The document provides a summary of Steven White's professional experience and qualifications. It outlines his over 10 years of experience in the pipeline industry, including experience in preliminary route selection, above ground as-builts, welding inspection, and familiarity with regulatory standards. It also lists his current certification as a CPWI+ Certified Pipeline Welding Inspector and details several pipeline projects he has worked on with companies like Gulf South, Energy Transfer, and Enterprise Products Partners, among others.
Book Paid Saswad Call Girls Pune 8250192130Low Budget Full Independent High P...
Pipeline Survey Professional with Over 10 Years Experience
1. Steven White
Whites1@suddenlink.net
(318)372-4907 6071 Old Monroe Rd Bastrop, La 71220
Professional Profile
I have been in the Pipeline Industry since 2008 and have completed several projects. I
have experience from preliminary route selection to above ground Asbuilt’s. I am
proficient with the C.A.T.S. Traceability. Currently hold a CPWI+ Certified Pipeline
Welding Inspector Certificate. I am familiar with API 1104, ASME B31.4, ASME B31.8,
Transportation DOT 195 and 192 regulations and standards. Proficient with excel, digital
camera, various reports. Strive to bring accuracy and detail oriented data to meet the
client’s needs.
Linked In Profile
link:https://www.linkedin.com/profile/view?id=287118702&trk=nav_responsive_tab_p
rofile_pic
Project Coordination
Preliminary Route Selection
Staking and Restake
HDD and Road Bores
Weld Mapping
Tie In’s
Professional Experience
Site Work and ISO Drawing’s
Lowering In
Pot Hole
Clearing, Grade, Ditching and
Clean up
Boundary Survey
Pipe Tally
Projects :
Gulf South 2015:
24’’ Meter site (Asbuilt) Calhoun, La
2’’ Seme Jumper (Asbuilt) Richton, Ms 5 Miles
Wildhorse Midstream 2015:
16’’ Spillers to DCP (Asbuilt) Choudrant, La 15 Miles
6’’ Emory Well Connect (Preliminary) Choudrant, La 1.5 Miles
PennTex 2015:
8’’ Lateral (Asbuilt) Simsboro, La 3 Miles
10’’ NGL Ext. (Asbuilt) Bryceland, La 15 Miles
CenterPoint Energy 2015:
12’’ Oxford (Preliminary) Oxford, Ms 15 Miles
Kinder Morgan 2008-2009, 2015:
42” Rockies Express (Restake and Asbuilt) Illinois and Indiana 140 Miles
8’’ Ethanol Rail Terminal, Tank and Truck Terminal (Above Ground Asbuilt) Belton, SC
6’’ Bio Diesel Rail Terminal, Tank and Truck Terminal (Above Ground Asbuilt) Belton, SC
43 Acre Topographic Survey for Future Rail Terminal and Tank Farm Expansion Belton, SC
5 Acre Topographic Survey for Compressor Station, North Augusta, SC
43 Acre Topographic Survey for Future Trucking Terminal, Richmond Hill, Ga
2. Steven White318-372-4907whites1@suddenlink.net
Page 2
Thanks
Energy Transfer 2010-2012, 2015 :
42” Tiger Pipeline (Restake and Asbuilt) Louisiana 120 Miles
16” Lone Star Pipeline(Stake, Restake, and Asbuilt)Texas 120 Miles
36” Lone Star Express(Preliminary and Boundary)Texas 150 Miles
Enterprise Products Partners L.P 2010-2012:
20’’ & 24” Shilling to Shoup (Preliminary) Texas 93 Miles
42’’ & 36’’ Acadian Haynesville Extension (Restake and Asbuilt) Louisiana 100 Miles
24’’ Sealy to Falls City Crude Pipeline (Restake and Asbuilt) Texas 120 Miles
Copano 2011:
24’’ Boldt Pipeline (Asbuilt) Texas 25 Miles
24’’ Brisco Pipeline (Asbuilt) Texas 27 Miles
30’’ Liberty Pipeline (Asbuilt) Texas 30 Miles
NET 2011-2013:
30’’ Eagle Ford Midstream (Restake and Asbuilt) Texas 106 Miles
16’’ Tilden to Cotulla (Asbuilt) Texas 27 Miles
4’’ Ashe 1 (Meter Site Asbuilt) Texas
4’’ Cresent Sea (Meter Site Asbuilt) Texas
6’’ Goodridge Lateral (Preliminary, Restake and Asbuilt) Texas 2 Miles
6’’ Nueces Mineral Lateral (Preliminary, Restake and Asbuilt) Texas 6 Miles
Devon Energy 2013-2014:
12’’ Victoria Express Pipeline (Staking and Asbuilt)Texas 57 Miles
Sunoco 2014:
12’’ Granite Wash Extension (Asbuilt) Oklahoma and Texas 186 Miles
Navitas Midstream 2014-2015:
20’’ Labahia (Preliminary) Texas 13 Miles
12’’ Innerconnect (Preliminary) Texas 2 Miles
6’’ Blinky (Preliminary) Texas 1.5 Mile
6’’ Chapparal (Preliminary) Texas 4.5 Mile
Hunt, Guillot, and Associates Ruston, La
6/15 to current
Party Chief
Responsibilities:
Meet with Project Manager
Complete all Phases from Preliminary Survey to Above Ground Asbuilt.
Various reports
Pipeline Project Services West Monroe, La
10/14 to 1/15, 3/15 to 6/15
Survey Supervisor/ Party Chief
Responsibilities:
Direct three crew on 4 Project
Time and Expense Management
Coordinate with Row and Gas Company on project priorities
Stantec West Monroe, La
07/14 to 10/14
Party Chief
3. Steven White318-372-4907whites1@suddenlink.net
Page 3
Thanks
Responsibilities:
Daily Reports
Asbuilt Pipelines
Clean Professional Appearance
Mustang Engineering, Houston, Tx
10/12 to 7/14, 1/15 to 3/15
Crew Chief
Responsibilities:
Tie Ins
Lowering In
Staking Row
Daily progress and expense reports
Gullet and Associates, Houston, Tx
4/10 to 9/10-4/11 to 10/12
Party Chief
Responsibilities:
Hiring new employee’s and training
Daily progress and expense reports
Asbuilts
Vehicle maintenance and professional appearance
Sam Inc, Austin, Tx
9/10 to 4/11
Instrument man/ Crew Chief
Responsibilities:
Preliminary
Asbuilt
Daily progress reports and JSA’s
Locate existing hot line’s
Education
University Louisiana Monroe, Monroe, La
Occupational Therapy
DNF
National Welding Burton, Tx
Welding Inspection
CPWI+
References
Laz Machen-RPLS-318-732-0060 Pipeline Project Services (former Stantec)
Danny Smith- RPLS -903-563-5072 Crossways Survey
Noel Collum-Survey Supervisor-318-805-8410 Wood Group Mustang Engineering
Robert Hood-RPLS-832-269-0011 DPS HDD