Project Document for
Mun-Labs
[Project Document – Project Proposal, Design
and Operations[Mun-Labs, whose vision is to provide accurate, valuable
and reliable assay value information to small-scale miners to create an enabling
environment for the profitable and economical extraction of minerals at a reasonable
cost, seeks to create a bridge between ‘peasant’ mining and real small scale mining
with growth potential.]]
S. Munyaradzi - Project Director
Mining and Metallurgical Consultants [ MMC] 2013
Table of Contents:
Topic Page
Executive Summary 4
Projects
That put
Mberengwa
on the Gold
Map2
Mining and Metallurgical Consultants [ MMC] 2013
General Company Description 5
Contact Persons 6
Location of the Project 7
Mission and Vision of the Project 7
Management and Organization 8
Capitalization and Start-up Expenses 9
Financial Needs Summary 9
Complimentary Equipment 10
Recurrent revenue & expenditure economics 11
Cash flow Projections 12
Application for Land 13
Proposed Site Plan to Council 14
Council Offer letter 15
Projected Operations [8 months] 16
Land Payment Plan 17
Projected Financial Operations [8 months] 18
Projected Labour 19
Projected Operation Curves 20
Construction Plans 21 - 28
Final Site Plan 26
MMC MunLabs Product List 29
Projects
That put
Mberengwa
on the Gold
Map3
Mining and Metallurgical Consultants [ MMC] 2013
Executive Summary
Mun-Labs is a consultancy project, specializing in analyzing rock, solution and carbon
samples from mines, determining the quality and quantity of minerals in the given
sample. The metallurgical report then generated will be used by the concerned miner in
the design of his geological data base and his extraction plans.
The project is not yet running but will be located in the Midlands' mining district of
Mberengwa.
The creation of this project has been necessitated by the absence of sample assay
services in the districts yet there are several small-scale miners in this and surrounding
districts. The government has also made it a requisite that detailed geological data
about reefs and blocks be obtained by every miner from a recognized laboratory or
mining consultant before they commence operations at their mines.
The project will generate its income from the service of analyzing rock, solution and
carbon samples brought by clients. With a projected inflow of over 400 samples daily,
the project can generate up to US$ 85 000 monthly.
The project is new and staff would need to be hired. However reliance can be placed on
the project director Mr. Simba Munyaradzi. He has vast experience in mine
management with several reputable mining companies for over 25 years.
The project is seeking funding to the tune of US$ 222 808; this will be to finance the
construction of a building complex, installation of laboratory equipment. If this is
provided then the project will likely commence operation within 2 months.
Projects
That put
Mberengwa
on the Gold
Map4
Mining and Metallurgical Consultants [ MMC] 2013
General Company Description
Mun-Labs project is a project that seeks to establish a laboratory in Mberengwa,
Midlands, which specializes in taking rock or solution or carbon samples from mines,
determining the value of a mineral in that sample. The aim is to provide accurate
information to the concerned miner so that they know how to invest or work on a
particular type of ore, shaft or tunnel, with professional resource information and most
economic and environmentally friendly methods of doing so.
It is also a procedural requirement that miners have a detailed geological and mineral
resource report that is backed by assay reports when registration of their blocks is done,
but this has been hampered in the past the non-availability of Mine Laboratories, and
the few that are there belong to established mines who are struggling to cope with
thousands of their own samples. This project seeks to be a bridge to cover that gap.
The target end user is the small scale miner, who commands the majority of miners in
the Mberengwa and Zvishavane areas. Samples from outside this region will be a
bonus, and with time will be a major driver for the whole project.
This project has also been necessitated by discovery of new minerals in the areas-for
example antimony, tantalite, PGM’s, copper, etc. The laboratory will be there to assist
miners seeking to know the quantity and quality of the mineral that they can profitably
extract at their mines, and as Metallurgical Laboratory, assist in Milling Process designs
and improvements on already existing plants.
The laboratory will also take samples of water and soil (in case of farmers), for
determination of quality and its ‘activity’. This project will achieve its objective through all
kinds of assaying, from fire assays, wet assays and instrument analysis using Atomic
Absorption Spectrometers (AAS machines).
The laboratory will also do Leach Diagnostic Tests, using Bottle Roll Machines to mimic
actual operations to determine the best possible process designs for the vastly different
ores so that miners can mine and win their valuable metals effectively and efficiently.
Projects
That put
Mberengwa
on the Gold
Map5
Mining and Metallurgical Consultants [ MMC] 2013
Contact Persons:
1. Simba Munyaradzi (Project Director)
Cell: +263774968841
Email: simba.munyaradzi@yahoo.com
2. Mutswunguma Ishmael (Project Accountant)
Cell: +263737869462
Email: ishmutswunguma@gmail.com
Website www.mmclabs.org
Projects
That put
Mberengwa
on the Gold
Map6
Mining and Metallurgical Consultants [ MMC] 2013
Location of the Project:
This project will be located at Mberengwa Offices, Mberengwa. The place serves as a
central and reachable place by clients from both Zvishavane and Mberengwa. The
laboratory can also serve clients from as far as Masvingo.
Project Mission and Vision
The project's mission is to provide accurate mining resource data that will enable the
small-scale miner to economically and profitably extract minerals at a reasonable cost.
Its vision is to bridge the gap between ‘peasant’ mining and real small scale mining with
growth potential.
Projects
That put
Mberengwa
on the Gold
Map7
Mining and Metallurgical Consultants [ MMC] 2013
Management and Organization:
The project is not yet running. However the project is to be run by professional assayers
and assistant assayers and laboratory assistants. A grounds man is also needed for
general cleanliness of the premises.
The organization will therefore be comprised of the following:
(i) Assayer (1)
These personnel will be responsible for assaying rock/solution/carbon samples, and
water and determining the quality of mineral therein.
(ii) Assistant Assayer (1)
Will be assisting the assayer in his duties mentioned above.
(iii) Laboratory Assistants (5)
Will be assisting the assayers with various laboratory processes
(iv) Grounds man (1)
The major source of labour will be professionals to be hired since the project is not yet
operational.
However, the project director Mr. Simba Munyaradzi has vast experience in the various
facets of the mining field with more than 25 years metallurgical experience. He has
worked in various mining companies including ZMDC Sabi Gold Mines, Falcon Venice
Mine, ZMDC Alaska Copper mines, Lonrho’s Arcturus Mines in Mashonaland East,
Golden Kopje Mines in Chinhoyi, Mackrock Exor Mines in Shamva and Anesugold in
Mberengwa, in different managerial capacities. Currently he is the Mineral Processing
(Plant) Manager for Anesugold; Mberengwa. He can be counted on to lead a viable
project.
Projects
That put
Mberengwa
on the Gold
Map8
Mining and Metallurgical Consultants [ MMC] 2013
Capitalization and Start-up Expenses:
Financial Needs Summary:-
Generally, setting up a laboratory requires offices, a laboratory itself, the equipment,
water and electricity supply. The following lists quoted prices or values of items of
equipment from reputable suppliers as at 13th June 2013.
1. AAS (from Thermo Fisher or SDL) $28 000
2. Precision Balances (scales) (from SDL)
Mettler PL303 310gx0.001g $7 221
Mettler MS603S 620gx0.001g $13 263
MettlerMS1003S 1020gx0.001g $16 729
3. Fusion Furnace (from ProGlo) $35 000
4. Transformer for furnace (from ProGlo) $10 000
5. Muffle Furnace (from ProGlo) $21 625
_______
Total $131 838
Projects
That put
Mberengwa
on the Gold
Map9
Mining and Metallurgical Consultants [ MMC] 2013
Complementary Equipment
1. Heavy duty digestion hot plate $2 125
2. Anvil $320
3. Tongs $135
4. Water distiller $5 795
5. Fume hood $11 595
_______
Total $19 970
Other equipment not yet quoted
1. Primary Crusher $10 000
2. Secondary Crusher $10 000
3. Pulverizer $10 000
4. Bottle-roll machine $4000
5. Glassware $2000
6. Building Complex $35 000
_______
Total estimated capital costs $222 808
Projects
That put
Mberengwa
on the Gold
Map10
Mining and Metallurgical Consultants [ MMC] 2013
Recurrent revenue-expenditure Economics:
The project's income is generated solely from assaying samples brought by clients.
It is expected that 200 solid samples will be brought per day. Assaying costs miners
US$15 per sample; thus in 26-day month US$78 000 will be realized.
The project expects to receive 200 solution samples per day. Assaying solution samples
costs miners US$1 per sample; thus in a 26-day month US$5200 will be realized.
About 100 carbon samples are expected to be brought for assay per month. With a
sample being charged at US$20 to assay, the project expects to get US$2600 in a 26-
day month.
On the other hand the major cost drivers will be power, wages/salaries as well as
consumables.
At the prevailing rates an assayer gets US$600 monthly while his assistant gets
US$500. A laboratory assistant is paid US$300 monthly. A grounds man gets US$250
in a month.
Chemicals (litharge, nitric acid, HCL, HCLO, zinc, stannous chloride) are expected to
cost US$250 while materials (tongs, cupels, crucibles, glo bars, elements etc) will
consume US$200.
The attached chart shows how revenue and expenditure will be fluctuating. See
Annexure ''A''.
Projects
That put
Mberengwa
on the Gold
Map11
Mining and Metallurgical Consultants [ MMC] 2013
Cash-flow Projections:
Once funds are availed, the project will immediately commence construction of a
laboratory and offices as well as installation of equipment. Work will be expected to start
at the end of the first month.
The projected fluctuations in cash flows are as reflected in Annexure ''B''
Anesugold P/L
C Mine
Projects
That put
Mberengwa
on the Gold
Map12
Mining and Metallurgical Consultants [ MMC] 2013
P.O. Box 77,
Mberengwa
12th
December, 2013
The Chief Executive Officer
Mberengwa Rural District Council
P. O. Box
Mataga
Dear Sir,
Re: Application for an Industrial Stand to Build and set up a Mining laboratory
I hereby apply for a piece of land in the Light industry Area to build a Mining Analytical
laboratory.
My name is Simba Munyaradzi and I currently work for Anesugold in Mberengwa as Plant
Manager/ Metallurgist but I have a strong willing to build and operate my own Mining
Laboratory in line with Government Indigenization, Empowerment, and Employment Creation
Policy.
I am in the process of identifying partners and funding to make the dream a success, and if I am
allocated a stand for this purpose, the fund-raising process will be much easier.
When this dream becomes a reality, Mberengwa will boast to be the first to have a state- of- the-
art Mining Analytical Laboratory run by indigenous people. We will also create employment for
our youths, but above all, we will provide an essential service to our local ‘small’ miners who
have been struggling to get such services for a very long time. At the present our miners are just
mining haphazardly, without any geological knowledge or any professional assays and samples
not because they do not want to have them, but simply because such service is just not there.
You might also be aware that it’s a regulatory requirement that miners submit assays before
registration of a mine is done, but a lot of shortcuts had to be done because there is no such
laboratory in Mberengwa, Zvishavane or even Masvingo.
I pray to you and your council to be part of this revolutionary and visionary process and grant us
this piece of land.
I would to like to thank you very much in advance.
Yours faithfully,
Simba Munyaradzi.
0774 96 88 41 simba.munyaradzi@yahoo.com
Projects
That put
Mberengwa
on the Gold
Map13
Mining and Metallurgical Consultants [ MMC] 2013
Proposed site Plan
All correspondence to be addressed to the Chief Executive Officer
MBERENGWA RURAL DISTRICT COUNCIL
Projects
That put
Mberengwa
on the Gold
Map14
Mining and Metallurgical Consultants [ MMC] 2013
P O Box 50 Tel: 0517/231/276/277
MATAGA
mberengwardc@yahoo.co.uk
Date:___1 October 2014______________________________
Your Ref: APPL NO/__________________
Our Ref:XC/4/16
_Munyaradzi Simba________________________
----C –Mine ------------------------------------------------
-----Mberengwa ------------------------------------------
RE: OFFER LETTER FOR _MINE LABOTARY AT MBERENGWA RSC CENTER IN
MBERENGWA DISTRICT .
We are pleased to inform you that your application letter for ___MINE LABORATARY____ at
____MBERENGWA RSC______ Center was successful. If you are still interested you are advised to
make the following payments in full, at Mberengwa RDC offices at Mataga during normal working hours
and days. This offer is valid up to __31 October 2014_____________________________
if council does not get any response from you , this offer shall be withdrawn and the stand reallocated..
Lease Application $__58-00_______________________________
Pegging Fees $__86-00_______________________________
Development Permit $__1725-00____
Building Inspection $___92-00____
Contractors Permit $___58-00__
Sale of Plan/Plan Approval $___138-00__
Sand Extraction $____228______
15% VAT $___INCLUSIVE______
TOTAL $___2385-00_________
Conditions and Terms
• Pegging of the stand shall be done after full payments of above fees.
• Again upon completion of full payment of the above fees, Council shall issue you with Lease Agreement
and Development Conditions before construction.
• The applicant/offer can be transferred to other business centers in case where stands are no longer
available at the above named center.
• A total of 25 % handling fee will be charged on all refunds .
If you have any clarifications please do not hesitate to contact this office. PLEASE BRING THIS OFFER
LETTER WHEN MAKING PAYMENTS .
Yours faithfully
P.T Mwedzi ( 0712287844)
For Chief Executive Officer
Projects
That put
Mberengwa
on the Gold
Map15
Mining and Metallurgical Consultants [ MMC] 2013
MMC Mun-Labs
MMC Mun-LABS
P. O. Box 77,
Mberengwa
Zimbabwe
www.mmclabs.org
simba.munyaradzi@yahoo.com
The Chief Executive Officer
Mberengwa Rural District Council,
P.O. Box 50,
Mataga
Monday, September 29, 2014
Dear Sir,
RE: Proposal For Payment Plan For the Land Offered to us for the erection of Mine Lab
I hereby submit our payment plan for the land offered to us for the setting up of a laboratory to
service our small-to-medium scale miners and farmers, in line with our Government
Indigenisation Policy, Land Reform, ZIMASSET and the creation of jobs for our youths in
Mberengwa.
Our total bill according to the Offer Letter is $2,385-00. We want to deposit $1,000-00 and pay
monthly instalments of $116-00 for the next twelve months.
By notice of this letter and our commitment to honour our side of the contract and focus our
attention to other pressing issues with regards to rapid completion of this project, we pray to you,
Sir, to grant us permission to start construction work as we are already behind schedule.
Thank you so much in advance for the support for this noble cause.
Yours Sincerely,
S. Munyaradzi – for and on behalf of Munlabs
Projects
That put
Mberengwa
on the Gold
Map16
Mining and Metallurgical Consultants [ MMC] 2013
MMC MunLabs P/L
Projected Operations
Month 1 2 3 4 5 6 7 8
Solution Samples 60 520 520 780 780 900 900 1000
Solid Samples 60 520 520 780 1560 2600 3120 3120
Carbon Samples 20 20 50 60 60 100 100 100
Cost/Soln Sample $0.05 $0.05 $0.05 $0.05 $0.05 $0.05 $0.05 $0.05
Cost/Solid Sample $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33
Cost/Carbon Sample $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33
Income/Soln Sample $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00
Income/Solid Sample $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 $15.00
Income/Carbon
Sample $20.00 $20.00 $20.00 $20.00 $20.00 $20.00 $20.00 $20.00
Total Cost Solutions $3.00 $26.00 $26.00 $39.00 $39.00 $45.00 $45.00 $50.00
Total Cost Solids $20.00 $173.33 $173.33 $260.00 $520.00 $866.67 $1,040.00 $1,040.00
Total Cost Carbons $6.67 $6.67 $16.67 $20.00 $20.00 $33.33 $33.33 $33.33
Total Costs $29.67 $206.00 $216.00 $319.00 $579.00 $945.00 $1,118.33 $1,123.33
Total Income
Solutions $60.00 $520.00 $520.00 $780.00 $780.00 $900.00 $900.00 $1,000.00
Total Income Solids $900.00 $7,800.00 $7,800.00 $11,700.00 $23,400.00 $39,000.00 $46,800.00 $46,800.00
Total Income
Carbons $400.00 $400.00 $1,000.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00 $2,000.00
Total Income $1,360.00 $8,720.00 $9,320.00 $13,680.00 $25,380.00 $41,900.00 $49,700.00 $49,800.00
Net Operating
Income $1,330.33
$8,514.0
0
$9,104.0
0
$13,361.0
0
$24,801.0
0
$40,955.0
0
$48,581.6
7 $48,676.67
Projects
That put
Mberengwa
on the Gold
Map17
Mining and Metallurgical Consultants [ MMC] 2013
MMC MunLabs P/L
MMC
MunLabs
P/L
Projected Financial Operations
Cash-in-flows Month 1 2 3 4 5 6 7 8
Bal b/f $1,360.00 $2,504.00 $4,217.34 $4,694.81 $11,911.21 $28,652.32 $49,878.60
Loan
$234,741.6
7 $5,868.54 $6,015.26 $6,165.64 $6,182.98 $6,083.75 $5,816.85 $5,465.27
Own K
Income $1,360.00 $8,720.00 $9,320.00 $13,680.00 $25,380.00 $41,900.00 $49,700.00 $49,800.00
Total-In-flows
$236,101.6
7 $10,080.00 $11,824.00 $17,897.34 $30,074.81 $53,811.21 $78,352.32 $99,678.60
Out-flows
Bldg complex $35,000.00
Equipment
$187,808.0
0
Consumables $29.67 $206.00 $216.00 $319.00 $579.00 $945.00 $1,118.33 $1,123.33
Salaries $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00
Power $1,500.00 $1,515.00 $1,530.15 $1,545.45 $1,560.91 $1,576.52 $1,592.28 $1,608.20
Water $100.00 $101.00 $102.01 $103.03 $104.06 $105.10 $106.15 $107.21
Misc Expenses $450.00 $454.50 $459.05 $463.64 $468.27 $472.95 $477.68
Licence $5,000.00
Loan repmnt $0.00 $0.00 $0.00 $5,472.00 $10,152.00 $16,760.00 $19,880.00 $19,920.00
Totalo/f
$234,741.6
7 $7,576.00 $7,606.66 $13,202.53 $18,163.60 $25,158.89 $28,473.72 $28,540.43
bal c/f $1,360.00 $2,504.00 $4,217.34 $4,694.81 $11,911.21 $28,652.32 $49,878.60 $71,138.17
Loan Balance
$234,741.6
7 $240,610.21
$246,625.4
6
$247,319.1
0
$243,350.0
8
$232,673.8
3
$218,610.6
8 $204,155.94
Projects
That put
Mberengwa
on the Gold
Map18
Mining and Metallurgical Consultants [ MMC] 2013
MMC MunLabs P/L
Labour Budget
JOB TITLE GRADE COMP. $/Man/Shift $/Man/Moth TOTAL/Month
Snr Assayer 12 1 $30.00 $780.00 $780.00
Assayer 11 1 $25.00 $650.00 $650.00
Admin 9 1 $20.00 $520.00 $520.00
Ass. Assayers 7 2 $16.00 $416.00 $832.00
Lab Assistants 4 5 $13.00 $338.00 $1,690.00
Groundsman 1 1 $13.00 $338.00 $338.00
$0.00
Driver 5 1 $19.00 $494.00 $494.00
TOTALS 12 $5,304.00
Projects
That put
Mberengwa
on the Gold
Map19
Mining and Metallurgical Consultants [ MMC] 2013
Mun-Labs Projected operation Curves
Projects
That put
Mberengwa
on the Gold
Map20
Mining and Metallurgical Consultants [ MMC] 2013
N.B. These projected values are for the first 24 months and the monetary values are $000, i.e., divided by
1000.
Projects
That put
Mberengwa
on the Gold
Map21
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map22
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map23
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map24
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map25
Mining and Metallurgical Consultants [ MMC] 2013
Final Site Plan
Projects
That put
Mberengwa
on the Gold
Map26
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map27
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map28
Mining and Metallurgical Consultants [ MMC] 2013
[MMC Mun-Labs]
[www.mmclabs.org]
[simba.munyaradzi@yahoo.com]
[+263 774 96 88 41]
MMC Mun-labs offers a
wide range of Services and
Products
1. Analysis of Platinum, Palladium and Gold samples by Fire
Assay Technique
2. Base metal analysis (Cu, Fe, Cr, Zn, Pb, Ni, etc)
3. Analysis of carbon samples for gold and activity
4. Carbon acid treatment and re-activation
5. Determination of recoverable gold in dump samples by bottle-
rolling
6. Analysis of gold in solution samples from CIL, CIP AND CIS
Plants
7. Determination of free cyanide in solution samples
8. pH measurements in solution and pulp samples
9. Heavy duty metallurgical testwork and pilot plant running on
bulk samples
10. Elution of carbon on-site
11. Supply of all kinds of chemicals
12. Supply of cyanide antidotes
13. Supply of cyanide destruction chemicals
Projects
That put
Mberengwa
on the Gold
Map29
Nurturing projects to produce Gold
Mining and Metallurgical Consultants [ MMC] 2013
Projects
That put
Mberengwa
on the Gold
Map30
Nurturing projects to produce Gold

More Related Content

Similar to Project Document

Masauso Mumba Resume_2015
Masauso Mumba Resume_2015Masauso Mumba Resume_2015
Masauso Mumba Resume_2015
Masauso Mumba
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013
FirstQuantum
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016
Weifeng Li
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
FirstQuantum
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
Brad Young
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
Ruan Kukard
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
Braam Smit
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013
FirstQuantum
 

Similar to Project Document (20)

Masauso Mumba Resume_2015
Masauso Mumba Resume_2015Masauso Mumba Resume_2015
Masauso Mumba Resume_2015
 
Corporate Presentation - August 2013
Corporate Presentation - August 2013Corporate Presentation - August 2013
Corporate Presentation - August 2013
 
Tailings dump recovery concept
Tailings dump recovery conceptTailings dump recovery concept
Tailings dump recovery concept
 
Corporate Presentation - March 2023
Corporate Presentation - March 2023Corporate Presentation - March 2023
Corporate Presentation - March 2023
 
Tiernan Gold - Corporate Update, January 2023
Tiernan Gold - Corporate Update, January 2023Tiernan Gold - Corporate Update, January 2023
Tiernan Gold - Corporate Update, January 2023
 
CV_WeifnegLi_2016
CV_WeifnegLi_2016CV_WeifnegLi_2016
CV_WeifnegLi_2016
 
Tiernan Gold - Corporate Presentation February 2023
Tiernan Gold - Corporate Presentation February 2023 Tiernan Gold - Corporate Presentation February 2023
Tiernan Gold - Corporate Presentation February 2023
 
Tiernan Gold - Corporate Presentation - September 2022
Tiernan Gold - Corporate Presentation - September 2022Tiernan Gold - Corporate Presentation - September 2022
Tiernan Gold - Corporate Presentation - September 2022
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
Aa ggold presentation
Aa ggold presentationAa ggold presentation
Aa ggold presentation
 
Tiernan Gold - Corporate Presentation, October 2022
Tiernan Gold - Corporate Presentation, October 2022Tiernan Gold - Corporate Presentation, October 2022
Tiernan Gold - Corporate Presentation, October 2022
 
Tiernan Gold - Corporate Update, November 2022
Tiernan Gold - Corporate Update, November 2022Tiernan Gold - Corporate Update, November 2022
Tiernan Gold - Corporate Update, November 2022
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentation
 
Tiernan Gold - Corporate Presentation, December 2022
Tiernan Gold - Corporate Presentation, December 2022Tiernan Gold - Corporate Presentation, December 2022
Tiernan Gold - Corporate Presentation, December 2022
 
Res15-Brad Young_151221
Res15-Brad Young_151221Res15-Brad Young_151221
Res15-Brad Young_151221
 
RMC Corporate November 2014
RMC Corporate November 2014RMC Corporate November 2014
RMC Corporate November 2014
 
Corporate Presentation - November 2014
Corporate Presentation - November 2014Corporate Presentation - November 2014
Corporate Presentation - November 2014
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)AZMET-Newsletter 2016 (English)
AZMET-Newsletter 2016 (English)
 
Corporate Presentation - September 2013
Corporate Presentation - September 2013Corporate Presentation - September 2013
Corporate Presentation - September 2013
 

More from Simba Munyaradzi

More from Simba Munyaradzi (7)

MMC Mun-labs Product List
MMC Mun-labs Product ListMMC Mun-labs Product List
MMC Mun-labs Product List
 
THE PROTOCOLS OF MUN-LABS BUSINESS CULTURE
THE PROTOCOLS OF MUN-LABS BUSINESS CULTURETHE PROTOCOLS OF MUN-LABS BUSINESS CULTURE
THE PROTOCOLS OF MUN-LABS BUSINESS CULTURE
 
MMC Mission Statement
MMC Mission StatementMMC Mission Statement
MMC Mission Statement
 
Architecture's Impression
Architecture's ImpressionArchitecture's Impression
Architecture's Impression
 
Project Document
Project DocumentProject Document
Project Document
 
New Sands Retreatment Plant 2
New Sands Retreatment Plant 2New Sands Retreatment Plant 2
New Sands Retreatment Plant 2
 
Munyaradzi S`s Resume
Munyaradzi S`s ResumeMunyaradzi S`s Resume
Munyaradzi S`s Resume
 

Project Document

  • 1. Projects That Put Mberengwa on the Gold Map1 MMC Mun-Labs MMC MunLabs P/L] [Year2014] Project Document for Mun-Labs [Project Document – Project Proposal, Design and Operations[Mun-Labs, whose vision is to provide accurate, valuable and reliable assay value information to small-scale miners to create an enabling environment for the profitable and economical extraction of minerals at a reasonable cost, seeks to create a bridge between ‘peasant’ mining and real small scale mining with growth potential.]] S. Munyaradzi - Project Director
  • 2. Mining and Metallurgical Consultants [ MMC] 2013 Table of Contents: Topic Page Executive Summary 4 Projects That put Mberengwa on the Gold Map2
  • 3. Mining and Metallurgical Consultants [ MMC] 2013 General Company Description 5 Contact Persons 6 Location of the Project 7 Mission and Vision of the Project 7 Management and Organization 8 Capitalization and Start-up Expenses 9 Financial Needs Summary 9 Complimentary Equipment 10 Recurrent revenue & expenditure economics 11 Cash flow Projections 12 Application for Land 13 Proposed Site Plan to Council 14 Council Offer letter 15 Projected Operations [8 months] 16 Land Payment Plan 17 Projected Financial Operations [8 months] 18 Projected Labour 19 Projected Operation Curves 20 Construction Plans 21 - 28 Final Site Plan 26 MMC MunLabs Product List 29 Projects That put Mberengwa on the Gold Map3
  • 4. Mining and Metallurgical Consultants [ MMC] 2013 Executive Summary Mun-Labs is a consultancy project, specializing in analyzing rock, solution and carbon samples from mines, determining the quality and quantity of minerals in the given sample. The metallurgical report then generated will be used by the concerned miner in the design of his geological data base and his extraction plans. The project is not yet running but will be located in the Midlands' mining district of Mberengwa. The creation of this project has been necessitated by the absence of sample assay services in the districts yet there are several small-scale miners in this and surrounding districts. The government has also made it a requisite that detailed geological data about reefs and blocks be obtained by every miner from a recognized laboratory or mining consultant before they commence operations at their mines. The project will generate its income from the service of analyzing rock, solution and carbon samples brought by clients. With a projected inflow of over 400 samples daily, the project can generate up to US$ 85 000 monthly. The project is new and staff would need to be hired. However reliance can be placed on the project director Mr. Simba Munyaradzi. He has vast experience in mine management with several reputable mining companies for over 25 years. The project is seeking funding to the tune of US$ 222 808; this will be to finance the construction of a building complex, installation of laboratory equipment. If this is provided then the project will likely commence operation within 2 months. Projects That put Mberengwa on the Gold Map4
  • 5. Mining and Metallurgical Consultants [ MMC] 2013 General Company Description Mun-Labs project is a project that seeks to establish a laboratory in Mberengwa, Midlands, which specializes in taking rock or solution or carbon samples from mines, determining the value of a mineral in that sample. The aim is to provide accurate information to the concerned miner so that they know how to invest or work on a particular type of ore, shaft or tunnel, with professional resource information and most economic and environmentally friendly methods of doing so. It is also a procedural requirement that miners have a detailed geological and mineral resource report that is backed by assay reports when registration of their blocks is done, but this has been hampered in the past the non-availability of Mine Laboratories, and the few that are there belong to established mines who are struggling to cope with thousands of their own samples. This project seeks to be a bridge to cover that gap. The target end user is the small scale miner, who commands the majority of miners in the Mberengwa and Zvishavane areas. Samples from outside this region will be a bonus, and with time will be a major driver for the whole project. This project has also been necessitated by discovery of new minerals in the areas-for example antimony, tantalite, PGM’s, copper, etc. The laboratory will be there to assist miners seeking to know the quantity and quality of the mineral that they can profitably extract at their mines, and as Metallurgical Laboratory, assist in Milling Process designs and improvements on already existing plants. The laboratory will also take samples of water and soil (in case of farmers), for determination of quality and its ‘activity’. This project will achieve its objective through all kinds of assaying, from fire assays, wet assays and instrument analysis using Atomic Absorption Spectrometers (AAS machines). The laboratory will also do Leach Diagnostic Tests, using Bottle Roll Machines to mimic actual operations to determine the best possible process designs for the vastly different ores so that miners can mine and win their valuable metals effectively and efficiently. Projects That put Mberengwa on the Gold Map5
  • 6. Mining and Metallurgical Consultants [ MMC] 2013 Contact Persons: 1. Simba Munyaradzi (Project Director) Cell: +263774968841 Email: simba.munyaradzi@yahoo.com 2. Mutswunguma Ishmael (Project Accountant) Cell: +263737869462 Email: ishmutswunguma@gmail.com Website www.mmclabs.org Projects That put Mberengwa on the Gold Map6
  • 7. Mining and Metallurgical Consultants [ MMC] 2013 Location of the Project: This project will be located at Mberengwa Offices, Mberengwa. The place serves as a central and reachable place by clients from both Zvishavane and Mberengwa. The laboratory can also serve clients from as far as Masvingo. Project Mission and Vision The project's mission is to provide accurate mining resource data that will enable the small-scale miner to economically and profitably extract minerals at a reasonable cost. Its vision is to bridge the gap between ‘peasant’ mining and real small scale mining with growth potential. Projects That put Mberengwa on the Gold Map7
  • 8. Mining and Metallurgical Consultants [ MMC] 2013 Management and Organization: The project is not yet running. However the project is to be run by professional assayers and assistant assayers and laboratory assistants. A grounds man is also needed for general cleanliness of the premises. The organization will therefore be comprised of the following: (i) Assayer (1) These personnel will be responsible for assaying rock/solution/carbon samples, and water and determining the quality of mineral therein. (ii) Assistant Assayer (1) Will be assisting the assayer in his duties mentioned above. (iii) Laboratory Assistants (5) Will be assisting the assayers with various laboratory processes (iv) Grounds man (1) The major source of labour will be professionals to be hired since the project is not yet operational. However, the project director Mr. Simba Munyaradzi has vast experience in the various facets of the mining field with more than 25 years metallurgical experience. He has worked in various mining companies including ZMDC Sabi Gold Mines, Falcon Venice Mine, ZMDC Alaska Copper mines, Lonrho’s Arcturus Mines in Mashonaland East, Golden Kopje Mines in Chinhoyi, Mackrock Exor Mines in Shamva and Anesugold in Mberengwa, in different managerial capacities. Currently he is the Mineral Processing (Plant) Manager for Anesugold; Mberengwa. He can be counted on to lead a viable project. Projects That put Mberengwa on the Gold Map8
  • 9. Mining and Metallurgical Consultants [ MMC] 2013 Capitalization and Start-up Expenses: Financial Needs Summary:- Generally, setting up a laboratory requires offices, a laboratory itself, the equipment, water and electricity supply. The following lists quoted prices or values of items of equipment from reputable suppliers as at 13th June 2013. 1. AAS (from Thermo Fisher or SDL) $28 000 2. Precision Balances (scales) (from SDL) Mettler PL303 310gx0.001g $7 221 Mettler MS603S 620gx0.001g $13 263 MettlerMS1003S 1020gx0.001g $16 729 3. Fusion Furnace (from ProGlo) $35 000 4. Transformer for furnace (from ProGlo) $10 000 5. Muffle Furnace (from ProGlo) $21 625 _______ Total $131 838 Projects That put Mberengwa on the Gold Map9
  • 10. Mining and Metallurgical Consultants [ MMC] 2013 Complementary Equipment 1. Heavy duty digestion hot plate $2 125 2. Anvil $320 3. Tongs $135 4. Water distiller $5 795 5. Fume hood $11 595 _______ Total $19 970 Other equipment not yet quoted 1. Primary Crusher $10 000 2. Secondary Crusher $10 000 3. Pulverizer $10 000 4. Bottle-roll machine $4000 5. Glassware $2000 6. Building Complex $35 000 _______ Total estimated capital costs $222 808 Projects That put Mberengwa on the Gold Map10
  • 11. Mining and Metallurgical Consultants [ MMC] 2013 Recurrent revenue-expenditure Economics: The project's income is generated solely from assaying samples brought by clients. It is expected that 200 solid samples will be brought per day. Assaying costs miners US$15 per sample; thus in 26-day month US$78 000 will be realized. The project expects to receive 200 solution samples per day. Assaying solution samples costs miners US$1 per sample; thus in a 26-day month US$5200 will be realized. About 100 carbon samples are expected to be brought for assay per month. With a sample being charged at US$20 to assay, the project expects to get US$2600 in a 26- day month. On the other hand the major cost drivers will be power, wages/salaries as well as consumables. At the prevailing rates an assayer gets US$600 monthly while his assistant gets US$500. A laboratory assistant is paid US$300 monthly. A grounds man gets US$250 in a month. Chemicals (litharge, nitric acid, HCL, HCLO, zinc, stannous chloride) are expected to cost US$250 while materials (tongs, cupels, crucibles, glo bars, elements etc) will consume US$200. The attached chart shows how revenue and expenditure will be fluctuating. See Annexure ''A''. Projects That put Mberengwa on the Gold Map11
  • 12. Mining and Metallurgical Consultants [ MMC] 2013 Cash-flow Projections: Once funds are availed, the project will immediately commence construction of a laboratory and offices as well as installation of equipment. Work will be expected to start at the end of the first month. The projected fluctuations in cash flows are as reflected in Annexure ''B'' Anesugold P/L C Mine Projects That put Mberengwa on the Gold Map12
  • 13. Mining and Metallurgical Consultants [ MMC] 2013 P.O. Box 77, Mberengwa 12th December, 2013 The Chief Executive Officer Mberengwa Rural District Council P. O. Box Mataga Dear Sir, Re: Application for an Industrial Stand to Build and set up a Mining laboratory I hereby apply for a piece of land in the Light industry Area to build a Mining Analytical laboratory. My name is Simba Munyaradzi and I currently work for Anesugold in Mberengwa as Plant Manager/ Metallurgist but I have a strong willing to build and operate my own Mining Laboratory in line with Government Indigenization, Empowerment, and Employment Creation Policy. I am in the process of identifying partners and funding to make the dream a success, and if I am allocated a stand for this purpose, the fund-raising process will be much easier. When this dream becomes a reality, Mberengwa will boast to be the first to have a state- of- the- art Mining Analytical Laboratory run by indigenous people. We will also create employment for our youths, but above all, we will provide an essential service to our local ‘small’ miners who have been struggling to get such services for a very long time. At the present our miners are just mining haphazardly, without any geological knowledge or any professional assays and samples not because they do not want to have them, but simply because such service is just not there. You might also be aware that it’s a regulatory requirement that miners submit assays before registration of a mine is done, but a lot of shortcuts had to be done because there is no such laboratory in Mberengwa, Zvishavane or even Masvingo. I pray to you and your council to be part of this revolutionary and visionary process and grant us this piece of land. I would to like to thank you very much in advance. Yours faithfully, Simba Munyaradzi. 0774 96 88 41 simba.munyaradzi@yahoo.com Projects That put Mberengwa on the Gold Map13
  • 14. Mining and Metallurgical Consultants [ MMC] 2013 Proposed site Plan All correspondence to be addressed to the Chief Executive Officer MBERENGWA RURAL DISTRICT COUNCIL Projects That put Mberengwa on the Gold Map14
  • 15. Mining and Metallurgical Consultants [ MMC] 2013 P O Box 50 Tel: 0517/231/276/277 MATAGA mberengwardc@yahoo.co.uk Date:___1 October 2014______________________________ Your Ref: APPL NO/__________________ Our Ref:XC/4/16 _Munyaradzi Simba________________________ ----C –Mine ------------------------------------------------ -----Mberengwa ------------------------------------------ RE: OFFER LETTER FOR _MINE LABOTARY AT MBERENGWA RSC CENTER IN MBERENGWA DISTRICT . We are pleased to inform you that your application letter for ___MINE LABORATARY____ at ____MBERENGWA RSC______ Center was successful. If you are still interested you are advised to make the following payments in full, at Mberengwa RDC offices at Mataga during normal working hours and days. This offer is valid up to __31 October 2014_____________________________ if council does not get any response from you , this offer shall be withdrawn and the stand reallocated.. Lease Application $__58-00_______________________________ Pegging Fees $__86-00_______________________________ Development Permit $__1725-00____ Building Inspection $___92-00____ Contractors Permit $___58-00__ Sale of Plan/Plan Approval $___138-00__ Sand Extraction $____228______ 15% VAT $___INCLUSIVE______ TOTAL $___2385-00_________ Conditions and Terms • Pegging of the stand shall be done after full payments of above fees. • Again upon completion of full payment of the above fees, Council shall issue you with Lease Agreement and Development Conditions before construction. • The applicant/offer can be transferred to other business centers in case where stands are no longer available at the above named center. • A total of 25 % handling fee will be charged on all refunds . If you have any clarifications please do not hesitate to contact this office. PLEASE BRING THIS OFFER LETTER WHEN MAKING PAYMENTS . Yours faithfully P.T Mwedzi ( 0712287844) For Chief Executive Officer Projects That put Mberengwa on the Gold Map15
  • 16. Mining and Metallurgical Consultants [ MMC] 2013 MMC Mun-Labs MMC Mun-LABS P. O. Box 77, Mberengwa Zimbabwe www.mmclabs.org simba.munyaradzi@yahoo.com The Chief Executive Officer Mberengwa Rural District Council, P.O. Box 50, Mataga Monday, September 29, 2014 Dear Sir, RE: Proposal For Payment Plan For the Land Offered to us for the erection of Mine Lab I hereby submit our payment plan for the land offered to us for the setting up of a laboratory to service our small-to-medium scale miners and farmers, in line with our Government Indigenisation Policy, Land Reform, ZIMASSET and the creation of jobs for our youths in Mberengwa. Our total bill according to the Offer Letter is $2,385-00. We want to deposit $1,000-00 and pay monthly instalments of $116-00 for the next twelve months. By notice of this letter and our commitment to honour our side of the contract and focus our attention to other pressing issues with regards to rapid completion of this project, we pray to you, Sir, to grant us permission to start construction work as we are already behind schedule. Thank you so much in advance for the support for this noble cause. Yours Sincerely, S. Munyaradzi – for and on behalf of Munlabs Projects That put Mberengwa on the Gold Map16
  • 17. Mining and Metallurgical Consultants [ MMC] 2013 MMC MunLabs P/L Projected Operations Month 1 2 3 4 5 6 7 8 Solution Samples 60 520 520 780 780 900 900 1000 Solid Samples 60 520 520 780 1560 2600 3120 3120 Carbon Samples 20 20 50 60 60 100 100 100 Cost/Soln Sample $0.05 $0.05 $0.05 $0.05 $0.05 $0.05 $0.05 $0.05 Cost/Solid Sample $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 Cost/Carbon Sample $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 $0.33 Income/Soln Sample $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 $1.00 Income/Solid Sample $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 Income/Carbon Sample $20.00 $20.00 $20.00 $20.00 $20.00 $20.00 $20.00 $20.00 Total Cost Solutions $3.00 $26.00 $26.00 $39.00 $39.00 $45.00 $45.00 $50.00 Total Cost Solids $20.00 $173.33 $173.33 $260.00 $520.00 $866.67 $1,040.00 $1,040.00 Total Cost Carbons $6.67 $6.67 $16.67 $20.00 $20.00 $33.33 $33.33 $33.33 Total Costs $29.67 $206.00 $216.00 $319.00 $579.00 $945.00 $1,118.33 $1,123.33 Total Income Solutions $60.00 $520.00 $520.00 $780.00 $780.00 $900.00 $900.00 $1,000.00 Total Income Solids $900.00 $7,800.00 $7,800.00 $11,700.00 $23,400.00 $39,000.00 $46,800.00 $46,800.00 Total Income Carbons $400.00 $400.00 $1,000.00 $1,200.00 $1,200.00 $2,000.00 $2,000.00 $2,000.00 Total Income $1,360.00 $8,720.00 $9,320.00 $13,680.00 $25,380.00 $41,900.00 $49,700.00 $49,800.00 Net Operating Income $1,330.33 $8,514.0 0 $9,104.0 0 $13,361.0 0 $24,801.0 0 $40,955.0 0 $48,581.6 7 $48,676.67 Projects That put Mberengwa on the Gold Map17
  • 18. Mining and Metallurgical Consultants [ MMC] 2013 MMC MunLabs P/L MMC MunLabs P/L Projected Financial Operations Cash-in-flows Month 1 2 3 4 5 6 7 8 Bal b/f $1,360.00 $2,504.00 $4,217.34 $4,694.81 $11,911.21 $28,652.32 $49,878.60 Loan $234,741.6 7 $5,868.54 $6,015.26 $6,165.64 $6,182.98 $6,083.75 $5,816.85 $5,465.27 Own K Income $1,360.00 $8,720.00 $9,320.00 $13,680.00 $25,380.00 $41,900.00 $49,700.00 $49,800.00 Total-In-flows $236,101.6 7 $10,080.00 $11,824.00 $17,897.34 $30,074.81 $53,811.21 $78,352.32 $99,678.60 Out-flows Bldg complex $35,000.00 Equipment $187,808.0 0 Consumables $29.67 $206.00 $216.00 $319.00 $579.00 $945.00 $1,118.33 $1,123.33 Salaries $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 $5,304.00 Power $1,500.00 $1,515.00 $1,530.15 $1,545.45 $1,560.91 $1,576.52 $1,592.28 $1,608.20 Water $100.00 $101.00 $102.01 $103.03 $104.06 $105.10 $106.15 $107.21 Misc Expenses $450.00 $454.50 $459.05 $463.64 $468.27 $472.95 $477.68 Licence $5,000.00 Loan repmnt $0.00 $0.00 $0.00 $5,472.00 $10,152.00 $16,760.00 $19,880.00 $19,920.00 Totalo/f $234,741.6 7 $7,576.00 $7,606.66 $13,202.53 $18,163.60 $25,158.89 $28,473.72 $28,540.43 bal c/f $1,360.00 $2,504.00 $4,217.34 $4,694.81 $11,911.21 $28,652.32 $49,878.60 $71,138.17 Loan Balance $234,741.6 7 $240,610.21 $246,625.4 6 $247,319.1 0 $243,350.0 8 $232,673.8 3 $218,610.6 8 $204,155.94 Projects That put Mberengwa on the Gold Map18
  • 19. Mining and Metallurgical Consultants [ MMC] 2013 MMC MunLabs P/L Labour Budget JOB TITLE GRADE COMP. $/Man/Shift $/Man/Moth TOTAL/Month Snr Assayer 12 1 $30.00 $780.00 $780.00 Assayer 11 1 $25.00 $650.00 $650.00 Admin 9 1 $20.00 $520.00 $520.00 Ass. Assayers 7 2 $16.00 $416.00 $832.00 Lab Assistants 4 5 $13.00 $338.00 $1,690.00 Groundsman 1 1 $13.00 $338.00 $338.00 $0.00 Driver 5 1 $19.00 $494.00 $494.00 TOTALS 12 $5,304.00 Projects That put Mberengwa on the Gold Map19
  • 20. Mining and Metallurgical Consultants [ MMC] 2013 Mun-Labs Projected operation Curves Projects That put Mberengwa on the Gold Map20
  • 21. Mining and Metallurgical Consultants [ MMC] 2013 N.B. These projected values are for the first 24 months and the monetary values are $000, i.e., divided by 1000. Projects That put Mberengwa on the Gold Map21
  • 22. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map22
  • 23. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map23
  • 24. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map24
  • 25. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map25
  • 26. Mining and Metallurgical Consultants [ MMC] 2013 Final Site Plan Projects That put Mberengwa on the Gold Map26
  • 27. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map27
  • 28. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map28
  • 29. Mining and Metallurgical Consultants [ MMC] 2013 [MMC Mun-Labs] [www.mmclabs.org] [simba.munyaradzi@yahoo.com] [+263 774 96 88 41] MMC Mun-labs offers a wide range of Services and Products 1. Analysis of Platinum, Palladium and Gold samples by Fire Assay Technique 2. Base metal analysis (Cu, Fe, Cr, Zn, Pb, Ni, etc) 3. Analysis of carbon samples for gold and activity 4. Carbon acid treatment and re-activation 5. Determination of recoverable gold in dump samples by bottle- rolling 6. Analysis of gold in solution samples from CIL, CIP AND CIS Plants 7. Determination of free cyanide in solution samples 8. pH measurements in solution and pulp samples 9. Heavy duty metallurgical testwork and pilot plant running on bulk samples 10. Elution of carbon on-site 11. Supply of all kinds of chemicals 12. Supply of cyanide antidotes 13. Supply of cyanide destruction chemicals Projects That put Mberengwa on the Gold Map29 Nurturing projects to produce Gold
  • 30. Mining and Metallurgical Consultants [ MMC] 2013 Projects That put Mberengwa on the Gold Map30 Nurturing projects to produce Gold