SlideShare a Scribd company logo
1 of 16
Estimation of storm damage  and proposals for cleaning  and reforestation 3/12/2010 Leire Sanz
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object]
[object Object]
II. Context of the study and the problem ,[object Object],[object Object],[object Object],[object Object],[object Object]
II.   Development of process for estimate the damages on the plots Plot 703 Plot 720
II.   Development of process for estimate the damages on the plots Plot 781 Plot 315 Plot 406
II. Development of process for estimate the damages on the plots Plot 452
II. Development of process for estimate the damages on the plots ●  Dendrometric datas ( Measuring diameter and heigth of  twelve tree per stand  because it is a contemporary mass   ). ●  Evaluation of damage’s percentage - <20%  - Between 20 and 40%  - Between 40 and 60%  -> 60%.   ●  Evaluation of the age of the stand ( counting whorls ). ●  Percentage of natural regeneration (As the evaluation of damage´s percentage).
III.  Results obtained on the property MP*=   Maritim pine MP* MP* MP* MP* MP* MP* Species  35-40 30-35 20-25 30-35 20-25 30-35 Age stand 10 15 10 0 25 20 % Rege acquired 40 35 25 30 25 30 Diameter medium 45 45 35 35 25 40 Diameter dominant 20 21 15 20 16 19 Hmoy 22 22 17 22 20 21 Ho 8,71 2,95 15,26 1,455 6,716 5,168 Total surface 720 703 452 315 781 406 Cadastral plot B B B B B B Section
III.  Results obtained on the property No 40 0,51 gap 1 703 Yes (N11) 10 3,4 gap 1 720 Yes (N11) 40 1,6 gap 1 406 No 0,44 gap 2 No 90 0,54 gap 1 781 No 90 0,45 gap 1 315 Yes (N11) 2 gap 4 Yes(N11) 1,6 gap 3 Yes (N11) 1,25 gap 2 No 40 0,72 gap 1 452 Subvention (Norm) % Damage Gap’s surface Gaps Cadastral plot
IV. Creation of a subvention file IV.1.Presentation of the file 60% More 15 years N12 40 - 60 % More 15 years N11 More 40% Less 15 years N10 <50 ha 60% More 15 years N22 40 - 60 % More 15 years N21 More 40% Less 15 years N20 >50 ha Damage Plot Code Surface Subsidy
IV. Creation of a subvention file IV.2.Presentation of the subvention 1/ Caller identification   (Name, address, type of owner, bank account)   2/ Project features  (Name of the town, surface cleaning, surface reforest) 3/ Forward spending calculated according to the previous (Amount and nature of the scale ex: N20, N21, N22)   3 Steps:
V. Establishment of suggestions of cleaning and reforestation For cleaning and reforestation we considered several criteria: ●  The total area of the plot  ●  The area affected in the plot  ●  The cost of the work required  ●  The average diameter and stand age  ●  The presence of various species  ●  Presence of regeneration or not
VI. Conclusion ,[object Object],[object Object],[object Object],[object Object],[object Object]
Thanks for attention

More Related Content

Similar to Grupo 2 presentacion[1]ip_b_azas

Soil water holding capacity affected by erosion in olive orchards under semi-...
Soil water holding capacity affected by erosion in olive orchards under semi-...Soil water holding capacity affected by erosion in olive orchards under semi-...
Soil water holding capacity affected by erosion in olive orchards under semi-...ExternalEvents
 
Tesi Asp Presentation
Tesi Asp PresentationTesi Asp Presentation
Tesi Asp Presentationbinh11091983
 
presentaion-gp2.pptx
presentaion-gp2.pptxpresentaion-gp2.pptx
presentaion-gp2.pptxssuser400a95
 
Ti02 ENM for wastewater odour control networks
Ti02 ENM for wastewater odour control networksTi02 ENM for wastewater odour control networks
Ti02 ENM for wastewater odour control networksDuncan Reynolds
 
Management of landfill leachate: The legacy of European Union Directives
Management of landfill leachate: The legacy of European Union DirectivesManagement of landfill leachate: The legacy of European Union Directives
Management of landfill leachate: The legacy of European Union DirectivesRaymond Brennan
 
The Interactive Atlas
The Interactive AtlasThe Interactive Atlas
The Interactive Atlasipcc-media
 
EIA scoping report -
EIA scoping report -EIA scoping report -
EIA scoping report -Roberta Nanci
 
Towards healthy soils: Is soil contamination a real issue? Luca Montanarella...
Towards healthy soils: Is soil contamination a real issue?  Luca Montanarella...Towards healthy soils: Is soil contamination a real issue?  Luca Montanarella...
Towards healthy soils: Is soil contamination a real issue? Luca Montanarella...FAO
 
Wellhead protection zones
Wellhead protection zonesWellhead protection zones
Wellhead protection zoneskontious
 
Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...
Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...
Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...IES / IAQM
 
Are emission reductions from peatlands mrv able
Are emission reductions from peatlands mrv ableAre emission reductions from peatlands mrv able
Are emission reductions from peatlands mrv ableecosystemsclimate
 
Urban beach management figueira da foz_case study_intro ecogestus
Urban beach management   figueira da foz_case study_intro ecogestusUrban beach management   figueira da foz_case study_intro ecogestus
Urban beach management figueira da foz_case study_intro ecogestusJoao Vaz
 
Pre proposal presentation on the impact of different land-uses within an urba...
Pre proposal presentation on the impact of different land-uses within an urba...Pre proposal presentation on the impact of different land-uses within an urba...
Pre proposal presentation on the impact of different land-uses within an urba...Loretta Roberson
 

Similar to Grupo 2 presentacion[1]ip_b_azas (20)

September 1 - 1030 - Zhiming Qi
September 1 - 1030 - Zhiming QiSeptember 1 - 1030 - Zhiming Qi
September 1 - 1030 - Zhiming Qi
 
Soil water holding capacity affected by erosion in olive orchards under semi-...
Soil water holding capacity affected by erosion in olive orchards under semi-...Soil water holding capacity affected by erosion in olive orchards under semi-...
Soil water holding capacity affected by erosion in olive orchards under semi-...
 
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
Promoting Climate Resilient Rural Infrastructure in Northern Vietnam: Final W...
 
Tesi Asp Presentation
Tesi Asp PresentationTesi Asp Presentation
Tesi Asp Presentation
 
presentaion-gp2.pptx
presentaion-gp2.pptxpresentaion-gp2.pptx
presentaion-gp2.pptx
 
009 amelia castro
009 amelia castro009 amelia castro
009 amelia castro
 
ENGAGE sinking island
ENGAGE sinking islandENGAGE sinking island
ENGAGE sinking island
 
Ti02 ENM for wastewater odour control networks
Ti02 ENM for wastewater odour control networksTi02 ENM for wastewater odour control networks
Ti02 ENM for wastewater odour control networks
 
Management of landfill leachate: The legacy of European Union Directives
Management of landfill leachate: The legacy of European Union DirectivesManagement of landfill leachate: The legacy of European Union Directives
Management of landfill leachate: The legacy of European Union Directives
 
The Interactive Atlas
The Interactive AtlasThe Interactive Atlas
The Interactive Atlas
 
EIA scoping report -
EIA scoping report -EIA scoping report -
EIA scoping report -
 
Towards healthy soils: Is soil contamination a real issue? Luca Montanarella...
Towards healthy soils: Is soil contamination a real issue?  Luca Montanarella...Towards healthy soils: Is soil contamination a real issue?  Luca Montanarella...
Towards healthy soils: Is soil contamination a real issue? Luca Montanarella...
 
Wellhead protection zones
Wellhead protection zonesWellhead protection zones
Wellhead protection zones
 
Eia procedures
Eia proceduresEia procedures
Eia procedures
 
presentation
presentationpresentation
presentation
 
Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...
Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...
Managing Land Contamination Risks and Liabilities Across A UK wide Portfolio ...
 
Climate change and agriculture
Climate change and  agricultureClimate change and  agriculture
Climate change and agriculture
 
Are emission reductions from peatlands mrv able
Are emission reductions from peatlands mrv ableAre emission reductions from peatlands mrv able
Are emission reductions from peatlands mrv able
 
Urban beach management figueira da foz_case study_intro ecogestus
Urban beach management   figueira da foz_case study_intro ecogestusUrban beach management   figueira da foz_case study_intro ecogestus
Urban beach management figueira da foz_case study_intro ecogestus
 
Pre proposal presentation on the impact of different land-uses within an urba...
Pre proposal presentation on the impact of different land-uses within an urba...Pre proposal presentation on the impact of different land-uses within an urba...
Pre proposal presentation on the impact of different land-uses within an urba...
 

Grupo 2 presentacion[1]ip_b_azas

  • 1. Estimation of storm damage and proposals for cleaning and reforestation 3/12/2010 Leire Sanz
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. II. Development of process for estimate the damages on the plots Plot 703 Plot 720
  • 7. II. Development of process for estimate the damages on the plots Plot 781 Plot 315 Plot 406
  • 8. II. Development of process for estimate the damages on the plots Plot 452
  • 9. II. Development of process for estimate the damages on the plots ● Dendrometric datas ( Measuring diameter and heigth of twelve tree per stand because it is a contemporary mass ). ● Evaluation of damage’s percentage - <20% - Between 20 and 40% - Between 40 and 60% -> 60%. ● Evaluation of the age of the stand ( counting whorls ). ● Percentage of natural regeneration (As the evaluation of damage´s percentage).
  • 10. III. Results obtained on the property MP*= Maritim pine MP* MP* MP* MP* MP* MP* Species 35-40 30-35 20-25 30-35 20-25 30-35 Age stand 10 15 10 0 25 20 % Rege acquired 40 35 25 30 25 30 Diameter medium 45 45 35 35 25 40 Diameter dominant 20 21 15 20 16 19 Hmoy 22 22 17 22 20 21 Ho 8,71 2,95 15,26 1,455 6,716 5,168 Total surface 720 703 452 315 781 406 Cadastral plot B B B B B B Section
  • 11. III. Results obtained on the property No 40 0,51 gap 1 703 Yes (N11) 10 3,4 gap 1 720 Yes (N11) 40 1,6 gap 1 406 No 0,44 gap 2 No 90 0,54 gap 1 781 No 90 0,45 gap 1 315 Yes (N11) 2 gap 4 Yes(N11) 1,6 gap 3 Yes (N11) 1,25 gap 2 No 40 0,72 gap 1 452 Subvention (Norm) % Damage Gap’s surface Gaps Cadastral plot
  • 12. IV. Creation of a subvention file IV.1.Presentation of the file 60% More 15 years N12 40 - 60 % More 15 years N11 More 40% Less 15 years N10 <50 ha 60% More 15 years N22 40 - 60 % More 15 years N21 More 40% Less 15 years N20 >50 ha Damage Plot Code Surface Subsidy
  • 13. IV. Creation of a subvention file IV.2.Presentation of the subvention 1/ Caller identification (Name, address, type of owner, bank account) 2/ Project features (Name of the town, surface cleaning, surface reforest) 3/ Forward spending calculated according to the previous (Amount and nature of the scale ex: N20, N21, N22) 3 Steps:
  • 14. V. Establishment of suggestions of cleaning and reforestation For cleaning and reforestation we considered several criteria: ● The total area of the plot ● The area affected in the plot ● The cost of the work required ● The average diameter and stand age ● The presence of various species ● Presence of regeneration or not
  • 15.