TITLE:- THEODOLITE TRAVERSING
OBJECTIVES:
 To know the advantages of bearing and their use in various survey works.
 To be familiar with the checks and errors in a closed traverse and solve them.
 To be familiar with various types and methods of traverse surveying for detailing.
 To know well about the traverse computation and be fluent in it.
INSTRUMENTSREQUIRED:
 Theodolite with Tripod Stand
 Tape
 Ranging rod
 Pegs and Hammer
 Prismatic Compass with Stand.
THEORY :-
Traversing is that type of survey in which member of connected survey lines from the frame work and the
direction and lengths of the survey lines are measured with the help of an angle measuring instrument and
a tape. When the lines form a circuit which ends at the starting points, it is known as closed traverse. It the
circuit ends else. where,it is said to be an open traverse.
The close traverse is suitable for locating the boundaries of lakes, grounds, city maps etc. and for the
survey of large areas,whereas open traverse is suitable for surveying a long narrow strip of land as
required for a road or canal or the coast line.
The main principle of traverse is that a series of the straight line are connected to each other and the
length and direction of each lines are known. The joins of two points of each lines is known as traverse
station and the angle at any station between two consecutive traverse legs is known as traverse angle.
THEODOLITE TRAVERSING:-
Theodolite traversing is a method of establishing control points, their positionbeing determined by
measuring the distances between the traverse stations (which serve as control points) and the
angles subtended at the various stations by their adjacent stations. The traversing in which the
length between two stations of the traverse is measured directly by chaining or taping in the ground
and angle of the station is measured by the theodolite is called theodolite traversing.
PROCEDURE:
- First of all the traverse stations were fixed around the given area to the surveyed keeping
in the ratio of traverse legs 1:2 for major and 1:3 for minor traverse. The stations were
chosen in this place where instrument is easy to setup.
- Measurement of the horizontal distance between one station to another station by using
the tape. And also measure the nearby permanent structure for reference when
unfortunately traverse station is missing.
- Now, with the help of theodolite two sets of horizontal angle between the traverse legs
were measured. i.e. face left and face right.
- The height of the instrument in every set up of theodolite was also measured.
- With the help of prismatic compass, magnetic bearing of one traverse line was measured.
CONCLUSION :
Here the traverse computation is done in above tabular form. For complete traverse
computations, following steps were carried out:
- The interior angles were adjusted to satisfy the geometrical conditions, ie sum of interior
angles to be equal to (2n-4)x90
- Starting with observed bearing of one line the bearings of all the others lines were
calculated.
- Consecutive co-ordinates (latitude and departure) were calculated. i.e. ∑ L and ∑ D
- Necessary corrections were applied to the latitudes and departures of the lines so that ∑
L=0 and ∑ D=0. The corrections were applied by the transit rule.
Using the corrected consecutive co-ordinates, the independent value were calculated.
- The correct lengths and the correct bearings of the traverse lines were also calculated
using the corrected consecutive co-ordinates.
i.e. true length (l) =√(L^2+D^2 )
true bearing (θ) = tan-1( D/L )
The traverse lines or legs should be passed through the area to be surveyed.
https://www.scribd.com/document/367091011/Survey-Camp-Report-2017-at-NEA-Kharipati-
Bhaktapur-by-Suman-Jyoti

More Related Content

What's hot

Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1Est
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - TraversingXinYee Khoo
 
Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-LevelingShane Ah
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - TraverseKai Yun Pang
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Est
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - LevellingKai Yun Pang
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfMuhammadMuazzam16
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversingseenyee
 
Combiend curves of surveying
Combiend curves of surveyingCombiend curves of surveying
Combiend curves of surveyingShahIshani1996
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2Shane Ah
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Riezat Zainal
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: TransversingFarah Sham
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Haziq1511
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Enoch Wong
 

What's hot (20)

Levelling report
Levelling reportLevelling report
Levelling report
 
Site surveying report1
Site surveying report1Site surveying report1
Site surveying report1
 
Traversing
TraversingTraversing
Traversing
 
Site Surveying Report - Traversing
Site Surveying Report - TraversingSite Surveying Report - Traversing
Site Surveying Report - Traversing
 
Site surveying-Leveling
Site surveying-LevelingSite surveying-Leveling
Site surveying-Leveling
 
Assignment 2 - Traverse
Assignment 2 - TraverseAssignment 2 - Traverse
Assignment 2 - Traverse
 
Lecture 1 precise levelling
Lecture 1 precise levellingLecture 1 precise levelling
Lecture 1 precise levelling
 
Sem 2 Site surveying report 2
Sem 2 Site surveying report 2Sem 2 Site surveying report 2
Sem 2 Site surveying report 2
 
Assignment 1 - Levelling
Assignment 1 - LevellingAssignment 1 - Levelling
Assignment 1 - Levelling
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdfREPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
 
Project 2- traversing
Project 2- traversingProject 2- traversing
Project 2- traversing
 
Combiend curves of surveying
Combiend curves of surveyingCombiend curves of surveying
Combiend curves of surveying
 
Site surveying-report-2
Site surveying-report-2Site surveying-report-2
Site surveying-report-2
 
Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)Area and Volume Survey Engineering (RZ)
Area and Volume Survey Engineering (RZ)
 
SITE SURVEYING: Transversing
SITE SURVEYING: TransversingSITE SURVEYING: Transversing
SITE SURVEYING: Transversing
 
Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)Site Surveying Report 2 (Traversing)
Site Surveying Report 2 (Traversing)
 
Setting out work
Setting out workSetting out work
Setting out work
 
Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)Fieldwork 2 (Traversing)
Fieldwork 2 (Traversing)
 
Triangulation
Triangulation Triangulation
Triangulation
 

Similar to Theory of theodolite traversing

Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) PartBishnuBhandari12
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docxalexandermwaura
 
contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdfshucaybcabdi
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdfsandipanpaul16
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse surveyanjali adabala
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveyingSimonReuben2
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveyingPhurba Tamang
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levellingParimal Jha
 
survey 12.pdf
survey 12.pdfsurvey 12.pdf
survey 12.pdfDarSafwan
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and TrilaterationPramesh Hada
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric surveyStudent
 
Wall Station Surveys
Wall Station SurveysWall Station Surveys
Wall Station Surveysbrett_grocock
 
CE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & GeomaticsCE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & GeomaticsBIKIMALLIK1
 
Surveying instruments with their uses
Surveying instruments with their uses Surveying instruments with their uses
Surveying instruments with their uses Talha Hussain
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptxJanak82
 

Similar to Theory of theodolite traversing (20)

Survey camp report main (2nd) Part
Survey camp report main (2nd) PartSurvey camp report main (2nd) Part
Survey camp report main (2nd) Part
 
traversing survey principles.docx
traversing survey principles.docxtraversing survey principles.docx
traversing survey principles.docx
 
surveying contouring
surveying contouring surveying contouring
surveying contouring
 
contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdf
 
Contouring
ContouringContouring
Contouring
 
fundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdffundamentals_of_surveying (2).pdf
fundamentals_of_surveying (2).pdf
 
1392741020 traverse survey
1392741020 traverse survey1392741020 traverse survey
1392741020 traverse survey
 
Fundamentals of surveying
Fundamentals of surveyingFundamentals of surveying
Fundamentals of surveying
 
Theodolite surveying
Theodolite surveyingTheodolite surveying
Theodolite surveying
 
Triangulation survey
Triangulation surveyTriangulation survey
Triangulation survey
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
survey 12.pdf
survey 12.pdfsurvey 12.pdf
survey 12.pdf
 
Triangulation and Trilateration
Triangulation and TrilaterationTriangulation and Trilateration
Triangulation and Trilateration
 
Tacheometric survey
Tacheometric surveyTacheometric survey
Tacheometric survey
 
Wall Station Surveys
Wall Station SurveysWall Station Surveys
Wall Station Surveys
 
CE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & GeomaticsCE(PC)403 Surveying & Geomatics
CE(PC)403 Surveying & Geomatics
 
Surveying instruments with their uses
Surveying instruments with their uses Surveying instruments with their uses
Surveying instruments with their uses
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
surveying and levelling.pptx
surveying and levelling.pptxsurveying and levelling.pptx
surveying and levelling.pptx
 

More from Suman Jyoti

A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...Suman Jyoti
 
A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...Suman Jyoti
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Suman Jyoti
 
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSurvey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSuman Jyoti
 
Engineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 reportEngineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 reportSuman Jyoti
 
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...Suman Jyoti
 
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman JyotiAggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman JyotiSuman Jyoti
 
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...Suman Jyoti
 
Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021Suman Jyoti
 
Topographic map level transfer to traverse
Topographic map level transfer to traverseTopographic map level transfer to traverse
Topographic map level transfer to traverseSuman Jyoti
 
Topographic map fly levelling 1
Topographic map fly levelling 1Topographic map fly levelling 1
Topographic map fly levelling 1Suman Jyoti
 
Topographic map detailling 1
Topographic map detailling  1Topographic map detailling  1
Topographic map detailling 1Suman Jyoti
 
Topographic map distance and angular measurement 0
Topographic map  distance and angular measurement  0Topographic map  distance and angular measurement  0
Topographic map distance and angular measurement 0Suman Jyoti
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversingSuman Jyoti
 
Road alignment survey 02
Road alignment survey 02Road alignment survey 02
Road alignment survey 02Suman Jyoti
 
Road alignment survey 01
Road alignment survey 01Road alignment survey 01
Road alignment survey 01Suman Jyoti
 
Bridge site survey 02
Bridge site survey 02Bridge site survey 02
Bridge site survey 02Suman Jyoti
 
Bridge site survey 01
Bridge site survey 01Bridge site survey 01
Bridge site survey 01Suman Jyoti
 
Theory of linear measurement
Theory of linear measurementTheory of linear measurement
Theory of linear measurementSuman Jyoti
 
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyotiSurvey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyotiSuman Jyoti
 

More from Suman Jyoti (20)

A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
A Thesis of NUMERICAL SIMULATION OF FLOW THROUGH OPEN CHANNEL WITH SERIES OF ...
 
A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...A thesis of numerical simulation of flow through open channel with series of ...
A thesis of numerical simulation of flow through open channel with series of ...
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
 
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pagesSurvey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
Survey camp report of Madan Ashrit at Kharipati - Bhaktapur! 100 pages
 
Engineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 reportEngineering materials bsc. civil lab 14 report
Engineering materials bsc. civil lab 14 report
 
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
Cement: Properties, uses and types, manufacturing methods, reaction taking pl...
 
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman JyotiAggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
Aggregates, Types, Properties, Sources, Uses and its test by Suman Jyoti
 
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
Economics 50 long questions solve by suman jyoti (dhaka university of enginee...
 
Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021Ielts speaking by suman jyoti 2020/021
Ielts speaking by suman jyoti 2020/021
 
Topographic map level transfer to traverse
Topographic map level transfer to traverseTopographic map level transfer to traverse
Topographic map level transfer to traverse
 
Topographic map fly levelling 1
Topographic map fly levelling 1Topographic map fly levelling 1
Topographic map fly levelling 1
 
Topographic map detailling 1
Topographic map detailling  1Topographic map detailling  1
Topographic map detailling 1
 
Topographic map distance and angular measurement 0
Topographic map  distance and angular measurement  0Topographic map  distance and angular measurement  0
Topographic map distance and angular measurement 0
 
Theodolite traversing
Theodolite traversingTheodolite traversing
Theodolite traversing
 
Road alignment survey 02
Road alignment survey 02Road alignment survey 02
Road alignment survey 02
 
Road alignment survey 01
Road alignment survey 01Road alignment survey 01
Road alignment survey 01
 
Bridge site survey 02
Bridge site survey 02Bridge site survey 02
Bridge site survey 02
 
Bridge site survey 01
Bridge site survey 01Bridge site survey 01
Bridge site survey 01
 
Theory of linear measurement
Theory of linear measurementTheory of linear measurement
Theory of linear measurement
 
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyotiSurvey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
Survey camp report 2017 at nea kharipati, bhaktapur by suman jyoti
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 

Theory of theodolite traversing

  • 1. TITLE:- THEODOLITE TRAVERSING OBJECTIVES:  To know the advantages of bearing and their use in various survey works.  To be familiar with the checks and errors in a closed traverse and solve them.  To be familiar with various types and methods of traverse surveying for detailing.  To know well about the traverse computation and be fluent in it. INSTRUMENTSREQUIRED:  Theodolite with Tripod Stand  Tape  Ranging rod  Pegs and Hammer  Prismatic Compass with Stand. THEORY :- Traversing is that type of survey in which member of connected survey lines from the frame work and the direction and lengths of the survey lines are measured with the help of an angle measuring instrument and a tape. When the lines form a circuit which ends at the starting points, it is known as closed traverse. It the circuit ends else. where,it is said to be an open traverse. The close traverse is suitable for locating the boundaries of lakes, grounds, city maps etc. and for the survey of large areas,whereas open traverse is suitable for surveying a long narrow strip of land as required for a road or canal or the coast line. The main principle of traverse is that a series of the straight line are connected to each other and the length and direction of each lines are known. The joins of two points of each lines is known as traverse station and the angle at any station between two consecutive traverse legs is known as traverse angle. THEODOLITE TRAVERSING:- Theodolite traversing is a method of establishing control points, their positionbeing determined by measuring the distances between the traverse stations (which serve as control points) and the angles subtended at the various stations by their adjacent stations. The traversing in which the length between two stations of the traverse is measured directly by chaining or taping in the ground and angle of the station is measured by the theodolite is called theodolite traversing. PROCEDURE: - First of all the traverse stations were fixed around the given area to the surveyed keeping in the ratio of traverse legs 1:2 for major and 1:3 for minor traverse. The stations were chosen in this place where instrument is easy to setup. - Measurement of the horizontal distance between one station to another station by using the tape. And also measure the nearby permanent structure for reference when unfortunately traverse station is missing. - Now, with the help of theodolite two sets of horizontal angle between the traverse legs were measured. i.e. face left and face right. - The height of the instrument in every set up of theodolite was also measured. - With the help of prismatic compass, magnetic bearing of one traverse line was measured.
  • 2. CONCLUSION : Here the traverse computation is done in above tabular form. For complete traverse computations, following steps were carried out: - The interior angles were adjusted to satisfy the geometrical conditions, ie sum of interior angles to be equal to (2n-4)x90 - Starting with observed bearing of one line the bearings of all the others lines were calculated. - Consecutive co-ordinates (latitude and departure) were calculated. i.e. ∑ L and ∑ D - Necessary corrections were applied to the latitudes and departures of the lines so that ∑ L=0 and ∑ D=0. The corrections were applied by the transit rule. Using the corrected consecutive co-ordinates, the independent value were calculated. - The correct lengths and the correct bearings of the traverse lines were also calculated using the corrected consecutive co-ordinates. i.e. true length (l) =√(L^2+D^2 ) true bearing (θ) = tan-1( D/L ) The traverse lines or legs should be passed through the area to be surveyed. https://www.scribd.com/document/367091011/Survey-Camp-Report-2017-at-NEA-Kharipati- Bhaktapur-by-Suman-Jyoti