This document provides details of a construction project to build 3 hostels and other works at the campus of BIT Sindri, Dhanbad in Jharkhand, India. The client is the Jharkhand State Building Construction Corporation Ltd. and the consultant is Mass N Void Design Consultants. M/S Niranjan Rai has been awarded the contract for 76.39 crore rupees to be completed by March 2025. The project involves constructing 3 hostel buildings up to 4 floors each to house 160 rooms and accommodate 320 students per building. Construction is currently underway with plinth work completed for all buildings and ground and first floor slab work in progress.
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Hostel Construction
1. Construction of 3 Nos. Hostel
and Other Work in the
Campus of BIT Sindri,
Dhanbad
Client:
Jharkhand State Building
Construction Corporation
Ltd.
Consultant:
Mass N Void Design
Consultants (A Pranav Group)
Agency:
M/S Niranjan Rai
Agreement No. – 06-SBD/2022-2023
Agreement Value – 76,39,80,420.00
Agreement Date – 14/03/2023
Completion Date – 13/03/2025
8. Project Area Statement
S.No Floor Level Super Builtup Area
(Sqm.)
Rooms Details
1 Ground Floor 3060 32 Rooms, Offices, Visitor Room’s, Store, Electrical Room, Toilets,
Dinning & Mess, Staff room,s
2 First Floor 2730 32 Room’s, Toilets, MultiPurpose Hall, TV Room, Electrical Room
3 Second Floor 1780 32 Room’s, Toilets, Electrical Room
4 Third Floor 1780 32 Room’s, Toilets, Electrical Room
5 Fourth Floor 1780 32 Room’s, Toilets, Electrical Room
Total Area 11,130 160 Room’s @ 320 students Capacity
9. Specification of Building
S.No Item Qty
1 Area of One Hostel 3059 Sqm.
2 Area of Three Hostel’s 9177 Sqm.
3 Capacity of One Building 320 Nos.
4 Capacity of Three Building’s 960 Nos.
5 Total Site Area 64,400 Sqm.
6 Super Built Up Area of One Building 11,130 Sqm.
7 Super Built Up Area of Three Building’s 33,390 Sqm.
8 Height of Building 19.8 Rmt.
9 Lift with 16 passenger capacity per Building 2 Nos.
10 Lift with 16 passenger capacity of three Building 6 Nos.
10. Hostel - 1
Front Side
Upto Plinth Work is Completed Ground Floor & First Slab Shuttering and Reinforcement Work is in progress
Back Side
11. Hostel - 2
Front Side
Back Side
Upto Plinth Work is Completed Ground & First Floor Slab Shuttering and Reinforcement Work is in progress
12. Hostel – 3
Front Side
Back Side
Upto Plinth Work is Completed Ground & First Floor Slab Shuttering and Reinforcement Work is in progress