SlideShare a Scribd company logo
1 of 3
Download to read offline
SUMMAR
S
ex
an
to
pu
or
Objective
S
co
ar
Personal





Education


Computer




Professio
Novembe
Saudi Ben
Projects d
King A
 For Haram
A project w
O
C
A
M
Title: Sen
With the fo
 R
co
ar
 R
 A
do
RY OF MAIN Q
enior architect
xperience in fu
nalytical and p
o learn and to
unctual and ta
rganization tha
s
eeking a chall
onstruction wh
rchitectural en
information
Birth: October
Nationality: Eg
Marital Status
Languages: A
Duty: exempte
n
B.Sc. Fine Art
Graduation
Graduation
Preparatory C
r skills
AutoCAD 2D,
Adobe Photos
3D Max
Microsoft Offic
onal Experien
r/2008-Curren
n Laden Grou
escription:-
Abdullah Bin A
m Expansion 
with an Estima
Owner: (MOE)
Consultant: (DA
rchitect: (DAH
Main contractor
ior Architect
ollowing duties
Review and und
oordinate serv
rchitects and e
Responsible for
ssisting with p
ocuments.
H
QUALIFICATIO
t & design coo
ull construction
problem solvin
share informa
ask oriented. D
at I work for.
lenging positio
here I can dev
ngineering.
r 12, 1980
gyptian
s: married and
Arabic: mother
ed 
ts, Architectur
Grade: Accep
Project: excel
Course for PM
3D.
shop.
ce
ce
nt
up (SBG)-ABC
Abdul Aziz, Cu
and its Relate
ation cost of 10
Minist
AH) Dar E
H) Dar E
r(SBG) Saudi
s:
derstand all pr
vice shop draw
engineers befo
r communicati
preparation of
Hesham M
Senior Archite
Eng_hesham
(0096
ONS
ordinator Dedi
n documents o
ng abilities com
ation with expe
Dependable an
on with a stron
elop my skills
have 4 childre
r tongue. Engli
e Department
pted.
lent
P Certification
CD
ustodian of th
ed Elements
00 billion SR.
try Of Higher E
El handasaa/C
El Handasaa/B
Bin laden Gro
roject contract
wings, specific
ore constructio
ing and resolv
tender packag
Mohamed
ect | design co
melsawy@hotm
66) 542434966
cated, self-mo
organizing bet
mbined with ex
erience to orga
nd have alway
ng and reputab
and acquire m
en
ish:-very good
t Alex. Univers
n 36 PDU
he two Holy M
Education.
airo
Beirut.
oup.
t documents (d
ations, contra
on activities co
ving design iss
ges, reviews te
Elsawy
oordinator
mail.com
6
otivated profes
tween drawing
xcellent interpe
anize tasks am
ys assigned cr
ble organizatio
more knowledg
d spoken writin
sity 2002.
Mosques Proj
drawings, sho
ct documents
ommence
sues with the d
ender returns
ssional with (1
gs of various d
ersonal skills.
mong team me
ritical responsi
on in the field o
ge in the vario
ng.
ject 
op drawings, c
etc.); coordin
design consult
and construct
3) years’
disciplines. Str
Team player
embers. Flexib
ibilities in the
of building
ous fields of
omposite
ate with other
tant.
tion contract
rong
keen
ble,
r site
 R
de
 R
co
 R
ap
 M
re
 A
as
 R
 R
ap
June/2008
Saudi Oge
Projects d
King A
A project w
O
C
A
M
Title: arch
With the fo
 R
en
 R
 P
 C
 R
su
 P
K AIC
A project w
O
C
A
M
Title: arch
With the fo
 P
 P
 P
KAEC
A project w
O
C
A
M
Title: arch
With the fo
 R
 P
 Fo
 P
Reviewing of co
esign impact /
Review related
ontractors; ens
Reviewing all d
ppropriate).
Monitoring con
equired.
ttend meeting
s and when re
Reviewing cont
Review related
pproval and fo
8-October/201
er Limited (S
escription:-
Abdullah Bin A
with an Estima
Owner: (MOI)
Consultant: (K&
rchitect: (ZFP
Main contractor
hitect
ollowing duties
Reviewing the d
ngineering.
Reviewing all d
reparing shop
Coordination be
Restudy the BO
ubmitted for cl
reparing week
C – King Abdu
with an Estima
Owner(MOF)
Consultant:
rchitect:
Main contractor
hitect
ollowing duties
reparing tende
reparing the B
reparing shop
C – King Abdul
with an Estima
Owner: (MOI)
Consultant: (K&
rchitec(ZFP)
Main contractor
hitect and Sit
ollowing duties
Redesign for al
reparing shop
ollowing and s
reparing as Bu
ontractor techn
/ suitability.
construction m
sure complian
esign team IF
tractor shop-d
gs (e.g. progre
equired.
tractors bids te
as-built draw
or final constru
11
OL)-Technica
Abdul-Aziz Pro
ation cost of 53
Minist
&A) Khatib
) Zuhai
r (SOL) Saud
s:
development o
esign team IF
p drawing doe
etween other t
OQ after the m
lient approval.
kly reports for
ullah Internatio
ation cost of 30
Minist
Rashid
Oger I
r(SOL) Saudi
s:
er drawing as
BOQ and spec
p drawing with
lah Economic
ation cost of 65
Ministr
&A) Khatib
Zuhair
r(SOL) Saudi
e coordinato
s:
l elevations w
p drawing for e
solving site pro
uilt drawing fo
nical variation
materials, tech
nce against mi
FC documents
drawings for c
ess meetings,
echnical offers
wings provided
uction record p
l Site Support
oject for Develo
300 Million SR
try Of interior.
b&Alami
ir Fayez Partn
di Oger Limited
of the tender d
FC documents
to the site con
trades (structu
modifications w
the design pro
onal Conferen
000 Million SR
try Of Finance
d Engineering
nternational F
Oger Limited
per the design
cifications and
full details.
City
50 Million SR.
ry Of interior.
b&Alami
r Fayez Partne
Oger Limited
r.
ith full present
elevations with
oblems with co
or towers.
s, RFI submitt
hnical data and
nisterial requir
, including spe
conformance
coordination a
s against the p
d by contracto
purposes.
t Division-Jedd
opment of Sec
R.
nership.
d.
drawing due to
.
nditions and su
ure, hvac, plum
was done on th
ogress.
ce Centre
R.
e
.
France.
.
n drawing.
submit for con
ership.
.
tation and sub
h full details.
onsultant.
tals, substitutio
d material and
rements and t
ecifications, dr
to the design
and specially
project specs.
rs prior to the
dah-KSA.
curity Facilities
o the contract
ubmits for con
mping).
he design and
nsultant appro
bmit for client a
on requests a
d finishes sam
technical spec
rawings, (desi
n; including th
called meetin
eir submittal to
s.
addendum an
nsultant approv
the site adapt
oval.
approval.
nd proposals f
mples submitte
cifications.
gn notes wher
hird party revi
ngs with clients
o local ministri
nd value
val.
tation to be
for
d by
re
ews if
s etc.)
ies for
 C
June/2006
Saudi Ben
Projects d
Centra
A project w
O
C
A
M
Title: arch
With the fo
 P
 P
 D
 P
 C
 P
 A
Novembe
Dar Elben
Title: arch
With the fo
 M
 D
 P
 P
 C

Projec
KSA
 Le
 To
 K
 H
 P
 P
 P
Egypt
 M
55
 P
 C
 C
 D
 M
Coordinating be
6-May/2008
n Laden Grou
escription:-
al Security Bui
with an Estima
Owner: (MOI)
Consultant: (DA
rchitect: (SDC
Main contractor
hitect
ollowing duties
reparing desig
resentation (2
eveloping the
repare shop d
Coordinate betw
reparing the d
s-built drawing
r/2002-April/2
naa urban des
itect and desig
ollowing duties
Member in the
esign and pre
resentation fo
reparing BOQ
Coordinate with
cts description
exus showroo
oyota showroo
hayat mall Jed
otel Building D
rivate Villa Jed
rivate Compou
rivate Villa Du
Member in the
500 m2 with to
rivate Villa Ca
Cleopatra Tour
Canarya Touris
ream Island V
Many important
etween consu
up (SBG)-ABC
ildings(Phase
ation cost of 39
Min
AR) Dar
C) Sau
r: (SBG) Sau
s:
gn drawing an
2D, 3D) for the
Architect draw
drawing with fu
ween different
door and windo
g for Jeddah s
2006
sign and Arch
gn coordinator
s:
design team o
epare tender d
r the previous
Q and specifica
h other consult
:
m Jeddah (El-
om Jeddah (E
ddah (El-Khay
Dammam (El-s
ddah (El-sheik
und Obhor-Je
ubai (El-sheikh
designing team
otal cost 500 m
airo (El-sheikh
ism Village No
sm Village Nor
Village King Ma
t Residential B
ltant and subc
CD
1)& Regional
900 Million SR
istry Of interio
r Al handassa
udi Diar Consu
udi Bin laden G
d working draw
e previous item
wing (design d
ull details.
t departments
ow schedule w
site (phase 1).
hitect-Alexan
r.
of Egyptian mu
rawings for m
s item.
ations.
tants (Hvac. P
-sheikh Moham
l-sheikh Moha
yat family).
sheikh Ismaee
kh Ismaeel El-
ddah (Abdella
h Abdellah El-J
m of el Maamo
million LE )
Mohamed Ab
orth Coast-Ale
rth Coast-Alex
ariout-Alexand
Building in Alex
contractors for
administration
R. consists of 2
or.
Shair&Parten
ulting.
Group.
wing for some
ms and submit
drawing) befor
(structure, Ele
with complete
ndria-Egypt
useum compe
any projects in
Pl and Elec.).
med Abd el- la
amed Abd el- l
el El-Rajhi).
-Rajhi).
ah Hashim).
Jassmy)
ora hotel (A ho
bd el- lateef Ga
exandria.
xandria.
dria
xandria.
r shop drawing
n building(Pha
2 phases in KS
rs
e extensions fo
for consultant
re submitting f
ectro mechani
BOQ and spe
etition.
n Egypt and S
ateef Gameel)
lateef Gameel
otel & residen
ameel)
g approval.
ase2)
SA.
or the project.
t approval.
for consultant
ical, precast w
ecifications.
Saudi Arabia.
).
l).
tial hotel Apar
approval.
work (Premco)
rtments –total
).
area

More Related Content

What's hot

RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDANMani Kandan
 
Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)Ibrahim Al-Shayea
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1Vincent Lee
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyorfady qezman
 
Research development
Research developmentResearch development
Research developmentJ-Sern Phua
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoubGhobrial1
 
hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mansour
 
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Macy Khor
 
M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -Mohamed Salah
 
Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016JESUS MENDOZA
 
CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif KhanMUHAMMAD KHAN
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONIRAGI MIHIGO Didier
 

What's hot (20)

RESUME-MANIKANDAN
RESUME-MANIKANDANRESUME-MANIKANDAN
RESUME-MANIKANDAN
 
Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)Ibrahim S. Al-Shayea CV (Project Engineer)
Ibrahim S. Al-Shayea CV (Project Engineer)
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
Prashant_Bachchhav
Prashant_BachchhavPrashant_Bachchhav
Prashant_Bachchhav
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
Fady Samy -Quantity Surveyor
Fady Samy -Quantity SurveyorFady Samy -Quantity Surveyor
Fady Samy -Quantity Surveyor
 
Adil rasheed
Adil rasheedAdil rasheed
Adil rasheed
 
Irshad (Autocad CV)
Irshad (Autocad CV)Irshad (Autocad CV)
Irshad (Autocad CV)
 
Research development
Research developmentResearch development
Research development
 
Abanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineerAbanoub ghobrial , Senior planning engineer
Abanoub ghobrial , Senior planning engineer
 
JODEL_BASISTER_resume
JODEL_BASISTER_resumeJODEL_BASISTER_resume
JODEL_BASISTER_resume
 
hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copy
 
Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)Ici j sern unit employer brief v2 (1)
Ici j sern unit employer brief v2 (1)
 
MOHAMMAD SHAHBAZ RIAZ
MOHAMMAD SHAHBAZ RIAZMOHAMMAD SHAHBAZ RIAZ
MOHAMMAD SHAHBAZ RIAZ
 
M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -M.Salah-Senior Architect CV -
M.Salah-Senior Architect CV -
 
Resume
ResumeResume
Resume
 
Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016Jesus Mendoza .CV 2016
Jesus Mendoza .CV 2016
 
CV Muhammad Kashif Khan
CV Muhammad Kashif KhanCV Muhammad Kashif Khan
CV Muhammad Kashif Khan
 
mY cV PDF
mY cV PDFmY cV PDF
mY cV PDF
 
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATIONGRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
GRADUATE QS PORTFOLIO SUBMISSION FOR APPLICATION FOR REGISTRATION
 

Viewers also liked

FM Photography
FM PhotographyFM Photography
FM Photographymissizio
 
bảng giá thiết kế phim quảng cáo uy tín
bảng giá thiết kế phim quảng cáo uy tínbảng giá thiết kế phim quảng cáo uy tín
bảng giá thiết kế phim quảng cáo uy tínkrista461
 
Alamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 finalAlamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 finalalamosgoldinc
 
Jornal da Cidade - Bauru: Dados Commodities 15/01/2016
Jornal da Cidade - Bauru: Dados Commodities 15/01/2016Jornal da Cidade - Bauru: Dados Commodities 15/01/2016
Jornal da Cidade - Bauru: Dados Commodities 15/01/2016Agricultura Sao Paulo
 
Il carnevale italiano
Il carnevale italianoIl carnevale italiano
Il carnevale italianoteridev
 
brandonlerch_brochure
brandonlerch_brochurebrandonlerch_brochure
brandonlerch_brochureBrandon Lerch
 
Template 2-ppt
Template 2-pptTemplate 2-ppt
Template 2-pptLuthfunAli
 
ở đâu thiết kế clip quảng cáo uy tín
ở đâu thiết kế clip quảng cáo uy tínở đâu thiết kế clip quảng cáo uy tín
ở đâu thiết kế clip quảng cáo uy tíneddy655
 
Teach yourself Ruby on Rails
Teach yourself Ruby on RailsTeach yourself Ruby on Rails
Teach yourself Ruby on Railspatrikbona
 
Esker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOne
Esker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOneEsker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOne
Esker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOneESKER
 
Project Report on Slim 21Software PPT Slides
Project Report on Slim 21Software PPT SlidesProject Report on Slim 21Software PPT Slides
Project Report on Slim 21Software PPT SlidesRohan Naik
 
ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19
ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19 ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19
ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19 АКМР Corpmedia.ru
 
Ejercicio resuelto de microeconomía: función de producción
Ejercicio resuelto de microeconomía: función de producciónEjercicio resuelto de microeconomía: función de producción
Ejercicio resuelto de microeconomía: función de producciónJuan Carlos Aguado Franco
 

Viewers also liked (16)

kasEIZ
kasEIZkasEIZ
kasEIZ
 
FM Photography
FM PhotographyFM Photography
FM Photography
 
bảng giá thiết kế phim quảng cáo uy tín
bảng giá thiết kế phim quảng cáo uy tínbảng giá thiết kế phim quảng cáo uy tín
bảng giá thiết kế phim quảng cáo uy tín
 
Alamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 finalAlamos corporate presentation jan 25 2016 final
Alamos corporate presentation jan 25 2016 final
 
Jornal da Cidade - Bauru: Dados Commodities 15/01/2016
Jornal da Cidade - Bauru: Dados Commodities 15/01/2016Jornal da Cidade - Bauru: Dados Commodities 15/01/2016
Jornal da Cidade - Bauru: Dados Commodities 15/01/2016
 
INTRODUCCION A LA INFORMATICA
INTRODUCCION A LA INFORMATICAINTRODUCCION A LA INFORMATICA
INTRODUCCION A LA INFORMATICA
 
Il carnevale italiano
Il carnevale italianoIl carnevale italiano
Il carnevale italiano
 
brandonlerch_brochure
brandonlerch_brochurebrandonlerch_brochure
brandonlerch_brochure
 
Template 2-ppt
Template 2-pptTemplate 2-ppt
Template 2-ppt
 
ở đâu thiết kế clip quảng cáo uy tín
ở đâu thiết kế clip quảng cáo uy tínở đâu thiết kế clip quảng cáo uy tín
ở đâu thiết kế clip quảng cáo uy tín
 
Teach yourself Ruby on Rails
Teach yourself Ruby on RailsTeach yourself Ruby on Rails
Teach yourself Ruby on Rails
 
Esker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOne
Esker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOneEsker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOne
Esker étend ses intégrations ERP à Oracle® JD Edwards EnterpriseOne
 
Project Report on Slim 21Software PPT Slides
Project Report on Slim 21Software PPT SlidesProject Report on Slim 21Software PPT Slides
Project Report on Slim 21Software PPT Slides
 
ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19
ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19 ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19
ЛКМ - 2016: CARCADE, All@CARCADE.com, № 19
 
Ejercicio resuelto de microeconomía: función de producción
Ejercicio resuelto de microeconomía: función de producciónEjercicio resuelto de microeconomía: función de producción
Ejercicio resuelto de microeconomía: función de producción
 
Autobiografia
Autobiografia Autobiografia
Autobiografia
 

Similar to Hesham Mohamed Elsawy

Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitaeSALEM MOHAMMED
 
Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)Anwar Elgarwany
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Ghafoor Butt
 
Architect Mahmoud Ghonem cv
Architect Mahmoud Ghonem cvArchitect Mahmoud Ghonem cv
Architect Mahmoud Ghonem cvMahmoud Ghonem
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREduardo H. Pare
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil EngineerMohammad Sarowar
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAhamed Mohideen
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVAsmaa Gouda
 
Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)Mohamed Kamal
 
ATT_lotfy farouk CV25-10-2014
ATT_lotfy farouk  CV25-10-2014ATT_lotfy farouk  CV25-10-2014
ATT_lotfy farouk CV25-10-2014LOTFY FAROUK
 

Similar to Hesham Mohamed Elsawy (20)

Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)Senior2 Planning Engineer Anwar.c.v(word97)
Senior2 Planning Engineer Anwar.c.v(word97)
 
RCV JUN16
RCV JUN16RCV JUN16
RCV JUN16
 
Amr Moneim CV March 2016
Amr Moneim CV March 2016Amr Moneim CV March 2016
Amr Moneim CV March 2016
 
Ahmed hussain draftsman_cv_
Ahmed hussain draftsman_cv_Ahmed hussain draftsman_cv_
Ahmed hussain draftsman_cv_
 
Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )Abdul Ghafoor (SQS) ( )
Abdul Ghafoor (SQS) ( )
 
Sr. Civil & Structural Designer
Sr. Civil & Structural DesignerSr. Civil & Structural Designer
Sr. Civil & Structural Designer
 
ARCHITECT MAHMOUD CV
ARCHITECT MAHMOUD CVARCHITECT MAHMOUD CV
ARCHITECT MAHMOUD CV
 
Architect Mahmoud Ghonem cv
Architect Mahmoud Ghonem cvArchitect Mahmoud Ghonem cv
Architect Mahmoud Ghonem cv
 
Mahendran CV
Mahendran CVMahendran CV
Mahendran CV
 
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEEREDUARDO H. PARE CV - STRUCTURAL ENGINEER
EDUARDO H. PARE CV - STRUCTURAL ENGINEER
 
SMA CV2016-1
SMA CV2016-1SMA CV2016-1
SMA CV2016-1
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
AHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_originalAHAMED CHINNA MOHIDEEN.M_original
AHAMED CHINNA MOHIDEEN.M_original
 
ASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CVASMAA ATIA-Wuzzuf-CV
ASMAA ATIA-Wuzzuf-CV
 
amit CV
amit CVamit CV
amit CV
 
YOONAS_CV
YOONAS_CVYOONAS_CV
YOONAS_CV
 
Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)Project Controls CV (Mohamed Kamal)
Project Controls CV (Mohamed Kamal)
 
ATT_lotfy farouk CV25-10-2014
ATT_lotfy farouk  CV25-10-2014ATT_lotfy farouk  CV25-10-2014
ATT_lotfy farouk CV25-10-2014
 

Hesham Mohamed Elsawy

  • 1. SUMMAR S ex an to pu or Objective S co ar Personal      Education   Computer     Professio Novembe Saudi Ben Projects d King A  For Haram A project w O C A M Title: Sen With the fo  R co ar  R  A do RY OF MAIN Q enior architect xperience in fu nalytical and p o learn and to unctual and ta rganization tha s eeking a chall onstruction wh rchitectural en information Birth: October Nationality: Eg Marital Status Languages: A Duty: exempte n B.Sc. Fine Art Graduation Graduation Preparatory C r skills AutoCAD 2D, Adobe Photos 3D Max Microsoft Offic onal Experien r/2008-Curren n Laden Grou escription:- Abdullah Bin A m Expansion  with an Estima Owner: (MOE) Consultant: (DA rchitect: (DAH Main contractor ior Architect ollowing duties Review and und oordinate serv rchitects and e Responsible for ssisting with p ocuments. H QUALIFICATIO t & design coo ull construction problem solvin share informa ask oriented. D at I work for. lenging positio here I can dev ngineering. r 12, 1980 gyptian s: married and Arabic: mother ed  ts, Architectur Grade: Accep Project: excel Course for PM 3D. shop. ce ce nt up (SBG)-ABC Abdul Aziz, Cu and its Relate ation cost of 10 Minist AH) Dar E H) Dar E r(SBG) Saudi s: derstand all pr vice shop draw engineers befo r communicati preparation of Hesham M Senior Archite Eng_hesham (0096 ONS ordinator Dedi n documents o ng abilities com ation with expe Dependable an on with a stron elop my skills have 4 childre r tongue. Engli e Department pted. lent P Certification CD ustodian of th ed Elements 00 billion SR. try Of Higher E El handasaa/C El Handasaa/B Bin laden Gro roject contract wings, specific ore constructio ing and resolv tender packag Mohamed ect | design co melsawy@hotm 66) 542434966 cated, self-mo organizing bet mbined with ex erience to orga nd have alway ng and reputab and acquire m en ish:-very good t Alex. Univers n 36 PDU he two Holy M Education. airo Beirut. oup. t documents (d ations, contra on activities co ving design iss ges, reviews te Elsawy oordinator mail.com 6 otivated profes tween drawing xcellent interpe anize tasks am ys assigned cr ble organizatio more knowledg d spoken writin sity 2002. Mosques Proj drawings, sho ct documents ommence sues with the d ender returns ssional with (1 gs of various d ersonal skills. mong team me ritical responsi on in the field o ge in the vario ng. ject  op drawings, c etc.); coordin design consult and construct 3) years’ disciplines. Str Team player embers. Flexib ibilities in the of building ous fields of omposite ate with other tant. tion contract rong keen ble, r site
  • 2.  R de  R co  R ap  M re  A as  R  R ap June/2008 Saudi Oge Projects d King A A project w O C A M Title: arch With the fo  R en  R  P  C  R su  P K AIC A project w O C A M Title: arch With the fo  P  P  P KAEC A project w O C A M Title: arch With the fo  R  P  Fo  P Reviewing of co esign impact / Review related ontractors; ens Reviewing all d ppropriate). Monitoring con equired. ttend meeting s and when re Reviewing cont Review related pproval and fo 8-October/201 er Limited (S escription:- Abdullah Bin A with an Estima Owner: (MOI) Consultant: (K& rchitect: (ZFP Main contractor hitect ollowing duties Reviewing the d ngineering. Reviewing all d reparing shop Coordination be Restudy the BO ubmitted for cl reparing week C – King Abdu with an Estima Owner(MOF) Consultant: rchitect: Main contractor hitect ollowing duties reparing tende reparing the B reparing shop C – King Abdul with an Estima Owner: (MOI) Consultant: (K& rchitec(ZFP) Main contractor hitect and Sit ollowing duties Redesign for al reparing shop ollowing and s reparing as Bu ontractor techn / suitability. construction m sure complian esign team IF tractor shop-d gs (e.g. progre equired. tractors bids te as-built draw or final constru 11 OL)-Technica Abdul-Aziz Pro ation cost of 53 Minist &A) Khatib ) Zuhai r (SOL) Saud s: development o esign team IF p drawing doe etween other t OQ after the m lient approval. kly reports for ullah Internatio ation cost of 30 Minist Rashid Oger I r(SOL) Saudi s: er drawing as BOQ and spec p drawing with lah Economic ation cost of 65 Ministr &A) Khatib Zuhair r(SOL) Saudi e coordinato s: l elevations w p drawing for e solving site pro uilt drawing fo nical variation materials, tech nce against mi FC documents drawings for c ess meetings, echnical offers wings provided uction record p l Site Support oject for Develo 300 Million SR try Of interior. b&Alami ir Fayez Partn di Oger Limited of the tender d FC documents to the site con trades (structu modifications w the design pro onal Conferen 000 Million SR try Of Finance d Engineering nternational F Oger Limited per the design cifications and full details. City 50 Million SR. ry Of interior. b&Alami r Fayez Partne Oger Limited r. ith full present elevations with oblems with co or towers. s, RFI submitt hnical data and nisterial requir , including spe conformance coordination a s against the p d by contracto purposes. t Division-Jedd opment of Sec R. nership. d. drawing due to . nditions and su ure, hvac, plum was done on th ogress. ce Centre R. e . France. . n drawing. submit for con ership. . tation and sub h full details. onsultant. tals, substitutio d material and rements and t ecifications, dr to the design and specially project specs. rs prior to the dah-KSA. curity Facilities o the contract ubmits for con mping). he design and nsultant appro bmit for client a on requests a d finishes sam technical spec rawings, (desi n; including th called meetin eir submittal to s. addendum an nsultant approv the site adapt oval. approval. nd proposals f mples submitte cifications. gn notes wher hird party revi ngs with clients o local ministri nd value val. tation to be for d by re ews if s etc.) ies for
  • 3.  C June/2006 Saudi Ben Projects d Centra A project w O C A M Title: arch With the fo  P  P  D  P  C  P  A Novembe Dar Elben Title: arch With the fo  M  D  P  P  C  Projec KSA  Le  To  K  H  P  P  P Egypt  M 55  P  C  C  D  M Coordinating be 6-May/2008 n Laden Grou escription:- al Security Bui with an Estima Owner: (MOI) Consultant: (DA rchitect: (SDC Main contractor hitect ollowing duties reparing desig resentation (2 eveloping the repare shop d Coordinate betw reparing the d s-built drawing r/2002-April/2 naa urban des itect and desig ollowing duties Member in the esign and pre resentation fo reparing BOQ Coordinate with cts description exus showroo oyota showroo hayat mall Jed otel Building D rivate Villa Jed rivate Compou rivate Villa Du Member in the 500 m2 with to rivate Villa Ca Cleopatra Tour Canarya Touris ream Island V Many important etween consu up (SBG)-ABC ildings(Phase ation cost of 39 Min AR) Dar C) Sau r: (SBG) Sau s: gn drawing an 2D, 3D) for the Architect draw drawing with fu ween different door and windo g for Jeddah s 2006 sign and Arch gn coordinator s: design team o epare tender d r the previous Q and specifica h other consult : m Jeddah (El- om Jeddah (E ddah (El-Khay Dammam (El-s ddah (El-sheik und Obhor-Je ubai (El-sheikh designing team otal cost 500 m airo (El-sheikh ism Village No sm Village Nor Village King Ma t Residential B ltant and subc CD 1)& Regional 900 Million SR istry Of interio r Al handassa udi Diar Consu udi Bin laden G d working draw e previous item wing (design d ull details. t departments ow schedule w site (phase 1). hitect-Alexan r. of Egyptian mu rawings for m s item. ations. tants (Hvac. P -sheikh Moham l-sheikh Moha yat family). sheikh Ismaee kh Ismaeel El- ddah (Abdella h Abdellah El-J m of el Maamo million LE ) Mohamed Ab orth Coast-Ale rth Coast-Alex ariout-Alexand Building in Alex contractors for administration R. consists of 2 or. Shair&Parten ulting. Group. wing for some ms and submit drawing) befor (structure, Ele with complete ndria-Egypt useum compe any projects in Pl and Elec.). med Abd el- la amed Abd el- l el El-Rajhi). -Rajhi). ah Hashim). Jassmy) ora hotel (A ho bd el- lateef Ga exandria. xandria. dria xandria. r shop drawing n building(Pha 2 phases in KS rs e extensions fo for consultant re submitting f ectro mechani BOQ and spe etition. n Egypt and S ateef Gameel) lateef Gameel otel & residen ameel) g approval. ase2) SA. or the project. t approval. for consultant ical, precast w ecifications. Saudi Arabia. ). l). tial hotel Apar approval. work (Premco) rtments –total ). area