1. MEGASTRUCTURES FEATURING ADANI
SOLAR POWER PLANT
-BY TEAM VEER
BLESSED SACHIN(2007)
SANJAY THIRUVEEDHI S(2544)
VEERAPPAN PR(2551)
VISHNU PRASAD D(2554)
1
2. Adani group
Who, when, where?
โข Indian MNC
โข Originated in
1988
โข @Ahmedabad
โข By Gautam
Shantilal Adani
โข Started as a
commodity
trader
2
3. PHOTO VOLTAIC POWER POTENTIAL
3
It is defined as the specific yield of solar energy.
5. The Megastructure
โข THE NUMBERS:
โ 2.5 million solar panel modules
โ 2500 acres of land โ (42 MITs)
โ 1270 acres of panel
โ 8500 people
โ 648 MW
GOAL: By 2030 achieve 35% of
emission in 2005
5
90 kms from
Madurai Meenakshi
amman temple
6. Galvanised steel requirement
6
โข Galvanizing, or
galvanization, is a
manufacturing process
where a coating of zinc
is applied to steel or iron
to offer protection and
prevent rusting.
โข 30,000 metric tons
of steel was needed to
build the megastructure.
โข Roughly 4 Eifel towers can be built with 30000 tons
of steel.
7. Galvanization in depth
โข The steps in the galvanizing process
are as follows:
โข The steel is cleaned in a degreasing
solution
โข After being cleaned, the steel is pickled
by being lowered into a vat of diluted
hot sulfuric acid.
โข The steel is then dipped in an aqueous
solution of zinc-ammonium chloride.
โข The steel is galvanized through
immersion in molten zinc.
โข It is inspected for consistency. 7
8. SCADA
โข Supervisory Control And
Data Acquisition is a control
system architecture
comprising computers,
networked data
communications and
graphical user interfaces for
high-level supervision of
machines and processes.
โข PLC - PROGRAMMABLE
LOGIC CONTROLLER
8
9. Kamuthy
โข The challenges
of the location:
โ Non industrial site ๏ no
men for work and week
transportation
โ Invertors had to be in
closed shelters
โ Hired godowns
โ SCADA โ expected
duration of 2 days ๏
actually took 30 days
โ THE 2015 CYCLONE โ
VARDAH
9
10. Panel Maintenance
10
25 years โ average life of solar panel
upon proper maintenance
Water and labour intense process of cleaning is
replaced by Israel water less cleaning technique
11. More challenges..
โข Tuticorin port was stalled.
โข Knee deep rain water โ logistics
affected.
โข 50 metre long cable.
โข 3 months halt.
โข 6000 shipments in Tuticorin
port alone.
โข 8 different countries for panel
alone.
โข 10 MW of solar panels had to
be fitted in a day- ie 4000
panels
11
โข Inverter fan failure ๏ rise in
temperature from 50 to 83 degree
Celcius.
โข Electric grid power regulation as per
demand.
โข Improper cloud distribution over the
panels.
โข Brown out fuses.
โข March 9 solar eclipse
15. Fun facts
โข As of 2015 the largest single location solar power plant
was the one at Kamuthy(353 days) for 648 MW-
โข Second largest at California(3years) for 579MW.
โข 10000 MW solar power plant at rajasthan was set as an
ambitious target in 2015(currently the plant is set up for
2245MW โ Bhadla Solar power plant).
15