SlideShare a Scribd company logo
1 of 9
Download to read offline
Formal Education
Working Experiences
WELLY STAR
Perum. Paku Jaya Blok A7 RT 01/05 No.15 Serpong
Tangerang-Banten 15324
HP : 081286768563
email : starwelly@gmail.com
CURRICULUM VITAECURRICULUM VITAECURRICULUM VITAECURRICULUM VITAE
Name : Welly Star
Date of birth : Jakarta / April 15th
,1984
Gender : Female
Religion : Moslem
Marital Status : Single
2002 – 2008 : Chemical Engineering Department, Faculty of Engineering,
Gadjah Mada University, Jogjakarta
1999 – 2002 : Senior High School of SMUN 90 Jakarta
Process Engineer at PT Synergy Engineering
(July, 2008 – Current)
Responsible for preparation of concept study, process calculations, engineering drawings
(e.g. Piping & Instrumentation Diagram, Process Flow Diagram, Heat and Mass Balance,
etc), Process Simulations using HYSYS, Flarenet, Process Dispersion and Radiation
Modelling using Phast, Pipeline Flow Assurance simulation using Pipesim, OLGA, etc during
Front End Engineering Design (FEED) and Detailed Engineering Design (DED) phase.
Personal Data
Project Name : Conceptual Study For Block 46/13 Offshore Vietnam
Client : PetroVietnam Exploration and Production
Year : 2015
Responsibility for the project includes;
• Generate Process Simulation using HYSYS Simulator
• Generate Hydraulic Simulation using PIPESIM Simulator to identify pipeline size required
• Generate Equipment List for each Option.
• Calculate Production Recovery for each considered options
• Check and supervise junior engineer for process calculation and report
• Liaise and discuss with Client
Project Name : Tuna Field Conceptual Study
Client : Premier Oil
Year : 2014
Responsibility for the project includes;
• Identify concept development for full /partial processing of Gas, LPG, and Oil/Condensate
• Generate Process Simulation using HYSYS Simulator that consist Oil Stabilization System,
LPG Recovery System, Dehydration System, Compression System and Refrigeration
System
• Generate Hydraulic Simulation using PIPESIM Simulator to identify pipeline size required
• Generate Block Flow Diagram
• Generate Equipment List for each Options (i.e. FPSO, Fixed Platform, Storage System)
• Generate Schematic for Each Options
• Generate Process Flow Diagram for each Options
Project Name : PHE Nunukan Pre FEED Study
Client : Pertamina Hulu Energy Nunukan (PHE Nunukan)
Year : 2015
Responsibility for the project includes;
• Identify development concept options
• Determine and select the most feasible option for further review and definition
• Calculate Production Recovery for each considered options
• Generate process calculation and report
• Generate Process Flow Diagram and Heat Material Balance
Project Name : General Project Support Services for Tropik Energi Pandan
Client : PT. Tropik Energi Pandan (TEP)
Year : 2014
Responsibility for the project includes;
• Check process calculation and report
• Check process drawing as Process Flow Diagram and Piping & Instrumentation Diagram
• Liaise and discuss with Client to review FEED design and get optimization detail design
Project Name : Provision of Call off Engineer for Engineering Design Services for
Pangkah Facilities
Client : Hess (Indonesia – Pangkah) Limited / Saka - PGN
Year : 2014
Responsibility for the project includes;
• Perform Site Visit activity and generate site visit report (CTR-0001)
• Supervise and check process calculation (CTR-0004)
Project Name : Engineering Services for Tangguh LNG Operation
Client : BP Berau Ltd
Year : 2014
Responsibility for the project includes;
• Generate Piping and Instrumentation Diagram for Vorwata-A facility modification (CTR-
0001)
• Supervise calculation and check report for Depressurizing and Venting Rate in the New
Permanent Pig Launcher project (CTR-0005)
• Supervise calculation and check report for PSV sizing (CTR-0005)
• Supervise calculation and check report for Dispersion study (CTR-0005)
• Supervise calculation and check report for Tank and Pump sizing in the Amine Floating
Skimmer project (CTR-0007)
• Provide Process Flow Diagram for 500m3
RO Unit Early Works project (CTR-0013)
• Provide Piping and Instrumentation Diagram (CTR-0013)
• Provide Tie-in list (CTR-0013)
• Provide Line list (CTR-0013)
• Generate Process Design Basis (CTR-0013)
• Attend HAZOP session/workshop (CTR-0013)
Project Name : Oyong Longterm Facility & Strategy Project
Client : Santos
Year : 2014
Responsibility for the project includes;
• Identify development concept options to accommodate Oyong / Wortel production after end
of leasing Seagood FPSO & SPJ in September 2015
• Review the feasibility and suitability of the options above with respect to the Oyong field
production lifecycle
• Determine and select the most feasible option for further review and definition
• Calculate Production Recovery for each considered options
• Calculate Cost Estimate (CAPEX and OPEX) for each considered options
Project Name : Ande-Ande Lumut FPSO Study
Client : Santos
Year : 2014
Responsibility for the project includes;
• Investigate 5 options for topside process, including preparing simulation, generate PFD and
HMB
• Supervise process team and check process calculation (i.e. main equipment sizing, line
sizing, control valve sizing, PSV and blowdown calculation)
• Generate preliminary P&ID for preferable option
• Review and Study Energy Consumption and investigate power generation type and output
power requirement (i.e. Steam Turbine, Recipe Engine or Gas Turbine)
• Generate preliminary Equipment List for preferable option
• Review and Study Sand Handling including generate Basis of Design for Sand Removal and
Cleaning System and liaise with Vendor to identify sand handling system requirement
Project Name : KE-38 Temporary Production Facility (Conversion MOPU) Detailed
Design
Client : PT Pertamina WMO / Gryphon Energy
Year : 2013
Responsibility for the project includes;
• Supervise all process team and check all process deliverables (ie. Simulation, Calculation
Note, Report, P&ID, PFD, HMB, Process Line List, Equipment List, Process Control
Philosophy, Cause & Effect Diagram)
• Liaise/Coordination to other Discipline in line with process issues
Project Name : Detail Engineering of Gas Compressor at Subang Production Station
Client : Indoturbine / Pertamina EP Java Region
Year : 2013
Responsibility for the project includes;
• Supervise all process team and check all process deliverables (ie. Simulation, Calculation
Note, Report, P&ID, PFD, HMB, Process Line List) as Lead Process
• Liaise/Coordination to other Discipline in line with process issues
Project Name : PHE WMO Blanket Engineering Services (SOR for MOPU)
Client : PT Pertamina WMO
Year : 2012
Responsibility for the project includes;
• Generate Statement of Requirements (SOR) for Early Production System (EPS)
• Preparing Process Datasheet and Drawings (ie. Process Flow Diagram, Heat Material
Balance, Piping and Instrumentation Diagram) for supporting PHE WMO Bidding
Project Name : PHE ONWJ Lima Deck Raising EPC Detail Design
Client : PT Timas Suplindo
Year : 2012
Responsibility for the project includes;
• Support Piping and Instrumentation Diagram related to Demolition and Modification piping
routing
• Check equipment capacity that impacted into raising the platform (ie. Pump capacity,
suction and discharge pressure capability)
• Support all process issues related to deck raising activity
• Generate Process Line List and Tie-In List
Project Name : Talisman JOB Sungai Kenawang Expansion Concept Study
Client : Talisman – JOB Jambi Merang
Year : 2012
Responsibility for the project includes;
• Generate process simulation for 6 (six) viable options
• Generate Schematic Diagram for each options
• Generate and Check Process Flow Diagram for each options
• Generate Equipment List for each options
• Generate Overall Conceptual Study Report
Project Name : Ogan Interior Gas CBM Concept Study and Detail Engineering Phase
Client : Ogan Interior Gas and Santos
Year : 2012
Responsibility for the project includes;
• Generate Basis of Design
• Generate Process Simulation using HYSYS process simulator
• Supervise and Checking process calculation and report (ie. Process simulation report,
equipment sizing and utility demand report including dispersion-radiation study)
• Generate Block Flow Diagram
• Generate Process Flow Diagram and Heat Material Balance
• Generate Piping and Instrumentation Diagram
• Generate Equipment List
Project Name : Peluang Subsea Development FEED
Client : Santos (Madura Offshore) Pty Ltd
Year : 2012
Responsibility for the project includes;
• Generate Process Simulation using HYSYS Simulator
• Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD)
• Generate Piping and Instrumentation Diagram (P&ID) for Demolition and Modification on
Maleo Facility.
• Generate Piping and Instrumentation Diagram (P&ID) for Subsea Wellhead and TUTU.
• Generate Piping and Instrumentation Diagram (P&ID) for Peluang Wellhead Platform and
supporting system (i.e. Chemical Injection System and Drain-Vent System).
• Generate Process Safeguarding Flow Scheme (PSFS)
• Supervise all process team (especially for process calculation)
• Liaise/Coordination to other Discipline in line with process issues
Project Name : Conversion Oyong FPU to FPSO Concept
Client : Santos (Sampang) Pty Ltd
Year : 2012
Responsibility for the project includes;
• Generate Process Simulation using HYSYS Simulator
• Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD)
• Generate Piping and Instrumentation Diagram (P&ID)
• Generate Philosophies (i.e. Shutdown Philosophy, Flare - Relief and Blowdown Calculation
Philosophy, Operating and Manning Philosophy).
• Generate Basis of Design.
• Generate Functional Specification for Topside.
• Generate Functional Specification for Hull and Mooring.
• Generate Equipment List
• Supervise all process team (especially for process calculation)
Project Name : Maleo Booster Compressor Project FEED, Maleo Field Development
Client : Santos (Madura Offshore) Pty Ltd
Year : 2011
Responsibility for the project includes;
• Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD)
• Generate Piping and Instrumentation Diagram (P&ID) for Demolition and Modification
• Generate Process Safeguarding Flow Scheme (PSFS)
• Supervise all process team (especially for process calculation)
• Liaise/Coordination to other Discipline in line with process issues
• Liaise with Compressor Vendor (Solar Turbine) to review compressor specification
Project Name : Bekok-C MOPU Detailed Design
Client : Petronas Carigali Sdn Bhd / Gryphon Energy
Year : 2011
Responsibility for the project includes;
• Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD)
• Generate Piping and Instrumentation Diagram (P&ID)
• Generate Process Safeguarding Flow Scheme (PSFS)
• Liaise/Coordination to other Discipline in line with process issues
Project Name : North Geragai Liquid Metering Facilities Detailed Design
Client : Petrochina International / PT Citra Panji Manunggal
Year : 2010
Responsibility for the project includes;
• Generate Piping and Instrumentation Diagram (P&ID)
• Calculate line sizing and generate the calculation note
• Calculate dispersion and generate the report
• Review the existing facilities due to increased flowrate from SKGCP (i.e Condensate
Storage tank level, PCV inbreathing & outbreathing, PVSV, Vent system, piping hydraulic,
etc)
• Generate Process Design Basis and Control Philosophy
• Provide and generate all process and mechanical datasheets
Project Name : Jambi Merang Gas Dispersion and Explosion Study
Client : Pertamina-Talisman Jambi Merang Joint Operating Body
Year : 2010
Responsibility for the project includes;
• Build simulation for provide mass release using PHAST simulator.
• Build Fire modelling (Jet Fire, Pool Fire, Flash Fire) using PHAST simulator.
Project Name : Anoa Phase 4 – Compression Reconfiguration Topside FEED
Client : Premier Oil
Year : 2010
Responsibility for the project includes;
• Build simulation for Compression Reconfiguration Topside FEED using HYSYS simulator
and generate Heat and Material Balance.
• Generate and Update Piping and Instrumentation Diagram for Modification and Demolition
• Provide/Update Equipment List based on Anoa Phase 4 Project
• Provide Mechanical Design Basis for Anoa Phase 4 Project
• Provide/Update existing Specification (Pressure Vessel, Air Cooled Heat Exchanger and
Gas Compressor) that related with reconfiguration compressor on Anoa Phase 4 Project
• Provide and calculate firewater demand related to installation new Associated Gas
Compression System
• Provide and calculate utility consumption related to Anoa Compression Reconfiguration and
installation new Associated Gas Compression System
Project Name : GK Temporary Condensate Storage/Offloading Facilities Detailed
Design
Client : APD / SENSL (Salamander Energy North Sumatra Limited)
Year : 2009
Responsibility for the project includes;
• Supported in the generation of Piping and Instrumentation Diagram
• Preparing Process Data for Equipment Datasheets
• Determine nitrogen blanketing requirement for condensate tanks
• Line sizing and pressure drop calculation
• Firewater Demand Requirement for CSOF area
• Pressure Regulator and PVSV (Pressure Vacuum Safety Valve) calculation
• Preparation Tie-In List
Project Name : Hoang Long TGT Dev Flow Assurance
Client : Hoang Long
Year : 2008-2009
Responsibility for the project includes;
• Investigate the hydraulic behavior of each of the pipeline system, to provide a basis (size
and configuration) for pipeline mechanical design, using PIPESIM simulator
• Investigate the thermal behavior of the production pipeline system to ensure that the
appropriate temperatures are maintained along the pipelines throughout the field life, using
PIPESIM simulator
• Estimate the slug sizes (using OLGA dynamic simulator) that can reasonably be expected to
be received on the FPSO as a result of the normal and transient operations of the
production pipeline system
The pipeline operations that will be investigated are as follows:
Normal production
Turndown operation
Start up operation
Ramp up operation
Pigging operation
Cooldown operation
Project Name : APN-E, F & X Development Pre-FEED Study
Client : BP West Java
Year : 2008
Responsibility for the project includes;
• Line Sizing and Pressure Drop Calculation for APN E/F/X platforms
• Generate a Production Profile by using Hysys Simulation
• Supported in the generation of PFD and HMB
• Relief/Blowdown Calculation for APN E/F/X platforms
• Rating vessel calculation for evaluating existing vessels
I declare that curriculum vitae above are true.
Tangerang, June 26th
2015
Welly Star

More Related Content

What's hot (19)

Resume_Rangarajan (1)
Resume_Rangarajan (1)Resume_Rangarajan (1)
Resume_Rangarajan (1)
 
Mohsin Hashmi_Resume
Mohsin Hashmi_ResumeMohsin Hashmi_Resume
Mohsin Hashmi_Resume
 
SUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CVSUNIL MANOHAR SINGH_CV
SUNIL MANOHAR SINGH_CV
 
Giridhar
GiridharGiridhar
Giridhar
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
sounder
soundersounder
sounder
 
Latest CV of Gangadhar
Latest CV of GangadharLatest CV of Gangadhar
Latest CV of Gangadhar
 
Lead Process Engineer
Lead Process EngineerLead Process Engineer
Lead Process Engineer
 
RajeevCV2016
RajeevCV2016RajeevCV2016
RajeevCV2016
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
 
Resume sharad srivastava
Resume sharad srivastavaResume sharad srivastava
Resume sharad srivastava
 
resume-6
resume-6resume-6
resume-6
 
DAMAC Heights Project
DAMAC Heights ProjectDAMAC Heights Project
DAMAC Heights Project
 
Troy Weiss Resume
Troy Weiss ResumeTroy Weiss Resume
Troy Weiss Resume
 
Ehsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical EngineerEhsan Asghar - Hydromechanical Engineer
Ehsan Asghar - Hydromechanical Engineer
 
RizwanKhan CV
RizwanKhan CVRizwanKhan CV
RizwanKhan CV
 
abhinav rawat
abhinav rawatabhinav rawat
abhinav rawat
 
Monitoring Programme Review
Monitoring Programme ReviewMonitoring Programme Review
Monitoring Programme Review
 
Following the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre designFollowing the-EXEED-methodology: data centre design
Following the-EXEED-methodology: data centre design
 

Similar to CV-WELLY STAR

CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015PRADIP SAHA,CEng MIGEM
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016sathish kumar
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.Madhava Rao V
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)FERI NOVIARDI
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerSidharth Sunny
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerSidharth Sunny
 
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014Aestikani Mahani
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016zuraidi Ismail
 
MEPCO Full 191217.ppt
MEPCO Full 191217.pptMEPCO Full 191217.ppt
MEPCO Full 191217.pptMadavanR1
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsNirav Mistry
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerJitendra Shende
 

Similar to CV-WELLY STAR (20)

cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015cv Tajuddin 15 August 2015
cv Tajuddin 15 August 2015
 
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
CV of Pradip Saha_CEng MIGEM Senior Process Engineer 2015
 
CV_Chanchalerm
CV_ChanchalermCV_Chanchalerm
CV_Chanchalerm
 
CV_Chanchalerm
CV_ChanchalermCV_Chanchalerm
CV_Chanchalerm
 
CV_Chanchalerm
CV_ChanchalermCV_Chanchalerm
CV_Chanchalerm
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
CV for Static & Package Equipment Engineer (PMC) - V.M.Rao.
 
CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)CV of Feri Noviardi (Mechanical)
CV of Feri Noviardi (Mechanical)
 
Deepak Resume
Deepak ResumeDeepak Resume
Deepak Resume
 
MNFirdaus Resume
MNFirdaus ResumeMNFirdaus Resume
MNFirdaus Resume
 
Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015Ragab_Personel CV _Form_Jan_2015
Ragab_Personel CV _Form_Jan_2015
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
Manajemen proyek epci offshore utk kontraktor EPCI 23 aug 2014
 
Zuraidi Resume update 2016
Zuraidi Resume update 2016Zuraidi Resume update 2016
Zuraidi Resume update 2016
 
MEPCO Full 191217.ppt
MEPCO Full 191217.pptMEPCO Full 191217.ppt
MEPCO Full 191217.ppt
 
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package UnitsResume_Lead Mechanical Engineer - Static Equipment and Package Units
Resume_Lead Mechanical Engineer - Static Equipment and Package Units
 
Resume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping EngineerResume of Jitendra Shende for the post of Piping Engineer
Resume of Jitendra Shende for the post of Piping Engineer
 
Pes profile
Pes profilePes profile
Pes profile
 
CV_Amit Ghule
CV_Amit GhuleCV_Amit Ghule
CV_Amit Ghule
 

CV-WELLY STAR

  • 1. Formal Education Working Experiences WELLY STAR Perum. Paku Jaya Blok A7 RT 01/05 No.15 Serpong Tangerang-Banten 15324 HP : 081286768563 email : starwelly@gmail.com CURRICULUM VITAECURRICULUM VITAECURRICULUM VITAECURRICULUM VITAE Name : Welly Star Date of birth : Jakarta / April 15th ,1984 Gender : Female Religion : Moslem Marital Status : Single 2002 – 2008 : Chemical Engineering Department, Faculty of Engineering, Gadjah Mada University, Jogjakarta 1999 – 2002 : Senior High School of SMUN 90 Jakarta Process Engineer at PT Synergy Engineering (July, 2008 – Current) Responsible for preparation of concept study, process calculations, engineering drawings (e.g. Piping & Instrumentation Diagram, Process Flow Diagram, Heat and Mass Balance, etc), Process Simulations using HYSYS, Flarenet, Process Dispersion and Radiation Modelling using Phast, Pipeline Flow Assurance simulation using Pipesim, OLGA, etc during Front End Engineering Design (FEED) and Detailed Engineering Design (DED) phase. Personal Data
  • 2. Project Name : Conceptual Study For Block 46/13 Offshore Vietnam Client : PetroVietnam Exploration and Production Year : 2015 Responsibility for the project includes; • Generate Process Simulation using HYSYS Simulator • Generate Hydraulic Simulation using PIPESIM Simulator to identify pipeline size required • Generate Equipment List for each Option. • Calculate Production Recovery for each considered options • Check and supervise junior engineer for process calculation and report • Liaise and discuss with Client Project Name : Tuna Field Conceptual Study Client : Premier Oil Year : 2014 Responsibility for the project includes; • Identify concept development for full /partial processing of Gas, LPG, and Oil/Condensate • Generate Process Simulation using HYSYS Simulator that consist Oil Stabilization System, LPG Recovery System, Dehydration System, Compression System and Refrigeration System • Generate Hydraulic Simulation using PIPESIM Simulator to identify pipeline size required • Generate Block Flow Diagram • Generate Equipment List for each Options (i.e. FPSO, Fixed Platform, Storage System) • Generate Schematic for Each Options • Generate Process Flow Diagram for each Options Project Name : PHE Nunukan Pre FEED Study Client : Pertamina Hulu Energy Nunukan (PHE Nunukan) Year : 2015 Responsibility for the project includes; • Identify development concept options • Determine and select the most feasible option for further review and definition • Calculate Production Recovery for each considered options • Generate process calculation and report • Generate Process Flow Diagram and Heat Material Balance
  • 3. Project Name : General Project Support Services for Tropik Energi Pandan Client : PT. Tropik Energi Pandan (TEP) Year : 2014 Responsibility for the project includes; • Check process calculation and report • Check process drawing as Process Flow Diagram and Piping & Instrumentation Diagram • Liaise and discuss with Client to review FEED design and get optimization detail design Project Name : Provision of Call off Engineer for Engineering Design Services for Pangkah Facilities Client : Hess (Indonesia – Pangkah) Limited / Saka - PGN Year : 2014 Responsibility for the project includes; • Perform Site Visit activity and generate site visit report (CTR-0001) • Supervise and check process calculation (CTR-0004) Project Name : Engineering Services for Tangguh LNG Operation Client : BP Berau Ltd Year : 2014 Responsibility for the project includes; • Generate Piping and Instrumentation Diagram for Vorwata-A facility modification (CTR- 0001) • Supervise calculation and check report for Depressurizing and Venting Rate in the New Permanent Pig Launcher project (CTR-0005) • Supervise calculation and check report for PSV sizing (CTR-0005) • Supervise calculation and check report for Dispersion study (CTR-0005) • Supervise calculation and check report for Tank and Pump sizing in the Amine Floating Skimmer project (CTR-0007) • Provide Process Flow Diagram for 500m3 RO Unit Early Works project (CTR-0013) • Provide Piping and Instrumentation Diagram (CTR-0013) • Provide Tie-in list (CTR-0013) • Provide Line list (CTR-0013) • Generate Process Design Basis (CTR-0013) • Attend HAZOP session/workshop (CTR-0013)
  • 4. Project Name : Oyong Longterm Facility & Strategy Project Client : Santos Year : 2014 Responsibility for the project includes; • Identify development concept options to accommodate Oyong / Wortel production after end of leasing Seagood FPSO & SPJ in September 2015 • Review the feasibility and suitability of the options above with respect to the Oyong field production lifecycle • Determine and select the most feasible option for further review and definition • Calculate Production Recovery for each considered options • Calculate Cost Estimate (CAPEX and OPEX) for each considered options Project Name : Ande-Ande Lumut FPSO Study Client : Santos Year : 2014 Responsibility for the project includes; • Investigate 5 options for topside process, including preparing simulation, generate PFD and HMB • Supervise process team and check process calculation (i.e. main equipment sizing, line sizing, control valve sizing, PSV and blowdown calculation) • Generate preliminary P&ID for preferable option • Review and Study Energy Consumption and investigate power generation type and output power requirement (i.e. Steam Turbine, Recipe Engine or Gas Turbine) • Generate preliminary Equipment List for preferable option • Review and Study Sand Handling including generate Basis of Design for Sand Removal and Cleaning System and liaise with Vendor to identify sand handling system requirement Project Name : KE-38 Temporary Production Facility (Conversion MOPU) Detailed Design Client : PT Pertamina WMO / Gryphon Energy Year : 2013 Responsibility for the project includes; • Supervise all process team and check all process deliverables (ie. Simulation, Calculation Note, Report, P&ID, PFD, HMB, Process Line List, Equipment List, Process Control Philosophy, Cause & Effect Diagram) • Liaise/Coordination to other Discipline in line with process issues
  • 5. Project Name : Detail Engineering of Gas Compressor at Subang Production Station Client : Indoturbine / Pertamina EP Java Region Year : 2013 Responsibility for the project includes; • Supervise all process team and check all process deliverables (ie. Simulation, Calculation Note, Report, P&ID, PFD, HMB, Process Line List) as Lead Process • Liaise/Coordination to other Discipline in line with process issues Project Name : PHE WMO Blanket Engineering Services (SOR for MOPU) Client : PT Pertamina WMO Year : 2012 Responsibility for the project includes; • Generate Statement of Requirements (SOR) for Early Production System (EPS) • Preparing Process Datasheet and Drawings (ie. Process Flow Diagram, Heat Material Balance, Piping and Instrumentation Diagram) for supporting PHE WMO Bidding Project Name : PHE ONWJ Lima Deck Raising EPC Detail Design Client : PT Timas Suplindo Year : 2012 Responsibility for the project includes; • Support Piping and Instrumentation Diagram related to Demolition and Modification piping routing • Check equipment capacity that impacted into raising the platform (ie. Pump capacity, suction and discharge pressure capability) • Support all process issues related to deck raising activity • Generate Process Line List and Tie-In List Project Name : Talisman JOB Sungai Kenawang Expansion Concept Study Client : Talisman – JOB Jambi Merang Year : 2012 Responsibility for the project includes; • Generate process simulation for 6 (six) viable options • Generate Schematic Diagram for each options • Generate and Check Process Flow Diagram for each options • Generate Equipment List for each options • Generate Overall Conceptual Study Report
  • 6. Project Name : Ogan Interior Gas CBM Concept Study and Detail Engineering Phase Client : Ogan Interior Gas and Santos Year : 2012 Responsibility for the project includes; • Generate Basis of Design • Generate Process Simulation using HYSYS process simulator • Supervise and Checking process calculation and report (ie. Process simulation report, equipment sizing and utility demand report including dispersion-radiation study) • Generate Block Flow Diagram • Generate Process Flow Diagram and Heat Material Balance • Generate Piping and Instrumentation Diagram • Generate Equipment List Project Name : Peluang Subsea Development FEED Client : Santos (Madura Offshore) Pty Ltd Year : 2012 Responsibility for the project includes; • Generate Process Simulation using HYSYS Simulator • Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD) • Generate Piping and Instrumentation Diagram (P&ID) for Demolition and Modification on Maleo Facility. • Generate Piping and Instrumentation Diagram (P&ID) for Subsea Wellhead and TUTU. • Generate Piping and Instrumentation Diagram (P&ID) for Peluang Wellhead Platform and supporting system (i.e. Chemical Injection System and Drain-Vent System). • Generate Process Safeguarding Flow Scheme (PSFS) • Supervise all process team (especially for process calculation) • Liaise/Coordination to other Discipline in line with process issues Project Name : Conversion Oyong FPU to FPSO Concept Client : Santos (Sampang) Pty Ltd Year : 2012 Responsibility for the project includes; • Generate Process Simulation using HYSYS Simulator • Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD) • Generate Piping and Instrumentation Diagram (P&ID) • Generate Philosophies (i.e. Shutdown Philosophy, Flare - Relief and Blowdown Calculation Philosophy, Operating and Manning Philosophy). • Generate Basis of Design. • Generate Functional Specification for Topside. • Generate Functional Specification for Hull and Mooring. • Generate Equipment List
  • 7. • Supervise all process team (especially for process calculation) Project Name : Maleo Booster Compressor Project FEED, Maleo Field Development Client : Santos (Madura Offshore) Pty Ltd Year : 2011 Responsibility for the project includes; • Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD) • Generate Piping and Instrumentation Diagram (P&ID) for Demolition and Modification • Generate Process Safeguarding Flow Scheme (PSFS) • Supervise all process team (especially for process calculation) • Liaise/Coordination to other Discipline in line with process issues • Liaise with Compressor Vendor (Solar Turbine) to review compressor specification Project Name : Bekok-C MOPU Detailed Design Client : Petronas Carigali Sdn Bhd / Gryphon Energy Year : 2011 Responsibility for the project includes; • Generate Process Flow Diagram (PFD) and Utility Flow Diagram (UFD) • Generate Piping and Instrumentation Diagram (P&ID) • Generate Process Safeguarding Flow Scheme (PSFS) • Liaise/Coordination to other Discipline in line with process issues Project Name : North Geragai Liquid Metering Facilities Detailed Design Client : Petrochina International / PT Citra Panji Manunggal Year : 2010 Responsibility for the project includes; • Generate Piping and Instrumentation Diagram (P&ID) • Calculate line sizing and generate the calculation note • Calculate dispersion and generate the report • Review the existing facilities due to increased flowrate from SKGCP (i.e Condensate Storage tank level, PCV inbreathing & outbreathing, PVSV, Vent system, piping hydraulic, etc) • Generate Process Design Basis and Control Philosophy • Provide and generate all process and mechanical datasheets
  • 8. Project Name : Jambi Merang Gas Dispersion and Explosion Study Client : Pertamina-Talisman Jambi Merang Joint Operating Body Year : 2010 Responsibility for the project includes; • Build simulation for provide mass release using PHAST simulator. • Build Fire modelling (Jet Fire, Pool Fire, Flash Fire) using PHAST simulator. Project Name : Anoa Phase 4 – Compression Reconfiguration Topside FEED Client : Premier Oil Year : 2010 Responsibility for the project includes; • Build simulation for Compression Reconfiguration Topside FEED using HYSYS simulator and generate Heat and Material Balance. • Generate and Update Piping and Instrumentation Diagram for Modification and Demolition • Provide/Update Equipment List based on Anoa Phase 4 Project • Provide Mechanical Design Basis for Anoa Phase 4 Project • Provide/Update existing Specification (Pressure Vessel, Air Cooled Heat Exchanger and Gas Compressor) that related with reconfiguration compressor on Anoa Phase 4 Project • Provide and calculate firewater demand related to installation new Associated Gas Compression System • Provide and calculate utility consumption related to Anoa Compression Reconfiguration and installation new Associated Gas Compression System Project Name : GK Temporary Condensate Storage/Offloading Facilities Detailed Design Client : APD / SENSL (Salamander Energy North Sumatra Limited) Year : 2009 Responsibility for the project includes; • Supported in the generation of Piping and Instrumentation Diagram • Preparing Process Data for Equipment Datasheets • Determine nitrogen blanketing requirement for condensate tanks • Line sizing and pressure drop calculation • Firewater Demand Requirement for CSOF area • Pressure Regulator and PVSV (Pressure Vacuum Safety Valve) calculation • Preparation Tie-In List
  • 9. Project Name : Hoang Long TGT Dev Flow Assurance Client : Hoang Long Year : 2008-2009 Responsibility for the project includes; • Investigate the hydraulic behavior of each of the pipeline system, to provide a basis (size and configuration) for pipeline mechanical design, using PIPESIM simulator • Investigate the thermal behavior of the production pipeline system to ensure that the appropriate temperatures are maintained along the pipelines throughout the field life, using PIPESIM simulator • Estimate the slug sizes (using OLGA dynamic simulator) that can reasonably be expected to be received on the FPSO as a result of the normal and transient operations of the production pipeline system The pipeline operations that will be investigated are as follows: Normal production Turndown operation Start up operation Ramp up operation Pigging operation Cooldown operation Project Name : APN-E, F & X Development Pre-FEED Study Client : BP West Java Year : 2008 Responsibility for the project includes; • Line Sizing and Pressure Drop Calculation for APN E/F/X platforms • Generate a Production Profile by using Hysys Simulation • Supported in the generation of PFD and HMB • Relief/Blowdown Calculation for APN E/F/X platforms • Rating vessel calculation for evaluating existing vessels I declare that curriculum vitae above are true. Tangerang, June 26th 2015 Welly Star