be modified by or substituted with similar Products meeting the needs of the Buyer. This modification shall not
lead to the liability of the Seller, provided that the Seller ensures the substituted Product is similar to the Product initially ordered.
4.6 In the case where, after inspection, it is acknowledged that the Products contain defects, the Seller undertakes to replace the defective products as far as the supplies allow and without indemnities or
compensation of any kind for labor costs, delays, loss caused or any other reason. The replacement is guaranteed for a maximum of two months starting from the delivery date. Any replacement is excluded
for any event as set out in article 5 below.
4.7 The deadlines that the Seller is asked to state for the mailing of the Products are given for information only and are not guaranteed. If such deadlines are not met, it shall not lead to any damages
or cancellation of the orders, except for non acceptable delays exceeding [4] months from the stated deadline, without information from the Seller.In such case only, the Buyer shall be entitled to ask for a
reimbursement of its first down payment to the exclusion of any further damages.
4.8 The Seller does not make any warranties, express or implied, including, without limitation, those of saleability and fitness for a particular purpose, with respect to the Products. Although the Seller shall
take reasonable steps to screen Products for infection of viruses, worms, Trojan horses or other codes containing contaminating or destructive properties before making the Products available, the Seller
cannot guarantee that any Product will be free from infection.
5. Force majeure
The Seller shall not be liable for any delay in performance directly or indirectly caused by or resulting from acts of nature, fire, flood, accident, riot, war, government intervention, embargoes, strikes, labor
difficulties, equipment failure, late deliveries by suppliers or other difficulties which are beyond the control, and not the fault of the Seller.
6. Protection of the Seller’s IPR
6.1 All the IPR attached to the Products are and remain the property of the Seller and are protected under French and international copyright law and conventions.
6.2 The Buyer agreed not to disclose, copy, reproduce, redistribute, resell or publish the Product, or any part of it to any other party other than employees of its company. The Buyer shall have the right to use
the Products solely for its own internal information purposes. In particular, the Buyer shall therefore not use the Product for purposes such as:
- Information storage and retrieval systems; - Recordings and re-transmittals over any network (including any local area network); - Use in any timesharing, service bureau, bulletin board or similar
arrangement or public display; - Posting any Product to any other online service (including bulletin boards or the Internet);- Licensing, leasing, selling, offering for sale or assigning the Product.
6.3 The Buyer shall be solely responsible towards the Seller of all infringements of this obligation, whether this infringement comes from its employees or any person to whom the Buyer has sent the Products
and shall personally take care of any related proceedings, and the Buyer shall bear related financial consequences in their entirety.
6.4 The Buyer shall define within its company point of contact for the needs of the contract. This person will be the recipient of each new report in PDF format. This person shall also be responsible for respect
of the copyrights and will guaranty that the Products are not disseminated out of the company.
6.5 In the context of annual subscriptions, the person of contact shall decide who within the Buyer, shall be entitled to access on line the reports on I-micronews.com. In this respect, the Seller will give the
Buyer a maximum of 10 password, unless the multiple sites organisation of the Buyer requires more passwords. The Seller reserves the right to check from time to time the correct use of this password.
6.6 In the case of a multisite, multilicence, only the employee of the buyer can access the report or the employee of the companies in which the buyer have 100% shares. As a matter of fact the investor of a
company, the joint venture done with a third party etc… can not access the report and should pay a full licence price.
7. Termination
7.1 If the Buyer cancels the order in whole or in part or postpones the date of mailing, the Buyer shall indemnify the Seller for the entire costs that have been incurred as at the date of notification by the Buyer
of such delay or cancellation. This may also apply for any other direct or indirect consequential loss that may be borne by the Seller, following this decision.
7.2 In the event of breach by one Party under these conditions or the order, the non-breaching Party may send a notification to the other by recorded delivery letter upon which, after a period of thirty (30)
days without solving the problem, the non-breaching Party shall be entitled to terminate all the pending orders, without being liable for any compensation.
8. Miscellaneous
All the provisions of these Terms and Conditions are for the benefit of the Seller itself, but also for its licensors, employees and agents. Each of them is entitled to assert and enforce those provisions against
the Buyer.
Any notices under these Terms and Conditions shall be given in writing. They shall be effective upon receipt by the other Party.
The Seller may, from time to time, update these Terms and Conditions and the Buyer, is deemed to have accepted the latest version of these terms and conditions, provided they have been communicated
to him in due time.
9.Governing law and jurisdiction
9.1 Any dispute arising out or linked to these Terms and Conditions or to any contract (orders) entered into in application of these Terms and Conditions shall be settled by the French Commercial Courts of
Lyon, which shall have exclusive jurisdiction upon such issues.
9.2 French law shall govern the relation between the Buyer and the Seller, in accordance with these Terms and conditions.

More Related Content

What's hot

Tesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronicsTesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronicssystem_plus
 
SPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE Inverter
SPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE InverterSPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE Inverter
SPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE Invertersystem_plus
 
Pcb design best practices for more reliable manufacturing
Pcb design best practices for more reliable manufacturingPcb design best practices for more reliable manufacturing
Pcb design best practices for more reliable manufacturingScreaming Circuits
 
1200V Silicon IGBT vs SiC MOSFET Comparison 2018
 1200V Silicon IGBT vs SiC MOSFET Comparison 2018 1200V Silicon IGBT vs SiC MOSFET Comparison 2018
1200V Silicon IGBT vs SiC MOSFET Comparison 2018system_plus
 
Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...
Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...
Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...system_plus
 
ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...
ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...
ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...Yole Developpement
 
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...Yole Developpement
 
Flip Chip technology
Flip Chip technologyFlip Chip technology
Flip Chip technologyMantra VLSI
 
Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...
Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...
Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...system_plus
 
A view of semiconductor industry
A view of semiconductor industryA view of semiconductor industry
A view of semiconductor industryLen Mei
 
Growth of advanced packaging - What make it so special? Presentation by Rozal...
Growth of advanced packaging - What make it so special? Presentation by Rozal...Growth of advanced packaging - What make it so special? Presentation by Rozal...
Growth of advanced packaging - What make it so special? Presentation by Rozal...Yole Developpement
 
Flipchip bonding.
Flipchip bonding.Flipchip bonding.
Flipchip bonding.venkata016
 
Rohm SiC MOSFET Gen3 Trench Design Family
Rohm SiC MOSFET Gen3 Trench Design FamilyRohm SiC MOSFET Gen3 Trench Design Family
Rohm SiC MOSFET Gen3 Trench Design Familysystem_plus
 
CAD: Layout Extraction
CAD: Layout ExtractionCAD: Layout Extraction
CAD: Layout ExtractionTeam-VLSI-ITMU
 
RF Front End modules and components for cellphones 2017 - Report by Yole Deve...
RF Front End modules and components for cellphones 2017 - Report by Yole Deve...RF Front End modules and components for cellphones 2017 - Report by Yole Deve...
RF Front End modules and components for cellphones 2017 - Report by Yole Deve...Yole Developpement
 
Status of the Power Module Packaging Industry 2019 - Yole Développement
Status of the Power Module Packaging Industry 2019 - Yole DéveloppementStatus of the Power Module Packaging Industry 2019 - Yole Développement
Status of the Power Module Packaging Industry 2019 - Yole DéveloppementYole Developpement
 
io and pad ring.pdf
io and pad ring.pdfio and pad ring.pdf
io and pad ring.pdfquandao25
 
Flipchip Technologies & Market Trends 2015 Report by Yole Developpement
Flipchip Technologies & Market Trends 2015 Report by Yole DeveloppementFlipchip Technologies & Market Trends 2015 Report by Yole Developpement
Flipchip Technologies & Market Trends 2015 Report by Yole DeveloppementYole Developpement
 

What's hot (20)

Tesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronicsTesla Model 3 Inverter with SiC Power Module from STMicroelectronics
Tesla Model 3 Inverter with SiC Power Module from STMicroelectronics
 
SPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE Inverter
SPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE InverterSPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE Inverter
SPR21610 - Vitesco Technologies Power Module in Jaguar I-PACE Inverter
 
Pcb design best practices for more reliable manufacturing
Pcb design best practices for more reliable manufacturingPcb design best practices for more reliable manufacturing
Pcb design best practices for more reliable manufacturing
 
1200V Silicon IGBT vs SiC MOSFET Comparison 2018
 1200V Silicon IGBT vs SiC MOSFET Comparison 2018 1200V Silicon IGBT vs SiC MOSFET Comparison 2018
1200V Silicon IGBT vs SiC MOSFET Comparison 2018
 
Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...
Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...
Infineon FF400R07A01E3 Double Side Cooled IGBT Module - 2018 teardown reverse...
 
ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...
ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...
ROHM 1200V Trench SiC MOSFET BSM180D12P3C007 - teardown reverse costing repor...
 
Semiconductor Industry Tutorial
Semiconductor Industry TutorialSemiconductor Industry Tutorial
Semiconductor Industry Tutorial
 
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
2.5D / 3D TSV & Wafer-Level Stacking: Technology & Market Updates 2019 Report...
 
Flip Chip technology
Flip Chip technologyFlip Chip technology
Flip Chip technology
 
Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...
Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...
Texas Instruments’ LMG5200 GaN Power Stage - 2018 teardown reverse costing re...
 
A view of semiconductor industry
A view of semiconductor industryA view of semiconductor industry
A view of semiconductor industry
 
Growth of advanced packaging - What make it so special? Presentation by Rozal...
Growth of advanced packaging - What make it so special? Presentation by Rozal...Growth of advanced packaging - What make it so special? Presentation by Rozal...
Growth of advanced packaging - What make it so special? Presentation by Rozal...
 
Flipchip bonding.
Flipchip bonding.Flipchip bonding.
Flipchip bonding.
 
Rohm SiC MOSFET Gen3 Trench Design Family
Rohm SiC MOSFET Gen3 Trench Design FamilyRohm SiC MOSFET Gen3 Trench Design Family
Rohm SiC MOSFET Gen3 Trench Design Family
 
CAD: Layout Extraction
CAD: Layout ExtractionCAD: Layout Extraction
CAD: Layout Extraction
 
RF Front End modules and components for cellphones 2017 - Report by Yole Deve...
RF Front End modules and components for cellphones 2017 - Report by Yole Deve...RF Front End modules and components for cellphones 2017 - Report by Yole Deve...
RF Front End modules and components for cellphones 2017 - Report by Yole Deve...
 
Status of the Power Module Packaging Industry 2019 - Yole Développement
Status of the Power Module Packaging Industry 2019 - Yole DéveloppementStatus of the Power Module Packaging Industry 2019 - Yole Développement
Status of the Power Module Packaging Industry 2019 - Yole Développement
 
io and pad ring.pdf
io and pad ring.pdfio and pad ring.pdf
io and pad ring.pdf
 
OVERVIEW OF IC PACKAGING
OVERVIEW OF IC PACKAGINGOVERVIEW OF IC PACKAGING
OVERVIEW OF IC PACKAGING
 
Flipchip Technologies & Market Trends 2015 Report by Yole Developpement
Flipchip Technologies & Market Trends 2015 Report by Yole DeveloppementFlipchip Technologies & Market Trends 2015 Report by Yole Developpement
Flipchip Technologies & Market Trends 2015 Report by Yole Developpement
 

Viewers also liked

Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...
Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...
Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...Yole Developpement
 
Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...
Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...
Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...Yole Developpement
 
Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...
Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...
Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...Yole Developpement
 
Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...
Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...
Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...Yole Developpement
 
Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...
Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...
Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...Yole Developpement
 
Bulk GaN Substrate Market 2017 Report by Yole Developpement
Bulk GaN Substrate Market 2017 Report by Yole DeveloppementBulk GaN Substrate Market 2017 Report by Yole Developpement
Bulk GaN Substrate Market 2017 Report by Yole DeveloppementYole Developpement
 
UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...
UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...
UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...Yole Developpement
 
Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...
Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...
Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...Yole Developpement
 
Gate Driver Unit Market for Power Transistors 2014 Report by Yole Developpement
Gate Driver Unit Market for Power Transistors 2014 Report by Yole DeveloppementGate Driver Unit Market for Power Transistors 2014 Report by Yole Developpement
Gate Driver Unit Market for Power Transistors 2014 Report by Yole DeveloppementYole Developpement
 
Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...
Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...
Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...Yole Developpement
 
BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...
BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...
BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...Yole Developpement
 

Viewers also liked (11)

Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...
Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...
Transphorm TPH3002PS 600V GaN on Silicon HEMT 2015 teardown reverse costing r...
 
Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...
Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...
Transphorm GaN-on-Silicon HEMT TPH3206PS 2016 teardown reverse costing report...
 
Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...
Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...
Wolfspeed C3M™ Platform SiC 900V MOSFET - teardown reverse costing report pub...
 
Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...
Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...
Power SiC 2016: Materials, Devices, Modules, and Applications - 2016 Report b...
 
Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...
Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...
Panasonic PGA26C09DV 600V GaN HEMT teardown reverse costing report published ...
 
Bulk GaN Substrate Market 2017 Report by Yole Developpement
Bulk GaN Substrate Market 2017 Report by Yole DeveloppementBulk GaN Substrate Market 2017 Report by Yole Developpement
Bulk GaN Substrate Market 2017 Report by Yole Developpement
 
UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...
UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...
UV LEDs - Technology, Manufacturing and Application Trends 2016 Report by Yol...
 
Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...
Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...
Intel® Curie™ Module High Density System-in-Package for IoT 2016 teardown rev...
 
Gate Driver Unit Market for Power Transistors 2014 Report by Yole Developpement
Gate Driver Unit Market for Power Transistors 2014 Report by Yole DeveloppementGate Driver Unit Market for Power Transistors 2014 Report by Yole Developpement
Gate Driver Unit Market for Power Transistors 2014 Report by Yole Developpement
 
Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...
Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...
Maxim Integrated MAX30102 Optical Heart-Rate Sensor 2016 teardown reverse cos...
 
BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...
BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...
BOSCH Sensortec BMF055 Cortex M0+ 9-Axis Sensor Hub in SiP 2016 teardown reve...
 

Similar to CREE 1200V SiC Module teardown reverse costing report published by Yole Developpement

Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...Yole Developpement
 
Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...
Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...
Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...Yole Developpement
 
STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...
STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...
STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...Yole Developpement
 
SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...
SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...
SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...Yole Developpement
 
Tesla UBQ01B0 FSD Chip
Tesla UBQ01B0 FSD ChipTesla UBQ01B0 FSD Chip
Tesla UBQ01B0 FSD Chipsystem_plus
 
2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...
2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...
2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...Yole Developpement
 
Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...
Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...
Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...Yole Developpement
 
STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...
STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...
STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...Yole Developpement
 
Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...
Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...
Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...Yole Developpement
 
LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...
LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...
LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...Yole Developpement
 
ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...
ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...
ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...Yole Developpement
 
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...Yole Developpement
 
Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...
Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...
Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...Yole Developpement
 
Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)
Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)
Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)system_plus
 
Bose Automotive Audio Amplifier
Bose Automotive Audio AmplifierBose Automotive Audio Amplifier
Bose Automotive Audio Amplifiersystem_plus
 
Broadcom AFEM8200 MBHB PAMiD
Broadcom AFEM8200 MBHB PAMiDBroadcom AFEM8200 MBHB PAMiD
Broadcom AFEM8200 MBHB PAMiDsystem_plus
 
Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...
Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...
Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...Yole Developpement
 
Mitsubishi J1- Series 650V High-Power Modules for Automotive
Mitsubishi J1- Series 650V High-Power Modules for AutomotiveMitsubishi J1- Series 650V High-Power Modules for Automotive
Mitsubishi J1- Series 650V High-Power Modules for Automotivesystem_plus
 
FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...
FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...
FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...Yole Developpement
 
Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...
Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...
Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...Yole Developpement
 

Similar to CREE 1200V SiC Module teardown reverse costing report published by Yole Developpement (20)

Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
Littelfuse Silicon Carbide MOSFET LCIS1MO120E0080: 1200V 25A 80mOhms 2018 tea...
 
Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...
Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...
Murata SCC2000 Series X or Z-Axis Gyro & 3-Axis Accelerometer 2015 teardown r...
 
STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...
STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...
STMicroelectronics A3G4250D Automotive 3-Axis MEMS Gyroscope teardown reverse...
 
SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...
SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...
SETi - UVTOP270TO39HS and SS35DF227513 UVC LEDs for Disinfection and Chemical...
 
Tesla UBQ01B0 FSD Chip
Tesla UBQ01B0 FSD ChipTesla UBQ01B0 FSD Chip
Tesla UBQ01B0 FSD Chip
 
2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...
2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...
2-Axis Gyroscopes for Optical Image Stabilization: STMicroelectronics L2G2IS ...
 
Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...
Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...
Capella Microsystems CM3512 Ultraviolet Light Sensor teardown reverse costing...
 
STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...
STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...
STMicroelectronics LSM9DS0 9-Axis MEMS IMU teardown reverse costing report pu...
 
Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...
Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...
Bosch Sensortec BMX055 9-Axis MEMS IMU teardown reverse costing report publis...
 
LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...
LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...
LeddarVu8: The first off-the-shelf solid state high-definition LiDAR module f...
 
ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...
ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...
ROHM 1700V SiC MOSFET SCT2H12NZGC11 Discrete 2017 teardown reverse costing re...
 
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
SMA Sunny Boy SB 1.5 1-vl40 1500W 2015 teardown reverse costing report publis...
 
Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...
Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...
Maxim Integrated MAX21100 6-Axis MEMS IMU teardown reverse costing report pub...
 
Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)
Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)
Hikvision Intelligent Thermal Network Camera (DS-2TD2166-15 V1)
 
Bose Automotive Audio Amplifier
Bose Automotive Audio AmplifierBose Automotive Audio Amplifier
Bose Automotive Audio Amplifier
 
Broadcom AFEM8200 MBHB PAMiD
Broadcom AFEM8200 MBHB PAMiDBroadcom AFEM8200 MBHB PAMiD
Broadcom AFEM8200 MBHB PAMiD
 
Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...
Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...
Delphi Integrated Radar and Camera System (RACam) 2016 teardown reverse costi...
 
Mitsubishi J1- Series 650V High-Power Modules for Automotive
Mitsubishi J1- Series 650V High-Power Modules for AutomotiveMitsubishi J1- Series 650V High-Power Modules for Automotive
Mitsubishi J1- Series 650V High-Power Modules for Automotive
 
FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...
FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...
FLIR One 2nd Generation & FLIR LEPTON 3 IR Camera Core_2016 Report by Yole De...
 
Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...
Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...
Sensonor STIM210 High-precision MEMS Gyro Module teardown reverse costing rep...
 

More from Yole Developpement

Computing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - SampleComputing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - SampleYole Developpement
 
Processor Quarterly Market Monitor Q3 2021 - Sample
Processor Quarterly Market Monitor Q3 2021 - SampleProcessor Quarterly Market Monitor Q3 2021 - Sample
Processor Quarterly Market Monitor Q3 2021 - SampleYole Developpement
 
Automotive Semiconductor Trends 2021
Automotive Semiconductor Trends 2021Automotive Semiconductor Trends 2021
Automotive Semiconductor Trends 2021Yole Developpement
 
MicroLED Displays - Market, Industry and Technology Trends 2021
MicroLED Displays - Market, Industry and Technology Trends 2021MicroLED Displays - Market, Industry and Technology Trends 2021
MicroLED Displays - Market, Industry and Technology Trends 2021Yole Developpement
 
System-in-Package Technology and Market Trends 2021 - Sample
System-in-Package Technology and Market Trends 2021 - SampleSystem-in-Package Technology and Market Trends 2021 - Sample
System-in-Package Technology and Market Trends 2021 - SampleYole Developpement
 
Neuromorphic Computing and Sensing 2021 - Sample
Neuromorphic Computing and Sensing 2021 - SampleNeuromorphic Computing and Sensing 2021 - Sample
Neuromorphic Computing and Sensing 2021 - SampleYole Developpement
 
Future Soldier Technologies 2021
Future Soldier Technologies 2021Future Soldier Technologies 2021
Future Soldier Technologies 2021Yole Developpement
 
High-end Performance Packaging 2020
High-end Performance Packaging 2020High-end Performance Packaging 2020
High-end Performance Packaging 2020Yole Developpement
 
Computing for Datacenter Servers 2021 - Sample
Computing for Datacenter Servers 2021 - SampleComputing for Datacenter Servers 2021 - Sample
Computing for Datacenter Servers 2021 - SampleYole Developpement
 
5G’s Impact on RF Front-End and Connectivity for Cellphones 2020
5G’s Impact on RF Front-End and Connectivity for Cellphones 20205G’s Impact on RF Front-End and Connectivity for Cellphones 2020
5G’s Impact on RF Front-End and Connectivity for Cellphones 2020Yole Developpement
 
Ultrasound Sensing Technologies 2020
Ultrasound Sensing Technologies 2020Ultrasound Sensing Technologies 2020
Ultrasound Sensing Technologies 2020Yole Developpement
 
Status of the Memory Industry 2020
Status of the Memory Industry 2020Status of the Memory Industry 2020
Status of the Memory Industry 2020Yole Developpement
 
GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...
GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...
GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...Yole Developpement
 
Status of the Radar Industry: Players, Applications and Technology Trends 2020
Status of the Radar Industry: Players, Applications and Technology Trends 2020Status of the Radar Industry: Players, Applications and Technology Trends 2020
Status of the Radar Industry: Players, Applications and Technology Trends 2020Yole Developpement
 
GaN RF Market: Applications, Players, Technology and Substrates 2020
GaN RF Market: Applications, Players, Technology and Substrates 2020GaN RF Market: Applications, Players, Technology and Substrates 2020
GaN RF Market: Applications, Players, Technology and Substrates 2020Yole Developpement
 
BioMEMS Market and Technology 2020
BioMEMS Market and Technology 2020BioMEMS Market and Technology 2020
BioMEMS Market and Technology 2020Yole Developpement
 
Optical Transceivers for Datacom & Telecom 2020
Optical Transceivers for Datacom & Telecom 2020Optical Transceivers for Datacom & Telecom 2020
Optical Transceivers for Datacom & Telecom 2020Yole Developpement
 
Point-of-Need 2020 – Including PCR-Based Testing
Point-of-Need 2020 – Including PCR-Based TestingPoint-of-Need 2020 – Including PCR-Based Testing
Point-of-Need 2020 – Including PCR-Based TestingYole Developpement
 
Silicon Photonics Market & Technology 2020
Silicon Photonics Market & Technology 2020Silicon Photonics Market & Technology 2020
Silicon Photonics Market & Technology 2020Yole Developpement
 

More from Yole Developpement (20)

Computing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - SampleComputing and AI technologies for mobile and consumer applications 2021 - Sample
Computing and AI technologies for mobile and consumer applications 2021 - Sample
 
Processor Quarterly Market Monitor Q3 2021 - Sample
Processor Quarterly Market Monitor Q3 2021 - SampleProcessor Quarterly Market Monitor Q3 2021 - Sample
Processor Quarterly Market Monitor Q3 2021 - Sample
 
Automotive Semiconductor Trends 2021
Automotive Semiconductor Trends 2021Automotive Semiconductor Trends 2021
Automotive Semiconductor Trends 2021
 
MicroLED Displays - Market, Industry and Technology Trends 2021
MicroLED Displays - Market, Industry and Technology Trends 2021MicroLED Displays - Market, Industry and Technology Trends 2021
MicroLED Displays - Market, Industry and Technology Trends 2021
 
System-in-Package Technology and Market Trends 2021 - Sample
System-in-Package Technology and Market Trends 2021 - SampleSystem-in-Package Technology and Market Trends 2021 - Sample
System-in-Package Technology and Market Trends 2021 - Sample
 
Neuromorphic Computing and Sensing 2021 - Sample
Neuromorphic Computing and Sensing 2021 - SampleNeuromorphic Computing and Sensing 2021 - Sample
Neuromorphic Computing and Sensing 2021 - Sample
 
Silicon Photonics 2021
Silicon Photonics 2021Silicon Photonics 2021
Silicon Photonics 2021
 
Future Soldier Technologies 2021
Future Soldier Technologies 2021Future Soldier Technologies 2021
Future Soldier Technologies 2021
 
High-end Performance Packaging 2020
High-end Performance Packaging 2020High-end Performance Packaging 2020
High-end Performance Packaging 2020
 
Computing for Datacenter Servers 2021 - Sample
Computing for Datacenter Servers 2021 - SampleComputing for Datacenter Servers 2021 - Sample
Computing for Datacenter Servers 2021 - Sample
 
5G’s Impact on RF Front-End and Connectivity for Cellphones 2020
5G’s Impact on RF Front-End and Connectivity for Cellphones 20205G’s Impact on RF Front-End and Connectivity for Cellphones 2020
5G’s Impact on RF Front-End and Connectivity for Cellphones 2020
 
Ultrasound Sensing Technologies 2020
Ultrasound Sensing Technologies 2020Ultrasound Sensing Technologies 2020
Ultrasound Sensing Technologies 2020
 
Status of the Memory Industry 2020
Status of the Memory Industry 2020Status of the Memory Industry 2020
Status of the Memory Industry 2020
 
GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...
GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...
GaAs Wafer and Epiwafer Market: RF, Photonics, LED, Display and PV Applicatio...
 
Status of the Radar Industry: Players, Applications and Technology Trends 2020
Status of the Radar Industry: Players, Applications and Technology Trends 2020Status of the Radar Industry: Players, Applications and Technology Trends 2020
Status of the Radar Industry: Players, Applications and Technology Trends 2020
 
GaN RF Market: Applications, Players, Technology and Substrates 2020
GaN RF Market: Applications, Players, Technology and Substrates 2020GaN RF Market: Applications, Players, Technology and Substrates 2020
GaN RF Market: Applications, Players, Technology and Substrates 2020
 
BioMEMS Market and Technology 2020
BioMEMS Market and Technology 2020BioMEMS Market and Technology 2020
BioMEMS Market and Technology 2020
 
Optical Transceivers for Datacom & Telecom 2020
Optical Transceivers for Datacom & Telecom 2020Optical Transceivers for Datacom & Telecom 2020
Optical Transceivers for Datacom & Telecom 2020
 
Point-of-Need 2020 – Including PCR-Based Testing
Point-of-Need 2020 – Including PCR-Based TestingPoint-of-Need 2020 – Including PCR-Based Testing
Point-of-Need 2020 – Including PCR-Based Testing
 
Silicon Photonics Market & Technology 2020
Silicon Photonics Market & Technology 2020Silicon Photonics Market & Technology 2020
Silicon Photonics Market & Technology 2020
 

Recently uploaded

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 

Recently uploaded (20)

AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Pigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food ManufacturingPigging Solutions in Pet Food Manufacturing
Pigging Solutions in Pet Food Manufacturing
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 

CREE 1200V SiC Module teardown reverse costing report published by Yole Developpement

  • 1. DISCLAIMER : System Plus Consulting provides cost studies based on its knowledge of the manufacturing and selling prices of electronic components and systems. The given values are realistic estimates which do not bind System Plus Consulting nor the manufacturers quoted in the report. System Plus Consulting is in no case responsible for the consequences related to the use which is made of the contents of this report. The quoted trademarks are property of their owners. © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 1 Electronic Costing & Technology Experts www.systemplus.fr 21 rue la Nouë Bras de Fer 44200 Nantes – France Phone : +33 (0) 240 180 916 email : info@systemplus.fr February 2015 - Version 1 - Written by Sylvain Hallereau
  • 2. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 2 Glossary 1. Overview / Introduction 4 – Executive Summary – Reverse Costing Methodology 2. Company Profile 7 3. CAS120M12BM2 Characteristics 9 4. Physical Analysis 13 – Synthesis of the Physical Analysis 4.1 Package analysis – View and dimensions and marking – Housing – Base Plate Cross-Section – DBC Cross-Section 4.2 MOSFET Analysis – Dimension – Gate Supply Line and Guard Ring – Trench Gate Cross-Section – Revelation – CREE 1 gen vs 2 gen 4.3 Z-Rec Diode Analysis – Dimension – Guard Ring – Revelation 5. Manufacturing Process Flow 86 – Overview – MOSFET and Diode Process Flow – Description of the Wafer Fabrication Units – MOSFET Process Flow – Diode Process Flow – Package Process Flow 6. Cost Analysis 103 – Synthesis of the Cost Analysis – Main Steps of Economic Analysis – Yields Explanation 6.1 Cost Analysis MOSFET – Wafer Cost Hypothesis – MOSFET Wafer Cost – Breakdown per process step – MOSFET Probe Cost – MOSFET Die cost 6.2 Cost Analysis Diode 6.3 Cost Analysis CAS120M12BM2 – Assessing BOM – DBC Cost – CAS120M12BM2 Module Cost – Yield Synthesis 7. Estimated Manufacturer Price Analysis 132 – Manufacturers ratios – Estimated manufacturer Price Contact
  • 3. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 3 • This full reverse costing study has been conducted to provide insight on technology data, manufacturing cost and selling price of the CREE CAS120M12BM2. • The CAS120M12BM2 from CREE is a new generation SiC MOSFET high-voltage power module. With a breakdown voltage of 1200V for a current of 138A at 90°C, the module is optimized for: • Induction Heating • Solar and Wind Inverters, • DC/DC Converters, • Line Regen Drives, • BatteryChargers. • The CAS120M12BM2 is an all Silicon Carbide Half-Bridge Module with new C2M SiC MOSFET and Z-Rec Diode from CREE. The module is designed and manufactured by CREE. • The CAS120M12BM2 offers a very low on-resistance (13 mΩ) and a higher operating temperature (up to 150 °C) in a 62mm x 106mm x 30mm package. • A comparison between the second generation and the first is performed in this report. • The manufacturing of the SiC MOSFET and Z-rec Diode are realized by CREE in its 100mm wafer foundry in Durham, NC, USA. We estimate that the assembly module and final test (Back-end) are realized by Powerex and are assumed to take place in the USA.
  • 4. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 4 Package:  Dimensions: 106mm x62mm x30 mm  Number of Pins: 3- screw pin  Half bridge power module Module package Diode SiC MOSFET Diode:  Dimensions: XX x XXmm2  Electrical Connection: 300 µm Al wire bonding  Placement in the package: soldered on DBC MOSFET:  Dimension: XX x XX mm2  Electrical Connection: 300 µm Al wire bonding  Placement in the package: soldered on DBC.
  • 5. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 5 • Die dimensions: XXmm x XXmm • Thickness: XXµm (the substrate is thinned) • 4 wire bonds • No die markings • Drain contact at die bottom gate pad source pads Polyimide on the periphery Passivation layer Cross-Section : SEM view
  • 6. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 6 FTIR spectrum of polyimide Si-O The Si-O peak is from the underlying silicon oxide. The FTIR spectrum was taken in reflection. MOSFET gate : SEM view
  • 7. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 7 • Die dimensions: XXmm x XXmm • 2 wire bonds • No die markings
  • 8. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 8 00 00 0 Implantations •SiO2 deposition •Pattern SiO2 •P well implantation Implantations •SiO2 deposition •Pattern SiO2 •N+ source implantation Implantations •XX •XX •XX Drawing not to Scale N+ Source implantation 00 00 000 0
  • 9. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 9 • The front-end cost ranges from $xx to $xx according to yield variations. • The high cost of the wafer explain the portion of the manufacturing cost is due to yield losses in the cost. • The manufacturing yield is between xx% and xx% in 2014
  • 10. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 10 • The assembled module cost is estimated between $XX and $XX according to the yield. • The DBC cost accounts for XX% of the cost . • The copper base plate cost account for XX% of the cost. •The added value cost is $XX • The scrap cost (medium yield, XX%) is the total of all the losses during the assembly and the test.
  • 11. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 11 • The Component cost ranges from $xx to $xx according to yield variations. • The SiC Dies manufacturing represents xx% of the component cost. • The packaging represents xx% of the component cost. • Final test and yield losses account for xx% of the component cost.
  • 12. CREE – CAS120M12BM2 Return to TOC © 2015 by SYSTEM PLUS CONSULTING, all rights reserved. 12 Reverse costing analysis represents the best cost/price evaluation given the publically available data, and estimates completed by industry experts. Given the hypothesis presented in this analysis, the major sources of correction would lead to a +/- 10% correction on the manufacturing cost (if all parameters are cumulated). These results are open for discussion. We can reevaluate this circuit with your information. Please contact us: • Consulting and Specific Analysis – North America: Steve LaFerriere, Director of Northern America Business Development, Yole Inc. Email: laferriere@yole.fr – Japan: Yutaka Katano, General Manager, Yole Japan & President, Yole K.K. Email: katano@yole.fr – RoW: Jean-Christophe Eloy, President & CEO, Yole Développement Email: eloy@yole.fr • Report business – North America: Steve LaFerriere, Director of Northern America Business Development, Yole Inc. Email: laferriere@yole.fr – Europe: Fayçal El Khamassi, Headquarter Sales Coordination & Customer Service Email: khamassi@yole.fr – Japan & Asia: Takashi Onozawa, Sales Asia & General Manager, Yole K.K. Email: onozawa@yole.fr – Korea: Hailey Yang, Business Development Manager, Korean Office Email: yang@yole.fr • Financial services – Jean-Christophe Eloy, CEO & President Email: eloy@yole.fr • General – Email: info@yole.fr
  • 13. The CAS120M12BM2 from CREE Semiconductor is a power module of 2 transistors with a breakdown voltage of 1200V for a current of 138A (90°C), an ultra low on-resistance (13mΩ), a fast switching speed and a fast reverse recovery. The CAS120M12BM2 integrates 12 2nd generation high-voltage SiC (Silicon Carbide) power MOSFET dies with a current of 23A (90°C) for 10 sq mm, and 24x Z-Rec diode of 4.8 sq mm are integrated in the power module. The Z-Rec diode is a mix between a Schottky and junction barrier diode. The second generation MOSFET has a new gate design, a more sophisticated ohmic contact and a thinner substrate. The comparison between the 2 generations is developed in the report. System Plus Consulting is publishing a reverse costing report on this module. Based on a complete teardown analysis, the report provides an estimation of the production cost of the CAS120M12BM2 package, SiC MOSFET Transistor and Schottky Barrier Diode. Distributed by Performed by TABLE OF CONTENTS CREE 1200V SiC Module 2nd Generation SiC MOSFET with Z-Rec Diode SiC REVERSE COSTING ANALYSIS REPORT BY COMPLETE TEARDOWN WITH: • Detailed photos and identification • Comparison between the first and second generation MOSFET die. • Manufacturing process flow of MOSFET and Diode • In-depth economical analysis • Manufacturing cost breakdown • Selling price estimation CREE 1200V SiC Module 136 pages February 2015 Pdf file Xls file PRICE : Full report: EUR 3,490 1. Overview / Introduction 2. Companies Profile – CREE Profile 3. CAS120M12BM2 Characteristics – CAS120M12BM2 Characteristics 4. CAS120M12BM2 Physical Analysis – Physical Analysis Methodology – Package Views & Dimensions MOSFET – Die View, Dimensions & Marking – Guard Ring – Cross-Section Gate – Substrate and Epitaxy Layers, Backside – MOSFET Characteristics – Comparison First and Second Generation Diode – Die View, Dimensions & Marking – Guard Ring, Cross-Section – Substrate and Epitaxy Layers – Backside – Diode Characteristics 5. Manufacturing Process Flow – Global Overview – MOSFET Front end Unit, Tests Unit – Transistor Process Flow – Diode Front end Unit, Process Flow – Diode Process Flow – Power Module Process Flow 6. Cost Analysis – Synthesis of the cost analysis – Main steps of economic analysis MOSFET – Yields Hypotheses – MOSFET Epitaxy Cost – MOSFET Front-End Cost – MOSFET Wafer Cost – MOSFET Cost per process steps – MOSFET : Back-End : Probe and Diode CAS120M12BM2 – Package & Final Test 7. Price Estimation Contact In 3 years, the performance/cost ratio of SiC MOSFET has been multiplied by 3.
  • 14. ORDER FORM SHIP TO *For price in dollars please use the day’s exchange rate *All reports are delivered electronically in pdf format *For French customer, add 20 % for VAT  Full Reverse Costing report: EUR 3,490* ABOUT SYSTEM PLUS CONSULTING Distributed by Performed by BILLING CONTACT Name (Mr/Ms/Dr/Pr): ...................................................................................... Job Title: ...................................................................................... Company: ...................................................................................... Address: ...................................................................................... City: State: ...................................................................................... Postcode/Zip: ...................................................................................... Country*: ...................................................................................... *VAT ID Number for EU members: ...................................................................................... Tel: ...................................................................................... Email: ..................................................................................... Date: ....................................................................................... Signature : ...................................................................................... Name: ................................................................... Email:..................................................................... Phone:.................................................................... ABOUT YOLE DEVELOPPEMENT On line on Yole website: http://www.i-micronews.com/reports/ Credit Card:  Visa  Mastercard  Amex Name of the Card Holder: Credit Card Number: Card Verification Value (3 last digits except AMEX: 4 last digits) : Expiration date: By bank transfer: BANK INFO: HSBC, 1 place de la Bourse, F-69002 Lyon, France, Bank code : 30056, Branch code : 00170 Account No : 0170 200 1565 87, SWIFT or BIC code : CCFRFRPP, IBAN : FR76 3005 6001 7001 7020 0156 587 Return order by: • FAX: +33 (0)472 83 01 83 • MAIL: YOLE DEVELOPPEMENT, 75 Cours Emile Zola, F - 69100 Lyon - Villeurbanne Contact: David Jourdan, jourdan@yole.fr, Tel: +33 (0)472 83 01 90 (1) Our Terms and Conditions of Sale are available www.yole.fr/Terms_and_Conditions_of_Sale.aspx The present document is valid 12 months after its publishing date: 1th February 2015. . Beginning in 1998 with Yole Développement, we have grown to become a group of companies providing market research, technology analysis, strategy consulting, media in addition to finance services. With a solid focus on emerging applications using silicon and/or micro manufacturing Yole Développement group has expanded to include more than 40 associates worldwide covering MEMS, Microfluidics & Medical, Advanced Packaging, Compound Semiconductors, Power Electronics, LED, and Photovoltaic. The group supports companies, investors and R&D organizations worldwide to help them understand markets and follow technology trends to develop their business. CUSTOM STUDIES • Market data, market research & marketing analysis • Technology analysis • Reverse engineering & reverse costing • Strategy consulting • Corporate Finance Advisory (M&A and fund raising) MEDIA • Critical news, Bi-weekly: Micronews, the magazine • In-depth analysis & Quarterly Technology Magazines: MEMS Trends– 3D Packaging – PV Manufacturing – iLED – Power Dev' • Online disruptive technologies website: www.i- micronews.com • Exclusive Webcasts • Live event with Market Briefings TECHNOLOGY & MARKET REPORTS • Collection of reports • Players & market databases • Manufacturing cost simulation tools • Component reverse engineering & costing analysis More information on www.yole.fr Please process my order for “CREE CAS120M12BM2 SiC Module” Reverse Costing Report PAYMENT
  • 15. TERMS AND CONDITIONS OF SALES Definitions: “Acceptance”: Action by which the Buyer accepts the terms and conditions of sale in their entirety. It is done by ticking the box “I accept the conditions”. “Buyer”: Any business user (i.e. any person acting in the course of its business activities, for its business needs) entering into the following general conditions to the exclusion of consumers acting in their personal interests. “Contracting Parties” or “Parties”: The Seller on the one hand and the Buyer on the other hand. “Intellectual Property Rights” (“IPR”) means any rights held by the Seller in its Products, including any patents, trademarks, registered models, designs, copyrights, inventions, commercial secrets and know- how, technical information, company or trading names and any other intellectual property rights or similar in any part of the world, notwithstanding the fact that they have been registered or not and including any pending registration of one of the above mentioned rights. “License”: For the reports and databases, 3 different licenses are proposed. The buyer has to choose one license: 1. Single user license: the purchaser is the sole authorized user of the report 2. Multi-user, single site license: the report can be used by various users provided that the report is only use within the same company at same post address 3. Multi-user, multi-site license: the report can be used by various users within the same company or group and its subsidiaries (more than 50% share) at a global scale. “Products”: Depending on the purchase order, reports or database on MEMS, CSC, Optics/MOEMS, Nano, bio… to be bought either on a unit basis or as an annual subscription. (i.e. subscription for a period of 12 calendar months). The annual subscription to a package (i.e. a global discount based on the number of reports that the Buyer orders or accesses via the service, a global search service on line on I- micronews and a consulting approach), is defined in the order. Reports are established in PowerPoint and delivered on a PDF format and the database may include Excel files. “Seller”: Based in Lyon (France headquarters), Yole Développement is a market research and business development consultancy company, facilitating market access for advanced technology industrial projects. With more than 18 consultants, Yole works worldwide with the key industrial companies, R&D institutes and investors to help them understand the markets and technology trends. 1. Scope 1.1 The Contracting Parties undertake to observe the following general conditions when agreed by the Buyer and the Seller. ANY ADDITIONAL, DIFFERENT, OR CONFLICTING TERMS AND CONDITIONS IN ANY OTHER DOCUMENTS ISSUED BY THE BUYER AT ANY TIME ARE HEREBY OBJECTED TO BY THE SELLER, SHALL BE WHOLLY INAPPLICABLE TO ANY SALE MADE HEREUNDER AND SHALL NOT BE BINDING IN ANY WAY ON THE SELLER. 1.2 This agreement becomes valid and enforceable between the Contracting Parties after clear and non-equivocal consent by any duly authorised person representing the Buyer. For these purposes, the Buyer accepts these conditions of sales when ticking the box “I accept the conditions”. This results in acceptance by the Buyer. 1.3 Orders are deemed to be accepted only upon written acceptance and confirmation by the Seller, within [7 days] from the date of order, to be sent either by email or to the Buyer’s address. In the absence of any confirmation in writing, orders shall be deemed to have been accepted. 2. Mailing of the Products 2.1 Products are sent by email to the Buyer: - within [1] month from the order for Products already released; or - within a reasonable time for Products ordered prior to their effective release. In this case, the Seller shall use its best endeavours to inform the Buyer of an indicative release date and the evolution of the work in progress. 2.2 Some weeks prior to the release date the Seller can propose a pre-release discount to the Buyer The Seller shall by no means be responsible for any delay in respect of article 2.2 above, and including incases where a new event or access to new contradictory information would require for the analyst extra time to compute or compare the data in order to enable the Seller to deliver a high quality Products. 2.3 The mailing of the Product will occur only upon payment by the Buyer, in accordance with the conditions contained in article 3. 2.4. The mailing is operated through electronic meanseither by email via the sales department or automatically online via an email/password. If the Product’s electronic delivery format is defective, the Seller undertakes to replace it at no charge to the Buyer provided that it is informed of the defective formatting within 90 days from the date of the original download or receipt of the Product. 2.4 The person receiving the Products on behalf of the Buyer shall immediately verify the quality of the Products and their conformity to the order. Any claim for apparent defects or for non-conformity shall be sent in writing to the Seller within 8 days of receipt of the Products. For this purpose, the Buyer agrees to produce sufficient evidence of such defects. . 2.5 No return of Products shall be accepted without prior information to the Seller, even in case of delayed delivery. Any Product returned to the Seller without providing prior information to the Seller as required under article 2.5 shall remain at the Buyer’s risk. 3. Price, invoicing and payment 3.1 Prices are given in the orders corresponding to each Product sold on a unit basis or corresponding to annual subscriptions. They are expressed to be inclusive of all taxes. The prices may be reevaluated from time to time. The effective price is deemed to be the one applicable at the time of the order. 3.2 Yole may offer a pre release discount for the companies willing to acquire in the future the specific report and agreeing on the fact that the report may be release later than the anticipated release date. In exchange to this uncertainty, the company will get a discount that can vary from 15% to 10%. 3.3 Payments due by the Buyer shall be sent by cheque payable to Yole Développement, credit card or by electronic transfer to the following account: HSBC, 1 place de la Bourse 69002 Lyon France Bank code: 30056 Branch code: 200 1565 87BIC or SWIFT c00170 Account n°: 0170 ode: CCFRFRPP IBAN: FR76 3005 6001 7001 7020 0156 587 To ensure the payments, the Seller reserves the right to request down payments from the Buyer. In this case, the need of down payments will be mentioned on the order. 3.3 Payment is due by the Buyer to the Seller within 30 days from invoice date, except in the case of a particular written agreement. If the Buyer fails to pay within this time and fails to contact the Seller, the latter shall be entitled to invoice interest in arrears based on the annual rate Refi of the «BCE» + 7 points, in accordance with article L. 441-6 of the French Commercial Code. 3.4 In the event of termination of the contract, or of misconduct, during the contract, the Seller will have the right to invoice at the stage in progress, and to take legal action for damages. 4. Liabilities 4.1The Buyer or any other individual or legal person acting on its behalf, being a business user buying the Products for its business activities, shall be solely responsible for choosing the Products and for the use and interpretations he makes of the documents it purchases, of the results he obtains, and of the advice and acts it deduces thereof. 4.2 The Seller shall only be liable for (i) direct and (ii) foreseeable pecuniary loss, caused by the Products or arising from a material breach of this agreement 4.3 In no event shall the Seller be liable for: a) damages of any kind, including without limitation, incidental or consequential damages (including, but not limited to, damages for loss of profits, business interruption and loss of programs or information) arising out of the use of or inability to use the Seller’s website or the Products, or any information provided on the website, or in the Products; b) any claim attributable to errors, omissions or other inaccuracies in the Product or interpretations thereof. 4.4All the information contained in the Products has been obtained from sources believed to be reliable. The Seller does not warrant the accuracy, completeness adequacy or reliability of such information, which cannot be guaranteed to be free from errors. 4.5 All the Products that the Seller sells may, upon prior notice to the Buyer from time to time be modified by or substituted with similar Products meeting the needs of the Buyer. This modification shall not lead to the liability of the Seller, provided that the Seller ensures the substituted Product is similar to the Product initially ordered. 4.6 In the case where, after inspection, it is acknowledged that the Products contain defects, the Seller undertakes to replace the defective products as far as the supplies allow and without indemnities or compensation of any kind for labor costs, delays, loss caused or any other reason. The replacement is guaranteed for a maximum of two months starting from the delivery date. Any replacement is excluded for any event as set out in article 5 below. 4.7 The deadlines that the Seller is asked to state for the mailing of the Products are given for information only and are not guaranteed. If such deadlines are not met, it shall not lead to any damages or cancellation of the orders, except for non acceptable delays exceeding [4] months from the stated deadline, without information from the Seller.In such case only, the Buyer shall be entitled to ask for a reimbursement of its first down payment to the exclusion of any further damages. 4.8 The Seller does not make any warranties, express or implied, including, without limitation, those of saleability and fitness for a particular purpose, with respect to the Products. Although the Seller shall take reasonable steps to screen Products for infection of viruses, worms, Trojan horses or other codes containing contaminating or destructive properties before making the Products available, the Seller cannot guarantee that any Product will be free from infection. 5. Force majeure The Seller shall not be liable for any delay in performance directly or indirectly caused by or resulting from acts of nature, fire, flood, accident, riot, war, government intervention, embargoes, strikes, labor difficulties, equipment failure, late deliveries by suppliers or other difficulties which are beyond the control, and not the fault of the Seller. 6. Protection of the Seller’s IPR 6.1 All the IPR attached to the Products are and remain the property of the Seller and are protected under French and international copyright law and conventions. 6.2 The Buyer agreed not to disclose, copy, reproduce, redistribute, resell or publish the Product, or any part of it to any other party other than employees of its company. The Buyer shall have the right to use the Products solely for its own internal information purposes. In particular, the Buyer shall therefore not use the Product for purposes such as: - Information storage and retrieval systems; - Recordings and re-transmittals over any network (including any local area network); - Use in any timesharing, service bureau, bulletin board or similar arrangement or public display; - Posting any Product to any other online service (including bulletin boards or the Internet);- Licensing, leasing, selling, offering for sale or assigning the Product. 6.3 The Buyer shall be solely responsible towards the Seller of all infringements of this obligation, whether this infringement comes from its employees or any person to whom the Buyer has sent the Products and shall personally take care of any related proceedings, and the Buyer shall bear related financial consequences in their entirety. 6.4 The Buyer shall define within its company point of contact for the needs of the contract. This person will be the recipient of each new report in PDF format. This person shall also be responsible for respect of the copyrights and will guaranty that the Products are not disseminated out of the company. 6.5 In the context of annual subscriptions, the person of contact shall decide who within the Buyer, shall be entitled to access on line the reports on I-micronews.com. In this respect, the Seller will give the Buyer a maximum of 10 password, unless the multiple sites organisation of the Buyer requires more passwords. The Seller reserves the right to check from time to time the correct use of this password. 6.6 In the case of a multisite, multilicence, only the employee of the buyer can access the report or the employee of the companies in which the buyer have 100% shares. As a matter of fact the investor of a company, the joint venture done with a third party etc… can not access the report and should pay a full licence price. 7. Termination 7.1 If the Buyer cancels the order in whole or in part or postpones the date of mailing, the Buyer shall indemnify the Seller for the entire costs that have been incurred as at the date of notification by the Buyer of such delay or cancellation. This may also apply for any other direct or indirect consequential loss that may be borne by the Seller, following this decision. 7.2 In the event of breach by one Party under these conditions or the order, the non-breaching Party may send a notification to the other by recorded delivery letter upon which, after a period of thirty (30) days without solving the problem, the non-breaching Party shall be entitled to terminate all the pending orders, without being liable for any compensation. 8. Miscellaneous All the provisions of these Terms and Conditions are for the benefit of the Seller itself, but also for its licensors, employees and agents. Each of them is entitled to assert and enforce those provisions against the Buyer. Any notices under these Terms and Conditions shall be given in writing. They shall be effective upon receipt by the other Party. The Seller may, from time to time, update these Terms and Conditions and the Buyer, is deemed to have accepted the latest version of these terms and conditions, provided they have been communicated to him in due time. 9.Governing law and jurisdiction 9.1 Any dispute arising out or linked to these Terms and Conditions or to any contract (orders) entered into in application of these Terms and Conditions shall be settled by the French Commercial Courts of Lyon, which shall have exclusive jurisdiction upon such issues. 9.2 French law shall govern the relation between the Buyer and the Seller, in accordance with these Terms and conditions.