Introduction
• Reminder of the ACN-PCN system
• The change to ACR-PCR
• The new ACR-PCR system
• Comparing ACN and ACR values
• Case studies on the transition
• Estimate of the cost to industry
White, G 2022, ‘Practical implications for the implementation of the new international aircraft pavement
strength rating system’, 11th International Conference on the Bearing Capacity of Roads, Railways and
Airfields, Trondheim, Norway, 28-30 June.
The ACN-PCN System
• In place since the 1981
• Simple in nature
• Relative damage of different aircraft
– Basis of comparison is stress
– Simple treatment of pavement
• Calculated in COMFAA
• ACN compared to PCN
• Tyre pressure compared to limit
The ACN-PCN System
• Setting a PCN is more challenging
– Equal to the highest ACN in the design aircraft
– Equal to the ACN or the plane that operates regularly
– Following a prescribed methodology like the FAA’s
PCN 46/F/B/1500/T
SUBGRADE PROTECTION
TYRE PRESSURE
SUBGRADE CATEGORY
FLEXIBLE (OR RIGID)
TECHNICAL (OR USAGE)
Changing to ACR-PCR
• Pavement thickness design is more sophisticated
• Differences can create anomalies
– Designed for aircraft with ACN 90
– But FAA process returns PCN 88
– Design aircraft can’t operate freely
• ICAO developed ACR-PCR (over 6 years)
– Same calculations as FAARFIELD (FAA design software)
– Reduces anomalies
– Introduced by member States by 2024
The New ACR-PCR System
• ACR (R = Rating) replaces the ACN
• PCR replaces PCN
• The new system is otherwise identical to ACN-PCN
• Calculation of the ACR
– Different subgrade categories
– Different ‘standard’ pavement
– Aligns the rigid and flexible subgrade categories
– Anomalies reduced but not avoided
• New FAA and ICAO softwares
The New ACR-PCR System
The New ACR-PCR System
If your subgrade CBR value is 9…….
Comparing ACN and ACR values
• ACR ≈ 10 × ACN
• To avoid confusing ACR and ACN
• But higher for rigid pavements
• Big differences for some aircraft
• Average ratio is 9.75
• Ratio ranges from 7.7 to 12.0
• So you can’t guess your new PCR
• That is, PCR ≠ 10 × PCN
Case Study 1 – Mudgee Airport
• PCN 12/F/C/Y/U – based on historical F27 usage
• Current critical aircraft Falcon 7X (ACN = 10)
• So reset the PCN after a technical evaluation
• PCN 10/F/C/X/T
• Convert to a PCR, based on the Falcon 7X ACR
• PCR 92/F/C/X/T
• Required and inspection and analysis of historical records
Case Study 2 – Birdsville Airport
• PCN 10/F/B/Y/U – basis not known
• Aspires to a greater strength rating
• Geotechnical investigation procured
• Subgrade CBR 9 (moves from subgrade B to C)
• Found to be suitable for Challenger CL 604 (ACR = 98)
• PCR will be 98/F/C/Y/T
• Required geotech, analysis and a report
Case Study 3 – Proserpine Airport
• Post (2017) upgrade PCN 58/F/A/X/T
• Geotech, construction records and basis of PCN well known
• PCN based on the A330-300
• Calculate the A330-300 ACR to be 754
• Set the PCR to 754/F/A/X/T
• Required the simply calculation of the A330-300 ACR value
Case Study 4 – Brisbane Airport
• New runway PCN 124/F/D/X/T
• International airport accommodating all aircraft
• PCN allows B777-300ER, A380, A350-900, etc
• Calculate the ACR of all the largest aircraft
• Using FAA methodology, PCR should be 1272
• B777-300ER ACR is only 1233
• Set the runway PCR to 1233/F/D/X/T
• Required ACR and PCR calculations using new FAARFIELD
The Cost to Industry
• Every airport with a PCN will need a PCR
• All published on the same day
• Many won’t know their subgrade CBR (5 and 9 change)
• Significant professional service cost
– 350 airports
– Range of analyses required
– Estimate $3.75 M
• When will CASA make the transition?
Conclusions
• ACN-PCN has served us well for decades
• Anomalies with modern pavement design have arisen
• ICAO changing to ACR-PCR by 2024
• Principles are the same
• But every airport with a PCN will need to determine a PCR
• Significant cost to the industry
• No significant benefit outside of the USA
• When will Australia make the transition?
QUESTIONS?
AAA Pavement & Lighting Forum, 26-27 May 2021, Gold Coast

More Related Content

What's hot

Bearing capacity ch#05(geotech)
Bearing capacity ch#05(geotech)Bearing capacity ch#05(geotech)
Bearing capacity ch#05(geotech)
Irfan Malik
 
pavement analysis
pavement analysis pavement analysis
pavement analysis
Saeed Badeli
 
Cold In-Place Recycling (Foamed Asphalt) PowerPoint
Cold In-Place Recycling (Foamed Asphalt) PowerPointCold In-Place Recycling (Foamed Asphalt) PowerPoint
Cold In-Place Recycling (Foamed Asphalt) PowerPoint
Dennis McElroy
 
Classification os soil
Classification os soilClassification os soil
Classification os soil
aasimnaeem
 
Lect 6 pavement design
Lect 6 pavement designLect 6 pavement design
Lect 6 pavement design
M Firdaus
 

What's hot (20)

Problems on bearing capacity of soil
Problems on bearing capacity of soilProblems on bearing capacity of soil
Problems on bearing capacity of soil
 
Taxiway design
Taxiway designTaxiway design
Taxiway design
 
Landing gear
Landing gearLanding gear
Landing gear
 
Cold mix asphalt
Cold mix asphaltCold mix asphalt
Cold mix asphalt
 
Stiffness matrix method for beam , examples ce525
Stiffness  matrix method for beam , examples   ce525Stiffness  matrix method for beam , examples   ce525
Stiffness matrix method for beam , examples ce525
 
Design of rigid pavements
Design of rigid pavementsDesign of rigid pavements
Design of rigid pavements
 
Design of isolated footing by ACI code
Design of isolated footing by ACI codeDesign of isolated footing by ACI code
Design of isolated footing by ACI code
 
Unit3 hbn
Unit3 hbnUnit3 hbn
Unit3 hbn
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
ETOPS - Extended Twinned Engine Operations
ETOPS - Extended Twinned Engine OperationsETOPS - Extended Twinned Engine Operations
ETOPS - Extended Twinned Engine Operations
 
Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL) Determining equivalent single wheel load.(ESWL)
Determining equivalent single wheel load.(ESWL)
 
Bearing capacity ch#05(geotech)
Bearing capacity ch#05(geotech)Bearing capacity ch#05(geotech)
Bearing capacity ch#05(geotech)
 
pavement analysis
pavement analysis pavement analysis
pavement analysis
 
Runways
RunwaysRunways
Runways
 
Cold In-Place Recycling (Foamed Asphalt) PowerPoint
Cold In-Place Recycling (Foamed Asphalt) PowerPointCold In-Place Recycling (Foamed Asphalt) PowerPoint
Cold In-Place Recycling (Foamed Asphalt) PowerPoint
 
Classification os soil
Classification os soilClassification os soil
Classification os soil
 
Ex 8 standard proctor test
Ex 8 standard proctor testEx 8 standard proctor test
Ex 8 standard proctor test
 
Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)Vertical alignment of highway (transportation engineering)
Vertical alignment of highway (transportation engineering)
 
17. AASHTO Rigid Pavement Design (Example).pptx
17. AASHTO Rigid  Pavement Design (Example).pptx17. AASHTO Rigid  Pavement Design (Example).pptx
17. AASHTO Rigid Pavement Design (Example).pptx
 
Lect 6 pavement design
Lect 6 pavement designLect 6 pavement design
Lect 6 pavement design
 

Similar to Changing from ACN-PCN to ACR-PCR.pdf

Raa.ftc.ev.in flightwifi
Raa.ftc.ev.in flightwifiRaa.ftc.ev.in flightwifi
Raa.ftc.ev.in flightwifi
dmcclatc
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan
 

Similar to Changing from ACN-PCN to ACR-PCR.pdf (20)

Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016, Crossrail - Integrated Assurance, 17 May 2016,
Crossrail - Integrated Assurance, 17 May 2016,
 
aiaa_2004-5192
aiaa_2004-5192aiaa_2004-5192
aiaa_2004-5192
 
Nyk and weather routing
Nyk and weather routingNyk and weather routing
Nyk and weather routing
 
Training On Mastery Of Amphibious Technology For The Development Of N219 Airc...
Training On Mastery Of Amphibious Technology For The Development Of N219 Airc...Training On Mastery Of Amphibious Technology For The Development Of N219 Airc...
Training On Mastery Of Amphibious Technology For The Development Of N219 Airc...
 
Aerodynamic forces
Aerodynamic forcesAerodynamic forces
Aerodynamic forces
 
Future Offshore Wind Energy Technology
Future Offshore Wind Energy TechnologyFuture Offshore Wind Energy Technology
Future Offshore Wind Energy Technology
 
Raa.ftc.ev.in flightwifi
Raa.ftc.ev.in flightwifiRaa.ftc.ev.in flightwifi
Raa.ftc.ev.in flightwifi
 
Flight Inspection practical.pptx
Flight Inspection practical.pptxFlight Inspection practical.pptx
Flight Inspection practical.pptx
 
CleanSky_overview
CleanSky_overviewCleanSky_overview
CleanSky_overview
 
Aviation - True North - Time to Change
Aviation - True North - Time to ChangeAviation - True North - Time to Change
Aviation - True North - Time to Change
 
radwanS CV AGL
radwanS CV AGLradwanS CV AGL
radwanS CV AGL
 
Ashish shrivastava engineering consultant
Ashish shrivastava engineering consultantAshish shrivastava engineering consultant
Ashish shrivastava engineering consultant
 
LPV aircraft certification. EGNOS workshop
LPV aircraft certification. EGNOS workshopLPV aircraft certification. EGNOS workshop
LPV aircraft certification. EGNOS workshop
 
Bell shape lift_distribution
Bell shape lift_distributionBell shape lift_distribution
Bell shape lift_distribution
 
CV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
 
Do We Really Need TSN in Next-Generation Helicopters? Insights From a Case-Study
Do We Really Need TSN in Next-Generation Helicopters? Insights From a Case-StudyDo We Really Need TSN in Next-Generation Helicopters? Insights From a Case-Study
Do We Really Need TSN in Next-Generation Helicopters? Insights From a Case-Study
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
Current research on simulations of flaoting offshore wind turbines
Current research on simulations of flaoting offshore wind turbinesCurrent research on simulations of flaoting offshore wind turbines
Current research on simulations of flaoting offshore wind turbines
 
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
NASA Crossflow Attenuated Natural Laminar Flow (CATNLF) CATNLF Flight Test Ad...
 
Ficha A4Vicus eng
Ficha A4Vicus engFicha A4Vicus eng
Ficha A4Vicus eng
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 

Changing from ACN-PCN to ACR-PCR.pdf

  • 1. Changing from ACN-PCN to ACR-PCR AAA Pavement & Lighting Forum, 26-27 May 2021, Gold Coast Greg White 0400 218 048 | gwhite2@usc.edu.au
  • 2. Introduction • Reminder of the ACN-PCN system • The change to ACR-PCR • The new ACR-PCR system • Comparing ACN and ACR values • Case studies on the transition • Estimate of the cost to industry White, G 2022, ‘Practical implications for the implementation of the new international aircraft pavement strength rating system’, 11th International Conference on the Bearing Capacity of Roads, Railways and Airfields, Trondheim, Norway, 28-30 June.
  • 3. The ACN-PCN System • In place since the 1981 • Simple in nature • Relative damage of different aircraft – Basis of comparison is stress – Simple treatment of pavement • Calculated in COMFAA • ACN compared to PCN • Tyre pressure compared to limit
  • 4. The ACN-PCN System • Setting a PCN is more challenging – Equal to the highest ACN in the design aircraft – Equal to the ACN or the plane that operates regularly – Following a prescribed methodology like the FAA’s PCN 46/F/B/1500/T SUBGRADE PROTECTION TYRE PRESSURE SUBGRADE CATEGORY FLEXIBLE (OR RIGID) TECHNICAL (OR USAGE)
  • 5. Changing to ACR-PCR • Pavement thickness design is more sophisticated • Differences can create anomalies – Designed for aircraft with ACN 90 – But FAA process returns PCN 88 – Design aircraft can’t operate freely • ICAO developed ACR-PCR (over 6 years) – Same calculations as FAARFIELD (FAA design software) – Reduces anomalies – Introduced by member States by 2024
  • 6. The New ACR-PCR System • ACR (R = Rating) replaces the ACN • PCR replaces PCN • The new system is otherwise identical to ACN-PCN • Calculation of the ACR – Different subgrade categories – Different ‘standard’ pavement – Aligns the rigid and flexible subgrade categories – Anomalies reduced but not avoided • New FAA and ICAO softwares
  • 8. The New ACR-PCR System If your subgrade CBR value is 9…….
  • 9. Comparing ACN and ACR values • ACR ≈ 10 × ACN • To avoid confusing ACR and ACN • But higher for rigid pavements • Big differences for some aircraft • Average ratio is 9.75 • Ratio ranges from 7.7 to 12.0 • So you can’t guess your new PCR • That is, PCR ≠ 10 × PCN
  • 10. Case Study 1 – Mudgee Airport • PCN 12/F/C/Y/U – based on historical F27 usage • Current critical aircraft Falcon 7X (ACN = 10) • So reset the PCN after a technical evaluation • PCN 10/F/C/X/T • Convert to a PCR, based on the Falcon 7X ACR • PCR 92/F/C/X/T • Required and inspection and analysis of historical records
  • 11. Case Study 2 – Birdsville Airport • PCN 10/F/B/Y/U – basis not known • Aspires to a greater strength rating • Geotechnical investigation procured • Subgrade CBR 9 (moves from subgrade B to C) • Found to be suitable for Challenger CL 604 (ACR = 98) • PCR will be 98/F/C/Y/T • Required geotech, analysis and a report
  • 12. Case Study 3 – Proserpine Airport • Post (2017) upgrade PCN 58/F/A/X/T • Geotech, construction records and basis of PCN well known • PCN based on the A330-300 • Calculate the A330-300 ACR to be 754 • Set the PCR to 754/F/A/X/T • Required the simply calculation of the A330-300 ACR value
  • 13. Case Study 4 – Brisbane Airport • New runway PCN 124/F/D/X/T • International airport accommodating all aircraft • PCN allows B777-300ER, A380, A350-900, etc • Calculate the ACR of all the largest aircraft • Using FAA methodology, PCR should be 1272 • B777-300ER ACR is only 1233 • Set the runway PCR to 1233/F/D/X/T • Required ACR and PCR calculations using new FAARFIELD
  • 14. The Cost to Industry • Every airport with a PCN will need a PCR • All published on the same day • Many won’t know their subgrade CBR (5 and 9 change) • Significant professional service cost – 350 airports – Range of analyses required – Estimate $3.75 M • When will CASA make the transition?
  • 15. Conclusions • ACN-PCN has served us well for decades • Anomalies with modern pavement design have arisen • ICAO changing to ACR-PCR by 2024 • Principles are the same • But every airport with a PCN will need to determine a PCR • Significant cost to the industry • No significant benefit outside of the USA • When will Australia make the transition?
  • 16. QUESTIONS? AAA Pavement & Lighting Forum, 26-27 May 2021, Gold Coast