Key takeaways
Continuous improvement
can help energy companies
temper the effects of
market downturns and
position them to perform
even better in favorable
markets.
Continuous improvement
involves all levels of
employees working together
to streamline work and
reduce waste.
Companies using continuous
improvement achieved a
measurable benefits in
many different steps of
their value stream.
Continuous improvement
helps identify inefficiencies
or pain points and develop
high impact and fast
improvements.
Upstream optimization:
How continuous improvement methods
are having a positive impact on production
reliability and driving down cost
Oil and Gas
May 2015
For the energy industry, swings in supply and demand are a normal part of doing
business. Understandably, in times of low prices many companies look to cut costs and
increase efficiency.
As companies look to make those improvements, many successfully apply continuous
improvement methods to save money and eliminate waste. But, while continuous
improvement can be quite useful when plummeting prices focus management attention
on cost savings, this methodology is essential to energy companies looking to
grow and sustain a cost management discipline throughout the complete supply-and-
demand cycle.
Continuous improvement, a process for relentless waste elimination, involves all
levels of employees working together to streamline work and reduce non-value-added
activities and evolves constantly to proactively address broad marketplace conditions
as well as individual steps in the production process. Continuous improvement has
long been an essential part of the Lean1
toolkit, but in our experience it has not been
as effectively and consistently applied in the oil and gas industry as it could be, thus
not achieving the impact experienced in other industries. We believe that applying
continuous improvement techniques could not only help energy companies temper the
The experiences of four energy industry companies show how continuous
improvement techniques can produce measureable benefits, including improved
on-time work order completion, cost savings, increased productivity, inventory
reductions, and improved process effectiveness.
Jorge Mastellari and CJ Renegar
NEW PATHS TO PROFIT/ABILITYTM
1 Lean is a method focused on ongoing efforts to eliminate waste and activities that don’t add value from design,
manufacturing, distribution, and customer service processes.
2 Upstream optimization
effects of market downturns but also position them to perform even better when more
favorable market conditions return. Against that backdrop, we offer four examples of
energy companies that have employed continuous improvement methods to address
various performance issues and the benefits they realized by doing so.
By employing aspects of continuous improvement to various activities, these four
companies achieved measureable benefits in areas such as on-time work order
completion, cost savings, improved productivity, inventory reductions, and improved
process effectiveness.
Improving results by increasing accountability through Leader
Standard Work
The challenge: The leader of a base-maintenance organization recognized that
front-line managers’ roles and responsibilities were unclear and critical work-streams
lacked accountability. Key performance indicators such as schedule compliance,
work-order backlog, and overall labor cost were falling short of the mark and trending
downward. A continuous improvement team engaged by the leader to assess the
organization’s daily duties and processes identified several areas of concern, including:
• High-performance weeks happened by chance. There was little understanding of
the reasons for the good performance, so the same results were difficult to repeat.
• Front-line leaders spent only 10 to 20 percent of their time actively leading at the
work site. The remainder of their time was spent in their offices “fighting fires” or
dealing with exception reports.
• Many important tasks were executed inconsistently across similar roles with large
variations in quality.	
• Work standards were not being adhered to or weren’t understood. With a high
turnover rate, new supervisor development was inadequate.
The action: To address the issues, the continuous improvement team organized half-
day workshops with front-line managers taking a Leader Standard Work approach—
essentially the creation of checklists of leadership activities to be conducted on a
regular basis. During the workshops, the managers examined their daily and weekly
tasks to identify those that were critical to meeting objectives. The managers then
used that information to build their own “K Cards,” standard work cards on which
they scheduled essential daily tasks, with an emphasis on spending as much time in
the field or shop as possible and aligning the supervisor’s schedule with production
3 Upstream optimization
schedules, union breaks, and important meetings. A visual management board was
designed and placed at the maintenance leaders’ office to track KPIs, match periodic
managers’ activities with improvements, and peer-audit completion of tasks
on K-cards.
The results:
The company’s supervisors
now spend
of their time in the field
compared with 20 percent
earlier.
On-time work order
completion improved by
20%
in just 90 days.
And new supervisors
now learn daily routines and
what is expected of them in
days
rather than weeks.
Contractor productivity
increased by
15%
in the same period.
60%
Eliminating non-value added activities to achieve contractor cost reduction
The challenge: A company leader at an oil sands site believed there might be cost-
saving opportunities in the operations associated with removing gypsum and
ash from adjacent ponds and relocating or hauling the material to another facility
or customer. A contractor was responsible for the operations and management
of 50 subcontractors and their equipment, including road haulage trucks, 5 to
6 backhoes and front loaders, and 2 dragline excavators. The leader asked a
continuous improvement team to assess the operations.
The action: The team observed the process several times over the course of a week.
The team also reviewed contracts, invoices, and daily operator logs; completed an
end-to-end value stream map of the operation and identified process waste and
constraints; and met with the customer receiving the gypsum and ash to identify
delivery requirements. The continuous improvement team recommended several
actions to the leader, and then the customer, contractor, and supplier met in a
workshop to develop waste reduction methods.
The assessment led to several process improvements. Among them:
• Gypsum was hauled directly from the pond to the customer after two days instead
of repositioning it to another on-site area. The change eliminated the need for six
operators, a backhoe, and a front loader.
4 Upstream optimization
• The customer began providing weekly email orders and monthly forecasts
specifying how much gypsum it would need. The information went to the supplier’s
logistics coordinator, who determined if a contract was needed for the next 28-day
cycle. As a result, operations were suspended for three months while the customer
reduced excess inventory.
• Contractor operations and contracts were combined to share resources across
multiple ponds instead of relying on separate resources and contracts for each pond.
The results:
reduction in
direct costs
reduction in assets
required by
the contractor
reduction in
customer lead
time
reduction in
inventory
40% 33% 33% 70%
Exhibit 1: Continuous improvement results in improved contractor cycle time
Process before
continuous improvement
Value added
Cycle time =
3 hours
Cycle time =
2 hours
Process after
continuous improvement
Non value
added
5 Upstream optimization
Using Overall Equipment Effectiveness to improve reliability and utilization
The challenge: A process engineer saw management’s frustration with an oil
extraction plant’s inability to meet monthly production targets. The operation
suffered from the absence of any fact-based method of setting priorities for
improvement efforts in the plant; in many cases, reports from maintenance,
operations, and reliability were contradictory. Other issues included:
• Multiple groups using their own data;
• A lack of overall trust in other’s data;
• Inconsistent availability calculations that were not categorized by asset or
equipment; and
• Information on other factors such as start-up time, maintenance waiting
time, and lack of ore to extract was not captured.
Exhibit 2: Overall Equipment Effectiveness methodology improves reliability and utilization
Extraction plant: Downtime analysis
Availability = 80%
Performance = 82%
Quality = 99%
Overall equipment effectiveness = 65%
Capacity
Tonnes, hour
Sch Mtce Un Sch Mtce
Availability loss
Actual operating time
versus capacity = 80%
Performance loss
Actual throughput versus
operating capacity = 82%
Operating
capacity
Mine
losses
Downstream
losses
Prod plan
loss
Actual
production
Un Sch
Process
6 Upstream optimization
The action: Working with a continuous improvement team, the process engineer
identified a way to track the overall process using Overall Equipment Effectiveness
(OEE) methodology.2
They collected data through daily operation log sheets. After
two months of collecting data, they presented their findings to the operations general
manager. After several meetings they developed a new methodology and began
setting priorities based on the analysis.
Among the solutions implemented were:
• Daily reporting of reasons for missed hourly targets;
• Monthly A3 reports3
with charts showing top maintenance downtime areas and
actions to mitigate the downtime;
• Staging of maintenance supplies nearer conveyors to reduce downtime; and
• Identification of three continuous improvement projects regarding reducing
maintenance start-up time and improving crusher uptime.
The results:
After 90 days, a focus on key processes resulted in the extraction plant’s OEE score improving from
to
a considerable improvement in such a short period.
65% 72%
2 Overall Equipment Effectiveness (OEE) is a hierarchy of metrics used to determine how effectively a manufacturing
operation is utilized.
3 Concise two-page reports that derive their name from the paper size.
7 Upstream optimization
De-bottlenecking through end-to-end value stream mapping
and optimization
The challenge: The leadership team of an energy company’s upstream operation
sought to increase daily output from its mine operations and extraction plants by
getting them to work together more effectively and to reduce inefficiencies such
as trucks waiting around for an opportunity to dump ore or crushers sitting idle
while waiting for ore to arrive. The mining operations were charged with removing
overburden and providing the proper ore quality to the extraction plants. Both areas
faced challenges in terms of asset reliability and execution of scheduled maintenance.
The action: The continuous improvement team facilitated two three-day workshops
that brought together important participants in the mine and extraction operations.
The group created an end-to-end value stream map that highlighted areas of
opportunity. It also identified operations bottlenecks and constraints, including
crusher downtime caused by clogging, the need to balance the mining workload
between removing overburden and supplying ore to extraction, and the fact that key
operators were working from different daily production targets.
Among the solutions implemented as a result of the analysis were:
• The root causes of the crusher’s clogging were identified and necessary modifications
were made. Additional equipment was located at hoppers to break up large pieces
of ore.
• Daily and weekly plans by hour are now shared directly with all control room
operators and mine dispatchers.
• Surge piles were created or improved to stage ore during shift changes or lunch times.
• The quality of remote cameras was improved to show the actual size of surge piles.
• Visual management boards detailing critical process data and scheduling sequences
were installed near work areas.
• Daily Gemba4
sessions—visits to worksites to view processes in action—were started.
4 Gemba walks involve management visiting an operation’s front lines—the place where value occurs—to look for
examples of waste and opportunities to make shop floor improvements.
8 Upstream optimization
The results:
The operation realized a
increase in daily
production after just 30 days
+5%
About the authors
Jorge Mastellari, Senior VP, leads Argo’s Chemical and Oil and Gas practice. His international
projects focus on EBITDA and cash flow improvement, product portfolio and profitability analysis,
and the design and delivery of strategy deployment programs. CJ Renegar focuses on continuous
improvement projects in the oil and gas, manufacturing, and transportation industries.
Copyright © 2015 Argo, Inc. All rights reserved.
Photography: © Shutterstock.com/Kawinnings
Continuous improvement: Delivering better performance in any
market conditions
As the case studies demonstrate, continuous improvement is a powerful strategy
to help companies overcome a variety of business process issues. By providing a
framework for observing processes, gathering information, and analyzing that data,
continuous improvement offers a mechanism for not only identifying the inefficiencies
or pain points but also for designing and acting on the improvements necessary to
address them. Improving processes and eliminating inefficiencies is critical in a down
market, but for companies truly committed to empowering and sustaining a culture
of “high performance” under any market conditions, continuous improvement can
offer a powerful and genuine source of of competitive advantage.

More Related Content

What's hot

Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance ExcellenceDavid McDonald
 
Gail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extendedGail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extendedGail Rodriguez
 
Results Driven Mgr, MBA - Sean Blocker
Results Driven Mgr, MBA - Sean BlockerResults Driven Mgr, MBA - Sean Blocker
Results Driven Mgr, MBA - Sean BlockerSean Blocker
 
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellenceramstar
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newindi7257
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )Jehanzeb Hakim
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Jayson Narito
 
Lean Implementation-An Overview
Lean Implementation-An OverviewLean Implementation-An Overview
Lean Implementation-An OverviewJim McElroy
 
Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4Charles Wade
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington
 
Quality Philosophies and Standards: Baldrige to Six Sigma
Quality Philosophies and Standards: Baldrige to Six SigmaQuality Philosophies and Standards: Baldrige to Six Sigma
Quality Philosophies and Standards: Baldrige to Six SigmaBritt Watwood
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Art Rehn
 

What's hot (18)

Maintenance Excellence
Maintenance ExcellenceMaintenance Excellence
Maintenance Excellence
 
Gail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extendedGail Rodriguez Resume 2015 extended
Gail Rodriguez Resume 2015 extended
 
Results Driven Mgr, MBA - Sean Blocker
Results Driven Mgr, MBA - Sean BlockerResults Driven Mgr, MBA - Sean Blocker
Results Driven Mgr, MBA - Sean Blocker
 
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellence
 
Uop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--newUop ops-571-final-exam-guide-new-2017- score-3030--new
Uop ops-571-final-exam-guide-new-2017- score-3030--new
 
Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17Resume_JMD_ 01-14-17
Resume_JMD_ 01-14-17
 
MattHallead-resume 2016 Update
MattHallead-resume 2016 UpdateMattHallead-resume 2016 Update
MattHallead-resume 2016 Update
 
Jxhakim industrial 08'2016 ( updated )
Jxhakim industrial  08'2016 ( updated )Jxhakim industrial  08'2016 ( updated )
Jxhakim industrial 08'2016 ( updated )
 
Sdg latest
Sdg  latestSdg  latest
Sdg latest
 
GOKULESH_KUMAR
GOKULESH_KUMARGOKULESH_KUMAR
GOKULESH_KUMAR
 
Debahis CV
Debahis CVDebahis CV
Debahis CV
 
Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)Construction quality management plan (Construction Productivity Analysis)
Construction quality management plan (Construction Productivity Analysis)
 
Lean Implementation-An Overview
Lean Implementation-An OverviewLean Implementation-An Overview
Lean Implementation-An Overview
 
Charles New Resume 4
Charles New Resume 4Charles New Resume 4
Charles New Resume 4
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
Bruce Billington resume - July 2016
Bruce Billington resume - July 2016Bruce Billington resume - July 2016
Bruce Billington resume - July 2016
 
Quality Philosophies and Standards: Baldrige to Six Sigma
Quality Philosophies and Standards: Baldrige to Six SigmaQuality Philosophies and Standards: Baldrige to Six Sigma
Quality Philosophies and Standards: Baldrige to Six Sigma
 
Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16Arthur Rehn no contact information 4-9-16
Arthur Rehn no contact information 4-9-16
 

Viewers also liked

A marketing for amateurs - niche perfumes
A marketing for amateurs -  niche perfumesA marketing for amateurs -  niche perfumes
A marketing for amateurs - niche perfumesJulie Norcia Garnier
 
A marketing for amateurs - womenswear
A marketing for amateurs - womenswearA marketing for amateurs - womenswear
A marketing for amateurs - womenswearJulie Norcia Garnier
 
Scientificdrawings (lab equipment)
Scientificdrawings (lab equipment)Scientificdrawings (lab equipment)
Scientificdrawings (lab equipment)omneya_ghis ghis
 
Perceived feasibility of a primary care intervention
Perceived feasibility of a primary care interventionPerceived feasibility of a primary care intervention
Perceived feasibility of a primary care interventionTanja Tomson
 
Fiqrizal dzakwan miftahudin
Fiqrizal dzakwan miftahudinFiqrizal dzakwan miftahudin
Fiqrizal dzakwan miftahudinpanglimaagus
 
АТТЕ, презентация работ рекламного агенстсва
АТТЕ, презентация работ рекламного агенстсваАТТЕ, презентация работ рекламного агенстсва
АТТЕ, презентация работ рекламного агенстсваАТТЕ
 
25Jan201610015432 Shivnarayan Singh 1505-1509 (1)
25Jan201610015432  Shivnarayan Singh 1505-1509 (1)25Jan201610015432  Shivnarayan Singh 1505-1509 (1)
25Jan201610015432 Shivnarayan Singh 1505-1509 (1)Shivnarayan Singh Rana
 
BRAVDO export 2014 last
BRAVDO export 2014 lastBRAVDO export 2014 last
BRAVDO export 2014 lastZory Arkin
 

Viewers also liked (14)

Potter_3301_L1A1
Potter_3301_L1A1Potter_3301_L1A1
Potter_3301_L1A1
 
A marketing for amateurs - niche perfumes
A marketing for amateurs -  niche perfumesA marketing for amateurs -  niche perfumes
A marketing for amateurs - niche perfumes
 
A marketing for amateurs - womenswear
A marketing for amateurs - womenswearA marketing for amateurs - womenswear
A marketing for amateurs - womenswear
 
Scientificdrawings (lab equipment)
Scientificdrawings (lab equipment)Scientificdrawings (lab equipment)
Scientificdrawings (lab equipment)
 
Perceived feasibility of a primary care intervention
Perceived feasibility of a primary care interventionPerceived feasibility of a primary care intervention
Perceived feasibility of a primary care intervention
 
Fiqrizal dzakwan miftahudin
Fiqrizal dzakwan miftahudinFiqrizal dzakwan miftahudin
Fiqrizal dzakwan miftahudin
 
portfolio
portfolioportfolio
portfolio
 
АТТЕ, презентация работ рекламного агенстсва
АТТЕ, презентация работ рекламного агенстсваАТТЕ, презентация работ рекламного агенстсва
АТТЕ, презентация работ рекламного агенстсва
 
Lilac workshop 2016 - Peter Reilly
Lilac workshop 2016 - Peter ReillyLilac workshop 2016 - Peter Reilly
Lilac workshop 2016 - Peter Reilly
 
SAP-RD-PROFILE
SAP-RD-PROFILESAP-RD-PROFILE
SAP-RD-PROFILE
 
Other acti0009
Other acti0009Other acti0009
Other acti0009
 
25Jan201610015432 Shivnarayan Singh 1505-1509 (1)
25Jan201610015432  Shivnarayan Singh 1505-1509 (1)25Jan201610015432  Shivnarayan Singh 1505-1509 (1)
25Jan201610015432 Shivnarayan Singh 1505-1509 (1)
 
Climate change
Climate changeClimate change
Climate change
 
BRAVDO export 2014 last
BRAVDO export 2014 lastBRAVDO export 2014 last
BRAVDO export 2014 last
 

Similar to Upstream optimization: How continuous improvement methods are having a positive impact on production reliability and driving down cost

Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019MRPeasy
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryJaideep Chandrasekharan
 
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...David McDonald
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations managementpavani valiveti
 
Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Gurmeet Singh Guliani
 
12 Costs of Quality and Other Cost Management Issuesjacobl.docx
12 Costs of Quality and Other Cost Management Issuesjacobl.docx12 Costs of Quality and Other Cost Management Issuesjacobl.docx
12 Costs of Quality and Other Cost Management Issuesjacobl.docxmoggdede
 
service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...
service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...
service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...Data & Analytics Magazin
 
Russell C Davies
Russell C DaviesRussell C Davies
Russell C DaviesRuss Davies
 
Continuous Process Improvement.pptx
Continuous Process Improvement.pptxContinuous Process Improvement.pptx
Continuous Process Improvement.pptxJOHN PAUL ROBERTO
 
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationBUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationChaturvediAnay
 
2015 10 29 - East thames presentation Gravitas Event_Final
2015 10 29 - East thames presentation Gravitas Event_Final2015 10 29 - East thames presentation Gravitas Event_Final
2015 10 29 - East thames presentation Gravitas Event_FinalSimi Randhawa
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement SimulationBisher Yousfi
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate przpradeep sale
 
Total quality management
Total quality managementTotal quality management
Total quality managementAanand Gajjar
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceJames Fitzgerald
 

Similar to Upstream optimization: How continuous improvement methods are having a positive impact on production reliability and driving down cost (20)

Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019Top 10 most important manufacturing performance indicators in 2019
Top 10 most important manufacturing performance indicators in 2019
 
Continuous Improvement - The Westside Story
Continuous Improvement - The Westside StoryContinuous Improvement - The Westside Story
Continuous Improvement - The Westside Story
 
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 
Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016Competency (Lean & CI)- Gurmeet 2016
Competency (Lean & CI)- Gurmeet 2016
 
12 Costs of Quality and Other Cost Management Issuesjacobl.docx
12 Costs of Quality and Other Cost Management Issuesjacobl.docx12 Costs of Quality and Other Cost Management Issuesjacobl.docx
12 Costs of Quality and Other Cost Management Issuesjacobl.docx
 
service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...
service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...
service-concepts-the-key-to-unlocking-optimal-production-performance-2023-5-1...
 
Russell C Davies
Russell C DaviesRussell C Davies
Russell C Davies
 
Tqm
TqmTqm
Tqm
 
Continuous Process Improvement.pptx
Continuous Process Improvement.pptxContinuous Process Improvement.pptx
Continuous Process Improvement.pptx
 
Gerald_Schwartzmeyer2016
Gerald_Schwartzmeyer2016Gerald_Schwartzmeyer2016
Gerald_Schwartzmeyer2016
 
Tqm
TqmTqm
Tqm
 
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point PresentationBUSINESS PROCESS RE-ENGINEERING Power Point Presentation
BUSINESS PROCESS RE-ENGINEERING Power Point Presentation
 
2015 10 29 - East thames presentation Gravitas Event_Final
2015 10 29 - East thames presentation Gravitas Event_Final2015 10 29 - East thames presentation Gravitas Event_Final
2015 10 29 - East thames presentation Gravitas Event_Final
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement Simulation
 
Lakshya corporate prz
Lakshya corporate przLakshya corporate prz
Lakshya corporate prz
 
Jake Stenner Resume
Jake Stenner ResumeJake Stenner Resume
Jake Stenner Resume
 
Resume 2016a
Resume 2016aResume 2016a
Resume 2016a
 
Total quality management
Total quality managementTotal quality management
Total quality management
 
Boost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive MaintenanceBoost Equipment Performance, Save Money With Proactive Maintenance
Boost Equipment Performance, Save Money With Proactive Maintenance
 

Recently uploaded

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 

Recently uploaded (20)

Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 

Upstream optimization: How continuous improvement methods are having a positive impact on production reliability and driving down cost

  • 1. Key takeaways Continuous improvement can help energy companies temper the effects of market downturns and position them to perform even better in favorable markets. Continuous improvement involves all levels of employees working together to streamline work and reduce waste. Companies using continuous improvement achieved a measurable benefits in many different steps of their value stream. Continuous improvement helps identify inefficiencies or pain points and develop high impact and fast improvements. Upstream optimization: How continuous improvement methods are having a positive impact on production reliability and driving down cost Oil and Gas May 2015 For the energy industry, swings in supply and demand are a normal part of doing business. Understandably, in times of low prices many companies look to cut costs and increase efficiency. As companies look to make those improvements, many successfully apply continuous improvement methods to save money and eliminate waste. But, while continuous improvement can be quite useful when plummeting prices focus management attention on cost savings, this methodology is essential to energy companies looking to grow and sustain a cost management discipline throughout the complete supply-and- demand cycle. Continuous improvement, a process for relentless waste elimination, involves all levels of employees working together to streamline work and reduce non-value-added activities and evolves constantly to proactively address broad marketplace conditions as well as individual steps in the production process. Continuous improvement has long been an essential part of the Lean1 toolkit, but in our experience it has not been as effectively and consistently applied in the oil and gas industry as it could be, thus not achieving the impact experienced in other industries. We believe that applying continuous improvement techniques could not only help energy companies temper the The experiences of four energy industry companies show how continuous improvement techniques can produce measureable benefits, including improved on-time work order completion, cost savings, increased productivity, inventory reductions, and improved process effectiveness. Jorge Mastellari and CJ Renegar NEW PATHS TO PROFIT/ABILITYTM 1 Lean is a method focused on ongoing efforts to eliminate waste and activities that don’t add value from design, manufacturing, distribution, and customer service processes.
  • 2. 2 Upstream optimization effects of market downturns but also position them to perform even better when more favorable market conditions return. Against that backdrop, we offer four examples of energy companies that have employed continuous improvement methods to address various performance issues and the benefits they realized by doing so. By employing aspects of continuous improvement to various activities, these four companies achieved measureable benefits in areas such as on-time work order completion, cost savings, improved productivity, inventory reductions, and improved process effectiveness. Improving results by increasing accountability through Leader Standard Work The challenge: The leader of a base-maintenance organization recognized that front-line managers’ roles and responsibilities were unclear and critical work-streams lacked accountability. Key performance indicators such as schedule compliance, work-order backlog, and overall labor cost were falling short of the mark and trending downward. A continuous improvement team engaged by the leader to assess the organization’s daily duties and processes identified several areas of concern, including: • High-performance weeks happened by chance. There was little understanding of the reasons for the good performance, so the same results were difficult to repeat. • Front-line leaders spent only 10 to 20 percent of their time actively leading at the work site. The remainder of their time was spent in their offices “fighting fires” or dealing with exception reports. • Many important tasks were executed inconsistently across similar roles with large variations in quality. • Work standards were not being adhered to or weren’t understood. With a high turnover rate, new supervisor development was inadequate. The action: To address the issues, the continuous improvement team organized half- day workshops with front-line managers taking a Leader Standard Work approach— essentially the creation of checklists of leadership activities to be conducted on a regular basis. During the workshops, the managers examined their daily and weekly tasks to identify those that were critical to meeting objectives. The managers then used that information to build their own “K Cards,” standard work cards on which they scheduled essential daily tasks, with an emphasis on spending as much time in the field or shop as possible and aligning the supervisor’s schedule with production
  • 3. 3 Upstream optimization schedules, union breaks, and important meetings. A visual management board was designed and placed at the maintenance leaders’ office to track KPIs, match periodic managers’ activities with improvements, and peer-audit completion of tasks on K-cards. The results: The company’s supervisors now spend of their time in the field compared with 20 percent earlier. On-time work order completion improved by 20% in just 90 days. And new supervisors now learn daily routines and what is expected of them in days rather than weeks. Contractor productivity increased by 15% in the same period. 60% Eliminating non-value added activities to achieve contractor cost reduction The challenge: A company leader at an oil sands site believed there might be cost- saving opportunities in the operations associated with removing gypsum and ash from adjacent ponds and relocating or hauling the material to another facility or customer. A contractor was responsible for the operations and management of 50 subcontractors and their equipment, including road haulage trucks, 5 to 6 backhoes and front loaders, and 2 dragline excavators. The leader asked a continuous improvement team to assess the operations. The action: The team observed the process several times over the course of a week. The team also reviewed contracts, invoices, and daily operator logs; completed an end-to-end value stream map of the operation and identified process waste and constraints; and met with the customer receiving the gypsum and ash to identify delivery requirements. The continuous improvement team recommended several actions to the leader, and then the customer, contractor, and supplier met in a workshop to develop waste reduction methods. The assessment led to several process improvements. Among them: • Gypsum was hauled directly from the pond to the customer after two days instead of repositioning it to another on-site area. The change eliminated the need for six operators, a backhoe, and a front loader.
  • 4. 4 Upstream optimization • The customer began providing weekly email orders and monthly forecasts specifying how much gypsum it would need. The information went to the supplier’s logistics coordinator, who determined if a contract was needed for the next 28-day cycle. As a result, operations were suspended for three months while the customer reduced excess inventory. • Contractor operations and contracts were combined to share resources across multiple ponds instead of relying on separate resources and contracts for each pond. The results: reduction in direct costs reduction in assets required by the contractor reduction in customer lead time reduction in inventory 40% 33% 33% 70% Exhibit 1: Continuous improvement results in improved contractor cycle time Process before continuous improvement Value added Cycle time = 3 hours Cycle time = 2 hours Process after continuous improvement Non value added
  • 5. 5 Upstream optimization Using Overall Equipment Effectiveness to improve reliability and utilization The challenge: A process engineer saw management’s frustration with an oil extraction plant’s inability to meet monthly production targets. The operation suffered from the absence of any fact-based method of setting priorities for improvement efforts in the plant; in many cases, reports from maintenance, operations, and reliability were contradictory. Other issues included: • Multiple groups using their own data; • A lack of overall trust in other’s data; • Inconsistent availability calculations that were not categorized by asset or equipment; and • Information on other factors such as start-up time, maintenance waiting time, and lack of ore to extract was not captured. Exhibit 2: Overall Equipment Effectiveness methodology improves reliability and utilization Extraction plant: Downtime analysis Availability = 80% Performance = 82% Quality = 99% Overall equipment effectiveness = 65% Capacity Tonnes, hour Sch Mtce Un Sch Mtce Availability loss Actual operating time versus capacity = 80% Performance loss Actual throughput versus operating capacity = 82% Operating capacity Mine losses Downstream losses Prod plan loss Actual production Un Sch Process
  • 6. 6 Upstream optimization The action: Working with a continuous improvement team, the process engineer identified a way to track the overall process using Overall Equipment Effectiveness (OEE) methodology.2 They collected data through daily operation log sheets. After two months of collecting data, they presented their findings to the operations general manager. After several meetings they developed a new methodology and began setting priorities based on the analysis. Among the solutions implemented were: • Daily reporting of reasons for missed hourly targets; • Monthly A3 reports3 with charts showing top maintenance downtime areas and actions to mitigate the downtime; • Staging of maintenance supplies nearer conveyors to reduce downtime; and • Identification of three continuous improvement projects regarding reducing maintenance start-up time and improving crusher uptime. The results: After 90 days, a focus on key processes resulted in the extraction plant’s OEE score improving from to a considerable improvement in such a short period. 65% 72% 2 Overall Equipment Effectiveness (OEE) is a hierarchy of metrics used to determine how effectively a manufacturing operation is utilized. 3 Concise two-page reports that derive their name from the paper size.
  • 7. 7 Upstream optimization De-bottlenecking through end-to-end value stream mapping and optimization The challenge: The leadership team of an energy company’s upstream operation sought to increase daily output from its mine operations and extraction plants by getting them to work together more effectively and to reduce inefficiencies such as trucks waiting around for an opportunity to dump ore or crushers sitting idle while waiting for ore to arrive. The mining operations were charged with removing overburden and providing the proper ore quality to the extraction plants. Both areas faced challenges in terms of asset reliability and execution of scheduled maintenance. The action: The continuous improvement team facilitated two three-day workshops that brought together important participants in the mine and extraction operations. The group created an end-to-end value stream map that highlighted areas of opportunity. It also identified operations bottlenecks and constraints, including crusher downtime caused by clogging, the need to balance the mining workload between removing overburden and supplying ore to extraction, and the fact that key operators were working from different daily production targets. Among the solutions implemented as a result of the analysis were: • The root causes of the crusher’s clogging were identified and necessary modifications were made. Additional equipment was located at hoppers to break up large pieces of ore. • Daily and weekly plans by hour are now shared directly with all control room operators and mine dispatchers. • Surge piles were created or improved to stage ore during shift changes or lunch times. • The quality of remote cameras was improved to show the actual size of surge piles. • Visual management boards detailing critical process data and scheduling sequences were installed near work areas. • Daily Gemba4 sessions—visits to worksites to view processes in action—were started. 4 Gemba walks involve management visiting an operation’s front lines—the place where value occurs—to look for examples of waste and opportunities to make shop floor improvements.
  • 8. 8 Upstream optimization The results: The operation realized a increase in daily production after just 30 days +5% About the authors Jorge Mastellari, Senior VP, leads Argo’s Chemical and Oil and Gas practice. His international projects focus on EBITDA and cash flow improvement, product portfolio and profitability analysis, and the design and delivery of strategy deployment programs. CJ Renegar focuses on continuous improvement projects in the oil and gas, manufacturing, and transportation industries. Copyright © 2015 Argo, Inc. All rights reserved. Photography: © Shutterstock.com/Kawinnings Continuous improvement: Delivering better performance in any market conditions As the case studies demonstrate, continuous improvement is a powerful strategy to help companies overcome a variety of business process issues. By providing a framework for observing processes, gathering information, and analyzing that data, continuous improvement offers a mechanism for not only identifying the inefficiencies or pain points but also for designing and acting on the improvements necessary to address them. Improving processes and eliminating inefficiencies is critical in a down market, but for companies truly committed to empowering and sustaining a culture of “high performance” under any market conditions, continuous improvement can offer a powerful and genuine source of of competitive advantage.