Mobile Infrastructure and Long-term Solutions This presentation is designed to be amended before presentation to customers...
What are Mobile Infrastructure and Long-term Solutions? <ul><li>Mobile Infrastructure Solutions </li></ul><ul><li>Solution...
Long-term Solutions <ul><li>Modular, high specification construction </li></ul><ul><li>1,000–13,700 sq ft of CER (63–344 k...
Long-term Site Requirements <ul><li>Site requirements </li></ul><ul><li>Reasonably level site </li></ul><ul><li>Hard stand...
Long-term Construction Process <ul><li>Foundations laid out and levelled </li></ul><ul><li>Flat pack units (4 per truck)  ...
<ul><li>Wall panels installed </li></ul><ul><li>Air-conditioning units positioned and connected. </li></ul>Long-term Const...
Long-term Construction Process (continued) <ul><li>Raised floor installed </li></ul><ul><li>Small power installed (workpla...
Long-term Construction Process (continued) <ul><li>Furniture installed (workplace only) </li></ul><ul><li>Ramps and access...
Mobile Infrastructure Package <ul><li>Mitigates the effects of a disaster </li></ul><ul><li>Survey at an additional charge...
Mobile UPS <ul><li>400KVA containerised UPS </li></ul><ul><li>2 x 60KVA UPS (can be run in parallel to create 120KVA) </li...
Mobile Workplace <ul><li>2 or 3 volumetric units delivered within 24–36 hours </li></ul><ul><li>15 or 20 position desks an...
Mobile Midrange Recovery Unit <ul><li>Included within the Mobile Infrastructure Package but available separately </li></ul...
Bespoke Solutions <ul><li>Mobile Bank Branch provided for major Scottish bank  </li></ul><ul><li>Incident control solution...
Thank You
Upcoming SlideShare
Loading in …5
×

SunGard Mobile Infrastructure and long-term solutions

544 views

Published on

MOBILE:
If you can’t come to us, we’ll come to you! SunGard can deliver self-contained mobile units equipped with power, air conditioning and PBXs to house key IT staff and recovery servers to your own site or a pre-determined recovery location. Your mobile unit could be with you in as little as 8 hours and kept for up to 13 weeks.

The Mobile Infrastructure Package provides short-term support when an incident has occurred which affects the normal operation of your business but which is not serious enough to require a full transfer to one of our fixed disaster recovery sites.

Typically this might mean where there has been a minor fire, limited water damage or loss of electricity through an incident such as fire, explosion or flooding. The service comprises:

•Portable Accommodation and Storage Units
•Mobile Air Conditioning Units
•Power Distribution Units
•Diesel Generators and UPS
•Portable Structured Cabling
•Compatibility
•We advise customers to ensure that the equipment supplied by SunGard is capable of connecting into their environment.


LONG TERM:


Survive a building loss without having to relocate
The immediate response to an incident that affects the workplace is to move your key staff to one of SunGard's workplace recovery centres to ensure that your business continues to operate. Our state-of-the-art business recovery centres are strategically located throughout Britain.

However, when your premises are going to be out of action for more than three months SunGard can deliver an alternative workplace. The units can be delivered within 24 hours – 5 days, depending on their size, for indefinite use. The modular buildings can house up to 300 office staff or a data centre and are designed for customers who either own land or can obtain permission to install temporary buildings on site. The facility can be fitted out with all the office technology and telephony you need, along with power and air conditioning.

From delivery of PCs and servers to a complete office environment
SunGard's long-term recovery products offer the UK's most advanced range of facilities and services to ensure that your business survives.

Servers, PCs and communications, including data and telephony, can be pre-configured to your requirements and delivered to these temporary offices for even faster recovery.

Published in: Business
  • Be the first to comment

  • Be the first to like this

SunGard Mobile Infrastructure and long-term solutions

  1. 1. Mobile Infrastructure and Long-term Solutions This presentation is designed to be amended before presentation to customers. You may want to remove all references to cost (indicated in red) which are included for the benefit of account managers. Full details are included in the Workplace Price guide.
  2. 2. What are Mobile Infrastructure and Long-term Solutions? <ul><li>Mobile Infrastructure Solutions </li></ul><ul><li>Solutions delivered in 48 hours or less and designed to mitigate the effects of a disaster. </li></ul><ul><li>Long-term Solutions </li></ul><ul><li>Computer Equipment Room (CER) or Workplace constructed on your car park, over 5–20 days and available for long periods (up to 2 years or more). </li></ul>
  3. 3. Long-term Solutions <ul><li>Modular, high specification construction </li></ul><ul><li>1,000–13,700 sq ft of CER (63–344 kW cooling) </li></ul><ul><li>30–300 positions of Workplace Recovery </li></ul><ul><li>… or a combination of Workplace Recovery and CER </li></ul><ul><li>Erected within 5–20 days </li></ul><ul><li>Occupation for up to 2 years (longer with planning permission) </li></ul><ul><li>Minimal site preparation required </li></ul><ul><li>Initial survey included </li></ul><ul><li>Regularly tested </li></ul><ul><li>Cost-effective (£2,000 to £25,000 pa) </li></ul><ul><li>No invocation charge (cost +15% administration charge). </li></ul>
  4. 4. Long-term Site Requirements <ul><li>Site requirements </li></ul><ul><li>Reasonably level site </li></ul><ul><li>Hard standing </li></ul><ul><li>Access for articulated vehicles </li></ul><ul><li>Access for 25T crane </li></ul><ul><li>Space for external air-conditioning units, access ramps and generator </li></ul><ul><li>Optional preparation </li></ul><ul><li>Power </li></ul><ul><li>Communications </li></ul><ul><li>Foundation pads (for green field sites) </li></ul><ul><li>Planning permission. </li></ul>
  5. 5. Long-term Construction Process <ul><li>Foundations laid out and levelled </li></ul><ul><li>Flat pack units (4 per truck) lifted into position. </li></ul>
  6. 6. <ul><li>Wall panels installed </li></ul><ul><li>Air-conditioning units positioned and connected. </li></ul>Long-term Construction Process (continued)
  7. 7. Long-term Construction Process (continued) <ul><li>Raised floor installed </li></ul><ul><li>Small power installed (workplace only) </li></ul><ul><li>Cat6 structured cabling (workplace only). </li></ul>
  8. 8. Long-term Construction Process (continued) <ul><li>Furniture installed (workplace only) </li></ul><ul><li>Ramps and access stairs installed </li></ul><ul><li>Total erection time – 5 to 20 days. </li></ul>
  9. 9. Mobile Infrastructure Package <ul><li>Mitigates the effects of a disaster </li></ul><ul><li>Survey at an additional charge </li></ul><ul><li>Air-conditioning units (2.9kW to 63kW) </li></ul><ul><li>Power distribution units </li></ul><ul><li>Generators (6KVA–1000KVA) </li></ul><ul><li>Portable accommodation units </li></ul><ul><li>Cat6 structured cabling </li></ul><ul><li>Delivered within 12 hours </li></ul><ul><li>Cost-effective (£3,000 pa) </li></ul><ul><li>No invocation charge (cost +15% administration charge). </li></ul>
  10. 10. Mobile UPS <ul><li>400KVA containerised UPS </li></ul><ul><li>2 x 60KVA UPS (can be run in parallel to create 120KVA) </li></ul><ul><li>Delivered within 24 hours </li></ul><ul><li>No invocation charge (cost +15% administration charge) </li></ul><ul><li>Cost-effective (1,500 to £4,000 pa) </li></ul><ul><li>No invocation charge (cost +15% administration charge). </li></ul>
  11. 11. Mobile Workplace <ul><li>2 or 3 volumetric units delivered within 24–36 hours </li></ul><ul><li>15 or 20 position desks and chairs </li></ul><ul><li>Integral air conditioning </li></ul><ul><li>Pre-installed Cat5e structured cabling and small power </li></ul><ul><li>Avaya Prologix PBX with 15 or 20 analogue extensions </li></ul><ul><li>Wireless intruder alarm system </li></ul><ul><li>Containerised 50kVA power generator set (for 4 weeks) </li></ul><ul><li>Cost-effective (£3,000 or £4,000 pa) </li></ul><ul><li>No invocation charge (cost +15% administration charge). </li></ul>
  12. 12. Mobile Midrange Recovery Unit <ul><li>Included within the Mobile Infrastructure Package but available separately </li></ul><ul><li>200 sq ft stand alone unit, complete with air-conditioning </li></ul><ul><li>Delivered within 24 hours </li></ul><ul><li>Cost-effective (£900 pa) </li></ul><ul><li>No invocation charge (cost +15% administration charge). </li></ul>
  13. 13. Bespoke Solutions <ul><li>Mobile Bank Branch provided for major Scottish bank </li></ul><ul><li>Incident control solution for Health & Safety Executive. </li></ul>
  14. 14. Thank You

×