Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah
Volume 2C – Electrical Specifications Page 1 of 4
Electrical – Grounding and Bonding
Revision (0
SECTION 16170
GROUNDING AND BONDING
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Grounding electrodes and conductors.
B. Equipment grounding conductors.
C. Bonding.
1.2 REFERENCES
A. CP 1013 - Code of Practice - Earthing
B. BS 7671 - Requirements for Electrical Installation
C. BS 7430 - Earthing System Materials & Testing
D. BS 2784 & 970 - Earthing Material, Solid Copper Rods & Accessories
1.3 GROUNDING ELECTRODE SYSTEM
A. Metal underground water pipe.
B. Metal frame of the building.
C. Concrete-encased electrode.
D. Metal underground gas piping system.
E. Rod electrode.
F. Plate electrode.
G. Active electrode.
1.4 SUBMITTALS
A. Submit under provisions of Project requirements.
B. Product Data: Provide data for grounding electrodes and connections.
C. Test Reports: Indicate overall resistance to ground.
D. Manufacturer's Instructions: Include instructions for storage, handling, protection,
examination, preparation and installation of exothermic connectors.
1.5 PROJECT RECORD DOCUMENTS
A. Submit under provisions of Project requirements.
‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬
Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah
Volume 2C – Electrical Specifications Page 2 of 4
Electrical – Grounding and Bonding
Revision (0
B. Accurately record actual locations of grounding electrodes.
1.6 QUALIFICATIONS
A. Manufacturer: Company specializing in manufacturing Products specified in this
Section with minimum five years documented experience.
PART 2 - PRODUCTS
2.1 Earthing system materials shall include the bonding conductors, earth continuity conductors,
150 sq mm earth bar risers, 150 sq mm copper tape, earth pits and wells, earth grid bar,
thermal welding kits and accessories, lugs, terminals, clamps, accessories and other materials
indicated on the drawings and as required by BS 7430 & 7671.
2.2 The nominal cross-sectional area of all earth continuity conductors shall be in accordance with
the IEE Regulations. A separate earth wire shall run along with each armored cable.
2.3 All earth pits, wells and the lightning protection system pits shall be connected together to
create an earth grid extending throughout the site in the form of an earth ring with branches
connected to the equipment and building to be earthed. The earth grid shall comprise copper
earthing cable with green/yellow PVC sheathing.
2.4 All switchboards, metal conduit and trunking systems, metal frames, enclosures, light fittings
and cable sheaths shall be bonded together and connected through 16 sq mm PVC cable to
the earth bar of the appropriate switchboard. Similarly all earth pins and metallic plates of
socket outlets, switches, accessories and enclosures shall be bonded to earth with earth
continuity conductors. Each individual earth path shall be electrically continuous throughout its
length from the farthest pint of the associated part of the system back to the main earth.
2.5 Where separate pieces of apparatus connected to different phases are of necessity erected or
positioned less than two meters apart, an equipotential bonding conductor of single core 70 sq
mm PVC sheathed shall be installed between such pieces of apparatus.
2.6 In the substations, earth grid bus shall be provided and shall connect all the electrical
equipment to the earth pit.
2.7 The star point of the transformers and generators shall be solidly earthed through separate
earth well.
2.8 A 150 sq mm earth bar riser shall be installed in each electrical room and shall be connected
to 6 x 50 sq mm cross-sectional bus bar of suitable length. Earth bar with enough number of
ways and mounted on high impact uPVC channel with disconnecting link provided in each
electrical room and shall be connected to the individual switchboard earth bar through a cable
sized in accordance with IEE Regulations and to the equipotential bonding conductor
connecting metal conduits, trunking systems, metal frames, enclosures, cable sheaths, A/C
duct work pipe riser, etc. Earth bar riser shall be connected to separate earth pits through 150
sq mm copper tape.
2.9 A test connection link shall be provided for testing purpose.
a) Earth Well: Earth well shall be provided only to provide the earth grid at the service
block and at substations. Earth well with 100mm diameter GS pipe shall be driven
up to the water table (approx. depth 45m). An earth bar shall be welded to the top of
the earth well for branch connections. The well shall be protected by a concrete
housing with MS or concrete cover of 250mm x 250mm x 10mm at grade level.
‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬
Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah
Volume 2C – Electrical Specifications Page 3 of 4
Electrical – Grounding and Bonding
Revision (0
b) Earth Pits: 20mm diameter copper earth rod shall be driven to minimum depth of
6m and an earth bar shall be provided to the top of the earth pit for branch
connections. Earth pit shall be protected by concrete housing and MS or concrete
cover at grade level. Bentonite shall be provided in the pit around the earth rod.
2.10 The number and depth of pits shall be sufficient to make the system resistance less than one
ohm.
2.11 For telephone/data and other communication system, provide a minimum 25 sq mm insulated
earthing conductor in raceway from earthing electrode system to each service location,
terminal cabinet, wiring closet, and central equipment location. Terminate the earthing
conductor on earthing bus at wiring closets, service location and central equipment location.
Terminate earthing conductor on cabinet earthing terminal.
2.12 All metal poles supporting outdoor lighting fixtures shall be earthed using earth rod and earth
pit.
2.13 All connectors and splicers shall be made up of bronze.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that final backfill and compaction has been completed before driving rod
electrodes.
3.2 INSTALLATION
A. Install Products in accordance with manufacturer's instructions.
B. Install rod electrodes at locations indicated. Install additional rod electrodes as
required to achieve specified resistance to ground.
C. Provide grounding well pipe with cover at each rod location. Install well pipe top flush
with finished grade.
D. Provide grounding electrode conductor and connect to reinforcing steel in foundation
footing. Bond steel together.
E. Provide bonding to meet Regulatory Requirements.
F. Bond together metal siding not attached to grounded structure; bond to ground.
G. Bond together reinforcing steel and metal accessories in fountain structures.
H. Install transient suppression plate as required.
I. Bond together each metallic raceway, pipe, duct and other metal object entering
space under access floors.
J. Provide isolated grounding conductor for circuits supplying electronic cash registers,
computer room equipment.
K. Equipment Grounding Conductor: Provide separate, insulated conductor within each
feeder and branch circuit raceway. Terminate each end on suitable lug, bus, or
bushing.
‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬
Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah
Volume 2C – Electrical Specifications Page 4 of 4
Electrical – Grounding and Bonding
Revision (0
3.3 INTERFACE WITH OTHER PRODUCTS
A. Interface with site grounding system installed under Project requirements.
B. Interface with lightning protection system installed under Section 16670.
3.4 FIELD QUALITY CONTROL
A. Inspect grounding and bonding system conductors and connections for tightness and
proper installation.
B. Use suitable test instrument to measure resistance to ground of system. Perform
testing in accordance with test instrument manufacturer's recommendations using the
fall-of- potential method.
END OF SECTION

More Related Content

What's hot

Stray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom MollicaStray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom Mollicanacetwincities
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Mahesh Chandra Manav
 
Jmv presentation smart process plant (fertilizer)
Jmv  presentation  smart process  plant (fertilizer)Jmv  presentation  smart process  plant (fertilizer)
Jmv presentation smart process plant (fertilizer)Mahesh Chandra Manav
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS LtdMahesh Chandra Manav
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsMahesh Chandra Manav
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Mahesh Chandra Manav
 
Current carrying capacities & other technical tables
Current carrying capacities & other technical tablesCurrent carrying capacities & other technical tables
Current carrying capacities & other technical tablesasif raza
 
Power quality presentation by jmv lps
Power quality presentation by jmv lpsPower quality presentation by jmv lps
Power quality presentation by jmv lpsMahesh Chandra Manav
 
Portable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS UnitecPortable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS UnitecCS Unitec
 
Presentation: Induced AC Mitigation for Safety and Corrosion Control
Presentation: Induced AC Mitigation for Safety and Corrosion ControlPresentation: Induced AC Mitigation for Safety and Corrosion Control
Presentation: Induced AC Mitigation for Safety and Corrosion ControlMarcellus Drilling News
 
2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted HuckFloridaPipeTalk
 

What's hot (15)

Stray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom MollicaStray Current From DC Powered Transit Systems - Tom Mollica
Stray Current From DC Powered Transit Systems - Tom Mollica
 
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
Iec 62305 for lightning and surge protection follow in india nbc 2016 by bis(...
 
Jmv presentation smart process plant (fertilizer)
Jmv  presentation  smart process  plant (fertilizer)Jmv  presentation  smart process  plant (fertilizer)
Jmv presentation smart process plant (fertilizer)
 
Presentation Smart Hospital Projects and JMV LPS Ltd
 Presentation  Smart Hospital Projects  and JMV LPS Ltd Presentation  Smart Hospital Projects  and JMV LPS Ltd
Presentation Smart Hospital Projects and JMV LPS Ltd
 
Eat 105 Chapter 3
Eat 105  Chapter 3Eat 105  Chapter 3
Eat 105 Chapter 3
 
Hybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lpsHybrid battery +solar pv grid tie power project presentation by jmv lps
Hybrid battery +solar pv grid tie power project presentation by jmv lps
 
Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)Solar power pv presentation by jmv lps ltd (2)
Solar power pv presentation by jmv lps ltd (2)
 
Current carrying capacities & other technical tables
Current carrying capacities & other technical tablesCurrent carrying capacities & other technical tables
Current carrying capacities & other technical tables
 
Power quality presentation by jmv lps
Power quality presentation by jmv lpsPower quality presentation by jmv lps
Power quality presentation by jmv lps
 
Portable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS UnitecPortable Electric Band Saw Case Study by CS Unitec
Portable Electric Band Saw Case Study by CS Unitec
 
Presentation: Induced AC Mitigation for Safety and Corrosion Control
Presentation: Induced AC Mitigation for Safety and Corrosion ControlPresentation: Induced AC Mitigation for Safety and Corrosion Control
Presentation: Induced AC Mitigation for Safety and Corrosion Control
 
AluCellTech Cathode Assembly 150117
AluCellTech Cathode Assembly 150117AluCellTech Cathode Assembly 150117
AluCellTech Cathode Assembly 150117
 
2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck2012 FEPA Presentation: Ted Huck
2012 FEPA Presentation: Ted Huck
 
Finfet Technology
Finfet TechnologyFinfet Technology
Finfet Technology
 
Lobel Solar Latetst Specification
Lobel Solar Latetst SpecificationLobel Solar Latetst Specification
Lobel Solar Latetst Specification
 

Similar to 011 spec grounding and bonding

Electrical layout of
Electrical layout ofElectrical layout of
Electrical layout ofBhakti Stm
 
Nec and oesc-2
Nec and oesc-2Nec and oesc-2
Nec and oesc-2grantlerc
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1Mahesh Chandra Manav
 
Electric vechile public charging station presentation by jmv
Electric vechile public charging station presentation  by jmvElectric vechile public charging station presentation  by jmv
Electric vechile public charging station presentation by jmvMahesh Chandra Manav
 
Jmv presentation goods (dfcc) rail project
Jmv  presentation goods (dfcc) rail projectJmv  presentation goods (dfcc) rail project
Jmv presentation goods (dfcc) rail projectMahesh Chandra Manav
 
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Mahesh Chandra Manav
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentationMahesh Chandra Manav
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentationMahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS LtdMahesh Chandra Manav
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authorityMahesh Chandra Manav
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Mike Hamilton
 
Jmv presentation smart metro rail project
Jmv  presentation  smart metro rail projectJmv  presentation  smart metro rail project
Jmv presentation smart metro rail projectMahesh Chandra Manav
 
EIM SHS MODULE.pptx
EIM SHS MODULE.pptxEIM SHS MODULE.pptx
EIM SHS MODULE.pptxLeoLuga1
 
WIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxWIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxJayveeVillar3
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptxpramod719257
 
POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...
POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...
POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...Jobin Abraham
 

Similar to 011 spec grounding and bonding (20)

Electrical layout of
Electrical layout ofElectrical layout of
Electrical layout of
 
Nec and oesc-2
Nec and oesc-2Nec and oesc-2
Nec and oesc-2
 
Jmv presentation smart hospital projects india-1
Jmv  presentation  smart hospital projects india-1Jmv  presentation  smart hospital projects india-1
Jmv presentation smart hospital projects india-1
 
Maintenance free earth electrode
Maintenance free earth electrodeMaintenance free earth electrode
Maintenance free earth electrode
 
Electric vechile public charging station presentation by jmv
Electric vechile public charging station presentation  by jmvElectric vechile public charging station presentation  by jmv
Electric vechile public charging station presentation by jmv
 
Effect of grounding
Effect of groundingEffect of grounding
Effect of grounding
 
Jmv presentation goods (dfcc) rail project
Jmv  presentation goods (dfcc) rail projectJmv  presentation goods (dfcc) rail project
Jmv presentation goods (dfcc) rail project
 
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
Metro Rail ,DFCC and Indian Railway Presentation by JMV LPS Ltd
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentation
 
Smart city project jmv presentation
Smart city project jmv presentationSmart city project jmv presentation
Smart city project jmv presentation
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
presentation national desaster management and JMV LPS Ltd
 presentation  national desaster management  and JMV LPS Ltd presentation  national desaster management  and JMV LPS Ltd
presentation national desaster management and JMV LPS Ltd
 
Jmv presentation national desaster management authority
Jmv  presentation  national desaster management authorityJmv  presentation  national desaster management authority
Jmv presentation national desaster management authority
 
Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?Cable Ladder Bonding with Earth Wire, Is it Necessary?
Cable Ladder Bonding with Earth Wire, Is it Necessary?
 
Jmv presentation smart metro rail project
Jmv  presentation  smart metro rail projectJmv  presentation  smart metro rail project
Jmv presentation smart metro rail project
 
Instalaciones avionicas
Instalaciones avionicasInstalaciones avionicas
Instalaciones avionicas
 
EIM SHS MODULE.pptx
EIM SHS MODULE.pptxEIM SHS MODULE.pptx
EIM SHS MODULE.pptx
 
WIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptxWIRING DIAGRAMS.pptx
WIRING DIAGRAMS.pptx
 
Busduct___Busbar.pptx
Busduct___Busbar.pptxBusduct___Busbar.pptx
Busduct___Busbar.pptx
 
POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...
POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...
POWER QUALITY AND MANAGEMENT. EARTH GROUND GRID SYSTEM AND POWER GROUND SYSTE...
 

Recently uploaded

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 

Recently uploaded (20)

Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 

011 spec grounding and bonding

  • 1. ‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬ Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah Volume 2C – Electrical Specifications Page 1 of 4 Electrical – Grounding and Bonding Revision (0 SECTION 16170 GROUNDING AND BONDING PART 1 - GENERAL 1.1 SECTION INCLUDES A. Grounding electrodes and conductors. B. Equipment grounding conductors. C. Bonding. 1.2 REFERENCES A. CP 1013 - Code of Practice - Earthing B. BS 7671 - Requirements for Electrical Installation C. BS 7430 - Earthing System Materials & Testing D. BS 2784 & 970 - Earthing Material, Solid Copper Rods & Accessories 1.3 GROUNDING ELECTRODE SYSTEM A. Metal underground water pipe. B. Metal frame of the building. C. Concrete-encased electrode. D. Metal underground gas piping system. E. Rod electrode. F. Plate electrode. G. Active electrode. 1.4 SUBMITTALS A. Submit under provisions of Project requirements. B. Product Data: Provide data for grounding electrodes and connections. C. Test Reports: Indicate overall resistance to ground. D. Manufacturer's Instructions: Include instructions for storage, handling, protection, examination, preparation and installation of exothermic connectors. 1.5 PROJECT RECORD DOCUMENTS A. Submit under provisions of Project requirements.
  • 2. ‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬ Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah Volume 2C – Electrical Specifications Page 2 of 4 Electrical – Grounding and Bonding Revision (0 B. Accurately record actual locations of grounding electrodes. 1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing Products specified in this Section with minimum five years documented experience. PART 2 - PRODUCTS 2.1 Earthing system materials shall include the bonding conductors, earth continuity conductors, 150 sq mm earth bar risers, 150 sq mm copper tape, earth pits and wells, earth grid bar, thermal welding kits and accessories, lugs, terminals, clamps, accessories and other materials indicated on the drawings and as required by BS 7430 & 7671. 2.2 The nominal cross-sectional area of all earth continuity conductors shall be in accordance with the IEE Regulations. A separate earth wire shall run along with each armored cable. 2.3 All earth pits, wells and the lightning protection system pits shall be connected together to create an earth grid extending throughout the site in the form of an earth ring with branches connected to the equipment and building to be earthed. The earth grid shall comprise copper earthing cable with green/yellow PVC sheathing. 2.4 All switchboards, metal conduit and trunking systems, metal frames, enclosures, light fittings and cable sheaths shall be bonded together and connected through 16 sq mm PVC cable to the earth bar of the appropriate switchboard. Similarly all earth pins and metallic plates of socket outlets, switches, accessories and enclosures shall be bonded to earth with earth continuity conductors. Each individual earth path shall be electrically continuous throughout its length from the farthest pint of the associated part of the system back to the main earth. 2.5 Where separate pieces of apparatus connected to different phases are of necessity erected or positioned less than two meters apart, an equipotential bonding conductor of single core 70 sq mm PVC sheathed shall be installed between such pieces of apparatus. 2.6 In the substations, earth grid bus shall be provided and shall connect all the electrical equipment to the earth pit. 2.7 The star point of the transformers and generators shall be solidly earthed through separate earth well. 2.8 A 150 sq mm earth bar riser shall be installed in each electrical room and shall be connected to 6 x 50 sq mm cross-sectional bus bar of suitable length. Earth bar with enough number of ways and mounted on high impact uPVC channel with disconnecting link provided in each electrical room and shall be connected to the individual switchboard earth bar through a cable sized in accordance with IEE Regulations and to the equipotential bonding conductor connecting metal conduits, trunking systems, metal frames, enclosures, cable sheaths, A/C duct work pipe riser, etc. Earth bar riser shall be connected to separate earth pits through 150 sq mm copper tape. 2.9 A test connection link shall be provided for testing purpose. a) Earth Well: Earth well shall be provided only to provide the earth grid at the service block and at substations. Earth well with 100mm diameter GS pipe shall be driven up to the water table (approx. depth 45m). An earth bar shall be welded to the top of the earth well for branch connections. The well shall be protected by a concrete housing with MS or concrete cover of 250mm x 250mm x 10mm at grade level.
  • 3. ‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬ Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah Volume 2C – Electrical Specifications Page 3 of 4 Electrical – Grounding and Bonding Revision (0 b) Earth Pits: 20mm diameter copper earth rod shall be driven to minimum depth of 6m and an earth bar shall be provided to the top of the earth pit for branch connections. Earth pit shall be protected by concrete housing and MS or concrete cover at grade level. Bentonite shall be provided in the pit around the earth rod. 2.10 The number and depth of pits shall be sufficient to make the system resistance less than one ohm. 2.11 For telephone/data and other communication system, provide a minimum 25 sq mm insulated earthing conductor in raceway from earthing electrode system to each service location, terminal cabinet, wiring closet, and central equipment location. Terminate the earthing conductor on earthing bus at wiring closets, service location and central equipment location. Terminate earthing conductor on cabinet earthing terminal. 2.12 All metal poles supporting outdoor lighting fixtures shall be earthed using earth rod and earth pit. 2.13 All connectors and splicers shall be made up of bronze. PART 3 - EXECUTION 3.1 EXAMINATION A. Verify that final backfill and compaction has been completed before driving rod electrodes. 3.2 INSTALLATION A. Install Products in accordance with manufacturer's instructions. B. Install rod electrodes at locations indicated. Install additional rod electrodes as required to achieve specified resistance to ground. C. Provide grounding well pipe with cover at each rod location. Install well pipe top flush with finished grade. D. Provide grounding electrode conductor and connect to reinforcing steel in foundation footing. Bond steel together. E. Provide bonding to meet Regulatory Requirements. F. Bond together metal siding not attached to grounded structure; bond to ground. G. Bond together reinforcing steel and metal accessories in fountain structures. H. Install transient suppression plate as required. I. Bond together each metallic raceway, pipe, duct and other metal object entering space under access floors. J. Provide isolated grounding conductor for circuits supplying electronic cash registers, computer room equipment. K. Equipment Grounding Conductor: Provide separate, insulated conductor within each feeder and branch circuit raceway. Terminate each end on suitable lug, bus, or bushing.
  • 4. ‫ح‬ ‫األساسي‬ ‫للتعليم‬ ‫األنصارية‬ ‫رميثة‬ ‫مدرسة‬ ‫وإنجاز‬ ‫إنشاء‬1‫بنات‬‫ب‬‫مربض‬/‫الفجيرة‬ Romysaa Alansaryah Primary School for Girls/C1, Merbed/ Fujairah Volume 2C – Electrical Specifications Page 4 of 4 Electrical – Grounding and Bonding Revision (0 3.3 INTERFACE WITH OTHER PRODUCTS A. Interface with site grounding system installed under Project requirements. B. Interface with lightning protection system installed under Section 16670. 3.4 FIELD QUALITY CONTROL A. Inspect grounding and bonding system conductors and connections for tightness and proper installation. B. Use suitable test instrument to measure resistance to ground of system. Perform testing in accordance with test instrument manufacturer's recommendations using the fall-of- potential method. END OF SECTION