Presenting this set of slides with name - Success Metrics PowerPoint Presentation Slides. Enhance your audiences knowledge with this well researched complete deck. Showcase all the important features of the deck with perfect visuals. This deck comprises of total of twenty four slides with each slide explained in detail. Each template comprises of professional diagrams and layouts. Our professional PowerPoint experts have also included icons, graphs and charts for your convenience. All you have to do is DOWNLOAD the deck. Make changes as per the requirement. Yes, these PPT slides are completely customizable. Edit the colour, text and font size. Add or delete the content from the slide. And leave your audience awestruck with the professionally designed Success Metrics PowerPoint Presentation Slides complete deck.
2. Agenda
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
01
Agenda
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
02
Agenda
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
03
Agenda
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
04
Agenda
This slide is 100% editable. Adapt it to your needs and capture
your audience's attention.
05
Our
Agenda
2
3. PLANNED
VALUE
The hours left scheduled on the project
X-----
Project worker’s hourly rate
Planned % of tasks left to complete
X-----
Project budget
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
3
4. Actual Cost
PROJECT TASKS LABOR HOURS LABOR COST ($) MATERIAL COST ($) TRAVEL COST ($) OTHER COST ($) TOTAL PER TASK
Develop functional
specifications
1.0 1.00 1.00 1.00 1.00 5.00
Develop system architecture 1.0 1.00 1.00 1.00 1.00 5.00
Develop preliminary design
specification
1.0 1.00 1.00 1.00 1.00 5.00
Develop detailed design
specification
1.0 1.00 1.00 1.00 1.00 5.00
Develop acceptance test plan 1.0 1.00 1.00 1.00 1.00 5.00
SubTotal 5.0 5.00 5.00 5.00 5.00 25.00
Develop Components 0.0 0.00 0.00 0.00 0.00 0.00
Procure Software 0.0 0.00 0.00 0.00 0.00 0.00
Procure Hardware 0.0 0.00 0.00 0.00 0.00 0.00
Development acceptance test
package
0.0 0.00 0.00 0.00 0.00 0.00
Perform unit/ integration test 0.0 0.00 0.00 0.00 0.00 0.00
Subtotal 0.0 0.00 0.00 0.00 0.00 0.00
Install system 0.0 0.00 0.00 0.00 0.00 0.00
Train Customers 0.0 0.00 0.00 0.00 0.00 0.00
Perform acceptance test 0.0 0.00 0.00 0.00 0.00 0.00
Perform post project review 0.0 0.00 0.00 0.00 0.00 0.00
Provide warranty support 0.0 0.00 0.00 0.00 0.00 0.00
Archive materials 0.0 0.00 0.00 0.00 0.00 0.00
Subtotal 0.0 0.00 0.00 0.00 0.00 0.00
Project
Design
Project
Development
Project
Delivery
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
4
5. Earned Value (EV)
$0
$50000
$100000
$150000
$200000
1 2 3 4 5 6 7 8 9 10 11 12
Time (Weeks)
PV
AC
EV
PV – Planned Value EV – Earned Value AC – Actual Cost
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
5
6. Return (profit) – Investment (expense)
Investment (expense)
X 100
Net Return/ Profit
Investment (expense)
X 100
OR
ROI(%)
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Return on Investment (ROI) 6
7. Cost Variance (CV) (Planned Budget vs Actual Budget)
Manufacturing Overhead
Costs
Q1 Forecast ($) Q1 Actual ($) Variance ($) Var %
Indirect Labor
Management Salaries (fixed
cost)
90,000 92,000 2,000 2.2%
Hourly Wages (Variable Cost) 690,000 756,000 66,000 9.6%
Plant and Infrastructure
Floorspace leasing (Fixed Cost) 12,000 12,000 0 0.0%
Insurance (Fixed Cost) 10,000 10,500 500 5.0%
Maintenance (Variable Cost) 220,000 225,000 5,000 2.3%
Utilities (Variable Costs) 12,000 14,900 2,900 24.2%
Total Manufacture Overhead $ 1,034,000 1,110,400 76,400 7.4%
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
7
8. Cost Performance Index (CPI)
EV Term Value ($)
EV 100
AC 400
CPI =
EV
AC
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
8
9. Planned Hours of Work Vs Actual Situation
Overseeing this project metric indicates how many working hours were planned
for the project processes compared to the actual time spent
416
Actual hours of work
389
Planned hours of work
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
9
11. Name Here
Designation
Name Here
Designation
Name Here
Designation
Name Here
Designation
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Meet Our Team
11
12. This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
Text Here
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
Text Here
This slide is 100% editable.
Adapt it to your needs and
capture your audience's
attention.
Text Here
Vision
01.
Mission
02.
Goal
03.
Our Mission
12
13. Quotes
“ Opportunity is missed by most
people because it dresses in overalls
and looks like work. ”
…Thomas Edison
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
13
14. Timeline
Start
End
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2014
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2015
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2016
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2017
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
2018
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
14
15. Venn
04 01
02
03
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Text Here
15
16. Puzzle
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Text Here
This slide is 100% editable. Adapt it to
your needs and capture your audience's
attention.
Text Here
04
01
02
03
16
17. This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Bulb or idea
17
18. Post it
01
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
02
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
03
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
04
This slide is 100%
editable. Adapt it to
your needs and
capture your
audience's attention.
Text Here
18
19. Our Target
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
This slide is 100% editable. Adapt
it to your needs and capture your
audience's attention.
Text Here
19
20. Column Chart 20
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
0.5 0.8 1
1.6 1.9 2 2.4 2.8
3.4
1
1.5
2
2.5
3
3.5
4 3
4
0.5
0.8
1
1.6
1.9
2
2.4
2.8
2
0
2
4
6
8
10
2010 2011 2012 2013 2014 2015 2016 2017 2018
ExpenditureIn($Billions)
Years
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Product 01
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Product 02
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Product 03
21. This graph/chart is linked to excel, and changes automatically based on data. Just left click on it
and select “Edit Data”.
0
10
20
30
40
50
60
70
80
90
100
DecNovOctSepAugJulJunMayAprMarFebJan
InPercentage
In Years
21
Area Chart
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Product 01
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Product 02
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Product 03
22. Stacked Bar Chart
50%
65%
-15%
-9%
40%
50%
-19%
-2%
-30% -20% -10% 0% 10% 20% 30% 40% 50% 60% 70%
22
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Product 01
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Product 02
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Product 03
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it and select “Edit Data”.
23. $12
$10
$30
$50
$48
$43
$25
$23
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
0% 10% 20% 30% 40% 50%
InSales
In Percentage
This graph/chart is linked to excel, and changes automatically based on data. Just left click on it
and select “Edit Data”.
23
Bubble Chart
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Product 01
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Product 02
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Product 03