SlideShare a Scribd company logo
1 of 10
Download to read offline
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
1
Curriculum Vitae
Sten Johansson
Profession:  Principal Process Engineer
Education:  Diploma in Mining and Metallurgical
Engineering, Skellefteå Senior Technical
College, Skellefteå, Sweden, 1964.
 Chemistry 101,102,103 and Geology
101,102,103,
University of South Africa, 1975.
 Management Accounting Course, Wits
Business School, 1991.
 SEM 1 Management Course, 1982.
Registrations /
Affiliations
 Member, South African Institute of Mining
and Metallurgy.
Specialisation
Process engineering and operation. Design and operation of process and beneficiation plants for base
metals, gold, heavy minerals, iron ores and vanadium, chrome, steel and stainless steel production.
Recent and current activities include mining feasibility projects, reviews in support of CPR and due diligence
work as well as trouble shooting in operational plants.
Expertise
Sten has spent his entire career in process engineering since 1966. Experience includes design, research,
operations, project management and consultancy in a broad selection of metals including iron ore,
vanadium, lead, zinc, copper, gold and uranium. Sten has particular expertise in pelletizing, melting and
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
2
SAG milling applications. His experience has been applied in studies conducted in Europe, South Africa,
Ukraine, Brazil, Italy and various sub-Saharan African countries.
Sten also contributed to the development of the Carbon-in Pulp process for gold recovery including
managing pilot plant operations at Gencor and the design of the process for the Beatrix and Grootvlei
Plants.
The following are key areas of expertise:
 Iron ore processing
 SAG milling applications
 Pyrometallurgy and pelletizing
 Steel and stainless steel making
 Ferrochrome and ferromanganese production
 Gold and Uranium Production
 Vanadium production
 Base metal floatation and refining
 Phosphate flotation
 Hydrometallurgical processes including leaching, ion exchange and solvent extraction
 Heavy metals recovery
 Sten has extensive experience in the operation of smelter plants over a variety of products.
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
3
Employment History
2012 - 2015 Principal Metallurgical Consultant Royal HaskoningDHV (Associated)
2004 - 2012 Principal Metallurgical Consultant Turgis Consulting (Pty) Ltd (Associated)
2002 - 2004 Independent Metallurgical Consultant
1996 - 2002 Process Consultant Columbus Stainless Steel
1986 - 1996 Process Engineer & Consultant Columbus Joint Venture
1985 - 1986 Consulting Metallurgist Samancor Ltd. - Chrome Division
1979 - 1985 Head Metallurgical Engineer Gencor Group Research Laboratory
1977 - 1979 Plant Metallurgist Randfontein Estates Gold Mine
1976 - 1977 Plant Metallurgist Golden Dumps
1974 - 1976 Research Metallurgist Union Corporation Research Laboratory
1968 - 1974 Research Engineer Granges Mineral Processing Laboratory
1966 - 1968 Research Engineer LKAB (Sweden)
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
4
Key Experience
 Due Diligence on an off-shore phosphate recovery project in Namibia. This included the
processing design from the production of concentrate to the production of the phosphoric acid
and final products.
 Monitoring of the Northland Project, Sweden for progress and cost control on behalf of the
bankers. Process plant area.
 Technical review of all Xstrata ferrochrome and vanadium smelters
 Independent review of DFS documents (process plant areas) for an expansion project of a
major platinum producer in Zimbabwe.
 Assessment of a gold plant operation in Botswana and recommendation of improvements and
possible changes required for change of ore from oxide to sulphide.
 Scoping design and costing of a phosphate processing plant for the Elandsfontyn phosphate project
Western Cape, South Africa..
 Scoping design and costing of a processing plant for the Kodal project, Norway.
 Insurance assessment for Machadodorp ferrochrome plant and Kato Ridge ferromanganese plant.
 PEA for Duyker Eiland Phosphate scoping study, Western Cape, South Africa.
 Metallurgical review of the process design for the Northland iron ore project, Sweden
 Metallurgical part of a preliminary feasibility study for a gold mining project in South Africa
 Assessment of status of abandoned project for copper/cobalt recovery in an African country
 Due Diligence on a copper mine in Africa.
 Scoping study for a metallurgical plant as part of an iron ore project in South Africa
 Due Diligence on a Ferrochrome Plant in South Africa for prospective buyer.
 Metallurgical adviser to the owner’s team doing a PFS for a Ferrochrome Plant in China.
 Scoping study of four prospective phosphate deposits in South Africa. This was done in two stages. First
stage was evaluation of the four deposits from available data and recommending the best deposit for
further work. The second stage was the preliminary evaluation of the Duiker Eiland prospect to obtain
an indication of the potential as a viable project.
 Due diligence of a uranium project in Namibia.
 Specifying and preliminary costing a sinter plant for a manganese project in South Africa.
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
5
 Leading an investigation into the best option for sulphur capture from the BCL smelter in Botswana for
the European Commission.
 Due diligence on a Gold Recovery Plant in Ghana.
 Engaged by a Japanese /Korean consortium for a due diligence of a Brazilian company mining and
processing iron ore.
 Reports (43-101) for the Canadian Stock Exchange, metallurgical chapter, for miscellaneous Brazilian
and North American Projects.
 Investigating processing possibilities for a limonitic type iron ore from Kazakhstan
 Contribution to conceptual flow sheet and costing of metallurgical plant for conceptual study of
Ferrexpo’s Galeshne deposit in Ukraine.
 Engaged by SRK, Denver to take part in a review of four iron ore projects in Brazil including Minas Rio
and Amapa. The responsibilities included reviewing metallurgical testwork and proposed flowsheets as
well as already ongoing operations and as a competent person editing the metallurgical section of the
43-101 Reports.
 Plant review and high level capex and opex estimates for the refurbishing of the magnetite processing
plant at Nova Mine, Ukraine
 High level cost estimate for a magnetite process plant in Poltava, Ukraine.
 High level cost estimate for Twistdraai gold project including lay-out, capex and opex.
 Investigation into the cause of a fire at the solvent extraction plant at Konkola Copper Mines, Chingola,
Zambia.
 Assessment of milling layout using existing mills at lower tonnage for a gold mine in Ghana.
 Due diligence exercise for prospective bidder for iron, steel and vanadium works in South Africa.
 Due diligence of Severny Mining and Processing Works owned by Open Joint-Stock Company “SevGOK”,
Krivoy Rog, Ukraine. The responsibilities included reviewing the present process plants regarding
present assets and performance, ongoing investment plan and the strategic plan 2005-2015.
 Operational performance intervention for SMS Demag, Genoa: Inmetco process. The pellet production
during earlier trials did not reach the projected capacity of the plant and the task was to resolve the
problem.
 Commissioned by Uddeholm Technology to investigate the pollution impact from a Granshot iron
granulation plant on the water circuit at Saldanha Steel, South Africa. A sampling programme was
carried out over a period of time, the results were analysed and the mass balances for the main
possible pollutants were calculated and summarised in a report.
 Commissioned by IMS, South Africa, consultancy design, erection and commissioning of a steel plant
waste smelting plant at Columbus Stainless, South Africa.
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
6
 Consultant, Process Technology, Columbus Stainless. This position was as a full-time employee of
Columbus Stainless.
o Administrate the completion of the Technology Supply Contracts with Krupp Thyssen Stainless,
Nisshin Steel and Uddeholm Technology. The contracts with KTS and Nisshin were completed
and closed.
o Modelling plant throughput based on equipment design capacities and plant experience for
planning of the production build-up to be included in the five-year plan; Columbus Stainless
o Define shortcomings in the processes and carrying out feasibility studies, recommendations
and motivations for board decisions. Some of the equipment motivated and installed including
additional slab grinders, additional cut-to-length line and a heavy plate cut up line.
o Define and recommend future expansions. This includes development of flow sheets,
recommendations of new equipment, estimations of operating cost and capital cost and a cash
flow analysis to prove the viability.
o Direct implementation of an Environmental System that meets legal requirements.
 Process Engineer / Process Consultant for the Columbus Joint Venture Expansion Project.
o Techno/economic comparison study between building a new stainless steel plant or to expand
facilities at Middelburg to 500 000 tpa slab capacity rolled to hot or cold rolled coil. Value of
the final expansion US$1,000 million.
o Coordinate input from technology suppliers (Thyssen, Nisshin, Uddeholm), Project Engineers
and Plant Management to define the scope of the project and choice of processes and
equipment.
o Senior member of the team finalizing the feasibility study for Board approval followed by
vendor negotiations, choice of vendors and final contract negotiations.
o Arranging training at the Technology Suppliers plants and coordinating the Technology Supply
teams during commissioning was also a major responsibility as part of administration of the
contract.
o Scope definition for the BPEO (Best Practical Environmental Option) and negotiating contracts
for supply of process gases.
 Assistant Consulting Metallurgist/Consulting Metallurgist at Samancor Ltd., Chrome Division. Projects
included plants for Chrome and Manganese smelters. Part of the duties was also the Langphos mine in
the Saldanha Bay Municipality in Western Cape. The tasks included the process optimisation of the
plant for producing a suitable phosphate product for the fertiliser market.
 Research Metallurgist Union Corporation/Gencor Group Research Laboratory
o Development of projects to improve processes and products in the fields of concentration, pre-
treatment (agglomeration, roasting, pre-reduction, preheating), smelting and refining. Projects
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
7
outside the chrome recovery included heavy minerals from sand, titanium pigment, nickel, iron,
zinc and phosphates.
o R&D projects in precious and base metal processing. Supervising a department of 25 including
eight graduates and five technicians. Some of the processes included were flotation of base
metals (zinc, lead, copper), leaching and recovery of gold (especially the CIP process), magnetic
recovery of iron (both low intensity for magnetite and wet high intensity for hematite) and
gravity separation. Crushing and milling was always part of the investigations. Autogenous
milling for quartzitic gold ores was a specialty for the company.
o Acting Metallurgical Manager, Grootvlei Mine. Responsible for the gold recovery process plant.
o Assistant to Group Consulting Metallurgist Office. Compile chapter on carbon-in pulp in the
SAIMM published book on the Extractive Metallurgy of Gold in South Africa. Main achievement
was the development of a computer model for the carbon-in-pulp process for application in the
group.
 Plant Metallurgist at Randfontein Estates Gold Mine.
o Part of the team commissioning the Cooke Plant. Some responsibilities included
commissioning and optimising throughput and recovery of gold and uranium, establishing and
running a metallurgical accounting system for the gold and uranium recovery and responsible
for the dispatch of gold bars to Rand Refinery and yellow cake to Nufcor.
o Process development for the RBM heavy minerals plant.
o Process development for the Union Corporation gold mines to improve recovery.
o Autogenous milling of ores.
o Fluorspar flotation.
o Base metal flotation, including nickel, zinc and lead.
o Due diligence of a vanadium recovery plant in Mpumalanga.
 Research Engineer at Granges Mineral Processing Laboratory in Sweden. Supervising a team of five
permanent research officials and eight temporary workers.
o Iron ore concentration and pelletising projects. The projects were taken from initial tests,
through pilot plant tests to final flow sheet, estimate of operating and capital cost and a final
recommendation.
o Vanadium recovery from titaniferous magnetite project. This was a major project with many
novel process steps.
o Operation of a demonstration plant for production of cement bound pellets (Grangcold
Process) Plant capacity was 20 tph and about 70,000 ton was produced for test in Granges
Steel’s blast furnace in Oxelösund, Sweden.
o
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
8
 Research Engineer at LKAB Sweden.
o Iron ore concentration and pelletizing project. The main emphasis was on improving the
products from LKAB to be preferred by the main steel makers in the world. This was a period
for major development of pellets to be a preferred feed product in blast furnace iron making.
LKAB took the lead in developing standardized test procedures for pelletizing as well as the
pelletised product. The development included producing pellets in laboratory and pilot scale,
testing of different binders and slag formers, testing of the mechanical properties during the
process as well as for the produced pellets, and testing the product for properties during
reduction, simulating the conditions in a blast furnace. This work established LKAB as a
preferred supplier of pellets to major steel makers in Germany and Japan.
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
9
Comments regarding iron ore experience
 Experience prior to association with Turgis/RHDHV
o Working with LKAB, Sweden was during a intensive development time for pelletising. LKAB
required a product that could compete in the market with low cost produced ores from
Venezuela ,Brazil and other low cost open pit ores. The emphasis was to produce pellets
with superior properties regarding strength, reducibility and slag composition. The LKAB
ores are mainly magnetite ores of skarn type but also contain hematite. The ore dressing
included crushing, cobbing, milling followed by both magnetic and gravity separation. Fine
milling of a large portion of the ore was required to achive a good iron grade and hence the
agglomeration of the final concentrate was required.
o The Granges Mineral Processing Laboratory (Minpro) in Stråssa Sweden developed and
project managed the installation of processes both within and outside of the Granges
Group. The experience gained at this laboratory included development of processes to a
number of different ores including ores from Nimba and Tokadeh in Liberia. The LAMCO
operation was run by the Granges Group and all process development and trouble shooting
was carried out at Minpro. A new process including phosphate flotation and reverse
flotation of silicates was also developed for the Grangesberg ore and a new plant was
erected. Managing the operation of a pelletising plant was also part of the experience.
o During the Samancor and Columbus employments the experience of the pyrometallurgical
processes was invaluable regarding the properties of the chemistry and mechanical
properties of the feed materials that affects the process.
 Experience after association with Turgis/RHDHV
o Working on Itabirite type ores in Brazil, including pilot plant testwork.
o Work in Ukraine on Sevgog ore, Krivoi Rog and a number of ores in the Poltava district.
o Northland project in Sweden, reviewing the building of the plant using all the newest
equipment including autogenous milling, tower mills and automatic pressure filters (VPN)
o South African project in southern Mpumalanga. Scoping design and costing of plant.
Comments regarding phosphate processing experience
o As consulting metallurgist for Samancor one of the responsibilities was the Langfos plant at
Langebaanweg, in the Saldanha Bay municipality, Western Cape Province, South Africa. The ore
was typical phosphate sand with cellophane as the phosphate containing mineral and quartz as the
Sten Johansson
Principal Process Engineer
Email: stenjohansson027@gmail.com
Cell: +27 82 802 7559
10
main gangue. Milling, de-sliming and flotation were applied, producing a concentrate of typically
33% P2O5.
o As principal metallurgical engineer for Turgis Consulting and RHDHV a number of projects has been
carried out including:
 Technical assessment of four potential phosphate deposits for Montero.
 Preliminary assessment including flotation testwork, process and plant design, capex and
opex on a scoping level for the Duyker Eiland project Montero Mining., South Africa.
 Preliminary assessment including process and plant design, capex and opex for submission
of the Mining Works Programme for the Elandsfontein Project, South Africa.
o Leading an investigation into the best option for sulphur capture from the BCL smelter in Botswana
for the European Commission. This work involved:
 Researching technical options and recommending the best solution which was concluded
to be a sulphuric acid plant
 Investigating different sulphuric acid plant designs and estimating capital and operating
costs for different solutions.
 Investigating the possibility to use recovered acid for phosphoric acid and fertiliser
production.
o As part of a RHDHV team doing a review/audit of the processing design including:
 Reviewing the proposed concentration method for the phosphate
 Reviewing the proposed processing plant for production of phosphoric acid from the
concentrate. This is a new process able to produce the phosphoric acid economically from
lower grade concentrates than the conventional process.

More Related Content

What's hot

Short Linkedin CV
Short Linkedin CVShort Linkedin CV
Short Linkedin CVChris Swift
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal EngineerAhmad Hassan
 
Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015Symposium
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Engineering
 
Large natural flake graphite deposit
Large natural  flake graphite deposit Large natural  flake graphite deposit
Large natural flake graphite deposit Martin Tremblay
 
CV of MK Patham-Inner-groove Copper tube project
CV of MK Patham-Inner-groove Copper tube projectCV of MK Patham-Inner-groove Copper tube project
CV of MK Patham-Inner-groove Copper tube projectKunchitha Patham
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _BriefMark Fayle
 
Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015Symposium
 
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...Serena Fu
 
Iron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 ConferenceIron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 ConferenceIron_Road_Limited
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerNazrul Mokhtar
 

What's hot (17)

Short Linkedin CV
Short Linkedin CVShort Linkedin CV
Short Linkedin CV
 
CV. Mechincal Engineer
CV. Mechincal EngineerCV. Mechincal Engineer
CV. Mechincal Engineer
 
Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015Altech Chemicals Investor Roadshow Presentation September 2015
Altech Chemicals Investor Roadshow Presentation September 2015
 
HEVAL-PPT
HEVAL-PPTHEVAL-PPT
HEVAL-PPT
 
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical PlantNuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
Nuberg Wins $35m EPC Contract for Saudi Arabia Chemical Plant
 
Large natural flake graphite deposit
Large natural  flake graphite deposit Large natural  flake graphite deposit
Large natural flake graphite deposit
 
Blair John Stevens
Blair John Stevens Blair John Stevens
Blair John Stevens
 
CV of MK Patham-Inner-groove Copper tube project
CV of MK Patham-Inner-groove Copper tube projectCV of MK Patham-Inner-groove Copper tube project
CV of MK Patham-Inner-groove Copper tube project
 
Untitled document (1)
Untitled document (1)Untitled document (1)
Untitled document (1)
 
CV_Mark Fayle _Brief
CV_Mark Fayle _BriefCV_Mark Fayle _Brief
CV_Mark Fayle _Brief
 
JG Mech Eng CV
JG Mech Eng CVJG Mech Eng CV
JG Mech Eng CV
 
Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015
 
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
Shearer afc mechanization mining_underground coal mining_low coal seam_steepl...
 
Danny Duggan CV
Danny Duggan CVDanny Duggan CV
Danny Duggan CV
 
Iron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 ConferenceIron Road Presentation to Iron Ore 2017 Conference
Iron Road Presentation to Iron Ore 2017 Conference
 
zeeshu31
zeeshu31zeeshu31
zeeshu31
 
Resume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping DesignerResume Nazrul Mazdi Mokhtar - Piping Designer
Resume Nazrul Mazdi Mokhtar - Piping Designer
 

Viewers also liked

Viewers also liked (13)

Pm corridor m_masd
Pm corridor m_masdPm corridor m_masd
Pm corridor m_masd
 
Oymalı yatak odası takımı alanlar alan yerler
Oymalı yatak odası takımı alanlar alan yerlerOymalı yatak odası takımı alanlar alan yerler
Oymalı yatak odası takımı alanlar alan yerler
 
Ayaha el fakhary el a3zam
Ayaha el fakhary el a3zamAyaha el fakhary el a3zam
Ayaha el fakhary el a3zam
 
Diploma
DiplomaDiploma
Diploma
 
Sociedad del Conocimiento
Sociedad del ConocimientoSociedad del Conocimiento
Sociedad del Conocimiento
 
Sloping glacis weir OR canal drop
Sloping glacis weir OR canal dropSloping glacis weir OR canal drop
Sloping glacis weir OR canal drop
 
Wild animals.
Wild animals.Wild animals.
Wild animals.
 
Full report campfire charger
Full report campfire chargerFull report campfire charger
Full report campfire charger
 
Blog ppt
Blog pptBlog ppt
Blog ppt
 
рисуем грибы
рисуем грибырисуем грибы
рисуем грибы
 
Maglev Windmill
Maglev WindmillMaglev Windmill
Maglev Windmill
 
Smyd3
Smyd3Smyd3
Smyd3
 
A L T E R N A N C I A D E G E N E R A C I O N E S E N E L M U S G O (97 ...
A L T E R N A N C I A  D E  G E N E R A C I O N E S  E N  E L  M U S G O (97 ...A L T E R N A N C I A  D E  G E N E R A C I O N E S  E N  E L  M U S G O (97 ...
A L T E R N A N C I A D E G E N E R A C I O N E S E N E L M U S G O (97 ...
 

Similar to Sten Johansson CV1 -2016

Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
EPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability StatementEPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability Statementdjrobins
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016Weifeng Li
 
Aleksandar Jankovic CV 16
Aleksandar Jankovic CV 16Aleksandar Jankovic CV 16
Aleksandar Jankovic CV 16Alex Jankovic
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2Amin Hadjaran
 
brochure of Unionsum
brochure of Unionsumbrochure of Unionsum
brochure of Unionsumzhigang Huang
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015John Wood
 
REIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFEREIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFESymposium
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominique Tharandt
 
SCOTT, Peter Resume
SCOTT, Peter ResumeSCOTT, Peter Resume
SCOTT, Peter ResumePeter Scott
 
CV - John Mckee Scott (2015)
CV - John Mckee Scott (2015)CV - John Mckee Scott (2015)
CV - John Mckee Scott (2015)John McKee Scott
 
Evolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path BlossomsEvolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path BlossomsCopper North Mining Corp.
 

Similar to Sten Johansson CV1 -2016 (20)

CV_Rockandel_08-2015
CV_Rockandel_08-2015CV_Rockandel_08-2015
CV_Rockandel_08-2015
 
Grahame Binks 11.16
Grahame Binks 11.16Grahame Binks 11.16
Grahame Binks 11.16
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
EPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability StatementEPMS Mineral Sands Capability Statement
EPMS Mineral Sands Capability Statement
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016
 
Aleksandar Jankovic CV 16
Aleksandar Jankovic CV 16Aleksandar Jankovic CV 16
Aleksandar Jankovic CV 16
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
brochure of Unionsum
brochure of Unionsumbrochure of Unionsum
brochure of Unionsum
 
EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015EDWARD JOHN WOOD -March 2015
EDWARD JOHN WOOD -March 2015
 
Reduction in charge requirements of HIsmelt process
Reduction in charge requirements of HIsmelt processReduction in charge requirements of HIsmelt process
Reduction in charge requirements of HIsmelt process
 
REIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFEREIS 2013 Broken Hill - Eastern Iron ASX:EFE
REIS 2013 Broken Hill - Eastern Iron ASX:EFE
 
DominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_datesDominiqueTharandt_July2015_dates
DominiqueTharandt_July2015_dates
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
SCOTT, Peter Resume
SCOTT, Peter ResumeSCOTT, Peter Resume
SCOTT, Peter Resume
 
Current Resume
Current ResumeCurrent Resume
Current Resume
 
Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016Engineering Experience Scott Bullock August 2016
Engineering Experience Scott Bullock August 2016
 
Project Document
Project DocumentProject Document
Project Document
 
Project Document
Project DocumentProject Document
Project Document
 
CV - John Mckee Scott (2015)
CV - John Mckee Scott (2015)CV - John Mckee Scott (2015)
CV - John Mckee Scott (2015)
 
Evolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path BlossomsEvolving Direction _ Copper North Different Path Blossoms
Evolving Direction _ Copper North Different Path Blossoms
 

Sten Johansson CV1 -2016

  • 1. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 1 Curriculum Vitae Sten Johansson Profession:  Principal Process Engineer Education:  Diploma in Mining and Metallurgical Engineering, Skellefteå Senior Technical College, Skellefteå, Sweden, 1964.  Chemistry 101,102,103 and Geology 101,102,103, University of South Africa, 1975.  Management Accounting Course, Wits Business School, 1991.  SEM 1 Management Course, 1982. Registrations / Affiliations  Member, South African Institute of Mining and Metallurgy. Specialisation Process engineering and operation. Design and operation of process and beneficiation plants for base metals, gold, heavy minerals, iron ores and vanadium, chrome, steel and stainless steel production. Recent and current activities include mining feasibility projects, reviews in support of CPR and due diligence work as well as trouble shooting in operational plants. Expertise Sten has spent his entire career in process engineering since 1966. Experience includes design, research, operations, project management and consultancy in a broad selection of metals including iron ore, vanadium, lead, zinc, copper, gold and uranium. Sten has particular expertise in pelletizing, melting and
  • 2. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 2 SAG milling applications. His experience has been applied in studies conducted in Europe, South Africa, Ukraine, Brazil, Italy and various sub-Saharan African countries. Sten also contributed to the development of the Carbon-in Pulp process for gold recovery including managing pilot plant operations at Gencor and the design of the process for the Beatrix and Grootvlei Plants. The following are key areas of expertise:  Iron ore processing  SAG milling applications  Pyrometallurgy and pelletizing  Steel and stainless steel making  Ferrochrome and ferromanganese production  Gold and Uranium Production  Vanadium production  Base metal floatation and refining  Phosphate flotation  Hydrometallurgical processes including leaching, ion exchange and solvent extraction  Heavy metals recovery  Sten has extensive experience in the operation of smelter plants over a variety of products.
  • 3. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 3 Employment History 2012 - 2015 Principal Metallurgical Consultant Royal HaskoningDHV (Associated) 2004 - 2012 Principal Metallurgical Consultant Turgis Consulting (Pty) Ltd (Associated) 2002 - 2004 Independent Metallurgical Consultant 1996 - 2002 Process Consultant Columbus Stainless Steel 1986 - 1996 Process Engineer & Consultant Columbus Joint Venture 1985 - 1986 Consulting Metallurgist Samancor Ltd. - Chrome Division 1979 - 1985 Head Metallurgical Engineer Gencor Group Research Laboratory 1977 - 1979 Plant Metallurgist Randfontein Estates Gold Mine 1976 - 1977 Plant Metallurgist Golden Dumps 1974 - 1976 Research Metallurgist Union Corporation Research Laboratory 1968 - 1974 Research Engineer Granges Mineral Processing Laboratory 1966 - 1968 Research Engineer LKAB (Sweden)
  • 4. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 4 Key Experience  Due Diligence on an off-shore phosphate recovery project in Namibia. This included the processing design from the production of concentrate to the production of the phosphoric acid and final products.  Monitoring of the Northland Project, Sweden for progress and cost control on behalf of the bankers. Process plant area.  Technical review of all Xstrata ferrochrome and vanadium smelters  Independent review of DFS documents (process plant areas) for an expansion project of a major platinum producer in Zimbabwe.  Assessment of a gold plant operation in Botswana and recommendation of improvements and possible changes required for change of ore from oxide to sulphide.  Scoping design and costing of a phosphate processing plant for the Elandsfontyn phosphate project Western Cape, South Africa..  Scoping design and costing of a processing plant for the Kodal project, Norway.  Insurance assessment for Machadodorp ferrochrome plant and Kato Ridge ferromanganese plant.  PEA for Duyker Eiland Phosphate scoping study, Western Cape, South Africa.  Metallurgical review of the process design for the Northland iron ore project, Sweden  Metallurgical part of a preliminary feasibility study for a gold mining project in South Africa  Assessment of status of abandoned project for copper/cobalt recovery in an African country  Due Diligence on a copper mine in Africa.  Scoping study for a metallurgical plant as part of an iron ore project in South Africa  Due Diligence on a Ferrochrome Plant in South Africa for prospective buyer.  Metallurgical adviser to the owner’s team doing a PFS for a Ferrochrome Plant in China.  Scoping study of four prospective phosphate deposits in South Africa. This was done in two stages. First stage was evaluation of the four deposits from available data and recommending the best deposit for further work. The second stage was the preliminary evaluation of the Duiker Eiland prospect to obtain an indication of the potential as a viable project.  Due diligence of a uranium project in Namibia.  Specifying and preliminary costing a sinter plant for a manganese project in South Africa.
  • 5. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 5  Leading an investigation into the best option for sulphur capture from the BCL smelter in Botswana for the European Commission.  Due diligence on a Gold Recovery Plant in Ghana.  Engaged by a Japanese /Korean consortium for a due diligence of a Brazilian company mining and processing iron ore.  Reports (43-101) for the Canadian Stock Exchange, metallurgical chapter, for miscellaneous Brazilian and North American Projects.  Investigating processing possibilities for a limonitic type iron ore from Kazakhstan  Contribution to conceptual flow sheet and costing of metallurgical plant for conceptual study of Ferrexpo’s Galeshne deposit in Ukraine.  Engaged by SRK, Denver to take part in a review of four iron ore projects in Brazil including Minas Rio and Amapa. The responsibilities included reviewing metallurgical testwork and proposed flowsheets as well as already ongoing operations and as a competent person editing the metallurgical section of the 43-101 Reports.  Plant review and high level capex and opex estimates for the refurbishing of the magnetite processing plant at Nova Mine, Ukraine  High level cost estimate for a magnetite process plant in Poltava, Ukraine.  High level cost estimate for Twistdraai gold project including lay-out, capex and opex.  Investigation into the cause of a fire at the solvent extraction plant at Konkola Copper Mines, Chingola, Zambia.  Assessment of milling layout using existing mills at lower tonnage for a gold mine in Ghana.  Due diligence exercise for prospective bidder for iron, steel and vanadium works in South Africa.  Due diligence of Severny Mining and Processing Works owned by Open Joint-Stock Company “SevGOK”, Krivoy Rog, Ukraine. The responsibilities included reviewing the present process plants regarding present assets and performance, ongoing investment plan and the strategic plan 2005-2015.  Operational performance intervention for SMS Demag, Genoa: Inmetco process. The pellet production during earlier trials did not reach the projected capacity of the plant and the task was to resolve the problem.  Commissioned by Uddeholm Technology to investigate the pollution impact from a Granshot iron granulation plant on the water circuit at Saldanha Steel, South Africa. A sampling programme was carried out over a period of time, the results were analysed and the mass balances for the main possible pollutants were calculated and summarised in a report.  Commissioned by IMS, South Africa, consultancy design, erection and commissioning of a steel plant waste smelting plant at Columbus Stainless, South Africa.
  • 6. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 6  Consultant, Process Technology, Columbus Stainless. This position was as a full-time employee of Columbus Stainless. o Administrate the completion of the Technology Supply Contracts with Krupp Thyssen Stainless, Nisshin Steel and Uddeholm Technology. The contracts with KTS and Nisshin were completed and closed. o Modelling plant throughput based on equipment design capacities and plant experience for planning of the production build-up to be included in the five-year plan; Columbus Stainless o Define shortcomings in the processes and carrying out feasibility studies, recommendations and motivations for board decisions. Some of the equipment motivated and installed including additional slab grinders, additional cut-to-length line and a heavy plate cut up line. o Define and recommend future expansions. This includes development of flow sheets, recommendations of new equipment, estimations of operating cost and capital cost and a cash flow analysis to prove the viability. o Direct implementation of an Environmental System that meets legal requirements.  Process Engineer / Process Consultant for the Columbus Joint Venture Expansion Project. o Techno/economic comparison study between building a new stainless steel plant or to expand facilities at Middelburg to 500 000 tpa slab capacity rolled to hot or cold rolled coil. Value of the final expansion US$1,000 million. o Coordinate input from technology suppliers (Thyssen, Nisshin, Uddeholm), Project Engineers and Plant Management to define the scope of the project and choice of processes and equipment. o Senior member of the team finalizing the feasibility study for Board approval followed by vendor negotiations, choice of vendors and final contract negotiations. o Arranging training at the Technology Suppliers plants and coordinating the Technology Supply teams during commissioning was also a major responsibility as part of administration of the contract. o Scope definition for the BPEO (Best Practical Environmental Option) and negotiating contracts for supply of process gases.  Assistant Consulting Metallurgist/Consulting Metallurgist at Samancor Ltd., Chrome Division. Projects included plants for Chrome and Manganese smelters. Part of the duties was also the Langphos mine in the Saldanha Bay Municipality in Western Cape. The tasks included the process optimisation of the plant for producing a suitable phosphate product for the fertiliser market.  Research Metallurgist Union Corporation/Gencor Group Research Laboratory o Development of projects to improve processes and products in the fields of concentration, pre- treatment (agglomeration, roasting, pre-reduction, preheating), smelting and refining. Projects
  • 7. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 7 outside the chrome recovery included heavy minerals from sand, titanium pigment, nickel, iron, zinc and phosphates. o R&D projects in precious and base metal processing. Supervising a department of 25 including eight graduates and five technicians. Some of the processes included were flotation of base metals (zinc, lead, copper), leaching and recovery of gold (especially the CIP process), magnetic recovery of iron (both low intensity for magnetite and wet high intensity for hematite) and gravity separation. Crushing and milling was always part of the investigations. Autogenous milling for quartzitic gold ores was a specialty for the company. o Acting Metallurgical Manager, Grootvlei Mine. Responsible for the gold recovery process plant. o Assistant to Group Consulting Metallurgist Office. Compile chapter on carbon-in pulp in the SAIMM published book on the Extractive Metallurgy of Gold in South Africa. Main achievement was the development of a computer model for the carbon-in-pulp process for application in the group.  Plant Metallurgist at Randfontein Estates Gold Mine. o Part of the team commissioning the Cooke Plant. Some responsibilities included commissioning and optimising throughput and recovery of gold and uranium, establishing and running a metallurgical accounting system for the gold and uranium recovery and responsible for the dispatch of gold bars to Rand Refinery and yellow cake to Nufcor. o Process development for the RBM heavy minerals plant. o Process development for the Union Corporation gold mines to improve recovery. o Autogenous milling of ores. o Fluorspar flotation. o Base metal flotation, including nickel, zinc and lead. o Due diligence of a vanadium recovery plant in Mpumalanga.  Research Engineer at Granges Mineral Processing Laboratory in Sweden. Supervising a team of five permanent research officials and eight temporary workers. o Iron ore concentration and pelletising projects. The projects were taken from initial tests, through pilot plant tests to final flow sheet, estimate of operating and capital cost and a final recommendation. o Vanadium recovery from titaniferous magnetite project. This was a major project with many novel process steps. o Operation of a demonstration plant for production of cement bound pellets (Grangcold Process) Plant capacity was 20 tph and about 70,000 ton was produced for test in Granges Steel’s blast furnace in Oxelösund, Sweden. o
  • 8. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 8  Research Engineer at LKAB Sweden. o Iron ore concentration and pelletizing project. The main emphasis was on improving the products from LKAB to be preferred by the main steel makers in the world. This was a period for major development of pellets to be a preferred feed product in blast furnace iron making. LKAB took the lead in developing standardized test procedures for pelletizing as well as the pelletised product. The development included producing pellets in laboratory and pilot scale, testing of different binders and slag formers, testing of the mechanical properties during the process as well as for the produced pellets, and testing the product for properties during reduction, simulating the conditions in a blast furnace. This work established LKAB as a preferred supplier of pellets to major steel makers in Germany and Japan.
  • 9. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 9 Comments regarding iron ore experience  Experience prior to association with Turgis/RHDHV o Working with LKAB, Sweden was during a intensive development time for pelletising. LKAB required a product that could compete in the market with low cost produced ores from Venezuela ,Brazil and other low cost open pit ores. The emphasis was to produce pellets with superior properties regarding strength, reducibility and slag composition. The LKAB ores are mainly magnetite ores of skarn type but also contain hematite. The ore dressing included crushing, cobbing, milling followed by both magnetic and gravity separation. Fine milling of a large portion of the ore was required to achive a good iron grade and hence the agglomeration of the final concentrate was required. o The Granges Mineral Processing Laboratory (Minpro) in Stråssa Sweden developed and project managed the installation of processes both within and outside of the Granges Group. The experience gained at this laboratory included development of processes to a number of different ores including ores from Nimba and Tokadeh in Liberia. The LAMCO operation was run by the Granges Group and all process development and trouble shooting was carried out at Minpro. A new process including phosphate flotation and reverse flotation of silicates was also developed for the Grangesberg ore and a new plant was erected. Managing the operation of a pelletising plant was also part of the experience. o During the Samancor and Columbus employments the experience of the pyrometallurgical processes was invaluable regarding the properties of the chemistry and mechanical properties of the feed materials that affects the process.  Experience after association with Turgis/RHDHV o Working on Itabirite type ores in Brazil, including pilot plant testwork. o Work in Ukraine on Sevgog ore, Krivoi Rog and a number of ores in the Poltava district. o Northland project in Sweden, reviewing the building of the plant using all the newest equipment including autogenous milling, tower mills and automatic pressure filters (VPN) o South African project in southern Mpumalanga. Scoping design and costing of plant. Comments regarding phosphate processing experience o As consulting metallurgist for Samancor one of the responsibilities was the Langfos plant at Langebaanweg, in the Saldanha Bay municipality, Western Cape Province, South Africa. The ore was typical phosphate sand with cellophane as the phosphate containing mineral and quartz as the
  • 10. Sten Johansson Principal Process Engineer Email: stenjohansson027@gmail.com Cell: +27 82 802 7559 10 main gangue. Milling, de-sliming and flotation were applied, producing a concentrate of typically 33% P2O5. o As principal metallurgical engineer for Turgis Consulting and RHDHV a number of projects has been carried out including:  Technical assessment of four potential phosphate deposits for Montero.  Preliminary assessment including flotation testwork, process and plant design, capex and opex on a scoping level for the Duyker Eiland project Montero Mining., South Africa.  Preliminary assessment including process and plant design, capex and opex for submission of the Mining Works Programme for the Elandsfontein Project, South Africa. o Leading an investigation into the best option for sulphur capture from the BCL smelter in Botswana for the European Commission. This work involved:  Researching technical options and recommending the best solution which was concluded to be a sulphuric acid plant  Investigating different sulphuric acid plant designs and estimating capital and operating costs for different solutions.  Investigating the possibility to use recovered acid for phosphoric acid and fertiliser production. o As part of a RHDHV team doing a review/audit of the processing design including:  Reviewing the proposed concentration method for the phosphate  Reviewing the proposed processing plant for production of phosphoric acid from the concentrate. This is a new process able to produce the phosphoric acid economically from lower grade concentrates than the conventional process.