OVERVIEW
Risk
Process No. (6)
performed
throughout
the project
Executing
Process No. (8)
The process of implementing agreed-upon risk response plans.
The key benefits of this process is that
- it ensures that agreed-upon risk responses are executed as planned in order to address overall project risk exposure,
minimize individual project threats, and maximize individual project opportunities.
IMPLEMENT RISK RESPONSES
Inputs Tools & Techniques Outputs
.1 Project management plan
• Risk management plan
.2 Project documents
• Lessons learned register
• Risk register
• Risk report
.3 Organizational process assets
.1 Expert judgment
.2 Interpersonal and team skills
• Influencing
.3 Project management information
system
.1 Change requests
.2 Project documents updates
• Issue log
• Lessons learned register
• Project team assignments
• Risk register
• Risk report
OVERVIEW
1-PROJECT MANAGEMENT PLAN
Risk management plan:
 Lists the roles and responsibilities of project team members and other stakeholders for risk
management.
 Defines the level of detail for the risk management methodology for the project.
 Specifies risk thresholds for the project based on the risk appetite of key stakeholders, which
define the acceptable target that the implementation of risk responses is required to achieve.
Implement Risk Responses - Inputs
2-PROJECT DOCUMENTS
 Lessons learned register: Lessons learned earlier in the project with regard to implementing risk responses
can be applied to later phases in the project to improve the effectiveness of this process.
 Risk register: records the agreed-upon risk responses for each individual risk and the nominated owners for
each response plan.
 Risk report: includes an assessment of the current overall project risk exposure, as well as the agreed-upon
risk response strategy. It also describes the major individual project risks with their planned responses.
3- OPA
 Lessons learned repositories from similar completed projects that indicate the
effectiveness of particular risk responses.
Implement Risk Responses - Inputs
1-EXPERT JUDGMENT
 For this process, expertise should be considered from individuals or groups with specialized knowledge
to validate or modify risk responses if necessary, and decide how to implement them in the most efficient
and effective manner.
2-INTERPERSONAL AND TEAM SKILLS
 Influencing: The project manager or person responsible for facilitating the risk process may need to
exercise influencing to encourage nominated risk owners to take necessary action where required.
3-PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)
 Include schedule, resource, and cost software to ensure that agreed-upon risk response plans and their
associated activities are integrated into the project alongside other project activities.
Implement Risk Responses - Tools & Techniques
1-CHANGE REQUESTS
 Issue log: Where issues are identified as part of the Implement Risk Responses process, they are recorded in
the issue log.
 Lessons learned register: is updated with information on challenges encountered when implementing risk
responses and how they could have been avoided, as well as approaches that worked well for implementing
risk responses.
 Project team assignments: Once the risk responses are confirmed, the necessary resources should be
allocated to each action associated with a risk response plan. These resources include suitably qualified and
experienced personnel to execute the agreed-upon action (usually within the project team).
 Risk register: should be updated to reflect any changes to the previously agreed-upon risk responses for
individual project risks that are subsequently made as a result of the Implement Risk Responses process.
 Risk report: should be updated to reflect any changes to the previously agreed-upon risk response to overall
project risk exposure that are subsequently made as a result of the Implement Risk Responses process.
Implementation of risk responses may result in a change request to the cost and schedule baselines or other
components of the project management plan.
2-PROJECT DOCUMENTS UPDATES
Implement Risk Responses - Outputs
T H A N K S F O R W A T C H I N G
Together We will get it done
Sherif Sabri, PMP®

More Related Content

What's hot

Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Glen Alleman
 
Getting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGetting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGlen Alleman
 
PMP - Risk Management plan & template
PMP - Risk Management plan & templatePMP - Risk Management plan & template
PMP - Risk Management plan & templateAllie Gentry
 
Risk response planning
Risk response planningRisk response planning
Risk response planningRaj Sampat
 
Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019GSE Systems, Inc.
 
11.1 Plan Risk Management
11.1 Plan Risk Management11.1 Plan Risk Management
11.1 Plan Risk ManagementDavidMcLachlan1
 
PROJECT RISK MANAGEMENT
PROJECT  RISK  MANAGEMENTPROJECT  RISK  MANAGEMENT
PROJECT RISK MANAGEMENTNeenu Babu
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & SkillsPMC Mentor
 
Project control. Management
Project control. ManagementProject control. Management
Project control. ManagementMarius Miron
 
Building a risk tolerant integrated master schedule
Building a risk tolerant integrated master scheduleBuilding a risk tolerant integrated master schedule
Building a risk tolerant integrated master scheduleGlen Alleman
 
Project Management Control
Project Management ControlProject Management Control
Project Management Controlahmad bassiouny
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by StepGlen Alleman
 
Patrick Carroll Consulting Limited
Patrick Carroll Consulting LimitedPatrick Carroll Consulting Limited
Patrick Carroll Consulting LimitedPatrick Carroll
 
Progress control
Progress controlProgress control
Progress controlashamarsha
 
Risk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBookRisk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBookGlenn Peake
 

What's hot (20)

Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...Showing how to Increase the Probability of Project Success by applying the ...
Showing how to Increase the Probability of Project Success by applying the ...
 
Getting To Done - A Master Class Workshop
Getting To Done - A Master Class WorkshopGetting To Done - A Master Class Workshop
Getting To Done - A Master Class Workshop
 
IMP IMS overview
IMP IMS overviewIMP IMS overview
IMP IMS overview
 
PMP - Risk Management plan & template
PMP - Risk Management plan & templatePMP - Risk Management plan & template
PMP - Risk Management plan & template
 
Risk response planning
Risk response planningRisk response planning
Risk response planning
 
Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019Hyperspring Implementation of BWROG EP/SAG CONTE 2019
Hyperspring Implementation of BWROG EP/SAG CONTE 2019
 
APR Workshop 2010 - Risks - Chitra Deshpande
APR Workshop 2010 - Risks - Chitra DeshpandeAPR Workshop 2010 - Risks - Chitra Deshpande
APR Workshop 2010 - Risks - Chitra Deshpande
 
11.1 Plan Risk Management
11.1 Plan Risk Management11.1 Plan Risk Management
11.1 Plan Risk Management
 
PROJECT RISK MANAGEMENT
PROJECT  RISK  MANAGEMENTPROJECT  RISK  MANAGEMENT
PROJECT RISK MANAGEMENT
 
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & SkillsPMP TKS GUIDE:  Closing Process Group; Tasks, Knowledge & Skills
PMP TKS GUIDE: Closing Process Group; Tasks, Knowledge & Skills
 
GAFM Academy HOW TO START A PROJECT
GAFM Academy HOW TO START A PROJECTGAFM Academy HOW TO START A PROJECT
GAFM Academy HOW TO START A PROJECT
 
Project control. Management
Project control. ManagementProject control. Management
Project control. Management
 
Building a risk tolerant integrated master schedule
Building a risk tolerant integrated master scheduleBuilding a risk tolerant integrated master schedule
Building a risk tolerant integrated master schedule
 
Project Management Control
Project Management ControlProject Management Control
Project Management Control
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
IMP / IMS Step by Step
IMP / IMS Step by StepIMP / IMS Step by Step
IMP / IMS Step by Step
 
Patrick Carroll Consulting Limited
Patrick Carroll Consulting LimitedPatrick Carroll Consulting Limited
Patrick Carroll Consulting Limited
 
Progress control
Progress controlProgress control
Progress control
 
Risk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBookRisk Management Software Implementation Guide eBook
Risk Management Software Implementation Guide eBook
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 

Similar to Implement risk responses

Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxmattinsonjanel
 
Project management course for MSC students Chapter 4 and 5
Project management course for MSC students Chapter 4 and 5Project management course for MSC students Chapter 4 and 5
Project management course for MSC students Chapter 4 and 5Abebaw31
 
11.6 Implement Risk Responses
11.6 Implement Risk Responses11.6 Implement Risk Responses
11.6 Implement Risk ResponsesDavidMcLachlan1
 
Project of entrepreneurship
Project of entrepreneurship Project of entrepreneurship
Project of entrepreneurship AliAbbas390458
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan templateVivek Srivastava
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementHossam Maghrabi
 
riskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdfriskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdfWilliamTom9
 
Assignment 1.docx
Assignment 1.docxAssignment 1.docx
Assignment 1.docxUmair Abbas
 
Planning risk responses and Risk Controlling
Planning risk responses and Risk ControllingPlanning risk responses and Risk Controlling
Planning risk responses and Risk ControllingUsama Fayyaz
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions Singapore
 
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docxProject Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docxwkyra78
 
372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docx372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docxBHANU281672
 
372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docx372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docxpriestmanmable
 
Risk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptRisk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptYasirShaikh34
 

Similar to Implement risk responses (20)

Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docxTemplates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
Templates and ExamplesTEMPLATE RISK MANAGEMENT PLAN FOR .docx
 
Project management course for MSC students Chapter 4 and 5
Project management course for MSC students Chapter 4 and 5Project management course for MSC students Chapter 4 and 5
Project management course for MSC students Chapter 4 and 5
 
Risk analysis
Risk analysisRisk analysis
Risk analysis
 
11.6 Implement Risk Responses
11.6 Implement Risk Responses11.6 Implement Risk Responses
11.6 Implement Risk Responses
 
Project of entrepreneurship
Project of entrepreneurship Project of entrepreneurship
Project of entrepreneurship
 
Risk management-plan template
Risk management-plan templateRisk management-plan template
Risk management-plan template
 
Pmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk ManagementPmbok 5th planning process group part four _ Project Risk Management
Pmbok 5th planning process group part four _ Project Risk Management
 
Plan risk responses
Plan risk responsesPlan risk responses
Plan risk responses
 
riskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdfriskanalysis-120305101118-phpapp02.pdf
riskanalysis-120305101118-phpapp02.pdf
 
Assignment 1.docx
Assignment 1.docxAssignment 1.docx
Assignment 1.docx
 
11 project risk management
11 project risk management11 project risk management
11 project risk management
 
Planning risk responses and Risk Controlling
Planning risk responses and Risk ControllingPlanning risk responses and Risk Controlling
Planning risk responses and Risk Controlling
 
Session 18 -2 PMP 4th edition
Session 18 -2  PMP 4th editionSession 18 -2  PMP 4th edition
Session 18 -2 PMP 4th edition
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation Approach
 
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docxProject Name Risk Management PlanVersion 1.0 Error! Unkno.docx
Project Name Risk Management PlanVersion 1.0 Error! Unkno.docx
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docx372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docx
 
372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docx372the risk report described in . The risk report will be .docx
372the risk report described in . The risk report will be .docx
 
Risk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.pptRisk-Management-05012023-025512pm.ppt
Risk-Management-05012023-025512pm.ppt
 
Lab01.pptx
Lab01.pptxLab01.pptx
Lab01.pptx
 

More from Shereef Sabri

Project risk management overview
Project risk management overviewProject risk management overview
Project risk management overviewShereef Sabri
 
Plan procurement management
Plan procurement management Plan procurement management
Plan procurement management Shereef Sabri
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis Shereef Sabri
 
Perform qualitative risk analysis
Perform qualitative risk analysis Perform qualitative risk analysis
Perform qualitative risk analysis Shereef Sabri
 
Control procurement
Control procurement Control procurement
Control procurement Shereef Sabri
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements Shereef Sabri
 
Project procurement management overview
Project procurement management overviewProject procurement management overview
Project procurement management overviewShereef Sabri
 
Develop project charter
Develop project charterDevelop project charter
Develop project charterShereef Sabri
 

More from Shereef Sabri (9)

Project risk management overview
Project risk management overviewProject risk management overview
Project risk management overview
 
Plan procurement management
Plan procurement management Plan procurement management
Plan procurement management
 
Perform quantitative risk analysis
Perform quantitative risk analysis Perform quantitative risk analysis
Perform quantitative risk analysis
 
Perform qualitative risk analysis
Perform qualitative risk analysis Perform qualitative risk analysis
Perform qualitative risk analysis
 
Identify risks
Identify risksIdentify risks
Identify risks
 
Control procurement
Control procurement Control procurement
Control procurement
 
Conduct procurements
Conduct procurements Conduct procurements
Conduct procurements
 
Project procurement management overview
Project procurement management overviewProject procurement management overview
Project procurement management overview
 
Develop project charter
Develop project charterDevelop project charter
Develop project charter
 

Recently uploaded

Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...anilsa9823
 
Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
REFLECTIONS Newsletter Jan-Jul 2024.pdf.pdf
REFLECTIONS Newsletter Jan-Jul 2024.pdf.pdfREFLECTIONS Newsletter Jan-Jul 2024.pdf.pdf
REFLECTIONS Newsletter Jan-Jul 2024.pdf.pdfssusere8ea60
 
Postal Ballot procedure for employees to utilise
Postal Ballot procedure for employees to utilisePostal Ballot procedure for employees to utilise
Postal Ballot procedure for employees to utiliseccsubcollector
 
Lilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptxLilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptxABMWeaklings
 
Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666nishakur201
 
Breath, Brain & Beyond_A Holistic Approach to Peak Performance.pdf
Breath, Brain & Beyond_A Holistic Approach to Peak Performance.pdfBreath, Brain & Beyond_A Holistic Approach to Peak Performance.pdf
Breath, Brain & Beyond_A Holistic Approach to Peak Performance.pdfJess Walker
 
《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...
《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...
《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...ur8mqw8e
 
Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...
Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...
Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...CIOWomenMagazine
 
办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭o8wvnojp
 
Cheap Rate ➥8448380779 ▻Call Girls In Mg Road Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Mg Road GurgaonCheap Rate ➥8448380779 ▻Call Girls In Mg Road Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Mg Road GurgaonDelhi Call girls
 
E J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxE J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxJackieSparrow3
 
Dhule Call Girls #9907093804 Contact Number Escorts Service Dhule
Dhule Call Girls #9907093804 Contact Number Escorts Service DhuleDhule Call Girls #9907093804 Contact Number Escorts Service Dhule
Dhule Call Girls #9907093804 Contact Number Escorts Service Dhulesrsj9000
 
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ EscortsDelhi Escorts Service
 
social media chat application main ppt.pptx
social media chat application main ppt.pptxsocial media chat application main ppt.pptx
social media chat application main ppt.pptxsprasad829829
 
Call Girls In Andheri East Call US Pooja📞 9892124323 Book Hot And
Call Girls In Andheri East Call US Pooja📞 9892124323 Book Hot AndCall Girls In Andheri East Call US Pooja📞 9892124323 Book Hot And
Call Girls In Andheri East Call US Pooja📞 9892124323 Book Hot AndPooja Nehwal
 
办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改
办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改
办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改atducpo
 

Recently uploaded (20)

Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
Lucknow 💋 High Class Call Girls Lucknow 10k @ I'm VIP Independent Escorts Gir...
 
Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Kalyan Vihar Delhi 💯 Call Us 🔝8264348440🔝
 
REFLECTIONS Newsletter Jan-Jul 2024.pdf.pdf
REFLECTIONS Newsletter Jan-Jul 2024.pdf.pdfREFLECTIONS Newsletter Jan-Jul 2024.pdf.pdf
REFLECTIONS Newsletter Jan-Jul 2024.pdf.pdf
 
Postal Ballot procedure for employees to utilise
Postal Ballot procedure for employees to utilisePostal Ballot procedure for employees to utilise
Postal Ballot procedure for employees to utilise
 
Lilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptxLilac Illustrated Social Psychology Presentation.pptx
Lilac Illustrated Social Psychology Presentation.pptx
 
Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666Call Girls Anjuna beach Mariott Resort ₰8588052666
Call Girls Anjuna beach Mariott Resort ₰8588052666
 
escort service sasti (*~Call Girls in Paschim Vihar Metro❤️9953056974
escort service  sasti (*~Call Girls in Paschim Vihar Metro❤️9953056974escort service  sasti (*~Call Girls in Paschim Vihar Metro❤️9953056974
escort service sasti (*~Call Girls in Paschim Vihar Metro❤️9953056974
 
Breath, Brain & Beyond_A Holistic Approach to Peak Performance.pdf
Breath, Brain & Beyond_A Holistic Approach to Peak Performance.pdfBreath, Brain & Beyond_A Holistic Approach to Peak Performance.pdf
Breath, Brain & Beyond_A Holistic Approach to Peak Performance.pdf
 
《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...
《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...
《塔夫斯大学毕业证成绩单购买》做Tufts文凭毕业证成绩单/伪造美国假文凭假毕业证书图片Q微信741003700《塔夫斯大学毕业证购买》《Tufts毕业文...
 
Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...
Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...
Understanding Relationship Anarchy: A Guide to Liberating Love | CIO Women Ma...
 
办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭办理西悉尼大学毕业证成绩单、制作假文凭
办理西悉尼大学毕业证成绩单、制作假文凭
 
Cheap Rate ➥8448380779 ▻Call Girls In Mg Road Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Mg Road GurgaonCheap Rate ➥8448380779 ▻Call Girls In Mg Road Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Mg Road Gurgaon
 
E J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxE J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptx
 
Dhule Call Girls #9907093804 Contact Number Escorts Service Dhule
Dhule Call Girls #9907093804 Contact Number Escorts Service DhuleDhule Call Girls #9907093804 Contact Number Escorts Service Dhule
Dhule Call Girls #9907093804 Contact Number Escorts Service Dhule
 
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Govindpuri Delhi 💯Call Us 🔝8264348440🔝
 
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
(No.1)↠Young Call Girls in Sikanderpur (Gurgaon) ꧁❤ 9711911712 ❤꧂ Escorts
 
social media chat application main ppt.pptx
social media chat application main ppt.pptxsocial media chat application main ppt.pptx
social media chat application main ppt.pptx
 
Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Lado Sarai Delhi reach out to us at 🔝9953056974🔝
 
Call Girls In Andheri East Call US Pooja📞 9892124323 Book Hot And
Call Girls In Andheri East Call US Pooja📞 9892124323 Book Hot AndCall Girls In Andheri East Call US Pooja📞 9892124323 Book Hot And
Call Girls In Andheri East Call US Pooja📞 9892124323 Book Hot And
 
办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改
办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改
办理国外毕业证学位证《原版美国montana文凭》蒙大拿州立大学毕业证制作成绩单修改
 

Implement risk responses

  • 1. WELCOMEPMP Preparation Course [PMBOK V.6] Implement Risk Responses Sherif Sabri, PMP® With Sherif Sabri, PMP®
  • 2.  Overview Implement Risk Responses  Implement Risk Responses - Inputs  Implement Risk Responses - Tools & Techniques  Implement Risk Responses - Outputs Sherif Sabri, PMP®
  • 3. OVERVIEW Risk Process No. (6) performed throughout the project Executing Process No. (8)
  • 4. The process of implementing agreed-upon risk response plans. The key benefits of this process is that - it ensures that agreed-upon risk responses are executed as planned in order to address overall project risk exposure, minimize individual project threats, and maximize individual project opportunities. IMPLEMENT RISK RESPONSES Inputs Tools & Techniques Outputs .1 Project management plan • Risk management plan .2 Project documents • Lessons learned register • Risk register • Risk report .3 Organizational process assets .1 Expert judgment .2 Interpersonal and team skills • Influencing .3 Project management information system .1 Change requests .2 Project documents updates • Issue log • Lessons learned register • Project team assignments • Risk register • Risk report OVERVIEW
  • 5. 1-PROJECT MANAGEMENT PLAN Risk management plan:  Lists the roles and responsibilities of project team members and other stakeholders for risk management.  Defines the level of detail for the risk management methodology for the project.  Specifies risk thresholds for the project based on the risk appetite of key stakeholders, which define the acceptable target that the implementation of risk responses is required to achieve. Implement Risk Responses - Inputs
  • 6. 2-PROJECT DOCUMENTS  Lessons learned register: Lessons learned earlier in the project with regard to implementing risk responses can be applied to later phases in the project to improve the effectiveness of this process.  Risk register: records the agreed-upon risk responses for each individual risk and the nominated owners for each response plan.  Risk report: includes an assessment of the current overall project risk exposure, as well as the agreed-upon risk response strategy. It also describes the major individual project risks with their planned responses. 3- OPA  Lessons learned repositories from similar completed projects that indicate the effectiveness of particular risk responses. Implement Risk Responses - Inputs
  • 7. 1-EXPERT JUDGMENT  For this process, expertise should be considered from individuals or groups with specialized knowledge to validate or modify risk responses if necessary, and decide how to implement them in the most efficient and effective manner. 2-INTERPERSONAL AND TEAM SKILLS  Influencing: The project manager or person responsible for facilitating the risk process may need to exercise influencing to encourage nominated risk owners to take necessary action where required. 3-PROJECT MANAGEMENT INFORMATION SYSTEM (PMIS)  Include schedule, resource, and cost software to ensure that agreed-upon risk response plans and their associated activities are integrated into the project alongside other project activities. Implement Risk Responses - Tools & Techniques
  • 8. 1-CHANGE REQUESTS  Issue log: Where issues are identified as part of the Implement Risk Responses process, they are recorded in the issue log.  Lessons learned register: is updated with information on challenges encountered when implementing risk responses and how they could have been avoided, as well as approaches that worked well for implementing risk responses.  Project team assignments: Once the risk responses are confirmed, the necessary resources should be allocated to each action associated with a risk response plan. These resources include suitably qualified and experienced personnel to execute the agreed-upon action (usually within the project team).  Risk register: should be updated to reflect any changes to the previously agreed-upon risk responses for individual project risks that are subsequently made as a result of the Implement Risk Responses process.  Risk report: should be updated to reflect any changes to the previously agreed-upon risk response to overall project risk exposure that are subsequently made as a result of the Implement Risk Responses process. Implementation of risk responses may result in a change request to the cost and schedule baselines or other components of the project management plan. 2-PROJECT DOCUMENTS UPDATES Implement Risk Responses - Outputs