SlideShare a Scribd company logo
1 of 62
Download to read offline
NATURAL GAS
PROCESSES,
MODELING AND
SIMULATION
Dr Sourav Poddar
Department of Chemical Engineering
National Institute of Technology Warangal
Detailed Syllabus:
Gas Dehydration: Glycol Process: Operation, System Parameters,
Contactor Sizing and Stage Calculations, Graphical and Analytical
Methods. Regeneration. Solid Bed Absorption: Types of solid desiccants,
System Parameters, Operation and Design Sweetening: Acid Gases
Toxicity, Solid Bed Process , Absorbent Selection, Selection Variables
and Design , Physical & Chemical absorption Processes, Sulphur
Recovery Storage of Natural Gas: Pipeline Storage, Underground
Storage, Mined Caverns
Modeling and Simulation: Introduction, Absorber, Distillation Column,
Heat Exchanger, Regeneration unit, Simulation by software (Matlab and
Aspen Plus, etc.)
Reference Books:
1. Chi U.Ikoku, Natural Gas Production Engineering, John Wiley & Sons.1992.
2. James G Speight, Natural Gas –A Basic Hand Book, Gulf Publishing Company,
2007.
3. Sanjay Kumar, Gas Production Engineering, Gulf Publishing Company, Volume
4, 1987.
4. John M Campbell, Gas Conditioning & Processing Volume 2, Volume 3,
Volume 4 Campbell Petroleum Series.
5. Donald Katz, Hand Book of Natural Gas engineering, McGraw Hill, 1959.
6. LP Dake, Fundamentals of Reservoir Engineering, Elsevier, 1978.
7. Hussain K. Abdel-Aal, Mohammed Aggour, M.A. Fahim, Petroleum and Gas
field Processing,
Marcel Dekker, 2003.
INTRODUCTION
What Is Natural Gas?
➢ Natural gas is a subcategory of petroleum that is a naturally
occurring, complex mixture of hydrocarbons, with a minor amount of
inorganic compounds.
Table 1-1 shows composition of a typical natural gas.
Natural Gas Value Chain
The conversion of natural gas into a liquid has been an elusive
objective for a long time. Some parts of the produced gas –
propane, butane, and the natural condensate, can be shipped as
LPG or natural gasoline. If it is available in sufficient quantity,
the ethane can be split out and converted into petrochemicals
(ethylene and its derivatives). The big question has always been
what to do with the methane.
The chart shows the overall picture for natural gas monetization
options. The methane, or C1, portion can be transported by
pipeline or by liquefaction and shipping, or it can be chemically
converted to a liquid as methanol or by using the Fischer-
Tropsch reaction.
Figure 1: Chart foe Natural Gas Value line
Table-1.2
Gas Reserves in India
India has a bright long term natural gas supply outlook. Certified
reserves of over 28 BCM* on a deepwater block in the
Krishna/Godavari basin is a conservative figure with respect to
significant potential for future discoveries in the basin and the Bay of
Bengal. More than 9 big discoveries have been made in less than 3
years and a further multi-million deepwater exploration program was
kicked off recently.
The very first exploratory venture by RIL in this block has resulted in
world’s largest gas discovery for the year 2002. In addition, there is a
high probability of success based on the data available is expected for
the unexplored deeper targets. These targets are expected to yield new
discoveries and consequently the resources from the field are
expected to grow with time. It is anticipated that through sustained
exploratory drilling in the next few years, the reserves are likely to
increase and may range from 23 - 30 tcf**.
*Billion cubic metres of natural gas **trillion cubic feet
Miscellaneous Activities for New Opportunities to
Petroleum Specialists
➢ ONGC signed an agreement with L.N. Mittal group to form two
51:49 % joint venture companies - OMEL (ONGC Mittal Energy
Ltd) and OMESL (ONGC Mittal Energy Services Ltd) for
exploration, production and shipping activities abroad
➢ OMEL has entered into an MOU with Nigeria under which the
later will allocate deep water exploration blocks in Nigeria that
are expected to yield 32.5 million tones of oil every year for 25
years. The right of PSC has been obtained by offering Abuja a $
6 billion “capacity build up” package. OMEL will build or get
Indian companies to build power plants, railway system,
refining capacity and training institutes in Nigeria, in return of
equity oil
➢ ONGC Videsh will hold 50 % stake, Engineers India 25 %,
Indian Oil Corporation 15% and Oil India the remaining 10
% in the US $ 750 million refinery revamp and petroleum
products pipeline projects in Sudan.
➢ ONGC has offered 26 % partnership in to Coal India Ltd
(CIL) in its Underground Coal Gasification projects. CIL
is also likely to join ONGC in its CBM projects.
➢ ONGC board has approved setting up of a new company
Opal (ONGC Petro-additions Private Ltd) to implement the
C2-C3 extraction plant at Dahej from rich LNG to be
supplied by Petronet LNG Ltd.
➢ ONGC Videsh has signed a MOU with Ghana National Petroleum
Corporation GNPC) to study and evaluate data of Central basin
so as to enter an agreement for exploration, development and
production agreement.
➢ GAIL and EIL (Engineers India Ltd) have signed a MOU for gas
processing and transportation projects abroad.
➢ IOC (Indian Oil Corp) and STATOIL, Norway have formed into
a SPV (Special Purpose Vehicle) for acquisition of prospective
exploration acreage and producing properties. They have also
entered into a agreement for the formation of joint venture
SPV towards securing service business in oil and gas
industry internationally.
➢ ONGC Videsh and Norsk Hydro have signed a MOU under
which the companies will make opportunities available for
each other’s consideration on nonexclusive basis.
➢ ONGC has entered into an MOU with ENI for exchanging
information in a wide range of exploration opportunities in
India and overseas and be a strategic partner with state of
art technology, specially in deep water exploration and
development.
➢ OILEX of Australia has acquired 30 % stake in onshore
Cambay gas field in Gujarat from GSPC
➢ GAIL plans to set up a coal gasification plant of 2000 tonnes capacity
in Eastern India to produce three to four million cubic meters of syn-
gas per day using Shell Coal Gasification Process.
➢ ONGC has signed a MOU with Water and Power Consultancy
Services (WAPCS), a Government of India company, to address
deeper unexploited ground water in draught prone areas under
Project SARASWATI.
➢ GAIL and HPCL have entered into an agreement to jointly address
E&P and City Gas Projects. They will look for farm out opportunities
and bid for overseas E&P projects on the line of ONGC Videsh.
➢ India and Turkey have signed a MOU for cooperation in field of
oil and gas Indian and Turkish companies will cooperate in
bidding for NELP blocks and also in E&P, LNG, engineering
projects in third countries.
➢ GAIL has entered into an agreement with Ergo Exergy
Technologies Inc, Canada for ‘in-situ Lignite Gasification
technology for its project on Underground Coal Gasification in
Rajasthan.
➢ GAIL has signed a MOU with Arrow Energy, Australia and
Energy Infrastructure Group, Sweden for cooperation in
addressing CBM opportunities in India Australia and other
countries of mutual interest.
➢ ONGC has signed a MOU with Skochinsky Institute of Mining, Russia
for technical cooperation in underground coal gasification (UGC).
ONGC is also in process of signing MOU with Coal India, Neyeli Lignite
Corporation and GSPCL for cooperation in applying this technology in
various parts of India. The syn-gas produced during UGC comprises
methane, carbon monoxide and hydrogen and has lesser calorific value.
➢ ONGC has joined hands with GMDC (Gujrat Mineral Development
Corp) for UCG in Gujrat.
➢ ESSAR has drilled three wells to 1400 m depth in CB-ON-3 in North
Cambay Basin for CBM exploration. One of these wells has been
dewatered to produce CBM. The wells are planned to be on production
in February 2006.
➢ Reliance announced discovery of 3.76 tcf in place reserves
of coal bed methane gas in Sohagpur East and West blocks
in Madhya Pradesh.
➢ ONGC is presently testing 2 wells for coal bed methane gas.
Commercial production has taken place recently.
➢ Great Eastern Energy Corp Ltd (GEECL) has discovered
significant reserves of CBM in Raniganj coal field area in
West Bengal allotted to them on nomination basis before
CBM exploration rounds were started. Reserves estimated
by DGH are 1.385 tcf GEECL plans to drill 100 production
wells in the area and will soon start drilling of first 20 wells.
➢ ESSAR and Gardes Energy Services of USA have
formed a 50:50 joint venture to offer technology and
allied services for exploration and drilling for CBM
and oil/gas. The JV intends to bid for CBM and
oil/gas blocks in Russia, Kazakhstan, China, and
Turkey beside India.
➢ Cheveron will buy 29% interest in Reliance
Petroleum Ltd for nearly U$ 1.8 billion (₹ 8100
crores).
➢ Gas Hydrate: The first gas hydrate well KK-GH-01
has been spudded in Kerala-Konkan offshore in
water depth of 2674 m by research vessel JOIDES
Resolution 294 MW.
GAS PRODUCTION ENGINEERING FUNDAMENTALS
Introduction
The role of a production engineer is to maximize oil
and gas production in a cost-effective manner.
Fig. 4.1, shows a complete oil or gas production system
consists of a reservoir, well, flowline, separators, pumps, and
transportation pipelines. The reservoir supplies well-bore
with crude oil or gas.
Figure 4.1 A sketch of a Oil or Gas production system.
Pwf = flowing bottom hole pressure
_
p= average reservoir pressure
Reservoir
Hydrocarbon accumulations in geological traps can be
classified as reservoir, field, and pool. A ‘‘reservoir’’ is a
porous and permeable underground formation containing an
individual bank of hydrocarbons confined by impermeable
rock or water barriers and is characterized by a single
natural pressure system. A ‘‘field’’ is an area that consists of
one or more reservoirs all related to the same structural
feature. A ‘‘pool’’ contains one or more reservoirs in isolated
structures.
Hydrocarbon accumulations are classified as oil, gas
condensate, and gas reservoirs. Reservoir Condition is
shown in Fig. 4.2
Figure 4.2a A typical hydrocarbon phase diagram.
An oil that is at pressure above its bubble point pressure is
called an “unsaturated oil” because it can dissolve more gas
at the given temperature.
An oil that is at its bubble point pressure is called a
“saturated oil” because it can dissolve no more gas at the
given temperature.
Single phase flow prevails in an undersaturated oil
reservoir, where as two-phase (liquid oil and free gas) flow
exists in a saturated oil reservoir.
The reservoirs at and above dew point are classified as
gas reservoirs.
Gas Reservoirs
In general, if the reservoir temperature is above the critical
temperature of the hydrocarbon system, the reservoir is classified
as a natural gas reservoir. On the basis of their phase diagrams
and the prevailing reservoir conditions, natural gases can be
classified into four categories:
• Retrograde gas-condensate
• Near-critical gas-condensate
• Wet gas
• Dry gas
Retrograde gas-condensate reservoir: If the reservoir
temperature T lies between the critical temperature Tc and
cricondentherm* Tct of the reservoir fluid, the reservoir is
classified as a retrograde gas-condensate reservoir. This
category of gas reservoir is a unique type of hydrocarbon
accumulation in that the special thermodynamic behavior of
the reservoir fluid is the controlling factor in the development
and the depletion process of the reservoir. When the pressure
is decreased on these mixtures, instead of expanding (if a gas)
or vaporizing (if a liquid) as might be expected, they vaporize
instead of condensing. Consider that the initial condition of a
retrograde gas reservoir is represented by point 1 on the
pressure-temperature phase diagram of Figure 4.2b.
* The maximum temperature at which two phases can coexist.
Because the reservoir pressure is above the upper dew-point
pressure, the hydrocarbon system exists as a single phase
(i.e., vapor phase) in the reservoir. As the reservoir pressure
declines isothermally during production from the initial
pressure (point 1) to the upper dew-point pressure (point 2),
the attraction between the molecules of the light and heavy
components causes them to move further apart further
apart. As this occurs, attraction between the heavy
component molecules becomes more effective; thus, liquid
begins to condense.
Figure :4.2b A typical phase diagram of a retrograde system.
This retrograde condensation process continues with
decreasing pressure until the liquid dropout reaches its
maximum at point 3. Further reduction in pressure permits
the heavy molecules to commence the normal vaporization
process. This is the process whereby fewer gas molecules
strike the liquid surface and causes more molecules to leave
than enter the liquid phase. The vaporization process
continues until the reservoir pressure reaches the lower dew-
point pressure. This means that all the liquid that formed
must vaporize because the system is essentially all vapors at
the lower dew point. In most gas-condensate reservoirs, the
condensed liquid volume seldom exceeds more than 15%–
19% of the pore volume.
This liquid saturation is not large enough to allow any liquid
flow. It should be recognized, however, that around the
wellbore where the pressure drop is high, enough liquid
dropout might accumulate to give two-phase flow of gas and
retrograde liquid. The associated physical characteristics of
this category are:
• Gas-oil ratios between 8,000 to 70,000 scf/STB*. Generally, the
gas-oil ratio for a condensate system increases with time due to
the liquid dropout and the loss of heavy components in the
liquid.
• Condensate gravity above 50° API
• Stock-tank liquid is usually water-white or slightly colored.
* standard cubic foot per stock tank barrel.
There is a fairly sharp dividing line between oils and
condensates from a compositional standpoint. Reservoir
fluids that contain heptanes and are heavier in
concentrations of more than 12.5 mol% are almost always
in the liquid phase in the reservoir. Oils have been
observed with heptanes and heavier concentrations as low
as 10% and condensates as high as 15.5%. These cases are
rare, however, and usually have very high tank liquid
gravities.
Near-critical gas-condensate reservoir. If the reservoir
temperature is near the critical temperature, as shown in Figure
4.2c, the hydrocarbon mixture is classified as a near-critical gas-
condensate. The volumetric behavior of this category of natural
gas is described through the isothermal pressure declines as
shown by the vertical line 1-3 in Figure 4.2c. Because all the
quality lines converge at the critical point, a rapid liquid buildup
will immediately occur below the dew point as the pressure is
reduced to point 2
This behavior can be justified by the fact that several quality
lines are crossed very rapidly by the isothermal reduction in
pressure. At the point where the liquid ceases to build up and
begins to shrink again, the reservoir goes from the retrograde
region to a normal vaporization region.
Figure :4.2c A typical phase diagram for a near-
critical gas condensate reservoir.
Wet-gas reservoir: A typical phase diagram of a wet gas is
shown in Figure 4.2d, where reservoir temperature is above
the cricondentherm of the hydrocarbon mixture. Because
the reservoir temperature exceeds the cricondentherm of the
hydrocarbon system, the reservoir fluid will always remain
in the vapor phase region as the reservoir is depleted
isothermally, along the vertical line A-B. As the produced
gas flows to the surface, however, the pressure and
temperature of the gas will decline. If the gas enters the two-
phase region, a liquid phase will condense out of the gas and
be produced from the surface separators.
This is caused by a sufficient decrease in the kinetic energy
of heavy molecules with temperature drop and their
subsequent change to liquid through the attractive forces
between molecules. Wet-gas reservoirs are characterized by
the following properties:
• Gas oil ratios between 60,000 to 100,000 scf/STB*
• Stock-tank oil gravity above 60° API
• Liquid is water-white in color
• Separator conditions, i.e., separator pressure and
temperature, lie within the two-phase region.
* standard cubic foot per stock tank barrel.
Figure :4.2d Phase diagram for a wet gas.
Dry-gas reservoir: The hydrocarbon mixture exists as a
gas both in the reservoir and in the surface facilities. The
only liquid associated with the gas from a dry-gas
reservoir is water. A phase diagram of a dry-gas reservoir
is given in Figure 4.2e. Usually a system having a gas-oil
ratio greater than 100,000 scf/STB is considered to be a
dry gas. Kinetic energy of the mixture is so high and
attraction between molecules so small that none of them
coalesce to a liquid at stock-tank conditions of
temperature and pressure. It should be pointed out that
the classification of hydrocarbon fluids might be also
characterized by the initial composition of the system.
* standard cubic foot per stock tank barrel.
Figure :4.2e Phase diagram for a dry gas..
From the foregoing discussion, it can be observed that
hydrocarbon mixtures may exist in either the gaseous or
liquid state, depending on the reservoir and operating
conditions to which they are subjected. The qualitative
concepts presented may be of aid in developing
quantitative analyses. Empirical equations of state are
commonly used as a quantitative tool in describing and
classifying the hydrocarbon system
Wells in the same reservoir can fall into categories of oil,
condensate, and gas wells depending on the producing gas–
oil ratio (GOR).Gas wells are wells with producing GOR
being greater than 100,000 scf/stb; condensate wells are
those with producing GOR being less than 100,000 scf/stb
but greater than 5,000 scf/stb; and wells with producing
GOR being less than 5,000 scf/stb are classified as oil wells.
Well
Oil and gas wells are drilled like an upside-down
telescope. The large-diameter borehole section is at
the top of the well. Each section is cased to the
surface, or a liner is placed in the well that laps
over the last casing in the well. Each casing or liner
is cemented into the well
The ‘‘well head’’ is defined as the surface equipment set
below the master valve. As we can see in Fig. 4.3, it
includes casing heads and a tubing head. The casing head
(lowermost) is threaded onto the surface casing. This can
also be a flanged or studded connection. A ‘‘casing head’’
is a mechanical assembly used for hanging a casing string
(Fig. 4.4). Depending on casing programs in well drilling,
several casing heads can be installed during well
construction.
Figure 4.3 A sketch of a wellhead.
Figure 4.4 A sketch of a casing head.
Most flowing wells are produced through a string of
tubing run inside the production casing string. At the
surface, the tubing is supported by the tubing head (i.e.,
the tubing head is used for hanging tubing string on the
production casing head [Fig. 4.5]).
Figure 4.5 A sketch of a tubing head.
The equipment at the top of the producing wellhead is
called a ‘‘Christmas tree’’ (Fig. 4.6) and it is used to
control flow. The ‘‘Christmas tree’’ is installed above
the tubing head. An ‘‘adaptor’’ is a piece of equipment
used to join the two. The ‘‘Christmas tree’’ may have
one flow outlet (a tee) or two flow outlets (a cross).
Figure 4.6 A sketch of a ‘‘Christmas tree.’’
A Christmas tree consists of a main valve, wing valves,
and a needle valve. These valves are used for closing the
well when needed. At the top of the tee structure (on the
top of the ‘‘Christmas tree’’), there is a pressure gauge
that indicates the pressure in the tubing. The wing valves
and their gauges allow access (for pressure measurements
and gas or liquid flow) to the annulus spaces (Fig. 4.7).
Figure 4.7 A sketch of a surface valve.
‘‘Surface choke’’ (i.e., a restriction in the flowline) is a piece
of equipment used to control the flow rate (Fig. 4.8). In
most flowing wells, the oil production rate is altered by
adjusting the choke size. The choke causes back-pressure in
the line. The back-pressure (caused by the chokes or other
restrictions in the flowline) increases the bottomhole
flowing pressure. Increasing the bottom-hole flowing
pressure decreases the pressure drop from the reservoir to
the wellbore (pressure drawdown). Thus, increasing the
back-pressure in the well-bore decreases the flow rate from
the reservoir
Figure 4.8 A sketch of a wellhead choke.
Surface vessels should be open and clear before the well is
allowed to flow. All valves that are in the master valve and
other downstream valves are closed. Then follow the
following procedure to open a well:
1. The operator barely opens the master valve (just a
crack), and escaping fluid makes a hissing sound. When
the fluid no longer hisses through the valve, the pressure
has been equalized, and then the master valve is opened
wide.
2. If there are no gas/oil leaks, the operator cracks the next
downstream valve that is closed. Usually, this will be
either the second (backup) master valve or a wing valve.
Again, when the hissing sound stops, the valve is opened
wide.
3. The operator opens the other downstream valves the
same way.
4. To read the tubing pressure gauge, the operator must
open the needle valve at the top of the Christmas tree.
After reading and recording the pressure, the operator
may close the valve again to protect the gauge.
The procedure for ‘‘shutting-in’’ a well is the opposite of the
procedure for opening a well.
Flow Regimes
When a vertical well is open to produce gas/oil at production
rate q, it creates a pressure funnel of radius r around the
wellbore, as illustrated by the dotted line in Fig. 4.9a. In this
reservoir model, the h is the reservoir thickness, k is the
effective horizontal reservoir permeability to gas, μg is
viscosity of oil, Bg is gas formation volume factor, rw is
wellbore radius, pwf is the flowing bottom hole pressure, and p
is the pressure in the reservoir at the distance r from the
wellbore center line. The flow stream lines in the cylindrical
region form a horizontal radial flow pattern as depicted in
Fig. 4.9b.
Figure 4.9 A sketch of a radial flow reservoir model: (a)
lateral view, (b) top view.
Transient Flow
‘‘Transient flow’’ is defined as a flow regime where/when
the radius of pressure wave propagation from wellbore has
not reached any boundaries of the reservoir. During
transient flow, the developing pressure funnel is small
relative to the reservoir size. Therefore, the reservoir acts
like an infinitively large reservoir from transient pressure
analysis point of view.
Steady-State Flow
‘‘Steady-state flow’’ is defined as a flow regime where the
pressure at any point in the reservoir remains constant over
time. This flow condition prevails when the pressure funnel
shown in Fig. 4.9 has propagated to a constant pressure
boundary. The constant-pressure boundary can be an
aquifer or a water injection well. A sketch of the reservoir
model is shown in Fig. 4.10, where pe represents the pressure
at the constant-pressure boundary.
Figure 4.10 A sketch of a reservoir with a constant-pressure
boundary.
Pseudo–Steady-State Flow
‘‘Pseudo–steady-state’’ flow is defined as a flow regime where
the pressure at any point in the reservoir declines at the same
constant rate over time. This flow condition prevails after the
pressure funnel shown in Fig. 4.9 has propagated to all no-
flow boundaries. A no-flow boundary can be a sealing fault,
pinch-out of pay zone, or boundaries of drainage areas of
production wells. A sketch of the reservoir model is shown in
Fig. 4.11, where pe represents the pressure at the no-flow
boundary at time t4.
Figure 4.11 A sketch of a reservoir with no-flow boundaries.
Thank You

More Related Content

Similar to Lecture -1.pdf

Underground Coal Gasification - India & Global
Underground Coal Gasification -  India & GlobalUnderground Coal Gasification -  India & Global
Underground Coal Gasification - India & Globalmohkab1
 
Poyry - UK Shale Gas - where are we now? - Point of View
Poyry - UK Shale Gas - where are we now? - Point of ViewPoyry - UK Shale Gas - where are we now? - Point of View
Poyry - UK Shale Gas - where are we now? - Point of ViewPöyry
 
Project report on 33kv Substation and Automatic Power Factor Controller in ONGC
Project report on 33kv Substation and Automatic Power Factor Controller in ONGCProject report on 33kv Substation and Automatic Power Factor Controller in ONGC
Project report on 33kv Substation and Automatic Power Factor Controller in ONGCGirish Gupta
 
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickPipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickThorne & Derrick International
 
New base special 22 january 2014
New base special  22 january 2014New base special  22 january 2014
New base special 22 january 2014Khaled Al Awadi
 
New base special 22 january 2014 khaled alawadi
New base special  22 january 2014 khaled alawadiNew base special  22 january 2014 khaled alawadi
New base special 22 january 2014 khaled alawadiKhaled Al Awadi
 
New base special 23 january 2014 khaled al awadi
New base special  23 january 2014 khaled al awadiNew base special  23 january 2014 khaled al awadi
New base special 23 january 2014 khaled al awadiKhaled Al Awadi
 
NewBase 26-December-2022 Energy News issue - 1577 by Khaled Al Awadi_compres...
NewBase 26-December-2022  Energy News issue - 1577 by Khaled Al Awadi_compres...NewBase 26-December-2022  Energy News issue - 1577 by Khaled Al Awadi_compres...
NewBase 26-December-2022 Energy News issue - 1577 by Khaled Al Awadi_compres...Khaled Al Awadi
 
New base energy news issue 944 dated 06 november 2016
New base energy news issue  944 dated 06 november 2016New base energy news issue  944 dated 06 november 2016
New base energy news issue 944 dated 06 november 2016Khaled Al Awadi
 
New base 24 august energy news issue 1065 by khaled al awadi
New base 24 august  energy news issue   1065  by khaled al awadiNew base 24 august  energy news issue   1065  by khaled al awadi
New base 24 august energy news issue 1065 by khaled al awadiKhaled Al Awadi
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaasaifuddinkhan34
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...IPPAI
 
Tyumen Oman Oil Treatment
Tyumen Oman Oil TreatmentTyumen Oman Oil Treatment
Tyumen Oman Oil TreatmentNikita Galayko
 

Similar to Lecture -1.pdf (20)

IEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINALIEA GHG_BoundaryDamReport_Aug31_FINAL
IEA GHG_BoundaryDamReport_Aug31_FINAL
 
Underground Coal Gasification - India & Global
Underground Coal Gasification -  India & GlobalUnderground Coal Gasification -  India & Global
Underground Coal Gasification - India & Global
 
Poyry - UK Shale Gas - where are we now? - Point of View
Poyry - UK Shale Gas - where are we now? - Point of ViewPoyry - UK Shale Gas - where are we now? - Point of View
Poyry - UK Shale Gas - where are we now? - Point of View
 
Project report on 33kv Substation and Automatic Power Factor Controller in ONGC
Project report on 33kv Substation and Automatic Power Factor Controller in ONGCProject report on 33kv Substation and Automatic Power Factor Controller in ONGC
Project report on 33kv Substation and Automatic Power Factor Controller in ONGC
 
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & DerrickPipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
Pipeline Oil & Gas Magazine - October 2014 Featuring Thorne & Derrick
 
New base special 22 january 2014
New base special  22 january 2014New base special  22 january 2014
New base special 22 january 2014
 
New base special 22 january 2014 khaled alawadi
New base special  22 january 2014 khaled alawadiNew base special  22 january 2014 khaled alawadi
New base special 22 january 2014 khaled alawadi
 
New base special 23 january 2014 khaled al awadi
New base special  23 january 2014 khaled al awadiNew base special  23 january 2014 khaled al awadi
New base special 23 january 2014 khaled al awadi
 
Elbashir AIChE 2012 - Visulaization
Elbashir AIChE 2012 - VisulaizationElbashir AIChE 2012 - Visulaization
Elbashir AIChE 2012 - Visulaization
 
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
Research Coordination Network on Carbon Capture, Utilization and Storage Fund...
 
NewBase 26-December-2022 Energy News issue - 1577 by Khaled Al Awadi_compres...
NewBase 26-December-2022  Energy News issue - 1577 by Khaled Al Awadi_compres...NewBase 26-December-2022  Energy News issue - 1577 by Khaled Al Awadi_compres...
NewBase 26-December-2022 Energy News issue - 1577 by Khaled Al Awadi_compres...
 
New base energy news issue 944 dated 06 november 2016
New base energy news issue  944 dated 06 november 2016New base energy news issue  944 dated 06 november 2016
New base energy news issue 944 dated 06 november 2016
 
New base 24 august energy news issue 1065 by khaled al awadi
New base 24 august  energy news issue   1065  by khaled al awadiNew base 24 august  energy news issue   1065  by khaled al awadi
New base 24 august energy news issue 1065 by khaled al awadi
 
Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2Liquefied Natural Gas Report 2015: Part 2
Liquefied Natural Gas Report 2015: Part 2
 
Clough Enercore Brochure
Clough Enercore BrochureClough Enercore Brochure
Clough Enercore Brochure
 
Atlantic Council - Darren Mollot
Atlantic Council - Darren MollotAtlantic Council - Darren Mollot
Atlantic Council - Darren Mollot
 
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaajha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
jha_indian_coal-sector aaaaaaaaaaaaaaaaaaaaaaaaaaa
 
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
SMART SEWAGE TREATMENT PLANTS FOR SMART CITIES IN INDIA, NY USA - Mr. Asim C ...
 
Tyumen Oman Oil Treatment
Tyumen Oman Oil TreatmentTyumen Oman Oil Treatment
Tyumen Oman Oil Treatment
 
Khursaniyah Project Brochure
Khursaniyah Project BrochureKhursaniyah Project Brochure
Khursaniyah Project Brochure
 

More from Sourav Poddar (20)

Bioreactor_on_Bioprocess_Engineering.ppt
Bioreactor_on_Bioprocess_Engineering.pptBioreactor_on_Bioprocess_Engineering.ppt
Bioreactor_on_Bioprocess_Engineering.ppt
 
Module -1.pdf
Module -1.pdfModule -1.pdf
Module -1.pdf
 
Module 3.pdf
Module 3.pdfModule 3.pdf
Module 3.pdf
 
Module -6.pdf
Module -6.pdfModule -6.pdf
Module -6.pdf
 
Module 4.pdf
Module 4.pdfModule 4.pdf
Module 4.pdf
 
Module 2.pdf
Module 2.pdfModule 2.pdf
Module 2.pdf
 
Module 5.pdf
Module 5.pdfModule 5.pdf
Module 5.pdf
 
Module 4.pdf
Module 4.pdfModule 4.pdf
Module 4.pdf
 
Module - 2.pdf
Module - 2.pdfModule - 2.pdf
Module - 2.pdf
 
Module - 1.pptx
Module - 1.pptxModule - 1.pptx
Module - 1.pptx
 
Module - iv.pdf
Module - iv.pdfModule - iv.pdf
Module - iv.pdf
 
Module - 5.pdf
Module - 5.pdfModule - 5.pdf
Module - 5.pdf
 
Module - 3.pdf
Module - 3.pdfModule - 3.pdf
Module - 3.pdf
 
vector and tensor.pptx
vector and tensor.pptxvector and tensor.pptx
vector and tensor.pptx
 
Lecture -6.pdf
Lecture -6.pdfLecture -6.pdf
Lecture -6.pdf
 
lecture 5.pdf
lecture 5.pdflecture 5.pdf
lecture 5.pdf
 
lecture 4.pdf
lecture 4.pdflecture 4.pdf
lecture 4.pdf
 
lecture 3.pptx
lecture 3.pptxlecture 3.pptx
lecture 3.pptx
 
Matlab - BVP.pdf
Matlab - BVP.pdfMatlab - BVP.pdf
Matlab - BVP.pdf
 
lecture 2.pdf
lecture 2.pdflecture 2.pdf
lecture 2.pdf
 

Recently uploaded

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 

Recently uploaded (20)

Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 

Lecture -1.pdf

  • 1. NATURAL GAS PROCESSES, MODELING AND SIMULATION Dr Sourav Poddar Department of Chemical Engineering National Institute of Technology Warangal
  • 2. Detailed Syllabus: Gas Dehydration: Glycol Process: Operation, System Parameters, Contactor Sizing and Stage Calculations, Graphical and Analytical Methods. Regeneration. Solid Bed Absorption: Types of solid desiccants, System Parameters, Operation and Design Sweetening: Acid Gases Toxicity, Solid Bed Process , Absorbent Selection, Selection Variables and Design , Physical & Chemical absorption Processes, Sulphur Recovery Storage of Natural Gas: Pipeline Storage, Underground Storage, Mined Caverns Modeling and Simulation: Introduction, Absorber, Distillation Column, Heat Exchanger, Regeneration unit, Simulation by software (Matlab and Aspen Plus, etc.)
  • 3. Reference Books: 1. Chi U.Ikoku, Natural Gas Production Engineering, John Wiley & Sons.1992. 2. James G Speight, Natural Gas –A Basic Hand Book, Gulf Publishing Company, 2007. 3. Sanjay Kumar, Gas Production Engineering, Gulf Publishing Company, Volume 4, 1987. 4. John M Campbell, Gas Conditioning & Processing Volume 2, Volume 3, Volume 4 Campbell Petroleum Series. 5. Donald Katz, Hand Book of Natural Gas engineering, McGraw Hill, 1959. 6. LP Dake, Fundamentals of Reservoir Engineering, Elsevier, 1978. 7. Hussain K. Abdel-Aal, Mohammed Aggour, M.A. Fahim, Petroleum and Gas field Processing, Marcel Dekker, 2003.
  • 4. INTRODUCTION What Is Natural Gas? ➢ Natural gas is a subcategory of petroleum that is a naturally occurring, complex mixture of hydrocarbons, with a minor amount of inorganic compounds.
  • 5. Table 1-1 shows composition of a typical natural gas.
  • 6. Natural Gas Value Chain The conversion of natural gas into a liquid has been an elusive objective for a long time. Some parts of the produced gas – propane, butane, and the natural condensate, can be shipped as LPG or natural gasoline. If it is available in sufficient quantity, the ethane can be split out and converted into petrochemicals (ethylene and its derivatives). The big question has always been what to do with the methane. The chart shows the overall picture for natural gas monetization options. The methane, or C1, portion can be transported by pipeline or by liquefaction and shipping, or it can be chemically converted to a liquid as methanol or by using the Fischer- Tropsch reaction.
  • 7. Figure 1: Chart foe Natural Gas Value line
  • 9.
  • 10.
  • 11. Gas Reserves in India India has a bright long term natural gas supply outlook. Certified reserves of over 28 BCM* on a deepwater block in the Krishna/Godavari basin is a conservative figure with respect to significant potential for future discoveries in the basin and the Bay of Bengal. More than 9 big discoveries have been made in less than 3 years and a further multi-million deepwater exploration program was kicked off recently. The very first exploratory venture by RIL in this block has resulted in world’s largest gas discovery for the year 2002. In addition, there is a high probability of success based on the data available is expected for the unexplored deeper targets. These targets are expected to yield new discoveries and consequently the resources from the field are expected to grow with time. It is anticipated that through sustained exploratory drilling in the next few years, the reserves are likely to increase and may range from 23 - 30 tcf**. *Billion cubic metres of natural gas **trillion cubic feet
  • 12. Miscellaneous Activities for New Opportunities to Petroleum Specialists ➢ ONGC signed an agreement with L.N. Mittal group to form two 51:49 % joint venture companies - OMEL (ONGC Mittal Energy Ltd) and OMESL (ONGC Mittal Energy Services Ltd) for exploration, production and shipping activities abroad ➢ OMEL has entered into an MOU with Nigeria under which the later will allocate deep water exploration blocks in Nigeria that are expected to yield 32.5 million tones of oil every year for 25 years. The right of PSC has been obtained by offering Abuja a $ 6 billion “capacity build up” package. OMEL will build or get Indian companies to build power plants, railway system, refining capacity and training institutes in Nigeria, in return of equity oil
  • 13. ➢ ONGC Videsh will hold 50 % stake, Engineers India 25 %, Indian Oil Corporation 15% and Oil India the remaining 10 % in the US $ 750 million refinery revamp and petroleum products pipeline projects in Sudan. ➢ ONGC has offered 26 % partnership in to Coal India Ltd (CIL) in its Underground Coal Gasification projects. CIL is also likely to join ONGC in its CBM projects. ➢ ONGC board has approved setting up of a new company Opal (ONGC Petro-additions Private Ltd) to implement the C2-C3 extraction plant at Dahej from rich LNG to be supplied by Petronet LNG Ltd.
  • 14. ➢ ONGC Videsh has signed a MOU with Ghana National Petroleum Corporation GNPC) to study and evaluate data of Central basin so as to enter an agreement for exploration, development and production agreement. ➢ GAIL and EIL (Engineers India Ltd) have signed a MOU for gas processing and transportation projects abroad. ➢ IOC (Indian Oil Corp) and STATOIL, Norway have formed into a SPV (Special Purpose Vehicle) for acquisition of prospective exploration acreage and producing properties. They have also entered into a agreement for the formation of joint venture SPV towards securing service business in oil and gas industry internationally.
  • 15. ➢ ONGC Videsh and Norsk Hydro have signed a MOU under which the companies will make opportunities available for each other’s consideration on nonexclusive basis. ➢ ONGC has entered into an MOU with ENI for exchanging information in a wide range of exploration opportunities in India and overseas and be a strategic partner with state of art technology, specially in deep water exploration and development. ➢ OILEX of Australia has acquired 30 % stake in onshore Cambay gas field in Gujarat from GSPC
  • 16. ➢ GAIL plans to set up a coal gasification plant of 2000 tonnes capacity in Eastern India to produce three to four million cubic meters of syn- gas per day using Shell Coal Gasification Process. ➢ ONGC has signed a MOU with Water and Power Consultancy Services (WAPCS), a Government of India company, to address deeper unexploited ground water in draught prone areas under Project SARASWATI. ➢ GAIL and HPCL have entered into an agreement to jointly address E&P and City Gas Projects. They will look for farm out opportunities and bid for overseas E&P projects on the line of ONGC Videsh.
  • 17. ➢ India and Turkey have signed a MOU for cooperation in field of oil and gas Indian and Turkish companies will cooperate in bidding for NELP blocks and also in E&P, LNG, engineering projects in third countries. ➢ GAIL has entered into an agreement with Ergo Exergy Technologies Inc, Canada for ‘in-situ Lignite Gasification technology for its project on Underground Coal Gasification in Rajasthan. ➢ GAIL has signed a MOU with Arrow Energy, Australia and Energy Infrastructure Group, Sweden for cooperation in addressing CBM opportunities in India Australia and other countries of mutual interest.
  • 18. ➢ ONGC has signed a MOU with Skochinsky Institute of Mining, Russia for technical cooperation in underground coal gasification (UGC). ONGC is also in process of signing MOU with Coal India, Neyeli Lignite Corporation and GSPCL for cooperation in applying this technology in various parts of India. The syn-gas produced during UGC comprises methane, carbon monoxide and hydrogen and has lesser calorific value. ➢ ONGC has joined hands with GMDC (Gujrat Mineral Development Corp) for UCG in Gujrat. ➢ ESSAR has drilled three wells to 1400 m depth in CB-ON-3 in North Cambay Basin for CBM exploration. One of these wells has been dewatered to produce CBM. The wells are planned to be on production in February 2006.
  • 19. ➢ Reliance announced discovery of 3.76 tcf in place reserves of coal bed methane gas in Sohagpur East and West blocks in Madhya Pradesh. ➢ ONGC is presently testing 2 wells for coal bed methane gas. Commercial production has taken place recently. ➢ Great Eastern Energy Corp Ltd (GEECL) has discovered significant reserves of CBM in Raniganj coal field area in West Bengal allotted to them on nomination basis before CBM exploration rounds were started. Reserves estimated by DGH are 1.385 tcf GEECL plans to drill 100 production wells in the area and will soon start drilling of first 20 wells.
  • 20. ➢ ESSAR and Gardes Energy Services of USA have formed a 50:50 joint venture to offer technology and allied services for exploration and drilling for CBM and oil/gas. The JV intends to bid for CBM and oil/gas blocks in Russia, Kazakhstan, China, and Turkey beside India. ➢ Cheveron will buy 29% interest in Reliance Petroleum Ltd for nearly U$ 1.8 billion (₹ 8100 crores). ➢ Gas Hydrate: The first gas hydrate well KK-GH-01 has been spudded in Kerala-Konkan offshore in water depth of 2674 m by research vessel JOIDES Resolution 294 MW.
  • 21. GAS PRODUCTION ENGINEERING FUNDAMENTALS Introduction The role of a production engineer is to maximize oil and gas production in a cost-effective manner. Fig. 4.1, shows a complete oil or gas production system consists of a reservoir, well, flowline, separators, pumps, and transportation pipelines. The reservoir supplies well-bore with crude oil or gas.
  • 22. Figure 4.1 A sketch of a Oil or Gas production system. Pwf = flowing bottom hole pressure _ p= average reservoir pressure
  • 23. Reservoir Hydrocarbon accumulations in geological traps can be classified as reservoir, field, and pool. A ‘‘reservoir’’ is a porous and permeable underground formation containing an individual bank of hydrocarbons confined by impermeable rock or water barriers and is characterized by a single natural pressure system. A ‘‘field’’ is an area that consists of one or more reservoirs all related to the same structural feature. A ‘‘pool’’ contains one or more reservoirs in isolated structures. Hydrocarbon accumulations are classified as oil, gas condensate, and gas reservoirs. Reservoir Condition is shown in Fig. 4.2
  • 24. Figure 4.2a A typical hydrocarbon phase diagram.
  • 25. An oil that is at pressure above its bubble point pressure is called an “unsaturated oil” because it can dissolve more gas at the given temperature. An oil that is at its bubble point pressure is called a “saturated oil” because it can dissolve no more gas at the given temperature. Single phase flow prevails in an undersaturated oil reservoir, where as two-phase (liquid oil and free gas) flow exists in a saturated oil reservoir. The reservoirs at and above dew point are classified as gas reservoirs.
  • 26. Gas Reservoirs In general, if the reservoir temperature is above the critical temperature of the hydrocarbon system, the reservoir is classified as a natural gas reservoir. On the basis of their phase diagrams and the prevailing reservoir conditions, natural gases can be classified into four categories: • Retrograde gas-condensate • Near-critical gas-condensate • Wet gas • Dry gas
  • 27. Retrograde gas-condensate reservoir: If the reservoir temperature T lies between the critical temperature Tc and cricondentherm* Tct of the reservoir fluid, the reservoir is classified as a retrograde gas-condensate reservoir. This category of gas reservoir is a unique type of hydrocarbon accumulation in that the special thermodynamic behavior of the reservoir fluid is the controlling factor in the development and the depletion process of the reservoir. When the pressure is decreased on these mixtures, instead of expanding (if a gas) or vaporizing (if a liquid) as might be expected, they vaporize instead of condensing. Consider that the initial condition of a retrograde gas reservoir is represented by point 1 on the pressure-temperature phase diagram of Figure 4.2b. * The maximum temperature at which two phases can coexist.
  • 28. Because the reservoir pressure is above the upper dew-point pressure, the hydrocarbon system exists as a single phase (i.e., vapor phase) in the reservoir. As the reservoir pressure declines isothermally during production from the initial pressure (point 1) to the upper dew-point pressure (point 2), the attraction between the molecules of the light and heavy components causes them to move further apart further apart. As this occurs, attraction between the heavy component molecules becomes more effective; thus, liquid begins to condense.
  • 29. Figure :4.2b A typical phase diagram of a retrograde system.
  • 30. This retrograde condensation process continues with decreasing pressure until the liquid dropout reaches its maximum at point 3. Further reduction in pressure permits the heavy molecules to commence the normal vaporization process. This is the process whereby fewer gas molecules strike the liquid surface and causes more molecules to leave than enter the liquid phase. The vaporization process continues until the reservoir pressure reaches the lower dew- point pressure. This means that all the liquid that formed must vaporize because the system is essentially all vapors at the lower dew point. In most gas-condensate reservoirs, the condensed liquid volume seldom exceeds more than 15%– 19% of the pore volume.
  • 31. This liquid saturation is not large enough to allow any liquid flow. It should be recognized, however, that around the wellbore where the pressure drop is high, enough liquid dropout might accumulate to give two-phase flow of gas and retrograde liquid. The associated physical characteristics of this category are: • Gas-oil ratios between 8,000 to 70,000 scf/STB*. Generally, the gas-oil ratio for a condensate system increases with time due to the liquid dropout and the loss of heavy components in the liquid. • Condensate gravity above 50° API • Stock-tank liquid is usually water-white or slightly colored. * standard cubic foot per stock tank barrel.
  • 32. There is a fairly sharp dividing line between oils and condensates from a compositional standpoint. Reservoir fluids that contain heptanes and are heavier in concentrations of more than 12.5 mol% are almost always in the liquid phase in the reservoir. Oils have been observed with heptanes and heavier concentrations as low as 10% and condensates as high as 15.5%. These cases are rare, however, and usually have very high tank liquid gravities.
  • 33. Near-critical gas-condensate reservoir. If the reservoir temperature is near the critical temperature, as shown in Figure 4.2c, the hydrocarbon mixture is classified as a near-critical gas- condensate. The volumetric behavior of this category of natural gas is described through the isothermal pressure declines as shown by the vertical line 1-3 in Figure 4.2c. Because all the quality lines converge at the critical point, a rapid liquid buildup will immediately occur below the dew point as the pressure is reduced to point 2 This behavior can be justified by the fact that several quality lines are crossed very rapidly by the isothermal reduction in pressure. At the point where the liquid ceases to build up and begins to shrink again, the reservoir goes from the retrograde region to a normal vaporization region.
  • 34. Figure :4.2c A typical phase diagram for a near- critical gas condensate reservoir.
  • 35. Wet-gas reservoir: A typical phase diagram of a wet gas is shown in Figure 4.2d, where reservoir temperature is above the cricondentherm of the hydrocarbon mixture. Because the reservoir temperature exceeds the cricondentherm of the hydrocarbon system, the reservoir fluid will always remain in the vapor phase region as the reservoir is depleted isothermally, along the vertical line A-B. As the produced gas flows to the surface, however, the pressure and temperature of the gas will decline. If the gas enters the two- phase region, a liquid phase will condense out of the gas and be produced from the surface separators.
  • 36. This is caused by a sufficient decrease in the kinetic energy of heavy molecules with temperature drop and their subsequent change to liquid through the attractive forces between molecules. Wet-gas reservoirs are characterized by the following properties: • Gas oil ratios between 60,000 to 100,000 scf/STB* • Stock-tank oil gravity above 60° API • Liquid is water-white in color • Separator conditions, i.e., separator pressure and temperature, lie within the two-phase region. * standard cubic foot per stock tank barrel.
  • 37. Figure :4.2d Phase diagram for a wet gas.
  • 38. Dry-gas reservoir: The hydrocarbon mixture exists as a gas both in the reservoir and in the surface facilities. The only liquid associated with the gas from a dry-gas reservoir is water. A phase diagram of a dry-gas reservoir is given in Figure 4.2e. Usually a system having a gas-oil ratio greater than 100,000 scf/STB is considered to be a dry gas. Kinetic energy of the mixture is so high and attraction between molecules so small that none of them coalesce to a liquid at stock-tank conditions of temperature and pressure. It should be pointed out that the classification of hydrocarbon fluids might be also characterized by the initial composition of the system. * standard cubic foot per stock tank barrel.
  • 39. Figure :4.2e Phase diagram for a dry gas..
  • 40. From the foregoing discussion, it can be observed that hydrocarbon mixtures may exist in either the gaseous or liquid state, depending on the reservoir and operating conditions to which they are subjected. The qualitative concepts presented may be of aid in developing quantitative analyses. Empirical equations of state are commonly used as a quantitative tool in describing and classifying the hydrocarbon system
  • 41. Wells in the same reservoir can fall into categories of oil, condensate, and gas wells depending on the producing gas– oil ratio (GOR).Gas wells are wells with producing GOR being greater than 100,000 scf/stb; condensate wells are those with producing GOR being less than 100,000 scf/stb but greater than 5,000 scf/stb; and wells with producing GOR being less than 5,000 scf/stb are classified as oil wells.
  • 42. Well Oil and gas wells are drilled like an upside-down telescope. The large-diameter borehole section is at the top of the well. Each section is cased to the surface, or a liner is placed in the well that laps over the last casing in the well. Each casing or liner is cemented into the well
  • 43. The ‘‘well head’’ is defined as the surface equipment set below the master valve. As we can see in Fig. 4.3, it includes casing heads and a tubing head. The casing head (lowermost) is threaded onto the surface casing. This can also be a flanged or studded connection. A ‘‘casing head’’ is a mechanical assembly used for hanging a casing string (Fig. 4.4). Depending on casing programs in well drilling, several casing heads can be installed during well construction.
  • 44. Figure 4.3 A sketch of a wellhead.
  • 45. Figure 4.4 A sketch of a casing head.
  • 46. Most flowing wells are produced through a string of tubing run inside the production casing string. At the surface, the tubing is supported by the tubing head (i.e., the tubing head is used for hanging tubing string on the production casing head [Fig. 4.5]). Figure 4.5 A sketch of a tubing head.
  • 47. The equipment at the top of the producing wellhead is called a ‘‘Christmas tree’’ (Fig. 4.6) and it is used to control flow. The ‘‘Christmas tree’’ is installed above the tubing head. An ‘‘adaptor’’ is a piece of equipment used to join the two. The ‘‘Christmas tree’’ may have one flow outlet (a tee) or two flow outlets (a cross).
  • 48. Figure 4.6 A sketch of a ‘‘Christmas tree.’’
  • 49. A Christmas tree consists of a main valve, wing valves, and a needle valve. These valves are used for closing the well when needed. At the top of the tee structure (on the top of the ‘‘Christmas tree’’), there is a pressure gauge that indicates the pressure in the tubing. The wing valves and their gauges allow access (for pressure measurements and gas or liquid flow) to the annulus spaces (Fig. 4.7).
  • 50. Figure 4.7 A sketch of a surface valve.
  • 51. ‘‘Surface choke’’ (i.e., a restriction in the flowline) is a piece of equipment used to control the flow rate (Fig. 4.8). In most flowing wells, the oil production rate is altered by adjusting the choke size. The choke causes back-pressure in the line. The back-pressure (caused by the chokes or other restrictions in the flowline) increases the bottomhole flowing pressure. Increasing the bottom-hole flowing pressure decreases the pressure drop from the reservoir to the wellbore (pressure drawdown). Thus, increasing the back-pressure in the well-bore decreases the flow rate from the reservoir
  • 52. Figure 4.8 A sketch of a wellhead choke.
  • 53. Surface vessels should be open and clear before the well is allowed to flow. All valves that are in the master valve and other downstream valves are closed. Then follow the following procedure to open a well: 1. The operator barely opens the master valve (just a crack), and escaping fluid makes a hissing sound. When the fluid no longer hisses through the valve, the pressure has been equalized, and then the master valve is opened wide. 2. If there are no gas/oil leaks, the operator cracks the next downstream valve that is closed. Usually, this will be either the second (backup) master valve or a wing valve. Again, when the hissing sound stops, the valve is opened wide.
  • 54. 3. The operator opens the other downstream valves the same way. 4. To read the tubing pressure gauge, the operator must open the needle valve at the top of the Christmas tree. After reading and recording the pressure, the operator may close the valve again to protect the gauge. The procedure for ‘‘shutting-in’’ a well is the opposite of the procedure for opening a well.
  • 55. Flow Regimes When a vertical well is open to produce gas/oil at production rate q, it creates a pressure funnel of radius r around the wellbore, as illustrated by the dotted line in Fig. 4.9a. In this reservoir model, the h is the reservoir thickness, k is the effective horizontal reservoir permeability to gas, μg is viscosity of oil, Bg is gas formation volume factor, rw is wellbore radius, pwf is the flowing bottom hole pressure, and p is the pressure in the reservoir at the distance r from the wellbore center line. The flow stream lines in the cylindrical region form a horizontal radial flow pattern as depicted in Fig. 4.9b.
  • 56. Figure 4.9 A sketch of a radial flow reservoir model: (a) lateral view, (b) top view.
  • 57. Transient Flow ‘‘Transient flow’’ is defined as a flow regime where/when the radius of pressure wave propagation from wellbore has not reached any boundaries of the reservoir. During transient flow, the developing pressure funnel is small relative to the reservoir size. Therefore, the reservoir acts like an infinitively large reservoir from transient pressure analysis point of view.
  • 58. Steady-State Flow ‘‘Steady-state flow’’ is defined as a flow regime where the pressure at any point in the reservoir remains constant over time. This flow condition prevails when the pressure funnel shown in Fig. 4.9 has propagated to a constant pressure boundary. The constant-pressure boundary can be an aquifer or a water injection well. A sketch of the reservoir model is shown in Fig. 4.10, where pe represents the pressure at the constant-pressure boundary.
  • 59. Figure 4.10 A sketch of a reservoir with a constant-pressure boundary.
  • 60. Pseudo–Steady-State Flow ‘‘Pseudo–steady-state’’ flow is defined as a flow regime where the pressure at any point in the reservoir declines at the same constant rate over time. This flow condition prevails after the pressure funnel shown in Fig. 4.9 has propagated to all no- flow boundaries. A no-flow boundary can be a sealing fault, pinch-out of pay zone, or boundaries of drainage areas of production wells. A sketch of the reservoir model is shown in Fig. 4.11, where pe represents the pressure at the no-flow boundary at time t4.
  • 61. Figure 4.11 A sketch of a reservoir with no-flow boundaries.