SlideShare a Scribd company logo
1 of 8
CURRICULUM VITAE
for
GAVIN JOHN YATES
HOME ADDRESS : 12 Ostend Avenue
Thornhill Estate, Modderfontein, 1645,
Johannesburg, Gauteng, South Africa
HOME TELEPHONE No : +27 11 608-0857 (H)
FACSIMILE No : N/A
POSTAL ADDRESS : P.O. Box 2366
Edenvale, 1610,
Johannesburg, Gauteng, South Africa
WORK ADDRESS : SABMiller Drive, Harbour Industrial Layout, Bridge Head,
Off Atani Road, Onitsha, Anambra State,
Nigeria
TELEPHONE No : +234 703 547 7613 (W)
FACSIMILE No : N/A (W)
MOBILE PHONE No’s : +27 82 569-8643 (Private) & +234 703 547 7613 (Work)
EMAIL ADDRESS : Gavin.Yates@ng.sabmiller.com (Work)
EMAIL ADDRESS : gavin.yates@worldonline.co.za (Private)
PERSONNEL DATA: -
SURNAME : Yates
FIRST NAMES : Gavin John
IDENTITY NUMBER : 590707 5022 088
DATE OF BIRTH : 07 July 1959
SEX : Male
MARITAL STATUS : Married
DEPENDANTS : Bianca Leigh & Paula Lorraine Yates.
DRIVER'S LICENCE : Yes, code 08
NATIONALITY : South African
HOME LANGUAGE : English
OTHER LANGUAGES : Afrikaans (speaks, and understands)
FULLY BILINGUAL : My written Afrikaans is not equal to my written English
MILITARY SERVICE : Completed. No further obligations
CRIMINAL OFFENCES : None
HEALTH : Excellent
EDUCATIONAL QUALIFICATIONS: -
- PAGE 2 -
LAST SCHOOL ATTENDED : Jan de Klerk (Technical High School)
HIGHEST STD PASSED : Standard 9
SUBJECTS PASSED : English, Afrikaans, Mathematics, Science, Geography, Biology and
Workshops.
HIGHER EDUCATION : Johannesburg Technical College
TECHNICAL DIPLOMA : N.T.C. 1 to N.T.C. 6
COURSES UNDERTAKEN : AutoCAD Rel 10, 11, 12, 13, 14, 2000, 2002 & 2004,
Autoplant 3d Isometric Generator, Ramp 3D Modelling
Packaging, MSAccess 4.0, MSProjects 98 Version 8.0,
MSProject 2000 to 2003 & MSOffice 2010 Packages.
EMPLOYMENT HISTORY: -
COMPANY NAME : INTERNATIONAL BREWERIES Plc (SABMiller Africa & Asia).
(17/05/2015 – Present)
CURRENT POSITION : Projects / Construction Site Manager - Supervisor (6.1).
MAIN JOB FUNCTIONS : Took over from the incumbent Projects Manager due to his
retirement. I took responsibility for the 8 off remaining
Project from him to see them through to final handover to the
Region.
Contracts Values ranged from = ±1.2 to ±2.3 Million (USD).
Further to the above I am now responsible for ALL future
Projects at the Ilesha Brewing Facility. This involves budget
control, planning and final handover to the Client. In addition to
this I handle ALL Project related HSE issues with the regional
and contractors representatives. Issuing of ALL Projects related
‘Work Permits’. Tracking of ALL of the contractors on Site and
their adherence to programmes to ensure that the programmed
dates met in accordance with Clients expectations.
Contracts Values = ±1.8 to ±3.5 Million (USD).
REFERENCES : Mr. Clayton Kimber.
Mobile No. +234 814 689 9158 (Nigeria).
Email: - Clayton.Kimber@sabmiller.com (Work).
: Mr. Andrew Ross.
Mobile No. +234 812 913 0405 (Nigeria).
Email: - Andrew.Ross@ng.sabmiller.com (Work).
COMPANY NAME : INTAFACT BEVERAGES LIMITED (SABMiller Africa & Asia).
(01/02/2014 – 16/05/2015)
CURRENT POSITION : Construction Manager / Supervisor (6.1).
- PAGE 3 -
MAIN JOB FUNCTIONS : Am the incumbent Construction Manager responsible for
the Civil / Mechanical for ALL construction for the upgrade to
the brewing facility in Onitsha, Anambra State, Nigeria. I will be
working and consulting Aurecon, the designated resident
civil engineers on ALL the civil construction tasks being carried
out by Vita Construction Limited and their appointed sub-
contractors. Handle ALL SHE issues with the regional and
contractors representatives. Issuing of ALL Projects related
‘Work Permits’. Tracking of ALL of the contractors on Site
and their adherence to programmes to ensure that the ‘First Beer’
date is met in accordance with Clients expectations.
Contract Value = ±120 Million (USD).
REFERENCES : Mr. Clayton Kimber.
Mobile No. +234 814 689 9158 (Nigeria).
Email: - Clayton.Kimber@sabmiller.com (Work).
COMPANY NAME : FALCON ENGINEERING (PTY) LTD.
(07/05/2013 – 31/01/2013)
MAIN JOB FUNCTIONS : I am currently fulfilling the role & responsibilities of an
Operations Manager in the fabrication facility. My main role is to
draw up MSProject Plans for the fabrication of stainless steel
vessels for the Pharmaceutical, Mining and Food & Beverage
Industries. The Company are busy completing 10 Off SAF 2205
Stainless Steel Vessels for a mining concern in the Congo. Contract
Value’s range from ±6.3 up to ±18.75 Million (ZAR).
REFERENCES : Mr. Clarrie Parkins.
Tel No. +27 11 455-4900 (W).
Cell No. +27 83 627-3100.
Emails: - falcon@falconeng.com or falcon@global.co.za
COMPANY NAME : ZAMBIAN BREWERIES plc. (SABMiller Africa & Asia).
(01/11/2011 – 30/04/2013)
CURRENT POSITION : Construction Manager / Supervisor (6.1).
MAIN JOB FUNCTIONS : Set up the HUB Construction Camp at the Ndola facility.
Handle ALL SHE issues with the regional representatives both in
Ndola and the Lusaka facilities. Conducting the ‘Inductions’ of
ALL construction staff for the Project, in parallel with the region
SHE representatives. Issuing of ALL Projects related ‘Work
Permits’. Tracking of ALL of the contractors on Site and their
adherence to pre-defined programmes to ensure that the ‘First
Beer’ date is met in accordance with Clients expectations.
Contract Value = ±90 Million (USD).
REFERENCES : Mr. Harry Joelson.
Tel No. +27 11 453-5145 (H).
Cell No. +27 82 804-3873 (H).
Email: - harryj@iafrica.com (H).
COMPANY NAME : FALCON ENGINEERING (SA) (PTY) LTD.
(13/03/2006 – 30/10/2011)
MAIN JOB FUNCTIONS : Drawing up MSProject Plans for the fabrication of stainless
steel vessels for the Food & Beverage Industries. I have been
extensively involved in the implementation of various New
Developments in this field. I was the designated 16. (2) for this
Company on the Witbank Site Erection of 7 Off Vessels ranging
from 6.5m diameter up to 12m diameter and between 7.5m up to
- PAGE 4 -
12m in height. This project was brought to completion within the
companies’ budget. My next posting was as the Site Works
Manager at NamPak Corrugated in Rosslyn Pretoria where the
Company is busy with Site Erection of Ldx 2101 Vessels with
diameters from 5.3m to 8.5m and heights of between 11.6m to
13.6m. Current posting is at Multotec Wear Linings – Tshwane on
the on Site Erection of the D500 Spray Dryer and Support
Steelwork. My last Project was on the in works fabrication of
Stainless Steel Pressure Vessels for the Medupi Project in Elisrus
for Eskom. I have also managed various other Sites and Projects
for Falcon Engineering (Pty) Ltd.
Contract Value’s ranged from ±4.5 up to 48 Million (ZAR).
REFERENCES : Mr. Clarrie Parkins.
Tel No. +27 11 455-4900 (W).
Cell No. +27 83 627-3100.
Emails: - falcon@falconeng.com or falcon@global.co.za
COMPANY NAME : HIGH-TECH PROCESSING.
(01/01/2006 – 10/03/2006)
MAIN JOB FUNCTIONS : Currently busy with designs for the modifications to the
Raw Materials Handling Plant for the URSUS Breweries at their
Buzau Facility in Romania. Reason for leaving so soon was an
agreement between the MD’s of this company and Falcon that my
services would be better suited to Falcon.
REFERENCES : Mr. W. Tucker.
Tel No. +27 11 805-5737 (W).
Cell No. +27 83 650 5763.
Email: - wtucker@processing.co.za
COMPANY NAME : SAB – CHAMDOR F03, F04, F05 & F06 PROJECTS.
(01/11/2003 – 31/12/2005)
MAIN JOB FUNCTIONS : Received an “in-house” promotion to the position of
Contractor / Construction Manager in charge of ALL Project
activities for F03, F04, F05 & F06 Projects within the Production
Facility in Chamdor.
REFERENCES : Mr. V. Keys, Mr. R. Parsotam, Mr. T. Coleman & Mr. G. Maud
Tel No. +27 11 951-2600 (W).
COMPANY NAME : SAB – CHAMDOR PROJECT SUNBIRD, HIGHVELD & LOCAL
HERO.
(22/11/2002 – 31/10/2003)
MAIN JOB FUNCTIONS : On my return to SAB - Chamdor Brewery, my function was
to do ALL the Planning for Project “SUNBIRD”, “HIGHVELD”,
“LOCAL HERO” and the Minor F03 & F04 Projects currently on the
go at the Production Facility in Chamdor.
REFERENCES : Mr. P. Moodliar
Tel No. +27 82 924-2132 (W).
- PAGE 5 -
COMPANY NAME : KELLOGG BROWN & ROOT, SOUTH AFRICA
(01/08/2002 – 21/11/2002)
MAIN JOB FUNCTIONS : Joined the Company in the capacity of Senior Designer on
the Proposed Relocation of the VIVO Brewing Facility to Bom-Jesus
in Angola. I was instrumental in the Plant Layout working closely
with the Brewing Consultants at SABMiller PLC. Unfortunately the
Project was shelved.
REFERENCES : Mr. Gordon Hedley.
Tel No. +27 82 602-4335 (H).
COMPANY NAME : BHUKKA CC – DESIGN & ENGINEERING
(01/12/2001 – 31/07/2002)
MAIN JOB FUNCTIONS : Functioning as a Senior Design Piping Draughtsman &
Checker. Designing / Checking Piping Systems for SAPPI – Enstra
Mill and Ondeo Nalco water treatment and their Client base. I was
given some in-house training on the draughting packages MStation
Version 8 and PDS.
REFERENCES : Mr. Eddie J Fee .
Cell No. +27 83 452-1231.
COMPANY NAME : SAB – CHAMDOR PROJECT “EXTRACT IMPROVEMENT”
(01/05/2001 – 30/11/2001)
MAIN JOB FUNCTIONS : Functioned as the Project Planner for ALL the Contractors
at the Chamdor Site, using MSProjects 2000. I also fulfilled the
function of Project/Construction Engineer and managed the Main
Piping Contractor in conjunction with the SAB Regional
Representatives assigned to the Brewhouse Extract Improvement
Project. In addition to the above there were various Minor Regional
Projects being run at the same time, I was responsible for Project
Planning on these as well.
REFERENCES : Mr. C Tucker +27 11 389-1115 (W).
Mr. J Roseveare +27 82 921-8001 (W).
COMPANY NAME : SAB – CHAMDOR PROJECT “ORANGE”
(01/01/2000 – 30/04/2001)
MAIN JOB FUNCTIONS : My Main task on this Project was the Planning Functions
for all the Major Contractors on site reporting to the Construction,
Project Managers and discipline Engineers on their progress
against their fixed Cash Flow. Lastly I was involved in the
Mechanical Catalogues issued from the contractors to the Region. I
worked closely with the SAB Documentation personnel in
incorporating the Mechanical Catalogues into the Chamdor SAP
PDM System and assisted the Region personnel in setting up a
Documentation Library and getting all the Drawings done to the
SAB Specification EDS 001 & EGS 001. These were then done to
an “As Built” status, and incorporated into the PDM System.
REFERENCES : Mr. C Tucker Tel No. +27 11 389-1115 (W).
Mr. V Keys Tel No. +27 11 951-2673 (W).
Mr. J Du Plooy Tel No. +27 11 951-2600 (W).
- PAGE 6 -
COMPANY NAME : SAB – ALRODE LINE 8 PROJECT
(12/04/1999 – 31/12/1999)
MAIN JOB FUNCTIONS : My first task on this Project was to do an Audit on the entire
Municipal Water Supply to the Brewery. I had to generate full P & I
Diagrams with Pressure / Temperature & Flow Ratings from
Instruments in the field. I then took over the Planning Functions for
all the Major Contractors on site and generated monthly reports for
the Project Manager and Senior Cost Engineer. These reports also
had to be done every 3 to 4 months for the Project Steering
Committee at SAB’s Central Office for the Directors. Lastly I was
involved in the Mechanical Catalogues issued from the contractors
to the Region. I worked closely with the SAB Documentation
personnel in incorporating the Mechanical Catalogues into the
Alrode Library and getting all the Drawings done on the Project to
an “As Built” status, and onto the File Server.
REFERENCES : Mr. C Tucker Tel No.+27 11 389-1115 (W).
Mr. D Govender Cell No. +27 83 393-0636 (W).
COMPANY NAME : HALLIBURTON - BROWN & ROOT, SOUTH AFRICA
(20/01/1997 – 11/04/1999)
MAIN JOB FUNCTIONS : Started as a Design Draughtsman on the SAB – JUMBO
Kenyan Brewery Re-Location Project. Was involved with the
Utilities Portion of this Project. Due to a resource shortage I was
given the Process Portion of the Project. This entailed the
generation of both the PFD’s and P&ID’s on AutoCAD Rel 13 for
Windows. Worked closely on the Designs with Process Engineers
and developed Equipment, Line and Valve Lists on MSExcel. I then
started on generating Piping General Arrangements, also using
AutoCAD Rel 13. Then progressed onto AutoCAD Rel 14. The last
+/-6 months was spent doing the tasks of a Site / Project Engineer
working with the ME&I Contractor assisting on how the Brewery
was going to be stripped, in Garankua, to allow an effective and
quick Re-Installation of the Brewery in Thika, Kenya. I then
completed the Project by compiling the Process Mechanical
Catalogues, Electrical and Instrumentation Catalogues and closing
out the Project.
REFERENCES : Mr. Gordon Hedley.
Tel No. +27 82 602-4335 (H).
COMPANY NAME : MECS TECHNICAL SERVICES (PTY) LTD
(01/05/1995 – 19/01/1997)
MAIN JOB FUNCTIONS : Started on the Alrode / Chamdor Brewery Fixed Asset
Management Registers where I worked closely with a Programmer
to design a link with AutoCAD and MSAccess. So once the
drawings were tagged we ran this link LISP which automatically
started the Asset Register front end to enable the financial people
to begin the re-valuation of the said facility. I then went on the
MSAccess Course at the ISU Campus for Computer Training. This
training was put into practice by designing a Database which will
allow the user obtain Pressure Vessel, Equipment List and a
Drawing Register.
REFERENCES : Mr Eddie J Fee.
Tel No. +27 83 452-1231 (H).
- PAGE 7 -
COMPANY NAME : SOUTH AFRICAN BREWERIES – Central Office
(20/01/1988 - 30/04/1995)
MAIN JOB FUNCTIONS : Started on the Rosslyn Project and did all the
drawing/isometric's for the wort cooling in the brewhouse. Went on
an AutoCAD Course during December 1989. I have been doing
CAD drawing work since then. I am currently working on AutoCAD
REL 12 and a 3D Modelling packaged known as RAMP. I have
designed a Yeast Collection and Pitching Plant using the above-
mentioned CAD packages. I put together the Drawing Register
utilising the Microsoft Office Suite of MSAccess, MSExcel, MSWord
and MSPowerpoint. I also did the Fixed Asset Management
Registers for the Newlands and Butterworth Breweries. The Overall
Site Plan was put together using the Model / Paper Space utility
within AutoCAD Rel 12 for Windows.
REFERENCES : Mr Colin Tucker.
Tel No. +27 11 389-1115 (W)
COMPANY NAME : A.E.C.I LIMITED
(01/11/1986 – 19/01/1988)
MAIN JOB FUNCTIONS : Worked in the Pinelands Design Drawing Office on the
Midlands Factory Up-Grade. Involvement on this Project was to do
the Drawings to Tie-in the New (VCM) Acid Plant into the Existing.
This entailed a lot of Site Drawing work to be done. All the Isometric
work was done on the Intergraph CAD System and Issued to me for
Checking.
REFERENCES : Mr. Eddie Fee
Tel No. +27 83 452-1231 (H)
COMPANY NAME : TEMPO ENGINEERING (PTY) LTD
(01/07/1986 - 31/10/1986)
MAIN JOB FUNCTIONS : Worked as an assistant Works Manager. My duties
involved the day to day running of an engineering works as well as
all the drawing work required by the works. At the time of leaving
the Company I was promoted to Works Manager.
REFERENCES : Mr. Bill Lawrence
Tel No. +27 11 422-2005 (W)
Cell No. +27 82 854-3441.
COMPANY NAME : KEMPLANT (PTY) LTD
(01/01/1984 - 30/06/1986)
MAIN JOB FUNCTIONS : Involved in the plant layout and design of evaporator and
effluent plant. General arrangements and designs of pipework,
steelwork and uncoded vessels. Design and detailing of pressure
vessels. Capable of working with ASME VIII and TEMA
Specifications. Responsible for minimal administrative duties, e.g.
ordering of all drawing office supplies and dealing with suppliers
representatives.
REFERENCES : Mr. George Vasiloudis and Mr. Graham Crowe
Tel No. +27 11 804-1560 (W)
Cell No. +27 82 774-3211 and +27 82 295-7990 respectively.
COMPANY NAME : DORBYL PROJECTS & CONSTRUCTION (PTY) LTD
- PAGE 8 -
(01/11/1978 - 31/12/1983)
MAIN JOB FUNCTIONS : Started as a Trainee Draughtsman, advanced to post of
Junior Site Engineer. Twelve months site experience, involved in
the Commissioning of Bag Filter Plant at Samancor and Gas
Producer at Consol Glass - Olifontein Works. Layouts, Details and
Isometrics for a Forge Plant and Gas Producer. Also did some
Layout and Details for Structural Steelwork.

More Related Content

What's hot

Dennis Cagle Resume Builder
Dennis Cagle Resume BuilderDennis Cagle Resume Builder
Dennis Cagle Resume BuilderDennis Cagle
 
English JRG-CV Rev_Compact withphoto
English JRG-CV Rev_Compact withphotoEnglish JRG-CV Rev_Compact withphoto
English JRG-CV Rev_Compact withphotoJavier Rerjis
 
Sam Barton 2 Revised Dec. Resume
Sam Barton 2 Revised Dec. ResumeSam Barton 2 Revised Dec. Resume
Sam Barton 2 Revised Dec. ResumeSam Barton
 
Weldon Engineers, India, Cooling Tower & Scale Off
Weldon Engineers, India, Cooling Tower & Scale OffWeldon Engineers, India, Cooling Tower & Scale Off
Weldon Engineers, India, Cooling Tower & Scale OffIndiaMART InterMESH Limited
 
Lawrence Resume 07-07-2016 master
Lawrence Resume 07-07-2016 masterLawrence Resume 07-07-2016 master
Lawrence Resume 07-07-2016 masterLawrence Reythen
 
General Contractor Resume
General Contractor ResumeGeneral Contractor Resume
General Contractor ResumeAlicia Uecker
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux
 
TEODULO DE VILLA AXALAN -APPLICANT
TEODULO DE VILLA AXALAN -APPLICANTTEODULO DE VILLA AXALAN -APPLICANT
TEODULO DE VILLA AXALAN -APPLICANTTeodulo Axalan
 

What's hot (19)

Harley's CV1
Harley's  CV1Harley's  CV1
Harley's CV1
 
Dereque D.w-ref
Dereque D.w-refDereque D.w-ref
Dereque D.w-ref
 
Dennis Cagle Resume Builder
Dennis Cagle Resume BuilderDennis Cagle Resume Builder
Dennis Cagle Resume Builder
 
RESUME_080615_FLUOR
RESUME_080615_FLUORRESUME_080615_FLUOR
RESUME_080615_FLUOR
 
Gennaro Palmieri
Gennaro PalmieriGennaro Palmieri
Gennaro Palmieri
 
English JRG-CV Rev_Compact withphoto
English JRG-CV Rev_Compact withphotoEnglish JRG-CV Rev_Compact withphoto
English JRG-CV Rev_Compact withphoto
 
Sam Barton 2 Revised Dec. Resume
Sam Barton 2 Revised Dec. ResumeSam Barton 2 Revised Dec. Resume
Sam Barton 2 Revised Dec. Resume
 
resume_BFR
resume_BFRresume_BFR
resume_BFR
 
Weldon Engineers, India, Cooling Tower & Scale Off
Weldon Engineers, India, Cooling Tower & Scale OffWeldon Engineers, India, Cooling Tower & Scale Off
Weldon Engineers, India, Cooling Tower & Scale Off
 
Modern resume
Modern resumeModern resume
Modern resume
 
Resume
ResumeResume
Resume
 
updated CV 2016
updated CV 2016updated CV 2016
updated CV 2016
 
Resumè
ResumèResumè
Resumè
 
new power point profil
new power point profilnew power point profil
new power point profil
 
Lawrence Resume 07-07-2016 master
Lawrence Resume 07-07-2016 masterLawrence Resume 07-07-2016 master
Lawrence Resume 07-07-2016 master
 
Ron Brown
Ron BrownRon Brown
Ron Brown
 
General Contractor Resume
General Contractor ResumeGeneral Contractor Resume
General Contractor Resume
 
Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6Benoit Giroux - CV2015 English Linkedin no page 6
Benoit Giroux - CV2015 English Linkedin no page 6
 
TEODULO DE VILLA AXALAN -APPLICANT
TEODULO DE VILLA AXALAN -APPLICANTTEODULO DE VILLA AXALAN -APPLICANT
TEODULO DE VILLA AXALAN -APPLICANT
 

Similar to Gavin Yates CV

Similar to Gavin Yates CV (20)

Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017Bongani Mamkeli CV Rev.Jan2017
Bongani Mamkeli CV Rev.Jan2017
 
Edd resume April 2020
Edd resume  April 2020 Edd resume  April 2020
Edd resume April 2020
 
Background
BackgroundBackground
Background
 
Leonard Riczu Resume
Leonard Riczu ResumeLeonard Riczu Resume
Leonard Riczu Resume
 
Contract_No._481Q_2010_11
Contract_No._481Q_2010_11Contract_No._481Q_2010_11
Contract_No._481Q_2010_11
 
Resume of ken hagan. 1
Resume of ken hagan. 1Resume of ken hagan. 1
Resume of ken hagan. 1
 
Project Manger Resume
Project Manger ResumeProject Manger Resume
Project Manger Resume
 
CV D Schroeder 2016
CV D Schroeder 2016CV D Schroeder 2016
CV D Schroeder 2016
 
Edd resume march 2019
Edd resume march 2019Edd resume march 2019
Edd resume march 2019
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
Harsh Assistant Manager
Harsh Assistant ManagerHarsh Assistant Manager
Harsh Assistant Manager
 
CVofAndrewMichaelBlairworkhistory
CVofAndrewMichaelBlairworkhistoryCVofAndrewMichaelBlairworkhistory
CVofAndrewMichaelBlairworkhistory
 
GY Capability Profile
GY Capability ProfileGY Capability Profile
GY Capability Profile
 
CV - HV-1
CV - HV-1CV - HV-1
CV - HV-1
 
CV MIKE ALLEN2015
CV MIKE ALLEN2015CV MIKE ALLEN2015
CV MIKE ALLEN2015
 
ZAATHI PROFILE inside#
ZAATHI PROFILE inside#ZAATHI PROFILE inside#
ZAATHI PROFILE inside#
 
Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015Goss and Balfe Presentation 1974-Jan 2015
Goss and Balfe Presentation 1974-Jan 2015
 
Farrington
FarringtonFarrington
Farrington
 
Dimick, Glen Resume_Summary_July 2016
Dimick, Glen Resume_Summary_July 2016Dimick, Glen Resume_Summary_July 2016
Dimick, Glen Resume_Summary_July 2016
 
cecillo CV
cecillo CVcecillo CV
cecillo CV
 

Gavin Yates CV

  • 1. CURRICULUM VITAE for GAVIN JOHN YATES HOME ADDRESS : 12 Ostend Avenue Thornhill Estate, Modderfontein, 1645, Johannesburg, Gauteng, South Africa HOME TELEPHONE No : +27 11 608-0857 (H) FACSIMILE No : N/A POSTAL ADDRESS : P.O. Box 2366 Edenvale, 1610, Johannesburg, Gauteng, South Africa WORK ADDRESS : SABMiller Drive, Harbour Industrial Layout, Bridge Head, Off Atani Road, Onitsha, Anambra State, Nigeria TELEPHONE No : +234 703 547 7613 (W) FACSIMILE No : N/A (W) MOBILE PHONE No’s : +27 82 569-8643 (Private) & +234 703 547 7613 (Work) EMAIL ADDRESS : Gavin.Yates@ng.sabmiller.com (Work) EMAIL ADDRESS : gavin.yates@worldonline.co.za (Private) PERSONNEL DATA: - SURNAME : Yates FIRST NAMES : Gavin John IDENTITY NUMBER : 590707 5022 088 DATE OF BIRTH : 07 July 1959 SEX : Male MARITAL STATUS : Married DEPENDANTS : Bianca Leigh & Paula Lorraine Yates. DRIVER'S LICENCE : Yes, code 08 NATIONALITY : South African HOME LANGUAGE : English OTHER LANGUAGES : Afrikaans (speaks, and understands) FULLY BILINGUAL : My written Afrikaans is not equal to my written English MILITARY SERVICE : Completed. No further obligations CRIMINAL OFFENCES : None HEALTH : Excellent EDUCATIONAL QUALIFICATIONS: -
  • 2. - PAGE 2 - LAST SCHOOL ATTENDED : Jan de Klerk (Technical High School) HIGHEST STD PASSED : Standard 9 SUBJECTS PASSED : English, Afrikaans, Mathematics, Science, Geography, Biology and Workshops. HIGHER EDUCATION : Johannesburg Technical College TECHNICAL DIPLOMA : N.T.C. 1 to N.T.C. 6 COURSES UNDERTAKEN : AutoCAD Rel 10, 11, 12, 13, 14, 2000, 2002 & 2004, Autoplant 3d Isometric Generator, Ramp 3D Modelling Packaging, MSAccess 4.0, MSProjects 98 Version 8.0, MSProject 2000 to 2003 & MSOffice 2010 Packages. EMPLOYMENT HISTORY: - COMPANY NAME : INTERNATIONAL BREWERIES Plc (SABMiller Africa & Asia). (17/05/2015 – Present) CURRENT POSITION : Projects / Construction Site Manager - Supervisor (6.1). MAIN JOB FUNCTIONS : Took over from the incumbent Projects Manager due to his retirement. I took responsibility for the 8 off remaining Project from him to see them through to final handover to the Region. Contracts Values ranged from = ±1.2 to ±2.3 Million (USD). Further to the above I am now responsible for ALL future Projects at the Ilesha Brewing Facility. This involves budget control, planning and final handover to the Client. In addition to this I handle ALL Project related HSE issues with the regional and contractors representatives. Issuing of ALL Projects related ‘Work Permits’. Tracking of ALL of the contractors on Site and their adherence to programmes to ensure that the programmed dates met in accordance with Clients expectations. Contracts Values = ±1.8 to ±3.5 Million (USD). REFERENCES : Mr. Clayton Kimber. Mobile No. +234 814 689 9158 (Nigeria). Email: - Clayton.Kimber@sabmiller.com (Work). : Mr. Andrew Ross. Mobile No. +234 812 913 0405 (Nigeria). Email: - Andrew.Ross@ng.sabmiller.com (Work). COMPANY NAME : INTAFACT BEVERAGES LIMITED (SABMiller Africa & Asia). (01/02/2014 – 16/05/2015) CURRENT POSITION : Construction Manager / Supervisor (6.1).
  • 3. - PAGE 3 - MAIN JOB FUNCTIONS : Am the incumbent Construction Manager responsible for the Civil / Mechanical for ALL construction for the upgrade to the brewing facility in Onitsha, Anambra State, Nigeria. I will be working and consulting Aurecon, the designated resident civil engineers on ALL the civil construction tasks being carried out by Vita Construction Limited and their appointed sub- contractors. Handle ALL SHE issues with the regional and contractors representatives. Issuing of ALL Projects related ‘Work Permits’. Tracking of ALL of the contractors on Site and their adherence to programmes to ensure that the ‘First Beer’ date is met in accordance with Clients expectations. Contract Value = ±120 Million (USD). REFERENCES : Mr. Clayton Kimber. Mobile No. +234 814 689 9158 (Nigeria). Email: - Clayton.Kimber@sabmiller.com (Work). COMPANY NAME : FALCON ENGINEERING (PTY) LTD. (07/05/2013 – 31/01/2013) MAIN JOB FUNCTIONS : I am currently fulfilling the role & responsibilities of an Operations Manager in the fabrication facility. My main role is to draw up MSProject Plans for the fabrication of stainless steel vessels for the Pharmaceutical, Mining and Food & Beverage Industries. The Company are busy completing 10 Off SAF 2205 Stainless Steel Vessels for a mining concern in the Congo. Contract Value’s range from ±6.3 up to ±18.75 Million (ZAR). REFERENCES : Mr. Clarrie Parkins. Tel No. +27 11 455-4900 (W). Cell No. +27 83 627-3100. Emails: - falcon@falconeng.com or falcon@global.co.za COMPANY NAME : ZAMBIAN BREWERIES plc. (SABMiller Africa & Asia). (01/11/2011 – 30/04/2013) CURRENT POSITION : Construction Manager / Supervisor (6.1). MAIN JOB FUNCTIONS : Set up the HUB Construction Camp at the Ndola facility. Handle ALL SHE issues with the regional representatives both in Ndola and the Lusaka facilities. Conducting the ‘Inductions’ of ALL construction staff for the Project, in parallel with the region SHE representatives. Issuing of ALL Projects related ‘Work Permits’. Tracking of ALL of the contractors on Site and their adherence to pre-defined programmes to ensure that the ‘First Beer’ date is met in accordance with Clients expectations. Contract Value = ±90 Million (USD). REFERENCES : Mr. Harry Joelson. Tel No. +27 11 453-5145 (H). Cell No. +27 82 804-3873 (H). Email: - harryj@iafrica.com (H). COMPANY NAME : FALCON ENGINEERING (SA) (PTY) LTD. (13/03/2006 – 30/10/2011) MAIN JOB FUNCTIONS : Drawing up MSProject Plans for the fabrication of stainless steel vessels for the Food & Beverage Industries. I have been extensively involved in the implementation of various New Developments in this field. I was the designated 16. (2) for this Company on the Witbank Site Erection of 7 Off Vessels ranging from 6.5m diameter up to 12m diameter and between 7.5m up to
  • 4. - PAGE 4 - 12m in height. This project was brought to completion within the companies’ budget. My next posting was as the Site Works Manager at NamPak Corrugated in Rosslyn Pretoria where the Company is busy with Site Erection of Ldx 2101 Vessels with diameters from 5.3m to 8.5m and heights of between 11.6m to 13.6m. Current posting is at Multotec Wear Linings – Tshwane on the on Site Erection of the D500 Spray Dryer and Support Steelwork. My last Project was on the in works fabrication of Stainless Steel Pressure Vessels for the Medupi Project in Elisrus for Eskom. I have also managed various other Sites and Projects for Falcon Engineering (Pty) Ltd. Contract Value’s ranged from ±4.5 up to 48 Million (ZAR). REFERENCES : Mr. Clarrie Parkins. Tel No. +27 11 455-4900 (W). Cell No. +27 83 627-3100. Emails: - falcon@falconeng.com or falcon@global.co.za COMPANY NAME : HIGH-TECH PROCESSING. (01/01/2006 – 10/03/2006) MAIN JOB FUNCTIONS : Currently busy with designs for the modifications to the Raw Materials Handling Plant for the URSUS Breweries at their Buzau Facility in Romania. Reason for leaving so soon was an agreement between the MD’s of this company and Falcon that my services would be better suited to Falcon. REFERENCES : Mr. W. Tucker. Tel No. +27 11 805-5737 (W). Cell No. +27 83 650 5763. Email: - wtucker@processing.co.za COMPANY NAME : SAB – CHAMDOR F03, F04, F05 & F06 PROJECTS. (01/11/2003 – 31/12/2005) MAIN JOB FUNCTIONS : Received an “in-house” promotion to the position of Contractor / Construction Manager in charge of ALL Project activities for F03, F04, F05 & F06 Projects within the Production Facility in Chamdor. REFERENCES : Mr. V. Keys, Mr. R. Parsotam, Mr. T. Coleman & Mr. G. Maud Tel No. +27 11 951-2600 (W). COMPANY NAME : SAB – CHAMDOR PROJECT SUNBIRD, HIGHVELD & LOCAL HERO. (22/11/2002 – 31/10/2003) MAIN JOB FUNCTIONS : On my return to SAB - Chamdor Brewery, my function was to do ALL the Planning for Project “SUNBIRD”, “HIGHVELD”, “LOCAL HERO” and the Minor F03 & F04 Projects currently on the go at the Production Facility in Chamdor. REFERENCES : Mr. P. Moodliar Tel No. +27 82 924-2132 (W).
  • 5. - PAGE 5 - COMPANY NAME : KELLOGG BROWN & ROOT, SOUTH AFRICA (01/08/2002 – 21/11/2002) MAIN JOB FUNCTIONS : Joined the Company in the capacity of Senior Designer on the Proposed Relocation of the VIVO Brewing Facility to Bom-Jesus in Angola. I was instrumental in the Plant Layout working closely with the Brewing Consultants at SABMiller PLC. Unfortunately the Project was shelved. REFERENCES : Mr. Gordon Hedley. Tel No. +27 82 602-4335 (H). COMPANY NAME : BHUKKA CC – DESIGN & ENGINEERING (01/12/2001 – 31/07/2002) MAIN JOB FUNCTIONS : Functioning as a Senior Design Piping Draughtsman & Checker. Designing / Checking Piping Systems for SAPPI – Enstra Mill and Ondeo Nalco water treatment and their Client base. I was given some in-house training on the draughting packages MStation Version 8 and PDS. REFERENCES : Mr. Eddie J Fee . Cell No. +27 83 452-1231. COMPANY NAME : SAB – CHAMDOR PROJECT “EXTRACT IMPROVEMENT” (01/05/2001 – 30/11/2001) MAIN JOB FUNCTIONS : Functioned as the Project Planner for ALL the Contractors at the Chamdor Site, using MSProjects 2000. I also fulfilled the function of Project/Construction Engineer and managed the Main Piping Contractor in conjunction with the SAB Regional Representatives assigned to the Brewhouse Extract Improvement Project. In addition to the above there were various Minor Regional Projects being run at the same time, I was responsible for Project Planning on these as well. REFERENCES : Mr. C Tucker +27 11 389-1115 (W). Mr. J Roseveare +27 82 921-8001 (W). COMPANY NAME : SAB – CHAMDOR PROJECT “ORANGE” (01/01/2000 – 30/04/2001) MAIN JOB FUNCTIONS : My Main task on this Project was the Planning Functions for all the Major Contractors on site reporting to the Construction, Project Managers and discipline Engineers on their progress against their fixed Cash Flow. Lastly I was involved in the Mechanical Catalogues issued from the contractors to the Region. I worked closely with the SAB Documentation personnel in incorporating the Mechanical Catalogues into the Chamdor SAP PDM System and assisted the Region personnel in setting up a Documentation Library and getting all the Drawings done to the SAB Specification EDS 001 & EGS 001. These were then done to an “As Built” status, and incorporated into the PDM System. REFERENCES : Mr. C Tucker Tel No. +27 11 389-1115 (W). Mr. V Keys Tel No. +27 11 951-2673 (W). Mr. J Du Plooy Tel No. +27 11 951-2600 (W).
  • 6. - PAGE 6 - COMPANY NAME : SAB – ALRODE LINE 8 PROJECT (12/04/1999 – 31/12/1999) MAIN JOB FUNCTIONS : My first task on this Project was to do an Audit on the entire Municipal Water Supply to the Brewery. I had to generate full P & I Diagrams with Pressure / Temperature & Flow Ratings from Instruments in the field. I then took over the Planning Functions for all the Major Contractors on site and generated monthly reports for the Project Manager and Senior Cost Engineer. These reports also had to be done every 3 to 4 months for the Project Steering Committee at SAB’s Central Office for the Directors. Lastly I was involved in the Mechanical Catalogues issued from the contractors to the Region. I worked closely with the SAB Documentation personnel in incorporating the Mechanical Catalogues into the Alrode Library and getting all the Drawings done on the Project to an “As Built” status, and onto the File Server. REFERENCES : Mr. C Tucker Tel No.+27 11 389-1115 (W). Mr. D Govender Cell No. +27 83 393-0636 (W). COMPANY NAME : HALLIBURTON - BROWN & ROOT, SOUTH AFRICA (20/01/1997 – 11/04/1999) MAIN JOB FUNCTIONS : Started as a Design Draughtsman on the SAB – JUMBO Kenyan Brewery Re-Location Project. Was involved with the Utilities Portion of this Project. Due to a resource shortage I was given the Process Portion of the Project. This entailed the generation of both the PFD’s and P&ID’s on AutoCAD Rel 13 for Windows. Worked closely on the Designs with Process Engineers and developed Equipment, Line and Valve Lists on MSExcel. I then started on generating Piping General Arrangements, also using AutoCAD Rel 13. Then progressed onto AutoCAD Rel 14. The last +/-6 months was spent doing the tasks of a Site / Project Engineer working with the ME&I Contractor assisting on how the Brewery was going to be stripped, in Garankua, to allow an effective and quick Re-Installation of the Brewery in Thika, Kenya. I then completed the Project by compiling the Process Mechanical Catalogues, Electrical and Instrumentation Catalogues and closing out the Project. REFERENCES : Mr. Gordon Hedley. Tel No. +27 82 602-4335 (H). COMPANY NAME : MECS TECHNICAL SERVICES (PTY) LTD (01/05/1995 – 19/01/1997) MAIN JOB FUNCTIONS : Started on the Alrode / Chamdor Brewery Fixed Asset Management Registers where I worked closely with a Programmer to design a link with AutoCAD and MSAccess. So once the drawings were tagged we ran this link LISP which automatically started the Asset Register front end to enable the financial people to begin the re-valuation of the said facility. I then went on the MSAccess Course at the ISU Campus for Computer Training. This training was put into practice by designing a Database which will allow the user obtain Pressure Vessel, Equipment List and a Drawing Register. REFERENCES : Mr Eddie J Fee. Tel No. +27 83 452-1231 (H).
  • 7. - PAGE 7 - COMPANY NAME : SOUTH AFRICAN BREWERIES – Central Office (20/01/1988 - 30/04/1995) MAIN JOB FUNCTIONS : Started on the Rosslyn Project and did all the drawing/isometric's for the wort cooling in the brewhouse. Went on an AutoCAD Course during December 1989. I have been doing CAD drawing work since then. I am currently working on AutoCAD REL 12 and a 3D Modelling packaged known as RAMP. I have designed a Yeast Collection and Pitching Plant using the above- mentioned CAD packages. I put together the Drawing Register utilising the Microsoft Office Suite of MSAccess, MSExcel, MSWord and MSPowerpoint. I also did the Fixed Asset Management Registers for the Newlands and Butterworth Breweries. The Overall Site Plan was put together using the Model / Paper Space utility within AutoCAD Rel 12 for Windows. REFERENCES : Mr Colin Tucker. Tel No. +27 11 389-1115 (W) COMPANY NAME : A.E.C.I LIMITED (01/11/1986 – 19/01/1988) MAIN JOB FUNCTIONS : Worked in the Pinelands Design Drawing Office on the Midlands Factory Up-Grade. Involvement on this Project was to do the Drawings to Tie-in the New (VCM) Acid Plant into the Existing. This entailed a lot of Site Drawing work to be done. All the Isometric work was done on the Intergraph CAD System and Issued to me for Checking. REFERENCES : Mr. Eddie Fee Tel No. +27 83 452-1231 (H) COMPANY NAME : TEMPO ENGINEERING (PTY) LTD (01/07/1986 - 31/10/1986) MAIN JOB FUNCTIONS : Worked as an assistant Works Manager. My duties involved the day to day running of an engineering works as well as all the drawing work required by the works. At the time of leaving the Company I was promoted to Works Manager. REFERENCES : Mr. Bill Lawrence Tel No. +27 11 422-2005 (W) Cell No. +27 82 854-3441. COMPANY NAME : KEMPLANT (PTY) LTD (01/01/1984 - 30/06/1986) MAIN JOB FUNCTIONS : Involved in the plant layout and design of evaporator and effluent plant. General arrangements and designs of pipework, steelwork and uncoded vessels. Design and detailing of pressure vessels. Capable of working with ASME VIII and TEMA Specifications. Responsible for minimal administrative duties, e.g. ordering of all drawing office supplies and dealing with suppliers representatives. REFERENCES : Mr. George Vasiloudis and Mr. Graham Crowe Tel No. +27 11 804-1560 (W) Cell No. +27 82 774-3211 and +27 82 295-7990 respectively. COMPANY NAME : DORBYL PROJECTS & CONSTRUCTION (PTY) LTD
  • 8. - PAGE 8 - (01/11/1978 - 31/12/1983) MAIN JOB FUNCTIONS : Started as a Trainee Draughtsman, advanced to post of Junior Site Engineer. Twelve months site experience, involved in the Commissioning of Bag Filter Plant at Samancor and Gas Producer at Consol Glass - Olifontein Works. Layouts, Details and Isometrics for a Forge Plant and Gas Producer. Also did some Layout and Details for Structural Steelwork.