SlideShare a Scribd company logo
1 of 4
SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures)
SYED FAHAD HUSSAIN
Flat # A-409, Rufi Heaven, Email: syed_fahad_1988@hotmail.com
Block13D-II, Gulshan-e-Iqbal, Phone: +92-321-2048448
Karachi
To joina dynamicand progressingorganizationofferingsample opportunitiesfor
diversifiedexperienceandenhancementof professional skillsandcarriergrowth.
EA Consulting Pvt Ltd. Dec 2013 – Present
DesignEngineer
 Analysis&designingof buildings&bridgesoncommercial software packages.
 Coordinate withotherdifferentdisciplines likearchitecture,MEPdepartment.
 Reviewandperforms calculationsandevaluationsinthe designof structural
systems.
 Vettingof buildings&bridgesasperthe relevantcodesof practice.
PROJECTS:
 Category-IIIcheckingof bridgeslocated at junctionR5 & R7 ofAL- Rayyan Road, Qatar
The job wasto check the designof 2 & 3 span continuousbox girderbridgesonBScode.
All the bridgeswere curvedinplan&havingspanlengthsupto84m. Analysismodels
were developedonMIDASCivil.BD-37/01was referredforthe bridge loading.
 Category-IIIcheckingof Aspire Bridge (NewDoha Zoo), Qatar
Aspire bridge aimsto provide aconnectivityb/w Aspire Park&VillagioMall overAl-Waab
Road.The bridge hasbicycle lane,tramlane,pedestrianlane &elephantwalkway.Itisa
2 spanmulti-cellbox girderbridge havingavaryingwidthof 57m to 80m approx.Spans
were measured60m& 56m at the centerline of the bridge.Analysismodelwas
developedonMIDASCivil. BD-37/01was referredforthe bridge loading.
 FountainChowk Flyover,Lahore
It’san 8 span bridge withstraight&curvedsegments.The straightspansare of 30m
length& are simplysupportedprecasttwinbox girders;howeverthe curvedportionisa
4 spancontinuousCIPbox girder witha max 42m span.The carriagewaywidthis7.6m &
the radiusis 64m approx.Analysismodelswere developedonMIDASCivil.WestPakistan
HighwayCode isreferredfor bridge loading&AASHTOLRFDis used forthe design
purpose.
 RestrengtheningofThatta Sujawal Bridge through External Prestressing
Thatta Sujawal Bridge isapproximately980mlong.The structural systemcomprisesof
articulatedI-girderssupportedongirdersthatare cantileveredoutfromthe pier.Due to
cracks formation& excessive saggingof the bridge itwasdecidedtorestrengthenit
throughexternal prestressing.A complete 3Dmodel wasdevelopedonMIDASforthe
CONTACT
OBJECTIVE
WORK
EXPERIENCE
SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures)
accurate analysisof the system. WestPakistanHighwayCode isreferredforbridge
loading.
 Vettingof ‘C70’ Rawdhat Residential Building,AbuDhabi
RawdhatResidentialBuildingsare locatedinAbuDhabi,UAE andis part of “Rawdhat”
Development. The projectisconsistsof twomodernbuildings. The towerscomprisedof
3 basements&10 floorsinall.Buildingframe systemwasadopted withshearwalls&
columns.A 3D model isdevelopedonETABSfor the designingof beams,columns&shear
walls,while the foundationdesignisdone onSAFE12.UBC-97 & ACI-318-08 are followed
for the loading&designpurpose.
 UBL Regional Office Building,Lahore
The proposed project‘UBL regional headoffice islocatedatGulberg,Lahore. The
proposedbuildingsconsistsof two(02) Basements+lowerground+ groundfloor+ 6
typical floor+ Roof + UpperRoof. The slabsystemisflatslabwithperipherybeams. A 3D
model is developedonETABS& all the necessaryloadsare appliedinit. Slab&
foundationdesignisdone onSAFE12.UBC-97 & ACI-318-08 are followedforthe loading
& designpurpose.
 The Arkadians (Designingof Tower-M),Karachi
The Arkadiansisstatedas Pakistan’stallestresidential project. Amongst13residential
towers,Tower-Mis24 storeyhigh.Buildingframe system isadoptedwithshearwalls&
columns.Slabsystemis flatplate.Pile foundationisusedtosupportthe loadof the
tower.Analysis model is developedonETABS.The slab& foundationdesignisdone on
SAFE12.
 The Arkadians (Vettingof Tower-A),Karachi
Tower-A is34 storeyhigh. Buildingframe system isadoptedwithshearwalls&columns.
Slabsystemis flatplate.Pile foundationisusedtosupportthe loadof the tower. The job
was to vetthe designof thistowerinaccordance withACI & UBC Code.
 Bateen Marina, Abu Dhabi
Designingof keywallsforthe berthingof speedboatsin-frontof MarinaClub. Due to
greaterheightsof keywalls,pilefoundationsystemwasprovidedin ordertomake the
systemstable.
A.A. Associates Feb2011 – Nov 2013
JuniorDesign Engineer
PROJECTS:
 Reinstatementofexistingroad at SAS-AL-NAKHL,Abu Dhabi
Initiallythe superstructure of the bridge wasdesignedasa box sectionwithmultiple cells
but laterondue to some site constraintsitwas convertedtoAASHTOI-Girder.The final
scheme wasto design&detail a highlyskewed,4spanlive loadcontinuous bridge&to
submita detaileddesignreportinaccordance withADMstandards.A full scale 3D model
of the complete bridge wasdevelopedonSAP2000 in orderto capture the effectof high
skew.
SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures)
 Constructionof OverheadBridge CrossingRailway at Pano Aqil City
A majorU-curve flyovercomprisingaround21spans of mainbridge & 9 spansof ramp.
PosttensionedsimplysupportedI-girderswere usedforsupportingthe bridge deck. The
analysismodelsweredevelopedonSAP2000 & the code followedwasAASHTO LRFD
2007.
 Constructionof Sariab Road Flyover,Quetta
A 483.55m longand 20.10m wide flyoverwith9.3mwide dual carriagewaycrossingthe
railwaytrack andconnectsZarghoonRoad withSariabRoad inQuetta.The flyoveris
curvedinplan & contains2 ramp segments. Posttensioned simplysupported I-girders
were usedforsupportingthe bridge deck.The analysismodels weredevelopedon
SAP2000 & the code followedwasAASHTOLRFD2007.
Variousbuildingprojectsincluding,
 Soorty SpinningDivision,Karachi
Mill building,PowerHouse &G+4 Bachelor’sBarrack.
 Rajby Textiles,Karachi
A large scale EffluentTreatmentPlantwith2conical tanks.
 Reliance Cotton Mill,Karachi
Mill Building.
 Residence forKhwaja Abdul Majid Rahman, Islamabad
(B+G+2 Storey) 800 Sq yd.Bungalow.
M.Engg (Structures) Aug 2011 – Dec 2013
NED Universityof Engineering&Technology
Got 3.72 CGPA
B.E. (Civil) Jan 2007 –Dec 2010
NED Universityof Engineering&Technology
Secured2nd
positioninthe departmentwithanaggregate 82.7% marks
COMPUTER LITERACY
 MIDAS CIVIL
 ETABS
 SAP2000
 SAFE12
 AUTOCAD
 Adobe AcrobatProfessional
 MS EXCEL (Developed variousspreadsheetsusingadvancedformula&option)
EDUCATION
OTHER SKILLS
SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures)
KNOWLEDGE OF ENGINEERING CODES
 BS 5400
 ACI-318
 UBC-97
 AASHTOLRFD 2007
Analysis&designof superstructure of box girderbridge bydifferentmethods.The scope of
the projectwas to analyze,design&to compare the resultsof line beamanalysis&of 3D
modeling.SAP2000 was usedforthe modelingpurpose &the code followedwasAASHTO
LRFD 2007.
Soccer,Table Tennis& PC games.
Available onrequest
 Father’sName: SyedZakirHussain
 Date of Birth: October22, 1988
 CNICNo: 42401-9316745-9
 Marital Status: Single
 Nationality: Pakistani
 Religion: Islam(Sunni Muslim)
FINAL YEAR
PROJECT
INTERESTS
REFERENCES
OTHER
INFORMATION

More Related Content

What's hot (20)

My cv (en.)
My cv (en.)My cv (en.)
My cv (en.)
 
Resume (final cv)
Resume (final cv)Resume (final cv)
Resume (final cv)
 
C.V.
C.V.C.V.
C.V.
 
Resume--Shishir
Resume--ShishirResume--Shishir
Resume--Shishir
 
CV Suresh44UIC
CV Suresh44UICCV Suresh44UIC
CV Suresh44UIC
 
Mechanical_Draftsmen_
Mechanical_Draftsmen_Mechanical_Draftsmen_
Mechanical_Draftsmen_
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
 
C.V@ Haytham2015 final
C.V@ Haytham2015 finalC.V@ Haytham2015 final
C.V@ Haytham2015 final
 
Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)Aftab Ahmad CV_Sr. CM RB (1)
Aftab Ahmad CV_Sr. CM RB (1)
 
Diljith Thekkan(STRUCTURAL DESIGNER)
Diljith Thekkan(STRUCTURAL DESIGNER)Diljith Thekkan(STRUCTURAL DESIGNER)
Diljith Thekkan(STRUCTURAL DESIGNER)
 
Jvm1
Jvm1Jvm1
Jvm1
 
AECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.PAECOM BAH-Madhava.Kulal.P
AECOM BAH-Madhava.Kulal.P
 
CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)CV -(Technical Office structural Engineer)
CV -(Technical Office structural Engineer)
 
IMRAN CV (1)
IMRAN CV (1)IMRAN CV (1)
IMRAN CV (1)
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Ramprasad_Resume_SEP-2016
Ramprasad_Resume_SEP-2016Ramprasad_Resume_SEP-2016
Ramprasad_Resume_SEP-2016
 
Ahmad Anis STR
Ahmad Anis STRAhmad Anis STR
Ahmad Anis STR
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
M. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERM. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEER
 

Viewers also liked

Viewers also liked (12)

Mohammed Irfan cv
Mohammed Irfan cvMohammed Irfan cv
Mohammed Irfan cv
 
IEEE Pakistan WIE Forum Annual Report 2011-12
IEEE Pakistan WIE Forum Annual Report 2011-12IEEE Pakistan WIE Forum Annual Report 2011-12
IEEE Pakistan WIE Forum Annual Report 2011-12
 
Women entrepreneurship initiatives
Women entrepreneurship initiativesWomen entrepreneurship initiatives
Women entrepreneurship initiatives
 
Ahmed Noman CV
Ahmed Noman CVAhmed Noman CV
Ahmed Noman CV
 
Seema Resume
Seema ResumeSeema Resume
Seema Resume
 
ZAID CV 2016
ZAID CV 2016ZAID CV 2016
ZAID CV 2016
 
NOORULERUM
NOORULERUMNOORULERUM
NOORULERUM
 
HAMAD CV main
HAMAD CV mainHAMAD CV main
HAMAD CV main
 
Saman-Qureshi-C.V
Saman-Qureshi-C.VSaman-Qureshi-C.V
Saman-Qureshi-C.V
 
CV
CVCV
CV
 
IQRA Industries PROFILE
IQRA Industries PROFILEIQRA Industries PROFILE
IQRA Industries PROFILE
 
Warda Nair
Warda NairWarda Nair
Warda Nair
 

Similar to CV SYED FAHAD HUSSAIN

Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resumeAlaa Attiya
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...Rajesh Prasad
 
Sabs profile 8.10.13
Sabs profile 8.10.13Sabs profile 8.10.13
Sabs profile 8.10.13Ashish Chawla
 
C V SHIRIF SALLAM
C V SHIRIF SALLAMC V SHIRIF SALLAM
C V SHIRIF SALLAMeng shirif
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016Ayman Alhaggar
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir JavedAamir Javed
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCaleb Bercero
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani TyagiAshwani Tyagi
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi Sami
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPsureshrenu1996
 

Similar to CV SYED FAHAD HUSSAIN (20)

C-V_Naoras 2016
C-V_Naoras 2016C-V_Naoras 2016
C-V_Naoras 2016
 
bala resume
bala resumebala resume
bala resume
 
Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016Ahmed Abdel Salam 03.2016
Ahmed Abdel Salam 03.2016
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
Alaa_Attiya resume
Alaa_Attiya resumeAlaa_Attiya resume
Alaa_Attiya resume
 
Handbook cum coffee table book titled staying with cables a modern construct...
Handbook cum coffee table book titled staying with cables  a modern construct...Handbook cum coffee table book titled staying with cables  a modern construct...
Handbook cum coffee table book titled staying with cables a modern construct...
 
Sabs profile 8.10.13
Sabs profile 8.10.13Sabs profile 8.10.13
Sabs profile 8.10.13
 
Muhammad Qasim Zaib C.V
Muhammad Qasim Zaib C.VMuhammad Qasim Zaib C.V
Muhammad Qasim Zaib C.V
 
C V SHIRIF SALLAM
C V SHIRIF SALLAMC V SHIRIF SALLAM
C V SHIRIF SALLAM
 
My CV with Exp.26-11-2016
My CV with Exp.26-11-2016My CV with Exp.26-11-2016
My CV with Exp.26-11-2016
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Mjabbar Update
Mjabbar UpdateMjabbar Update
Mjabbar Update
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
CALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CVCALEB ICASIANO BERCERO - CV
CALEB ICASIANO BERCERO - CV
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani Tyagi
 
Ibrahim al kishki -cv
Ibrahim al kishki -cvIbrahim al kishki -cv
Ibrahim al kishki -cv
 
New C.V Shanu
New C.V ShanuNew C.V Shanu
New C.V Shanu
 
Wasi cv (Civil engineer)
Wasi cv (Civil engineer)Wasi cv (Civil engineer)
Wasi cv (Civil engineer)
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 

CV SYED FAHAD HUSSAIN

  • 1. SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures) SYED FAHAD HUSSAIN Flat # A-409, Rufi Heaven, Email: syed_fahad_1988@hotmail.com Block13D-II, Gulshan-e-Iqbal, Phone: +92-321-2048448 Karachi To joina dynamicand progressingorganizationofferingsample opportunitiesfor diversifiedexperienceandenhancementof professional skillsandcarriergrowth. EA Consulting Pvt Ltd. Dec 2013 – Present DesignEngineer  Analysis&designingof buildings&bridgesoncommercial software packages.  Coordinate withotherdifferentdisciplines likearchitecture,MEPdepartment.  Reviewandperforms calculationsandevaluationsinthe designof structural systems.  Vettingof buildings&bridgesasperthe relevantcodesof practice. PROJECTS:  Category-IIIcheckingof bridgeslocated at junctionR5 & R7 ofAL- Rayyan Road, Qatar The job wasto check the designof 2 & 3 span continuousbox girderbridgesonBScode. All the bridgeswere curvedinplan&havingspanlengthsupto84m. Analysismodels were developedonMIDASCivil.BD-37/01was referredforthe bridge loading.  Category-IIIcheckingof Aspire Bridge (NewDoha Zoo), Qatar Aspire bridge aimsto provide aconnectivityb/w Aspire Park&VillagioMall overAl-Waab Road.The bridge hasbicycle lane,tramlane,pedestrianlane &elephantwalkway.Itisa 2 spanmulti-cellbox girderbridge havingavaryingwidthof 57m to 80m approx.Spans were measured60m& 56m at the centerline of the bridge.Analysismodelwas developedonMIDASCivil. BD-37/01was referredforthe bridge loading.  FountainChowk Flyover,Lahore It’san 8 span bridge withstraight&curvedsegments.The straightspansare of 30m length& are simplysupportedprecasttwinbox girders;howeverthe curvedportionisa 4 spancontinuousCIPbox girder witha max 42m span.The carriagewaywidthis7.6m & the radiusis 64m approx.Analysismodelswere developedonMIDASCivil.WestPakistan HighwayCode isreferredfor bridge loading&AASHTOLRFDis used forthe design purpose.  RestrengtheningofThatta Sujawal Bridge through External Prestressing Thatta Sujawal Bridge isapproximately980mlong.The structural systemcomprisesof articulatedI-girderssupportedongirdersthatare cantileveredoutfromthe pier.Due to cracks formation& excessive saggingof the bridge itwasdecidedtorestrengthenit throughexternal prestressing.A complete 3Dmodel wasdevelopedonMIDASforthe CONTACT OBJECTIVE WORK EXPERIENCE
  • 2. SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures) accurate analysisof the system. WestPakistanHighwayCode isreferredforbridge loading.  Vettingof ‘C70’ Rawdhat Residential Building,AbuDhabi RawdhatResidentialBuildingsare locatedinAbuDhabi,UAE andis part of “Rawdhat” Development. The projectisconsistsof twomodernbuildings. The towerscomprisedof 3 basements&10 floorsinall.Buildingframe systemwasadopted withshearwalls& columns.A 3D model isdevelopedonETABSfor the designingof beams,columns&shear walls,while the foundationdesignisdone onSAFE12.UBC-97 & ACI-318-08 are followed for the loading&designpurpose.  UBL Regional Office Building,Lahore The proposed project‘UBL regional headoffice islocatedatGulberg,Lahore. The proposedbuildingsconsistsof two(02) Basements+lowerground+ groundfloor+ 6 typical floor+ Roof + UpperRoof. The slabsystemisflatslabwithperipherybeams. A 3D model is developedonETABS& all the necessaryloadsare appliedinit. Slab& foundationdesignisdone onSAFE12.UBC-97 & ACI-318-08 are followedforthe loading & designpurpose.  The Arkadians (Designingof Tower-M),Karachi The Arkadiansisstatedas Pakistan’stallestresidential project. Amongst13residential towers,Tower-Mis24 storeyhigh.Buildingframe system isadoptedwithshearwalls& columns.Slabsystemis flatplate.Pile foundationisusedtosupportthe loadof the tower.Analysis model is developedonETABS.The slab& foundationdesignisdone on SAFE12.  The Arkadians (Vettingof Tower-A),Karachi Tower-A is34 storeyhigh. Buildingframe system isadoptedwithshearwalls&columns. Slabsystemis flatplate.Pile foundationisusedtosupportthe loadof the tower. The job was to vetthe designof thistowerinaccordance withACI & UBC Code.  Bateen Marina, Abu Dhabi Designingof keywallsforthe berthingof speedboatsin-frontof MarinaClub. Due to greaterheightsof keywalls,pilefoundationsystemwasprovidedin ordertomake the systemstable. A.A. Associates Feb2011 – Nov 2013 JuniorDesign Engineer PROJECTS:  Reinstatementofexistingroad at SAS-AL-NAKHL,Abu Dhabi Initiallythe superstructure of the bridge wasdesignedasa box sectionwithmultiple cells but laterondue to some site constraintsitwas convertedtoAASHTOI-Girder.The final scheme wasto design&detail a highlyskewed,4spanlive loadcontinuous bridge&to submita detaileddesignreportinaccordance withADMstandards.A full scale 3D model of the complete bridge wasdevelopedonSAP2000 in orderto capture the effectof high skew.
  • 3. SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures)  Constructionof OverheadBridge CrossingRailway at Pano Aqil City A majorU-curve flyovercomprisingaround21spans of mainbridge & 9 spansof ramp. PosttensionedsimplysupportedI-girderswere usedforsupportingthe bridge deck. The analysismodelsweredevelopedonSAP2000 & the code followedwasAASHTO LRFD 2007.  Constructionof Sariab Road Flyover,Quetta A 483.55m longand 20.10m wide flyoverwith9.3mwide dual carriagewaycrossingthe railwaytrack andconnectsZarghoonRoad withSariabRoad inQuetta.The flyoveris curvedinplan & contains2 ramp segments. Posttensioned simplysupported I-girders were usedforsupportingthe bridge deck.The analysismodels weredevelopedon SAP2000 & the code followedwasAASHTOLRFD2007. Variousbuildingprojectsincluding,  Soorty SpinningDivision,Karachi Mill building,PowerHouse &G+4 Bachelor’sBarrack.  Rajby Textiles,Karachi A large scale EffluentTreatmentPlantwith2conical tanks.  Reliance Cotton Mill,Karachi Mill Building.  Residence forKhwaja Abdul Majid Rahman, Islamabad (B+G+2 Storey) 800 Sq yd.Bungalow. M.Engg (Structures) Aug 2011 – Dec 2013 NED Universityof Engineering&Technology Got 3.72 CGPA B.E. (Civil) Jan 2007 –Dec 2010 NED Universityof Engineering&Technology Secured2nd positioninthe departmentwithanaggregate 82.7% marks COMPUTER LITERACY  MIDAS CIVIL  ETABS  SAP2000  SAFE12  AUTOCAD  Adobe AcrobatProfessional  MS EXCEL (Developed variousspreadsheetsusingadvancedformula&option) EDUCATION OTHER SKILLS
  • 4. SYED FAHAD HUSSAIN – B.E.(Civil), M.E.(Structures) KNOWLEDGE OF ENGINEERING CODES  BS 5400  ACI-318  UBC-97  AASHTOLRFD 2007 Analysis&designof superstructure of box girderbridge bydifferentmethods.The scope of the projectwas to analyze,design&to compare the resultsof line beamanalysis&of 3D modeling.SAP2000 was usedforthe modelingpurpose &the code followedwasAASHTO LRFD 2007. Soccer,Table Tennis& PC games. Available onrequest  Father’sName: SyedZakirHussain  Date of Birth: October22, 1988  CNICNo: 42401-9316745-9  Marital Status: Single  Nationality: Pakistani  Religion: Islam(Sunni Muslim) FINAL YEAR PROJECT INTERESTS REFERENCES OTHER INFORMATION