SlideShare a Scribd company logo
1 of 2
Dear Gentlemen,

We have come across your details from website and learn about the activities and works experience in
the field of petroleum engineering projects.

Please be informed, our company and associates are involved in different segments of business,
among those, Agency, Representation, and Tender Consultancy are being conducted by one of our
company Global Consulting Services. We have experience to work with the overseas suppliers,
manufacturers and contractors in the following sectors: (narrated briefly)

    1. Railways: Supplied engineering items, locomotive spare parts, workshop equipment and
         permanent way materials to Bangladesh Railway; Our Principal and manufacturers were from
         Germany, U.S.A., Belgium and U.K.

    2. Water supply and Sewerage System: Supply, Erection and Commissioning of heavy duty
         raw water VT pumps, (surface water), under turnkey contract to Chittagong WASA (water and
         sewerage authority). Manufacturer, supplier, erection and commissioning was done by
         Kirloskar Brothers Limited, Pune-India.

    3. Steel Mills: Supplied and installed 24nos. continuous duty pumps to the reputed steel mills
         with spare and warranty maintenance.

    4. Irrigation pumps: marketed substantial quantity of irrigation mono bloc pumps under rural
         electrification board programmed through dealer’s network across the country;

    5. Experienced in participating many tenders of engineering products, Water supply project
         works pumps, electric motors, spare parts etc.. to the government and public sectors, some of
         those with successful completion.

Please be informed, The Government of Bangladesh, intends to modernize her only crude petroleum
refinery. As sequence of the project implementation, goes for global invitation for: “EXPRESSION OF
INTEREST FOR FINANCING, BMRE Project of the EASTERN REFINERY”.

Basic concept of BMRE: To increase its present capacity from 1.5million TPA to 4.5million TPA The
feasibility study indicates that estimated cost of BMRE project is US$867.00million for the capacity of
3.00 million metric tons per annum. Out of which US$709.00 million will be in foreign currency and
remaining US$158.00 million in local currency. The financial and economic analysis have been carried
out for ERL BMRE project considering three different crude and crude mix processing options. The
result of financial and economic analysis show that the project is highly attractive. The project
generates an after tax return on fixed capital cost of 16.6% (20year average), while IFRR & IERR are
around 20% and 23.5% respectively. The average annual foreign currency saving is US$220 million.
The payback period of the investment is 4.5 years. For smooth transfer of crude oil a single point
mooring and submarine pipe line are being constructed to connect the refinery storage. For SPM
project, selection of Consultant is under process and expected completion time of SPM project is
December 2012.

Now the executing agency, on behalf of the GOB, invited proposal from global interested sources to
submit proposal for financing this BMRE project on any of the following options:

    1)       Build-Own-Operate & Transfer (BOOT)
    2)       Public Private Partnership (PPP)
    3)       Financing only
    4)       Any other suitable option.
The Expressions of Interest to be submitted by 10th August, 2010.
We are looking for a competent company / organization / financer, interested to participate in this giant
project. For your kind information we are maintaining good liaison and connections with the Concerned
Ministry, Lead Agency and the higher ups and confident to work in this project with the team, as local
associate.

We await your response in this matter.

Thanks and Regards
Quazi Shamsud Tarique
Global Consulting Services
“Commercial Court” (5th floor)
95, Agrabad C/A
Chittagong-4100, Bangladesh.
Tel:880-31-720292, 713215, 725722
Fax:880-31-710066
e-mail:qstbiz@gmail.com; mumtazuddinahmed@msn.com

More Related Content

Viewers also liked

Universidad tecnica de ambato
Universidad tecnica de ambatoUniversidad tecnica de ambato
Universidad tecnica de ambato
dianapazminio
 
Survival kills risk assesment.2
Survival kills risk assesment.2Survival kills risk assesment.2
Survival kills risk assesment.2
Lolaasmedia
 
โครงงานพัฒนาพิกุลทอง
โครงงานพัฒนาพิกุลทองโครงงานพัฒนาพิกุลทอง
โครงงานพัฒนาพิกุลทอง
benya2013
 

Viewers also liked (12)

צעד ירוק- סיכומים ותובנות- שנת תשע''ד
צעד ירוק- סיכומים ותובנות- שנת תשע''דצעד ירוק- סיכומים ותובנות- שנת תשע''ד
צעד ירוק- סיכומים ותובנות- שנת תשע''ד
 
Yr 11 Light It Up Projects
Yr 11 Light It Up ProjectsYr 11 Light It Up Projects
Yr 11 Light It Up Projects
 
Circunferencia y seccion aurea
Circunferencia y seccion aureaCircunferencia y seccion aurea
Circunferencia y seccion aurea
 
Personal Objects
Personal ObjectsPersonal Objects
Personal Objects
 
день української писемності і мови
день української писемності і мовидень української писемності і мови
день української писемності і мови
 
Universidad tecnica de ambato
Universidad tecnica de ambatoUniversidad tecnica de ambato
Universidad tecnica de ambato
 
Survival kills risk assesment.2
Survival kills risk assesment.2Survival kills risk assesment.2
Survival kills risk assesment.2
 
Top 5 Elevator Scenes from Movies
Top 5 Elevator Scenes from MoviesTop 5 Elevator Scenes from Movies
Top 5 Elevator Scenes from Movies
 
โครงงานพัฒนาพิกุลทอง
โครงงานพัฒนาพิกุลทองโครงงานพัฒนาพิกุลทอง
โครงงานพัฒนาพิกุลทอง
 
Heroes
HeroesHeroes
Heroes
 
Estate slide show
Estate slide showEstate slide show
Estate slide show
 
Lol
LolLol
Lol
 

Similar to Global cs ltr

Charles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalphaCharles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalpha
Charlie Graham Twin-c
 
Charles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqpCharles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqp
Charlie Graham Twin-c
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
Empowerhosting
 
11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject
Ian Garbutt
 
NewBase 594 special 30 April 2015
NewBase 594 special 30 April  2015NewBase 594 special 30 April  2015
NewBase 594 special 30 April 2015
Khaled Al Awadi
 

Similar to Global cs ltr (20)

Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
GCC Oil and Gas Industry Report
GCC Oil and Gas Industry ReportGCC Oil and Gas Industry Report
GCC Oil and Gas Industry Report
 
Chad cameroon pipeline project
Chad cameroon pipeline projectChad cameroon pipeline project
Chad cameroon pipeline project
 
Charles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalphaCharles grahamfulldetaliedreportseekingalpha
Charles grahamfulldetaliedreportseekingalpha
 
Charles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqpCharles grahamfulldetaliedreportseekingalphacqp
Charles grahamfulldetaliedreportseekingalphacqp
 
New base 06 february 2021 energy news issue 1403 by khaled al awadi
New base 06 february  2021 energy news issue   1403  by khaled al awadiNew base 06 february  2021 energy news issue   1403  by khaled al awadi
New base 06 february 2021 energy news issue 1403 by khaled al awadi
 
Personal statement on implementation of arror and kimwarer dams in emc
Personal statement on implementation of arror and kimwarer dams in emcPersonal statement on implementation of arror and kimwarer dams in emc
Personal statement on implementation of arror and kimwarer dams in emc
 
A Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
 
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
 
A New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing MineralsA New Separation Technology to Process Tantalite Bearing Minerals
A New Separation Technology to Process Tantalite Bearing Minerals
 
Joint Venture Proposal for Dredging Works in India
Joint Venture Proposal for Dredging Works in IndiaJoint Venture Proposal for Dredging Works in India
Joint Venture Proposal for Dredging Works in India
 
11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject11337 CameronFctShts_LiquefactionProject
11337 CameronFctShts_LiquefactionProject
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
 
Infrastructure financing guide india netz capital
Infrastructure financing guide india netz capitalInfrastructure financing guide india netz capital
Infrastructure financing guide india netz capital
 
A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...A Basic Guide to infrastructure business development investment and financing...
A Basic Guide to infrastructure business development investment and financing...
 
PROJECT PROFILE AKWAN
PROJECT PROFILE AKWANPROJECT PROFILE AKWAN
PROJECT PROFILE AKWAN
 
NewBase 594 special 30 April 2015
NewBase 594 special 30 April  2015NewBase 594 special 30 April  2015
NewBase 594 special 30 April 2015
 
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
Public Private Partnerships. Infrastructure Projects Plan in Indonesia.
 
DABHOL POWER COMPANY, INDIA
DABHOL POWER COMPANY,  INDIADABHOL POWER COMPANY,  INDIA
DABHOL POWER COMPANY, INDIA
 

Recently uploaded

Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Recently uploaded (20)

COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Interdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptxInterdisciplinary_Insights_Data_Collection_Methods.pptx
Interdisciplinary_Insights_Data_Collection_Methods.pptx
 
OSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & SystemsOSCM Unit 2_Operations Processes & Systems
OSCM Unit 2_Operations Processes & Systems
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptxHMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
HMCS Vancouver Pre-Deployment Brief - May 2024 (Web Version).pptx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Plant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptxPlant propagation: Sexual and Asexual propapagation.pptx
Plant propagation: Sexual and Asexual propapagation.pptx
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Towards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptxTowards a code of practice for AI in AT.pptx
Towards a code of practice for AI in AT.pptx
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 

Global cs ltr

  • 1. Dear Gentlemen, We have come across your details from website and learn about the activities and works experience in the field of petroleum engineering projects. Please be informed, our company and associates are involved in different segments of business, among those, Agency, Representation, and Tender Consultancy are being conducted by one of our company Global Consulting Services. We have experience to work with the overseas suppliers, manufacturers and contractors in the following sectors: (narrated briefly) 1. Railways: Supplied engineering items, locomotive spare parts, workshop equipment and permanent way materials to Bangladesh Railway; Our Principal and manufacturers were from Germany, U.S.A., Belgium and U.K. 2. Water supply and Sewerage System: Supply, Erection and Commissioning of heavy duty raw water VT pumps, (surface water), under turnkey contract to Chittagong WASA (water and sewerage authority). Manufacturer, supplier, erection and commissioning was done by Kirloskar Brothers Limited, Pune-India. 3. Steel Mills: Supplied and installed 24nos. continuous duty pumps to the reputed steel mills with spare and warranty maintenance. 4. Irrigation pumps: marketed substantial quantity of irrigation mono bloc pumps under rural electrification board programmed through dealer’s network across the country; 5. Experienced in participating many tenders of engineering products, Water supply project works pumps, electric motors, spare parts etc.. to the government and public sectors, some of those with successful completion. Please be informed, The Government of Bangladesh, intends to modernize her only crude petroleum refinery. As sequence of the project implementation, goes for global invitation for: “EXPRESSION OF INTEREST FOR FINANCING, BMRE Project of the EASTERN REFINERY”. Basic concept of BMRE: To increase its present capacity from 1.5million TPA to 4.5million TPA The feasibility study indicates that estimated cost of BMRE project is US$867.00million for the capacity of 3.00 million metric tons per annum. Out of which US$709.00 million will be in foreign currency and remaining US$158.00 million in local currency. The financial and economic analysis have been carried out for ERL BMRE project considering three different crude and crude mix processing options. The result of financial and economic analysis show that the project is highly attractive. The project generates an after tax return on fixed capital cost of 16.6% (20year average), while IFRR & IERR are around 20% and 23.5% respectively. The average annual foreign currency saving is US$220 million. The payback period of the investment is 4.5 years. For smooth transfer of crude oil a single point mooring and submarine pipe line are being constructed to connect the refinery storage. For SPM project, selection of Consultant is under process and expected completion time of SPM project is December 2012. Now the executing agency, on behalf of the GOB, invited proposal from global interested sources to submit proposal for financing this BMRE project on any of the following options: 1) Build-Own-Operate & Transfer (BOOT) 2) Public Private Partnership (PPP) 3) Financing only 4) Any other suitable option. The Expressions of Interest to be submitted by 10th August, 2010.
  • 2. We are looking for a competent company / organization / financer, interested to participate in this giant project. For your kind information we are maintaining good liaison and connections with the Concerned Ministry, Lead Agency and the higher ups and confident to work in this project with the team, as local associate. We await your response in this matter. Thanks and Regards Quazi Shamsud Tarique Global Consulting Services “Commercial Court” (5th floor) 95, Agrabad C/A Chittagong-4100, Bangladesh. Tel:880-31-720292, 713215, 725722 Fax:880-31-710066 e-mail:qstbiz@gmail.com; mumtazuddinahmed@msn.com