SlideShare a Scribd company logo
1 of 1
Download to read offline
WorleyParsons RSA
31 Allen Drive
Loevenstein 7530
PO Box 398, Bellville 7535, South Africa
Telephone:+27 (0)21 912 3000
Facsimile: +27 (0)21 912 3222
www.worleyparsons.com
Incorporating KV3 ENGINEERS WorleyParsons RSA (Pty) Ltd ● REG NO: 1989/002048/07
Directors: ●SJB Bradie (GBR) ●MO Daly (GBR) ●RL Pearson (NZL) ●PJF Jacobs (CEO) ●DJ Dreyer ●AM September ●QMN Eister (Alt. Director)
Chairman: ●Dr FA Sonn
9 March 2012
Enquiries: T Wright
Other Ref:
Ref: 24212KD0
File:
Exeo Khokela Civil Engineering Construction (Pty) Ltd
PO Box 1232
Sanlamhof
7532
Attention : To whom it may concern
Dear Sir/Madam
LETTER OF REFERENCE FOR EXEO KHOKELA FOR THE CONSTRUCTION OF THE
DURBANVILLE CENTRAL COLLECTOR SEWER (PHASE 1)
The abovementioned project in Durbanville entailed the installation of a new 500 mm dia collector sewer with
a total length of ±3,000 meters through open trench excavation mainly in existing roads and restricted areas.
It further included the construction of 51 no. manholes, diversion of existing sewers into the new bulk sewer,
realignment of existing services, crossing of various roads and the rebuilding of roads complete with road
layers and kerbs. This required extensive liaison with local residents and continuous traffic accommodation
in residential areas.
The contract value at completion was ±R 11,95 million (excl. VAT) which, although higher than the original
contract value, was only due to an expanded scope of works, unforeseen additional work required and the
many difficulties encountered when working within in a built up area. The contract was completed
successfully within 8 months which is nearly 3 months less than the construction period of 48 weeks as
prescribed in their contract.
The quality of their work and the final product delivered to the Client was of an exceptionally high standard.
Their efficiency in critical situations is evidence of their competence to deliver a good quality product to the
satisfaction of the Client.
Exeo Khokela had a positive attitude during the entire contract period and eagerly assisted the Engineer and
Client to resolve unforeseen issues under testing circumstances. Their contracts manager, Mr Charles
Cooks, and site agent, Mr Terence Ismail, who were both directly involved with this project on a permanent
basis acted professionally throughout and conducted their tasks with diligence and pride.
Worley Parsons RSA would fully recommend Exeo Khokela in its capacity as civil engineering contractor for
similar construction projects in future.
Yours faithfully
WorleyParsons
JA Coetzee Pr Tech Eng

More Related Content

What's hot

Written Reference 2 - J L Kenyon and Son Plastering Ltd-1_signed
Written Reference 2 - J L Kenyon and Son Plastering Ltd-1_signedWritten Reference 2 - J L Kenyon and Son Plastering Ltd-1_signed
Written Reference 2 - J L Kenyon and Son Plastering Ltd-1_signedIsaac Kenyon
 
Fsi picco engineering stone and structural solutions v1
Fsi picco engineering stone and structural solutions v1Fsi picco engineering stone and structural solutions v1
Fsi picco engineering stone and structural solutions v1Blair Davies, P.Eng., M.B.A.
 
Intern operations project
Intern operations projectIntern operations project
Intern operations projectKidd Khazini
 
APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9
APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9
APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9John Russell
 
Letter of Recommendation - A Salyers
Letter of Recommendation - A SalyersLetter of Recommendation - A Salyers
Letter of Recommendation - A SalyersJames Rutherford
 
Plastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionPlastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionSimply Marcomms
 
Letter of Reference PR (1)
Letter of Reference PR (1)Letter of Reference PR (1)
Letter of Reference PR (1)Paul Russell
 
Recommendation Letter_Lee
Recommendation Letter_LeeRecommendation Letter_Lee
Recommendation Letter_LeeSeunghun Shin
 
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6eslam hussien
 
Joseph falkners resume
Joseph falkners resumeJoseph falkners resume
Joseph falkners resumejoseph falkner
 
Met Office Reference
Met Office ReferenceMet Office Reference
Met Office ReferenceJohn Roddy
 

What's hot (20)

Written Reference 2 - J L Kenyon and Son Plastering Ltd-1_signed
Written Reference 2 - J L Kenyon and Son Plastering Ltd-1_signedWritten Reference 2 - J L Kenyon and Son Plastering Ltd-1_signed
Written Reference 2 - J L Kenyon and Son Plastering Ltd-1_signed
 
Fsi picco engineering stone and structural solutions v1
Fsi picco engineering stone and structural solutions v1Fsi picco engineering stone and structural solutions v1
Fsi picco engineering stone and structural solutions v1
 
Intern operations project
Intern operations projectIntern operations project
Intern operations project
 
Steve Racher CV
Steve Racher CVSteve Racher CV
Steve Racher CV
 
APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9
APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9
APPROACH TO CLEARING NAILS AT BRYNGWYN WTW 9
 
GL&V
GL&VGL&V
GL&V
 
introduction
introductionintroduction
introduction
 
REFERENCE
REFERENCEREFERENCE
REFERENCE
 
ge
gege
ge
 
Letter of Recommendation - A Salyers
Letter of Recommendation - A SalyersLetter of Recommendation - A Salyers
Letter of Recommendation - A Salyers
 
Mohamed Adel Shams cv
Mohamed Adel Shams cvMohamed Adel Shams cv
Mohamed Adel Shams cv
 
Plastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for constructionPlastic surgeon cosmetic repairs for construction
Plastic surgeon cosmetic repairs for construction
 
Letter of Reference PR (1)
Letter of Reference PR (1)Letter of Reference PR (1)
Letter of Reference PR (1)
 
Recommendation Letter_Lee
Recommendation Letter_LeeRecommendation Letter_Lee
Recommendation Letter_Lee
 
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
ENP-YER-MTBE-SITE-T-15-0103 - YASREF Inspector Resume (Islam abdelrhman) 6
 
Joseph falkners resume
Joseph falkners resumeJoseph falkners resume
Joseph falkners resume
 
CV
CVCV
CV
 
Certificate Merlin
Certificate MerlinCertificate Merlin
Certificate Merlin
 
Met Office Reference
Met Office ReferenceMet Office Reference
Met Office Reference
 
VOILA TECHNICAL SERVICES (1)
VOILA TECHNICAL SERVICES (1)VOILA TECHNICAL SERVICES (1)
VOILA TECHNICAL SERVICES (1)
 

Similar to Contract_No._481Q_2010_11

Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017Bongani Mamkeli
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016Burger Rust
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1Kenny Hagan
 
Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Glenton Thomas
 
Construction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesConstruction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesSlideTeam
 
CVofAndrewMichaelBlairworkhistory
CVofAndrewMichaelBlairworkhistoryCVofAndrewMichaelBlairworkhistory
CVofAndrewMichaelBlairworkhistoryAndrew Blair
 
Curriculum_Vitae_Dave Horn 2016
Curriculum_Vitae_Dave Horn 2016Curriculum_Vitae_Dave Horn 2016
Curriculum_Vitae_Dave Horn 2016Dave Horn
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea
 
Construction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesConstruction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesSlideTeam
 
Tony Bradshaw CV Mott Mac 2015
Tony Bradshaw CV Mott Mac 2015Tony Bradshaw CV Mott Mac 2015
Tony Bradshaw CV Mott Mac 2015Tony Bradshaw
 
Key to a successful EGTL Site
Key to a successful EGTL SiteKey to a successful EGTL Site
Key to a successful EGTL SiteNick Tasker
 
HMF-Tender-Brochure-Email
HMF-Tender-Brochure-EmailHMF-Tender-Brochure-Email
HMF-Tender-Brochure-EmailStephanus Hyman
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume robbert1806
 

Similar to Contract_No._481Q_2010_11 (20)

Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017
 
Gavin Yates CV
Gavin Yates CVGavin Yates CV
Gavin Yates CV
 
Curriculum vitae 2016
Curriculum vitae 2016Curriculum vitae 2016
Curriculum vitae 2016
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
Bildspel
BildspelBildspel
Bildspel
 
btcv2015
btcv2015btcv2015
btcv2015
 
Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015
 
TAWANDA MAHLANGU CV.
TAWANDA MAHLANGU CV.TAWANDA MAHLANGU CV.
TAWANDA MAHLANGU CV.
 
Construction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation SlidesConstruction Bid Proposal Template PowerPoint Presentation Slides
Construction Bid Proposal Template PowerPoint Presentation Slides
 
CVofAndrewMichaelBlairworkhistory
CVofAndrewMichaelBlairworkhistoryCVofAndrewMichaelBlairworkhistory
CVofAndrewMichaelBlairworkhistory
 
Curriculum_Vitae_Dave Horn 2016
Curriculum_Vitae_Dave Horn 2016Curriculum_Vitae_Dave Horn 2016
Curriculum_Vitae_Dave Horn 2016
 
Richard Kildea. CV October 2016
Richard Kildea. CV October 2016Richard Kildea. CV October 2016
Richard Kildea. CV October 2016
 
Bothar brochure
Bothar brochureBothar brochure
Bothar brochure
 
George Christie CV
George Christie CVGeorge Christie CV
George Christie CV
 
Construction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation SlidesConstruction Work Schedule Proposal PowerPoint Presentation Slides
Construction Work Schedule Proposal PowerPoint Presentation Slides
 
Tony Bradshaw CV Mott Mac 2015
Tony Bradshaw CV Mott Mac 2015Tony Bradshaw CV Mott Mac 2015
Tony Bradshaw CV Mott Mac 2015
 
Key to a successful EGTL Site
Key to a successful EGTL SiteKey to a successful EGTL Site
Key to a successful EGTL Site
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
HMF-Tender-Brochure-Email
HMF-Tender-Brochure-EmailHMF-Tender-Brochure-Email
HMF-Tender-Brochure-Email
 
Robert W Kapp Resume
Robert W Kapp Resume Robert W Kapp Resume
Robert W Kapp Resume
 

Contract_No._481Q_2010_11

  • 1. WorleyParsons RSA 31 Allen Drive Loevenstein 7530 PO Box 398, Bellville 7535, South Africa Telephone:+27 (0)21 912 3000 Facsimile: +27 (0)21 912 3222 www.worleyparsons.com Incorporating KV3 ENGINEERS WorleyParsons RSA (Pty) Ltd ● REG NO: 1989/002048/07 Directors: ●SJB Bradie (GBR) ●MO Daly (GBR) ●RL Pearson (NZL) ●PJF Jacobs (CEO) ●DJ Dreyer ●AM September ●QMN Eister (Alt. Director) Chairman: ●Dr FA Sonn 9 March 2012 Enquiries: T Wright Other Ref: Ref: 24212KD0 File: Exeo Khokela Civil Engineering Construction (Pty) Ltd PO Box 1232 Sanlamhof 7532 Attention : To whom it may concern Dear Sir/Madam LETTER OF REFERENCE FOR EXEO KHOKELA FOR THE CONSTRUCTION OF THE DURBANVILLE CENTRAL COLLECTOR SEWER (PHASE 1) The abovementioned project in Durbanville entailed the installation of a new 500 mm dia collector sewer with a total length of ±3,000 meters through open trench excavation mainly in existing roads and restricted areas. It further included the construction of 51 no. manholes, diversion of existing sewers into the new bulk sewer, realignment of existing services, crossing of various roads and the rebuilding of roads complete with road layers and kerbs. This required extensive liaison with local residents and continuous traffic accommodation in residential areas. The contract value at completion was ±R 11,95 million (excl. VAT) which, although higher than the original contract value, was only due to an expanded scope of works, unforeseen additional work required and the many difficulties encountered when working within in a built up area. The contract was completed successfully within 8 months which is nearly 3 months less than the construction period of 48 weeks as prescribed in their contract. The quality of their work and the final product delivered to the Client was of an exceptionally high standard. Their efficiency in critical situations is evidence of their competence to deliver a good quality product to the satisfaction of the Client. Exeo Khokela had a positive attitude during the entire contract period and eagerly assisted the Engineer and Client to resolve unforeseen issues under testing circumstances. Their contracts manager, Mr Charles Cooks, and site agent, Mr Terence Ismail, who were both directly involved with this project on a permanent basis acted professionally throughout and conducted their tasks with diligence and pride. Worley Parsons RSA would fully recommend Exeo Khokela in its capacity as civil engineering contractor for similar construction projects in future. Yours faithfully WorleyParsons JA Coetzee Pr Tech Eng