SlideShare a Scribd company logo
1 of 12
Download to read offline
2014 PRODUCTS BROCHOURE
Suppliers of Scaffolding and Steel Products
www.kwikup.com.au
Kwikstage
Products
K-Stage Standard
Standards are vertical structural member of the
scaffold system which are made from 48.3 OD X
4mm Tubes
Standards have “V” pressings in clusters at 495
mm centres, which provide location points for
Transoms, Ledgers, Braces, Hopups etc and a spigot
fixed at the
top.
K-Stage Ledgers
Ledgers is horizontal member of the scaffold system
also known as guard rails are made from 48.3 OD
X 3.2 mm & 4 mm tubes. Ledgers fit into the upper
“V” Pressings on the standards.
K-Stage Transom
Transoms are made by welding two 5.00 mm angles
back to back. Transoms fit into the lower “V”
pressings on the standards to carry steel boards.2.4
m
Truss Transom
Used for heavy duty load spans and extended distances.
Spigot
Used to join 2 standards together. Requires either a hinged pin or
special bolt.
Mass
17.5kg
14.5kg
11.5kg
8.5kg
6.0kg
2.0kg
Mass
9.2kg
7.0kg
5.0kg
4.3kg
Mass
22.0kg
13.5kg
9.6kg
8.0kg
6.0kg
Length
3.0m
2.5m
2.0m
1.5m
1.0m
0.5m
Length
2.4m
1.8m
1.2m
0.7m
Length
1.8m
1.2m
1.0m
0.7m
K
K
Tr
b
2
KWIKUP PRODUCT
BROCHURE 2014
K-Stage Steel Plank
The steel plank spans between the transoms giving a
non slip surface with a is hot dip galvanized finish.
LVL Scaffold Plank
Individually proof tested and compliant in accordance
with AS 1577 for Stiffness, Strength, Sliding & Slip
Available in various lengths & can be cross cut to exact
lengths
Stamped as Scaffold plank with AS compliance mark
High strength
Chamfered edges
Suitable for PETROCHEMICAL & GAS industries
Meets industry standards
Enhanced durability & safety (AS)
Competitively priced
K-Stage Hop Ups
Board Stage Brackets / hopups fit into the “V” pressing
of the standard which is nearest to the wall. The 2 &
3 BSB have holes into which tie bar pins are attached.
They are used to provide cantilevered platform on the
inside of the scaffold nearest the wall.
Diagonal Braces
The diagonal brace is used to the full height of the scaf-
folding in a longitudinal direction.
Mass
15.0kg
10.5kg
6.5kg
4.0kg
Length
2.4m
1.8m
1.2m
0.7m
Mass
17.5kg
14.5kg
11.5kg
8.5kg
6.0kg
2.0kg
Mass
2.5kg
6.0kg
9.0kg
Mass
13.5kg
12.5kg
11.0kg
9.5kg
8.5kg
7.5kg
Length
3.0m
2.5m
2.0m
1.5m
1.0m
0.5m
Bracket
Type
1Board
2Board
3Board
Length
3.6m
3.2m
2.7m
2.4m
2.0m
1.7m
3
K-Stage Tie Bars
Tie bars have pins at each ends which fit in holes of
2 and 3 board stage brackets (hopups) to prevent the
brackets from spreading and the planks from becoming
dislodged.
End Toe Board Brackets
Fits into ‘V’ locating lugs on the standard at the end of a platform
to hold the end
batten toe board vertically in place.
Toe Board Bracket
Clamps to the standard with a captive wedge to hold the batten toe
board
vertically in place.
Double C Clip / Gantry Coupler
Used to Join Standards Back to Back
Ladder Access Transom
An adjustable transom with landing for ladder/stairs
Mass
7.0kg
5.0kg
3.0kg
2.1kg
Length
2.4m
1.8m
1.2m
0.7m
Mass
1.5kg
Mass
0.8kg
b
b
4
KWIKUP PRODUCT
BROCHURE 2014
Guardrail Post
Used for edge protection – slab or balcony’s. Bolted into concrete with 14mm
Dyna Bolts. Compatible with all sizes of ledgers which makes it very versatile.
Step Down Bracket
The first step onto a stair access or ladder access is always difficult due to site
constraints, ground levels and base outs. The use of the adjustable step down
bracket gives the comfort of adjustment to balance the variables so the step
becomes balanced when getting on or getting off a stair access at ground
level
Wall Tie Bracket
SizeSuitable for 48mm tube, used to secure the scaffold to a structure
Base Plate
Add more stability to your scaffold structures with a base plate. When secured
the base plate stops tube from slipping across the floor.
Internal Corner Panel
Used with Hop Up Brackets to fill any corner gaps in the scaffold structure.
Mass
2.20Kg
Size
225x225mm
B
I
U
5
Scaffold Tubes
Tubes have a 48.3mm outside diameter and
the wall thickness of 4.05 the tubes are to be
used with all types of couplers and fittings
Putlog Single Coupler
Used for joining putlogs or transoms to
ledger tubes, providing a level unconstructed surface for planks
and boards. Also used for securing ledgers to standards.
Half Coupler
Forged Steel piece, fit for 48.3MM tube, which is flat and un-
plated, suitable for welding
Double Coupler
A strong drop forged connector, providing strength under load
bearing situations joining tubes at 90 degree angles.
Blade Putlog
plug adapter/pressed clamp, Converts 48.3mm scaffold tube into
putlog for insertion into brickwork joints.
Couplers Tubes
and Fittings
Length
0.6m, 0.9m, 1.2m,
1.5m, 1.8m, 2.1m,
2.4m, 2.7m, 3.0m,
3.3m, 3.6m, 3.9m,
4.2m, 4.5m, 4.8m,
5.1m, 5.4m, 5.7m,
6.0m, 6.3m, 6.5m
Mass:
1.0 kg
Mass: 1.25 kg
6
KWIKUP PRODUCT
BROCHURE 2014
Double Putlog Coupler
Makes connection of putlogs and transoms to standard scaffold tube while
allowing scaffold boards to be laid on top of the tube.
Beam Clamp
Solid one piece drop forged steel fitting providing quick and secure fixing toS
beamsb
Always to be used in pairsA
Swivel Beam Clamp
Drop forged with swivel capability used in pairs for variable angle clampingD
of 48.3mm O.D. scaffold tubes to steel beam flanges up to 45mm thicko
Hook Putlog
The Hook and base plate is made up of mild steel. Alternative to RAC
Mass: 1.5 kg
Mass: 1.6 kg
7
Internal Joiner
Internal expanding type fitting to connection scaffold tube vertically end to
end
Swivel Coupler
Connections to standard scaffold tube at any angle required.
External Joiner / Sleeve Coupler
External compression type fitting to connection scaffold tube end to end
Hoarding Clip
Forged Steel piece, scaffold stop-ends and scaffold guard board returns are
neatly and efficiently locked into the correct positions to secure scaffolding
Hook Coupler
Used to attach ladders to scaffold
Mass: 1.3 kg
Mass: 1.3 kg
8
KWIKUP PRODUCT
BROCHURE 2014
Adjustable
Formwork Prop
The adjustable prop Provide
emporary support and is easy to
et up.
Prop Nut
Used to lock prop height
U Head Jacks
A high capacity so
stem with a fixed
head
Shoring Jacks
A high capacity solid jack
stem with a fixed 8 inch U
head
Mass
3.86 kg
7.75 kg
1.50 kg
4.42 kg
0.24 kg
Length
Prop No.0) 1.2 M-1.8 M
Prop No.1) 1.7 M–2.5 M
Prop No.2) 2.0 M–3.0 M
Prop No.3) 2.6 M–3.8 M
Prop No.4) 3.2 M–5.0 M
A
F
Th
te
se
M
1
1
2
2
3
Le
(P
(P
(P
(P
(P
Props and
Formwork
cks
olid jack
8 inchh U
cks
9
Aluminium
Hand Rail
Aluminium Hand Rails
provide stability and
support when climbing
stairs units
Aluminium
Top Hand Rail
Provide stability and
support when climbing
stairs units
Mesh Steel
Pallet
is a steel transport
structure with a cage
that holds goods in a stable fashion while
being lifted by a forklift
Ladder
Beams
de a clear heavy
n between extended
6.3 m
Swivel Jack
Provides stability for uneven surface.
180 degree rotation for extra flexibility.
Constructed of heavy duty steel.
Galvanised for long lasting protection.
Solid Base Jack
Adjustable base jack enables accurate
leveling of the scaffolding on uneven
ground and infinite adjustment on
sloping ground
Size: 36ODx710mm
Mass: 7.5 kg
Aluminium Stairs Unit
Aluminium Stair Units are the
perfect product to incorporate
within your Kwikstage scaffold
system. These 1.5m high stair
rises are lightweight with non-
slip treads and platform. Hand-
rails and Exit Rails are also avail-
able and comply with Australian
Standards
Steel Pallet
is a steel transport structure
that supports goods in a sta-
ble fashion while being lifted
by a forklift
Accesories
List
L
B
To provid
duty span
distances6
M
P
i
s
10
KWIKUP PRODUCT
BROCHURE 2014
Branch &
Distribution
Network
Branch & Distribution Network
When you need scaffolding anywhere, anytime, think KwikUP.
Find Us Online or Just Call
Find us on the web at www.kwikup.com.au or call us at (02) 9729
2122 to talk to someone now. Our staff is Friendly and eager to
help find what you are looking for.
Warehouse Information
KwikUP Head Office: 02 9729 2122
FAX: 02 97292473
Sydney Warehouse
28 – 54 Percival road
Smithfield NSW – 2164
Perth Warehouse
Unit C, 33 McDowell St.
Welshpool WA 6106
Postal Address
Post – P.O.Box 2166
Smithfield NSW 2164
11
Contact Details
KwikUP Head Office: 02 9729 2122
FAX: 02 97292473
Sydney Warehouse
28 – 54 Percival road
Smithfield NSW – 2164
Perth Warehouse
Unit C, 33 McDowell St.
Welshpool WA 6106
Postal Address
Post – P.O.Box 2166
Smithfield NSW 2164
www.kwikup.com.au
info@kwikup.com.au

More Related Content

What's hot

Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frameSatish Kambaliya
 
Fero Strata product brochure 2013_strata-support-plates
Fero Strata product brochure 2013_strata-support-platesFero Strata product brochure 2013_strata-support-plates
Fero Strata product brochure 2013_strata-support-platesBrian Patience
 
Fero Strata product brochure 2013_friction_bolts
Fero Strata product brochure 2013_friction_boltsFero Strata product brochure 2013_friction_bolts
Fero Strata product brochure 2013_friction_boltsBrian Patience
 
Design of mat and combined footing
Design of mat and combined footingDesign of mat and combined footing
Design of mat and combined footingMd Faiz Ali
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and jointsDeven Diran
 
B.tech admission in india
B.tech admission in indiaB.tech admission in india
B.tech admission in indiaEdhole.com
 
Unit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsUnit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsSelvakumar Palanisamy
 
Steel connections
Steel connectionsSteel connections
Steel connectionsbabunaveen
 
Extreme Roof Bracket Adjustable
Extreme Roof Bracket AdjustableExtreme Roof Bracket Adjustable
Extreme Roof Bracket AdjustableRoofers World
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)ahsanrabbani
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints Hanzlahakhlaq
 

What's hot (20)

Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frame
 
Fero Strata product brochure 2013_strata-support-plates
Fero Strata product brochure 2013_strata-support-platesFero Strata product brochure 2013_strata-support-plates
Fero Strata product brochure 2013_strata-support-plates
 
Fero Strata product brochure 2013_friction_bolts
Fero Strata product brochure 2013_friction_boltsFero Strata product brochure 2013_friction_bolts
Fero Strata product brochure 2013_friction_bolts
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Posttension vs flat slab
Posttension vs flat slabPosttension vs flat slab
Posttension vs flat slab
 
Design of mat and combined footing
Design of mat and combined footingDesign of mat and combined footing
Design of mat and combined footing
 
Rail fastenings and joints
Rail fastenings and jointsRail fastenings and joints
Rail fastenings and joints
 
Slab
SlabSlab
Slab
 
shoring and its techniques
shoring and its techniquesshoring and its techniques
shoring and its techniques
 
B.tech admission in india
B.tech admission in indiaB.tech admission in india
B.tech admission in india
 
Unit IV composite beams and continuous beams
Unit IV composite beams and continuous beamsUnit IV composite beams and continuous beams
Unit IV composite beams and continuous beams
 
Presentation
PresentationPresentation
Presentation
 
Steel connections
Steel connectionsSteel connections
Steel connections
 
Extreme Roof Bracket Adjustable
Extreme Roof Bracket AdjustableExtreme Roof Bracket Adjustable
Extreme Roof Bracket Adjustable
 
Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)Design of steel structure as per is 800(2007)
Design of steel structure as per is 800(2007)
 
CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)CHE :- 6 form work (MODULE 3)
CHE :- 6 form work (MODULE 3)
 
Type of structural joints
Type of structural joints Type of structural joints
Type of structural joints
 
Beams and columns
Beams and columns Beams and columns
Beams and columns
 
HMA joint construction
HMA joint constructionHMA joint construction
HMA joint construction
 

Similar to kwikupproducts2014 (small)

CATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdf
CATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdfCATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdf
CATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdffaithservices1
 
Muscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemMuscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemAlthaf Ahmed
 
hitech scaffolding (1).pptx
hitech scaffolding (1).pptxhitech scaffolding (1).pptx
hitech scaffolding (1).pptxRTPatil2
 
Square Tube in Pune
Square Tube in PuneSquare Tube in Pune
Square Tube in PuneRTPatil2
 
Coupler in Pune
Coupler in PuneCoupler in Pune
Coupler in PuneRTPatil2
 
Bestfabs profile slide share
Bestfabs profile   slide shareBestfabs profile   slide share
Bestfabs profile slide shareMadhu Menon
 
Cam flick group
Cam flick groupCam flick group
Cam flick groupRothna sou
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1Est
 
mild steel
 mild steel mild steel
mild steelAnu Dang
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundationsaayush koolwal
 
Types of toggle clamp sp2
Types of toggle clamp sp2Types of toggle clamp sp2
Types of toggle clamp sp2toggleclamp
 
KIit App Guide 10-1-16 Print
KIit App Guide 10-1-16 PrintKIit App Guide 10-1-16 Print
KIit App Guide 10-1-16 PrintRobert Noose
 
Types of toggle clamp sp2
Types of toggle clamp sp2Types of toggle clamp sp2
Types of toggle clamp sp2toggleclamp
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningkuldeep361335
 

Similar to kwikupproducts2014 (small) (20)

CATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdf
CATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdfCATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdf
CATALOGUE - FAITH SCAFFOLDING PVT.LTD (3).pdf
 
Company Profile - NEW
Company Profile - NEWCompany Profile - NEW
Company Profile - NEW
 
Company Profile
Company ProfileCompany Profile
Company Profile
 
Muscat scaffolding Cuplock System
Muscat scaffolding Cuplock SystemMuscat scaffolding Cuplock System
Muscat scaffolding Cuplock System
 
hitech scaffolding (1).pptx
hitech scaffolding (1).pptxhitech scaffolding (1).pptx
hitech scaffolding (1).pptx
 
Square Tube in Pune
Square Tube in PuneSquare Tube in Pune
Square Tube in Pune
 
Coupler in Pune
Coupler in PuneCoupler in Pune
Coupler in Pune
 
Bestfabs profile slide share
Bestfabs profile   slide shareBestfabs profile   slide share
Bestfabs profile slide share
 
Cam flick group
Cam flick groupCam flick group
Cam flick group
 
Cam flick group
Cam flick groupCam flick group
Cam flick group
 
Structural Steel Work
 Structural Steel  Work Structural Steel  Work
Structural Steel Work
 
Portal frame 1
Portal  frame 1Portal  frame 1
Portal frame 1
 
mild steel
 mild steel mild steel
mild steel
 
Building construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, FoundationsBuilding construction 4- steel connection, Trusses, Joints, Foundations
Building construction 4- steel connection, Trusses, Joints, Foundations
 
Caster mounting
Caster mountingCaster mounting
Caster mounting
 
Types of toggle clamp sp2
Types of toggle clamp sp2Types of toggle clamp sp2
Types of toggle clamp sp2
 
Basic system scaffold
Basic system scaffoldBasic system scaffold
Basic system scaffold
 
KIit App Guide 10-1-16 Print
KIit App Guide 10-1-16 PrintKIit App Guide 10-1-16 Print
KIit App Guide 10-1-16 Print
 
Types of toggle clamp sp2
Types of toggle clamp sp2Types of toggle clamp sp2
Types of toggle clamp sp2
 
various types of scffolding and formwork with underpining
various types of scffolding and formwork with underpiningvarious types of scffolding and formwork with underpining
various types of scffolding and formwork with underpining
 

kwikupproducts2014 (small)

  • 1. 2014 PRODUCTS BROCHOURE Suppliers of Scaffolding and Steel Products www.kwikup.com.au
  • 2. Kwikstage Products K-Stage Standard Standards are vertical structural member of the scaffold system which are made from 48.3 OD X 4mm Tubes Standards have “V” pressings in clusters at 495 mm centres, which provide location points for Transoms, Ledgers, Braces, Hopups etc and a spigot fixed at the top. K-Stage Ledgers Ledgers is horizontal member of the scaffold system also known as guard rails are made from 48.3 OD X 3.2 mm & 4 mm tubes. Ledgers fit into the upper “V” Pressings on the standards. K-Stage Transom Transoms are made by welding two 5.00 mm angles back to back. Transoms fit into the lower “V” pressings on the standards to carry steel boards.2.4 m Truss Transom Used for heavy duty load spans and extended distances. Spigot Used to join 2 standards together. Requires either a hinged pin or special bolt. Mass 17.5kg 14.5kg 11.5kg 8.5kg 6.0kg 2.0kg Mass 9.2kg 7.0kg 5.0kg 4.3kg Mass 22.0kg 13.5kg 9.6kg 8.0kg 6.0kg Length 3.0m 2.5m 2.0m 1.5m 1.0m 0.5m Length 2.4m 1.8m 1.2m 0.7m Length 1.8m 1.2m 1.0m 0.7m K K Tr b 2 KWIKUP PRODUCT BROCHURE 2014
  • 3. K-Stage Steel Plank The steel plank spans between the transoms giving a non slip surface with a is hot dip galvanized finish. LVL Scaffold Plank Individually proof tested and compliant in accordance with AS 1577 for Stiffness, Strength, Sliding & Slip Available in various lengths & can be cross cut to exact lengths Stamped as Scaffold plank with AS compliance mark High strength Chamfered edges Suitable for PETROCHEMICAL & GAS industries Meets industry standards Enhanced durability & safety (AS) Competitively priced K-Stage Hop Ups Board Stage Brackets / hopups fit into the “V” pressing of the standard which is nearest to the wall. The 2 & 3 BSB have holes into which tie bar pins are attached. They are used to provide cantilevered platform on the inside of the scaffold nearest the wall. Diagonal Braces The diagonal brace is used to the full height of the scaf- folding in a longitudinal direction. Mass 15.0kg 10.5kg 6.5kg 4.0kg Length 2.4m 1.8m 1.2m 0.7m Mass 17.5kg 14.5kg 11.5kg 8.5kg 6.0kg 2.0kg Mass 2.5kg 6.0kg 9.0kg Mass 13.5kg 12.5kg 11.0kg 9.5kg 8.5kg 7.5kg Length 3.0m 2.5m 2.0m 1.5m 1.0m 0.5m Bracket Type 1Board 2Board 3Board Length 3.6m 3.2m 2.7m 2.4m 2.0m 1.7m 3
  • 4. K-Stage Tie Bars Tie bars have pins at each ends which fit in holes of 2 and 3 board stage brackets (hopups) to prevent the brackets from spreading and the planks from becoming dislodged. End Toe Board Brackets Fits into ‘V’ locating lugs on the standard at the end of a platform to hold the end batten toe board vertically in place. Toe Board Bracket Clamps to the standard with a captive wedge to hold the batten toe board vertically in place. Double C Clip / Gantry Coupler Used to Join Standards Back to Back Ladder Access Transom An adjustable transom with landing for ladder/stairs Mass 7.0kg 5.0kg 3.0kg 2.1kg Length 2.4m 1.8m 1.2m 0.7m Mass 1.5kg Mass 0.8kg b b 4 KWIKUP PRODUCT BROCHURE 2014
  • 5. Guardrail Post Used for edge protection – slab or balcony’s. Bolted into concrete with 14mm Dyna Bolts. Compatible with all sizes of ledgers which makes it very versatile. Step Down Bracket The first step onto a stair access or ladder access is always difficult due to site constraints, ground levels and base outs. The use of the adjustable step down bracket gives the comfort of adjustment to balance the variables so the step becomes balanced when getting on or getting off a stair access at ground level Wall Tie Bracket SizeSuitable for 48mm tube, used to secure the scaffold to a structure Base Plate Add more stability to your scaffold structures with a base plate. When secured the base plate stops tube from slipping across the floor. Internal Corner Panel Used with Hop Up Brackets to fill any corner gaps in the scaffold structure. Mass 2.20Kg Size 225x225mm B I U 5
  • 6. Scaffold Tubes Tubes have a 48.3mm outside diameter and the wall thickness of 4.05 the tubes are to be used with all types of couplers and fittings Putlog Single Coupler Used for joining putlogs or transoms to ledger tubes, providing a level unconstructed surface for planks and boards. Also used for securing ledgers to standards. Half Coupler Forged Steel piece, fit for 48.3MM tube, which is flat and un- plated, suitable for welding Double Coupler A strong drop forged connector, providing strength under load bearing situations joining tubes at 90 degree angles. Blade Putlog plug adapter/pressed clamp, Converts 48.3mm scaffold tube into putlog for insertion into brickwork joints. Couplers Tubes and Fittings Length 0.6m, 0.9m, 1.2m, 1.5m, 1.8m, 2.1m, 2.4m, 2.7m, 3.0m, 3.3m, 3.6m, 3.9m, 4.2m, 4.5m, 4.8m, 5.1m, 5.4m, 5.7m, 6.0m, 6.3m, 6.5m Mass: 1.0 kg Mass: 1.25 kg 6 KWIKUP PRODUCT BROCHURE 2014
  • 7. Double Putlog Coupler Makes connection of putlogs and transoms to standard scaffold tube while allowing scaffold boards to be laid on top of the tube. Beam Clamp Solid one piece drop forged steel fitting providing quick and secure fixing toS beamsb Always to be used in pairsA Swivel Beam Clamp Drop forged with swivel capability used in pairs for variable angle clampingD of 48.3mm O.D. scaffold tubes to steel beam flanges up to 45mm thicko Hook Putlog The Hook and base plate is made up of mild steel. Alternative to RAC Mass: 1.5 kg Mass: 1.6 kg 7
  • 8. Internal Joiner Internal expanding type fitting to connection scaffold tube vertically end to end Swivel Coupler Connections to standard scaffold tube at any angle required. External Joiner / Sleeve Coupler External compression type fitting to connection scaffold tube end to end Hoarding Clip Forged Steel piece, scaffold stop-ends and scaffold guard board returns are neatly and efficiently locked into the correct positions to secure scaffolding Hook Coupler Used to attach ladders to scaffold Mass: 1.3 kg Mass: 1.3 kg 8 KWIKUP PRODUCT BROCHURE 2014
  • 9. Adjustable Formwork Prop The adjustable prop Provide emporary support and is easy to et up. Prop Nut Used to lock prop height U Head Jacks A high capacity so stem with a fixed head Shoring Jacks A high capacity solid jack stem with a fixed 8 inch U head Mass 3.86 kg 7.75 kg 1.50 kg 4.42 kg 0.24 kg Length Prop No.0) 1.2 M-1.8 M Prop No.1) 1.7 M–2.5 M Prop No.2) 2.0 M–3.0 M Prop No.3) 2.6 M–3.8 M Prop No.4) 3.2 M–5.0 M A F Th te se M 1 1 2 2 3 Le (P (P (P (P (P Props and Formwork cks olid jack 8 inchh U cks 9
  • 10. Aluminium Hand Rail Aluminium Hand Rails provide stability and support when climbing stairs units Aluminium Top Hand Rail Provide stability and support when climbing stairs units Mesh Steel Pallet is a steel transport structure with a cage that holds goods in a stable fashion while being lifted by a forklift Ladder Beams de a clear heavy n between extended 6.3 m Swivel Jack Provides stability for uneven surface. 180 degree rotation for extra flexibility. Constructed of heavy duty steel. Galvanised for long lasting protection. Solid Base Jack Adjustable base jack enables accurate leveling of the scaffolding on uneven ground and infinite adjustment on sloping ground Size: 36ODx710mm Mass: 7.5 kg Aluminium Stairs Unit Aluminium Stair Units are the perfect product to incorporate within your Kwikstage scaffold system. These 1.5m high stair rises are lightweight with non- slip treads and platform. Hand- rails and Exit Rails are also avail- able and comply with Australian Standards Steel Pallet is a steel transport structure that supports goods in a sta- ble fashion while being lifted by a forklift Accesories List L B To provid duty span distances6 M P i s 10 KWIKUP PRODUCT BROCHURE 2014
  • 11. Branch & Distribution Network Branch & Distribution Network When you need scaffolding anywhere, anytime, think KwikUP. Find Us Online or Just Call Find us on the web at www.kwikup.com.au or call us at (02) 9729 2122 to talk to someone now. Our staff is Friendly and eager to help find what you are looking for. Warehouse Information KwikUP Head Office: 02 9729 2122 FAX: 02 97292473 Sydney Warehouse 28 – 54 Percival road Smithfield NSW – 2164 Perth Warehouse Unit C, 33 McDowell St. Welshpool WA 6106 Postal Address Post – P.O.Box 2166 Smithfield NSW 2164 11
  • 12. Contact Details KwikUP Head Office: 02 9729 2122 FAX: 02 97292473 Sydney Warehouse 28 – 54 Percival road Smithfield NSW – 2164 Perth Warehouse Unit C, 33 McDowell St. Welshpool WA 6106 Postal Address Post – P.O.Box 2166 Smithfield NSW 2164 www.kwikup.com.au info@kwikup.com.au