SlideShare a Scribd company logo
1 of 7
Vincent Ivor Lee O’Dell
Profession : Professional Electrical Engineer
PRC ID No. : 2900 Reg. Date: 10/06/1994
Home Address : Lot 20 Road 28 Phase II Cogeo Village, Antipolo City
Office Address : P.O. Box 89426 Riyadh, Kingdom of Saudi Arabia
Telephone No./Home :
Globe : 09064790524 (Philippines)
Office : (+966-1) 479-0170 Ext. 654
Mobile : (+966)556197739 (Saudi Arabia)
E-mail : veodell@hotmail.com
phibeep@yahoo.com
Work Experience
Company : ABV Rock Group KB May, 1998 – Present
address : P.O. Box 89426 Riyadh, Kingdom of Saudi Arabia
Positions Held:
A) Technical Scrutinizer, Bid Tendering & Estimating Group
Project Start-ups for High Rise Buildings, Government Housing Projects,
Hospitals, Industrial/Petro chem. Plants and School Building:
1) Review Technical Requirements of Bid Invitations and prepare Bid
Tender Documents. Per Project Scope of work.
2) Prepare Bid Proposal Drawings for Turn key Projects Base on
Project Technical Requirements: a) Lighting Layout, b) Small Power
Layout, c) Electrical Equipment Layout, d) Single Line Diagram, e) Cable
Sizing Calculations, f) Illumination Calculations, g) Earthing Layout and
h) Lightning Protection ), I) Control and Safety Layout, j) 13.8 Kv Power
Distribution Layout.
3) Prepare Material Take Off for Bid Cost Estimates.
B) Technical Scrutinizer, Design Close Out Group
SSSP Site 6 Abha Site Close Out.
1) Prepare Design Advice Notes for outstanding Warranty Group Site
Queries, Repair Requests, Clarification Request and Non Conformity
reports.
2) Prepare as built drawings for on going warranty works.
3) Updated Technical data sheets, Spare parts list to show latest
equipment supplier part numbers and replacement parts of
discontinued spare parts.
1 of 6
4) Updated Vendor Drawings for show drawing reference to Site
drawing.
5) Updated Booster Station Power Generation Drawings due to
warranty replacement of Generator Units.
C) Engineer (Electrical and Electronics), Technical Support,
Warranty Group (Site 5).
1) Review, revise and approve construction drawings for System /
upgrade and/or fitment of updated OEM Spare parts.
2) Prepare Technical Documents / Correspondence to equipment
vendors for equipment warranty claims, sourcing of spare parts,
replacement of defective / faulty equipment.
3) Prepare Design Advice Notes / Proposals for Additional / Deleted
Items as per request / comments from Client (ARAMCO).
4) Update construction drawings and archive documents as Final As-
built for handover to Client (ARAMCO).
5) Assist in equipment start up / Commissioning of new / replaced
equipment.
D) Technical Scrutinizer (Electrical and Electronics), Field Engineering
Site 5.
1) Troubleshoot, Prepare and Implement Solutions/Drawings for
Electrical, Instrumentation & Control and Safety System
Commissioning Problems/
Punchlists.
2) Evaluate Client warranty Claims as to Contract/Warranty Coverage.
3) Update Drawings for Final as Built.
4) Update reference Documents, e.g. Cable List, Instrument List, PLC
Software/Data Base List and Electrical Equipment List.
5) Assist in Preparation of Maintenance and Operating Procedures for
13 .8kV Switchgear.
6) Prepare Requests for Claims to Equipment Vendor/Supplier regarding
Equipment Documentation and Final hand-over.
E) Technical Scrutinizer Installation, E&E.
1) Evaluate Drawings/ Design for Compatibility with equipment Installation
Requirement and Site Conditions.
2) Evaluate Control/ Power supply interface compatibility between equipment
from separate vendors.
3) Review equipment Data Sheets Prior to Purchase, Propose Data Sheet
Changes for Equipment to Meet Existing Site Conditions and Project
Requirements.
2 of 6
4) Review Project Documents e.g. Cable List, Bulk Material List for Consistency
with Drawings and Data Sheets Prior to Purchase.
5) Prepare and Propose design revisions to meet equipment installation and
operational requirements.
6) Update Drawings for Implementation of all approved changes/drawing
deviations.
7) Evaluate Client Claims and Request for Validity/Consistency with Scope of
Work.
8) Prepare Claims to Materials Supplier/ Vendor regarding Balance of
Deliveries per Purchase Orders.
F) Electrical Engineer, Installation E&E (Site 5).
1) Prepare Material Take Off for purchase.
2) Collect and review Drawings/Documents for Release /Implementation
to Jobsite.
3) Assist in field construction, regarding Quality Control/Material Control
Requirement.
4) Prepare Drawing Mark-ups for all implemented drawing revisions.
5) Prepare Shop / Fabrication drawings for Client approval. Shop drawings are
attached as to proposals for revisions / additions to Typical Installation Detail
drawings which are revised due to clashes in installation and other site
conditions.
Company : Ramcar Group of Companies May 1997-April 1998
address : Ramcar Center, 80-82 Roces Avenue, Diliman, Quezon City, MM.
Position Held:
Electrical Engineer, Corporate Planning.
For Construction of Main Corporate Office in Roces Ave., Quezon City and Agus
Industrial Estate in Sta. Maria, Bulacan.
1) Evaluate Material/Technical Services Quotations of bidders and various
Suppliers.
2) Review Plans/Drawings Prepared by Hired Architectural/Consultancy Firm
for various Company Expansion Projects.
3) Investigate/Evaluate frequent recurring breakdowns in various company
operated plants.
4) Assist Planner in updating construction activity schedule.
3 of 6
Company : Parson’s Engineering LTD. Jan. 1996-Aug. 1996
address : 10/F Rufino Pacific Tower, 6784 Ayala Avenue, 1226 Makati City,
Philippines
Position Held:
Senior Electrical Engineer Construction Management
1) Conduct Quantity inspection for Accomplishment Claims by Contractor.
2) Review Contractor shop drawings prior to final implementation.
3) Evaluate proposals for specification /drawing deviations from contractor.
4) Assists Planner in updating construction activity schedule.
Company : Semirara Coal Corporation Jan. 1991-Dec. 1996
address : Semirara Island, Caluya, Antique
7/F Quad Alpha Centrum, 125 Pioneer St., Mandaluyong
Metro-Manila
Positions Held:
Panian Design Group Manager (Electrical)
1) Prepare conceptual design for feasibility study of Panian Mine Development
Project.
2) Prepare budgetary cost estimate for electrical safety and control system
requirement for the propose continuous mining and fill Dewatering Equipment.
General Foreman (Electrical Operations).
1) Supervise overall mine pit electrical system.
2) Implement electrical and control system require for all mine development
projects.
3) Commission start-up and completed mine development projects.
4) Plans and implement all mine pit electrical maintenance programs.
Electrical Foreman (Electrical Operations)
1) Supervise shift operations: conduct equipment trouble shooting in case of
Breakdown.
2) Performed power change-over, emergency bus tie-ups in cases of powerplant
Power interruptions and mine development project connections.
3) Plans and implement excavation line no. 2 maintenance activity.
4) Supervise all line no. 2 mine development project.
4 of 6
Other personal information:
Citizenship : Filipino
Birth date : September 5, 1962
Status : Married
Passport No. : WW0138563
SSS No. : 0806751207
Phil. Health ID No. :190250426708
OFW ID No. :03 0449800
TIN No. :138 933 906
Driver’s License no. :F03-81-0086-41
Honors and Awards:
Third (3rd
) Place Associate Electrical Engineer-Board Examination
Seventh (7th
) Place Assistant Electrical Engineer –Board Examination
National State Scholarship Award
Computer Skills:
Auto Cad Release 14
Excel
Microsoft Word
Corel Word Perfect 8
Microstation
Other Particulars:
References:
Gösta Söderborg
Site Manager, Site 6, Abha
ABV Rock Group KB,
P.O. Box 89426 Riyadh, Kingdom of Saudi Arabia.
Tel. No. +966-7-482-6878
5 of 6
Peter Hausner
E&E Superintendent
Site 3 Installation Department
ABV Rock Group KB,
P.O. Box 1684, Burayda, Al-Qassim, Kingdom of Saudi Arabia
Tel. No. +966-4-847-6067
Filomeno Ecraela
General Manager
Four E Steel Builders
No. 35, Villa Angelica Subd. Camarin,
Caloocan City, Metro-Manila, Philippines
Tel. No. 0917-8031799
I hereby Certify that All Information above are True and Correct to the Best of my
Knowledge.
Vincent O’Dell
6 of 6
Peter Hausner
E&E Superintendent
Site 3 Installation Department
ABV Rock Group KB,
P.O. Box 1684, Burayda, Al-Qassim, Kingdom of Saudi Arabia
Tel. No. +966-4-847-6067
Filomeno Ecraela
General Manager
Four E Steel Builders
No. 35, Villa Angelica Subd. Camarin,
Caloocan City, Metro-Manila, Philippines
Tel. No. 0917-8031799
I hereby Certify that All Information above are True and Correct to the Best of my
Knowledge.
Vincent O’Dell
6 of 6

More Related Content

What's hot (20)

MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
CV Chenna
CV ChennaCV Chenna
CV Chenna
 
Cv For Sitemanager
Cv For SitemanagerCv For Sitemanager
Cv For Sitemanager
 
Manimaran
ManimaranManimaran
Manimaran
 
THOWFIC AHAMED CV
THOWFIC AHAMED CVTHOWFIC AHAMED CV
THOWFIC AHAMED CV
 
Instrumentation Engineer
Instrumentation EngineerInstrumentation Engineer
Instrumentation Engineer
 
LF Lanza Resume 2016
LF Lanza Resume 2016LF Lanza Resume 2016
LF Lanza Resume 2016
 
Piping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip KarmakarPiping Engineer CV -Sandip Karmakar
Piping Engineer CV -Sandip Karmakar
 
omarPro updated lates 2016
omarPro updated lates 2016omarPro updated lates 2016
omarPro updated lates 2016
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
CV ROBIN JACOB
CV ROBIN JACOBCV ROBIN JACOB
CV ROBIN JACOB
 
CV_Sukumar
CV_SukumarCV_Sukumar
CV_Sukumar
 
5. Afghanistan US Army Approval
5. Afghanistan US Army Approval5. Afghanistan US Army Approval
5. Afghanistan US Army Approval
 
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
 
resume-ehlibongco_2015e
resume-ehlibongco_2015eresume-ehlibongco_2015e
resume-ehlibongco_2015e
 
Vinothkumar
VinothkumarVinothkumar
Vinothkumar
 
Mechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire FightingMechanical Engineer - Plumbing and Fire Fighting
Mechanical Engineer - Plumbing and Fire Fighting
 
Simab CV sup.
Simab CV sup.Simab CV sup.
Simab CV sup.
 
Thooyavun R 010715
Thooyavun R 010715Thooyavun R 010715
Thooyavun R 010715
 
Resume
ResumeResume
Resume
 

Viewers also liked

Hipertensión arterial
Hipertensión arterialHipertensión arterial
Hipertensión arterialJuliana Matos
 
Что изменилось за 3 года
Что изменилось за 3 годаЧто изменилось за 3 года
Что изменилось за 3 года104ua
 

Viewers also liked (6)

Youtube
YoutubeYoutube
Youtube
 
Hipertensión arterial
Hipertensión arterialHipertensión arterial
Hipertensión arterial
 
Medio pedagogicos
Medio pedagogicosMedio pedagogicos
Medio pedagogicos
 
ASTREACO-HOTEL-PRODUCTS
ASTREACO-HOTEL-PRODUCTSASTREACO-HOTEL-PRODUCTS
ASTREACO-HOTEL-PRODUCTS
 
Что изменилось за 3 года
Что изменилось за 3 годаЧто изменилось за 3 года
Что изменилось за 3 года
 
Symposium Presentation
Symposium Presentation Symposium Presentation
Symposium Presentation
 

Similar to VincentIvorLeeres (20)

CS Design Engineer
CS Design EngineerCS Design Engineer
CS Design Engineer
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
Piping Designer CV
Piping Designer CVPiping Designer CV
Piping Designer CV
 
My Resume 2016 July
My Resume 2016 JulyMy Resume 2016 July
My Resume 2016 July
 
Sachin_Kumar_CV_Instrument
Sachin_Kumar_CV_InstrumentSachin_Kumar_CV_Instrument
Sachin_Kumar_CV_Instrument
 
Resume - Shabeer
Resume - ShabeerResume - Shabeer
Resume - Shabeer
 
ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
nestor
nestornestor
nestor
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
Amruta shinde resume
Amruta shinde resumeAmruta shinde resume
Amruta shinde resume
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
talhadiploma.doc
talhadiploma.doctalhadiploma.doc
talhadiploma.doc
 
Govind-CVC5
Govind-CVC5Govind-CVC5
Govind-CVC5
 
CV updated February 2017
CV updated  February 2017CV updated  February 2017
CV updated February 2017
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
Ardie cv
Ardie cvArdie cv
Ardie cv
 
My resume 2015
My resume 2015My resume 2015
My resume 2015
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Selvakumar Resume
Selvakumar ResumeSelvakumar Resume
Selvakumar Resume
 

VincentIvorLeeres

  • 1. Vincent Ivor Lee O’Dell Profession : Professional Electrical Engineer PRC ID No. : 2900 Reg. Date: 10/06/1994 Home Address : Lot 20 Road 28 Phase II Cogeo Village, Antipolo City Office Address : P.O. Box 89426 Riyadh, Kingdom of Saudi Arabia Telephone No./Home : Globe : 09064790524 (Philippines) Office : (+966-1) 479-0170 Ext. 654 Mobile : (+966)556197739 (Saudi Arabia) E-mail : veodell@hotmail.com phibeep@yahoo.com Work Experience Company : ABV Rock Group KB May, 1998 – Present address : P.O. Box 89426 Riyadh, Kingdom of Saudi Arabia Positions Held: A) Technical Scrutinizer, Bid Tendering & Estimating Group Project Start-ups for High Rise Buildings, Government Housing Projects, Hospitals, Industrial/Petro chem. Plants and School Building: 1) Review Technical Requirements of Bid Invitations and prepare Bid Tender Documents. Per Project Scope of work. 2) Prepare Bid Proposal Drawings for Turn key Projects Base on Project Technical Requirements: a) Lighting Layout, b) Small Power Layout, c) Electrical Equipment Layout, d) Single Line Diagram, e) Cable Sizing Calculations, f) Illumination Calculations, g) Earthing Layout and h) Lightning Protection ), I) Control and Safety Layout, j) 13.8 Kv Power Distribution Layout. 3) Prepare Material Take Off for Bid Cost Estimates. B) Technical Scrutinizer, Design Close Out Group SSSP Site 6 Abha Site Close Out. 1) Prepare Design Advice Notes for outstanding Warranty Group Site Queries, Repair Requests, Clarification Request and Non Conformity reports. 2) Prepare as built drawings for on going warranty works. 3) Updated Technical data sheets, Spare parts list to show latest equipment supplier part numbers and replacement parts of discontinued spare parts. 1 of 6
  • 2. 4) Updated Vendor Drawings for show drawing reference to Site drawing. 5) Updated Booster Station Power Generation Drawings due to warranty replacement of Generator Units. C) Engineer (Electrical and Electronics), Technical Support, Warranty Group (Site 5). 1) Review, revise and approve construction drawings for System / upgrade and/or fitment of updated OEM Spare parts. 2) Prepare Technical Documents / Correspondence to equipment vendors for equipment warranty claims, sourcing of spare parts, replacement of defective / faulty equipment. 3) Prepare Design Advice Notes / Proposals for Additional / Deleted Items as per request / comments from Client (ARAMCO). 4) Update construction drawings and archive documents as Final As- built for handover to Client (ARAMCO). 5) Assist in equipment start up / Commissioning of new / replaced equipment. D) Technical Scrutinizer (Electrical and Electronics), Field Engineering Site 5. 1) Troubleshoot, Prepare and Implement Solutions/Drawings for Electrical, Instrumentation & Control and Safety System Commissioning Problems/ Punchlists. 2) Evaluate Client warranty Claims as to Contract/Warranty Coverage. 3) Update Drawings for Final as Built. 4) Update reference Documents, e.g. Cable List, Instrument List, PLC Software/Data Base List and Electrical Equipment List. 5) Assist in Preparation of Maintenance and Operating Procedures for 13 .8kV Switchgear. 6) Prepare Requests for Claims to Equipment Vendor/Supplier regarding Equipment Documentation and Final hand-over. E) Technical Scrutinizer Installation, E&E. 1) Evaluate Drawings/ Design for Compatibility with equipment Installation Requirement and Site Conditions. 2) Evaluate Control/ Power supply interface compatibility between equipment from separate vendors. 3) Review equipment Data Sheets Prior to Purchase, Propose Data Sheet Changes for Equipment to Meet Existing Site Conditions and Project Requirements. 2 of 6
  • 3. 4) Review Project Documents e.g. Cable List, Bulk Material List for Consistency with Drawings and Data Sheets Prior to Purchase. 5) Prepare and Propose design revisions to meet equipment installation and operational requirements. 6) Update Drawings for Implementation of all approved changes/drawing deviations. 7) Evaluate Client Claims and Request for Validity/Consistency with Scope of Work. 8) Prepare Claims to Materials Supplier/ Vendor regarding Balance of Deliveries per Purchase Orders. F) Electrical Engineer, Installation E&E (Site 5). 1) Prepare Material Take Off for purchase. 2) Collect and review Drawings/Documents for Release /Implementation to Jobsite. 3) Assist in field construction, regarding Quality Control/Material Control Requirement. 4) Prepare Drawing Mark-ups for all implemented drawing revisions. 5) Prepare Shop / Fabrication drawings for Client approval. Shop drawings are attached as to proposals for revisions / additions to Typical Installation Detail drawings which are revised due to clashes in installation and other site conditions. Company : Ramcar Group of Companies May 1997-April 1998 address : Ramcar Center, 80-82 Roces Avenue, Diliman, Quezon City, MM. Position Held: Electrical Engineer, Corporate Planning. For Construction of Main Corporate Office in Roces Ave., Quezon City and Agus Industrial Estate in Sta. Maria, Bulacan. 1) Evaluate Material/Technical Services Quotations of bidders and various Suppliers. 2) Review Plans/Drawings Prepared by Hired Architectural/Consultancy Firm for various Company Expansion Projects. 3) Investigate/Evaluate frequent recurring breakdowns in various company operated plants. 4) Assist Planner in updating construction activity schedule. 3 of 6
  • 4. Company : Parson’s Engineering LTD. Jan. 1996-Aug. 1996 address : 10/F Rufino Pacific Tower, 6784 Ayala Avenue, 1226 Makati City, Philippines Position Held: Senior Electrical Engineer Construction Management 1) Conduct Quantity inspection for Accomplishment Claims by Contractor. 2) Review Contractor shop drawings prior to final implementation. 3) Evaluate proposals for specification /drawing deviations from contractor. 4) Assists Planner in updating construction activity schedule. Company : Semirara Coal Corporation Jan. 1991-Dec. 1996 address : Semirara Island, Caluya, Antique 7/F Quad Alpha Centrum, 125 Pioneer St., Mandaluyong Metro-Manila Positions Held: Panian Design Group Manager (Electrical) 1) Prepare conceptual design for feasibility study of Panian Mine Development Project. 2) Prepare budgetary cost estimate for electrical safety and control system requirement for the propose continuous mining and fill Dewatering Equipment. General Foreman (Electrical Operations). 1) Supervise overall mine pit electrical system. 2) Implement electrical and control system require for all mine development projects. 3) Commission start-up and completed mine development projects. 4) Plans and implement all mine pit electrical maintenance programs. Electrical Foreman (Electrical Operations) 1) Supervise shift operations: conduct equipment trouble shooting in case of Breakdown. 2) Performed power change-over, emergency bus tie-ups in cases of powerplant Power interruptions and mine development project connections. 3) Plans and implement excavation line no. 2 maintenance activity. 4) Supervise all line no. 2 mine development project. 4 of 6
  • 5. Other personal information: Citizenship : Filipino Birth date : September 5, 1962 Status : Married Passport No. : WW0138563 SSS No. : 0806751207 Phil. Health ID No. :190250426708 OFW ID No. :03 0449800 TIN No. :138 933 906 Driver’s License no. :F03-81-0086-41 Honors and Awards: Third (3rd ) Place Associate Electrical Engineer-Board Examination Seventh (7th ) Place Assistant Electrical Engineer –Board Examination National State Scholarship Award Computer Skills: Auto Cad Release 14 Excel Microsoft Word Corel Word Perfect 8 Microstation Other Particulars: References: Gösta Söderborg Site Manager, Site 6, Abha ABV Rock Group KB, P.O. Box 89426 Riyadh, Kingdom of Saudi Arabia. Tel. No. +966-7-482-6878 5 of 6
  • 6. Peter Hausner E&E Superintendent Site 3 Installation Department ABV Rock Group KB, P.O. Box 1684, Burayda, Al-Qassim, Kingdom of Saudi Arabia Tel. No. +966-4-847-6067 Filomeno Ecraela General Manager Four E Steel Builders No. 35, Villa Angelica Subd. Camarin, Caloocan City, Metro-Manila, Philippines Tel. No. 0917-8031799 I hereby Certify that All Information above are True and Correct to the Best of my Knowledge. Vincent O’Dell 6 of 6
  • 7. Peter Hausner E&E Superintendent Site 3 Installation Department ABV Rock Group KB, P.O. Box 1684, Burayda, Al-Qassim, Kingdom of Saudi Arabia Tel. No. +966-4-847-6067 Filomeno Ecraela General Manager Four E Steel Builders No. 35, Villa Angelica Subd. Camarin, Caloocan City, Metro-Manila, Philippines Tel. No. 0917-8031799 I hereby Certify that All Information above are True and Correct to the Best of my Knowledge. Vincent O’Dell 6 of 6