Cost
Mitigation
Strategies!
By: Kaushik Duvvuri
Understanding Software Cost Optimization
SOFTWARE COSTS:
SOFTWARE DEVELOPMENT COSTS MEAN
THE TOTAL COST INCURRED TO PRODUCE
THE FINISHED PRODUCT STARTING FROM
THE RESEARCH TO DEVELOPMENT
Software cost
factors
Programmer Ability:
Maintaining and production of software requires expert programmer
without an expert programmer the project is a failure as
programmers are the ones that create the software.
Client Requirements:
Before starting a project, we need to clearly understand the
requirements of the client so that the developed product is aligned
with the client needs so as to avoid the rework.
Complexity of the software system:
The more complex the software system it requires the more effort
and resources are required for developing the software. Which will
increase the need for the resources and time to build the project.
Software Cost:
Software costs are the costs that are required to develop a tool or a software
this is one of the major factor in product development. Some software's need
licensing to use which will increase the overall cost for the project.
Project Timeline:
Need to properly estimate the required time to finish a project wrong
estimation may lead to project extension and increasing the overall project
cost.
Cost Reducing Strategies
Embrace Open-Source Software:
Leverage open-source software components and libraries to reduce software development costs. Open-source solutions often provide robust
functionality, security, and community support without licensing fees.
Minimize Third-Party Integrations:
Integrations can bring a lot of value to a software project, but it's essential to consider the software development costs and potential complications that
come with them. Whenever we decide to integrate a third-party service, we make sure it directly contributes to the core functionalities and adds real
value to the final product.
Simplify The Design
By keeping the design clean and straightforward, you can cut down on development complexity and reduce software development costs significantly.
Metrics and Measurement I
Product Metrics - Size, complexity, design features, performance, and quality level of the product
are all factors to consider.
Process Metrics - To optimize software development and maintenance, process metrics can
be used. Eliminating the faults rate during development, the pattern of testing defect
arrival, and the time it takes for a fixed operation to complete are all examples.
Project Metrics - The characteristics and execution of a project are described by project
metrics. The number of software developers, staffing patterns across the software life cycle,
cost, scheduling, and productivity are all examples of factors to consider.
Real World Case Studies
Case Study - I
XYZ Corporation
Factors Contributing to Cost Overrun:
Scope Creep: Additional features and functionalities were added to the project scope without a proper change management process in place.
Inaccurate Initial Estimation: The initial budget of $5 million may have been based on inaccurate or overly optimistic estimations of the project's complexity and
resource requirements.
Resource Allocation Issues: Inefficient resource allocation, such as overstaffing or underutilization, can lead to higher costs.
Poor Risk Management: Inadequate identification and management of project risks can result in costly surprises.
Ineffective Project Management: Lack of experienced project management and control can lead to missed deadlines and increased expenses.
Cost Reduction Strategies:
1. Scope Management:
Implement a strict scope change control process to assess and approve any
additional features or changes.
Example: Refer to the practice of Agile development, where scope changes are
managed through a prioritized backlog. Only high-priority changes are
considered, and lower-priority changes are deferred to future releases.
2. Resource Optimization:
Review and adjust resource allocation to ensure efficient utilization.
Example: Implement a resource management tool that monitors workloads
and helps balance the workload among team members.
3. Risk Management:
Conduct a comprehensive risk assessment to identify potential issues and
develop mitigation plans.
Example: Refer to NASA's risk management practices for space missions, which
involve identifying and addressing potential risks at various stages of a project
to ensure success within budget constraints.
4. Effective Project Management:
Assign experienced project managers to oversee the project,
implement project management methodologies, and ensure
proper control mechanisms.
Example: Study the practices of companies like Apple, known for
delivering complex projects like the iPhone within budget and on
time through meticulous project management.
5. Continuous Monitoring and Reporting:
Implement regular monitoring of project progress and costs, and
report deviations from the plan promptly.
Example: Utilize tools like Earned Value Management (EVM) to
track project performance and make data-driven decisions to
control costs.
Case Study - II
Cost-Related Issues:
1. Changing Requirements: When requirements change frequently, it can lead
to increased development costs as the project needs to adapt continuously.
2. Unforeseen Technical Challenges: Technical challenges that were not
anticipated in the initial planning stages can result in delays and increased
costs.
3. Scope Creep: Expanding the project's scope without considering its impact
on cost and schedule can lead to cost overruns.
4. Inefficient Resource Allocation: Poor resource allocation, including
overstaffing or underutilizing resources, can drive up costs.
5. Lack of Effective Project Management: Inadequate project management
practices can result in missed deadlines and increased expenses.
Strategies to Mitigate Cost-Related Issues
1. Requirement Stability: Establish a robust requirement management process,
involving stakeholders from the beginning, to minimize changes. Implement change
control procedures to assess the impact of any requested changes on cost and
schedule.
2. Risk Management: Conduct a thorough risk assessment at the project's outset to
identify potential technical challenges. Allocate resources and develop contingency
plans to address these challenges effectively.
3. Scope Management: Implement a strict scope change control process. Evaluate
any proposed scope changes for their impact on cost and schedule before approving
them.
4. Resource Optimization: Continuously monitor resource allocation to ensure it
aligns with project needs. Adjust staffing levels as necessary to prevent overruns or
underutilization.
5. Effective Project Management: Employ experienced project managers who are
well-versed in managing large-scale government projects. Utilize project management
tools and methodologies (e.g., Agile, Waterfall, or hybrid) that suit the project's
nature.
6. Benchmarking and Knowledge Sharing: Analyze successful government software
projects, learn from their best practices, and implement similar approaches in Project
Alpha.
Real-World Examples:
1
1. HealthCare.gov (U.S.):
Initially faced significant cost
and technical challenges but
successfully recovered by
implementing rigorous project
management practices,
improving communication,
and leveraging agile
development methodologies.
2
2. UK Government Digital Service:
The UK government's efforts to
transform its digital services
included projects like the "Digital
by Default" program, which
aimed to reduce costs by
improving online service delivery.
They achieved significant cost
savings through better
procurement practices and a
focus on user-centric design.
3
3. Estonia's e-Government
Initiative: Estonia's digital
government initiatives have
been praised for their cost-
effectiveness. They streamlined
public services, reduced
bureaucracy, and achieved
significant savings by digitizing
various government processes
and promoting e-residency.
4
4. Singapore's eCitizen Portal:
Singapore's government
invested in the development of
the eCitizen portal, which
provides a centralized platform
for citizens to access
government services. This
project achieved cost savings by
consolidating services and
improving user experiences.
5
5. Australia's Digital
Transformation Agency: The
Australian government's Digital
Transformation Agency focuses
on optimizing government IT
projects' cost-effectiveness and
efficiency through better
procurement, agile
methodologies, and rigorous
project management.

More Related Content

Similar to Cost Mitigation Strategies for Software Projects

Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)Jed Concepcion
 
Agile Project Management for IT Projects
Agile Project Management for IT ProjectsAgile Project Management for IT Projects
Agile Project Management for IT Projectsrachna_nainani
 
SOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptx
SOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptxSOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptx
SOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptxchandanasreelaasya
 
Saving Money on Website Development Expert Insights.pdf
Saving Money on Website Development Expert Insights.pdfSaving Money on Website Development Expert Insights.pdf
Saving Money on Website Development Expert Insights.pdfWebGuru Infosystems Pvt. Ltd.
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software EngineeringFáber D. Giraldo
 
Project Cost Managementttttttttttt .pdf
Project Cost Managementttttttttttt   .pdfProject Cost Managementttttttttttt   .pdf
Project Cost Managementttttttttttt .pdfAliaaAl4
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality planKittitouch Suteeca
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions Singapore
 
How to Estimate Software Development Project Cost.pdf
How to Estimate Software Development Project Cost.pdfHow to Estimate Software Development Project Cost.pdf
How to Estimate Software Development Project Cost.pdfVrinsoft Technology
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsRaja Bavani
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9Ian Sommerville
 
Software Engineering Basics.pdf
Software Engineering Basics.pdfSoftware Engineering Basics.pdf
Software Engineering Basics.pdfPriyajit Sen
 
Software Development Methodologies Pros, Cons, & Use Cases
Software Development Methodologies Pros, Cons, & Use CasesSoftware Development Methodologies Pros, Cons, & Use Cases
Software Development Methodologies Pros, Cons, & Use CasesPolyxer Systems
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 

Similar to Cost Mitigation Strategies for Software Projects (20)

Project management (A Basic Approach)
Project management (A Basic Approach)Project management (A Basic Approach)
Project management (A Basic Approach)
 
Agile Project Management for IT Projects
Agile Project Management for IT ProjectsAgile Project Management for IT Projects
Agile Project Management for IT Projects
 
SOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptx
SOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptxSOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptx
SOFTWARE PROJECT MANAGEMENT IN INDUSTRY.pptx
 
Saving Money on Website Development Expert Insights.pdf
Saving Money on Website Development Expert Insights.pdfSaving Money on Website Development Expert Insights.pdf
Saving Money on Website Development Expert Insights.pdf
 
Project Planning in Software Engineering
Project Planning in Software EngineeringProject Planning in Software Engineering
Project Planning in Software Engineering
 
Project Cost Managementttttttttttt .pdf
Project Cost Managementttttttttttt   .pdfProject Cost Managementttttttttttt   .pdf
Project Cost Managementttttttttttt .pdf
 
Ch 6 development plan and quality plan
Ch 6 development plan and quality planCh 6 development plan and quality plan
Ch 6 development plan and quality plan
 
Cost estimation
Cost estimationCost estimation
Cost estimation
 
Project Management Introduction
Project Management IntroductionProject Management Introduction
Project Management Introduction
 
Software project management
Software project managementSoftware project management
Software project management
 
Software project management 3
Software project management 3Software project management 3
Software project management 3
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation Approach
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
How to Estimate Software Development Project Cost.pdf
How to Estimate Software Development Project Cost.pdfHow to Estimate Software Development Project Cost.pdf
How to Estimate Software Development Project Cost.pdf
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 
Ch23-Software Engineering 9
Ch23-Software Engineering 9Ch23-Software Engineering 9
Ch23-Software Engineering 9
 
Software Engineering Basics.pdf
Software Engineering Basics.pdfSoftware Engineering Basics.pdf
Software Engineering Basics.pdf
 
Software Development Methodologies Pros, Cons, & Use Cases
Software Development Methodologies Pros, Cons, & Use CasesSoftware Development Methodologies Pros, Cons, & Use Cases
Software Development Methodologies Pros, Cons, & Use Cases
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 

Recently uploaded

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 

Recently uploaded (20)

(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 

Cost Mitigation Strategies for Software Projects

  • 3. SOFTWARE COSTS: SOFTWARE DEVELOPMENT COSTS MEAN THE TOTAL COST INCURRED TO PRODUCE THE FINISHED PRODUCT STARTING FROM THE RESEARCH TO DEVELOPMENT
  • 4. Software cost factors Programmer Ability: Maintaining and production of software requires expert programmer without an expert programmer the project is a failure as programmers are the ones that create the software. Client Requirements: Before starting a project, we need to clearly understand the requirements of the client so that the developed product is aligned with the client needs so as to avoid the rework. Complexity of the software system: The more complex the software system it requires the more effort and resources are required for developing the software. Which will increase the need for the resources and time to build the project.
  • 5. Software Cost: Software costs are the costs that are required to develop a tool or a software this is one of the major factor in product development. Some software's need licensing to use which will increase the overall cost for the project. Project Timeline: Need to properly estimate the required time to finish a project wrong estimation may lead to project extension and increasing the overall project cost.
  • 6. Cost Reducing Strategies Embrace Open-Source Software: Leverage open-source software components and libraries to reduce software development costs. Open-source solutions often provide robust functionality, security, and community support without licensing fees. Minimize Third-Party Integrations: Integrations can bring a lot of value to a software project, but it's essential to consider the software development costs and potential complications that come with them. Whenever we decide to integrate a third-party service, we make sure it directly contributes to the core functionalities and adds real value to the final product. Simplify The Design By keeping the design clean and straightforward, you can cut down on development complexity and reduce software development costs significantly.
  • 7. Metrics and Measurement I Product Metrics - Size, complexity, design features, performance, and quality level of the product are all factors to consider. Process Metrics - To optimize software development and maintenance, process metrics can be used. Eliminating the faults rate during development, the pattern of testing defect arrival, and the time it takes for a fixed operation to complete are all examples. Project Metrics - The characteristics and execution of a project are described by project metrics. The number of software developers, staffing patterns across the software life cycle, cost, scheduling, and productivity are all examples of factors to consider.
  • 8. Real World Case Studies
  • 9. Case Study - I XYZ Corporation Factors Contributing to Cost Overrun: Scope Creep: Additional features and functionalities were added to the project scope without a proper change management process in place. Inaccurate Initial Estimation: The initial budget of $5 million may have been based on inaccurate or overly optimistic estimations of the project's complexity and resource requirements. Resource Allocation Issues: Inefficient resource allocation, such as overstaffing or underutilization, can lead to higher costs. Poor Risk Management: Inadequate identification and management of project risks can result in costly surprises. Ineffective Project Management: Lack of experienced project management and control can lead to missed deadlines and increased expenses.
  • 10. Cost Reduction Strategies: 1. Scope Management: Implement a strict scope change control process to assess and approve any additional features or changes. Example: Refer to the practice of Agile development, where scope changes are managed through a prioritized backlog. Only high-priority changes are considered, and lower-priority changes are deferred to future releases. 2. Resource Optimization: Review and adjust resource allocation to ensure efficient utilization. Example: Implement a resource management tool that monitors workloads and helps balance the workload among team members. 3. Risk Management: Conduct a comprehensive risk assessment to identify potential issues and develop mitigation plans. Example: Refer to NASA's risk management practices for space missions, which involve identifying and addressing potential risks at various stages of a project to ensure success within budget constraints.
  • 11. 4. Effective Project Management: Assign experienced project managers to oversee the project, implement project management methodologies, and ensure proper control mechanisms. Example: Study the practices of companies like Apple, known for delivering complex projects like the iPhone within budget and on time through meticulous project management. 5. Continuous Monitoring and Reporting: Implement regular monitoring of project progress and costs, and report deviations from the plan promptly. Example: Utilize tools like Earned Value Management (EVM) to track project performance and make data-driven decisions to control costs.
  • 12. Case Study - II Cost-Related Issues: 1. Changing Requirements: When requirements change frequently, it can lead to increased development costs as the project needs to adapt continuously. 2. Unforeseen Technical Challenges: Technical challenges that were not anticipated in the initial planning stages can result in delays and increased costs. 3. Scope Creep: Expanding the project's scope without considering its impact on cost and schedule can lead to cost overruns. 4. Inefficient Resource Allocation: Poor resource allocation, including overstaffing or underutilizing resources, can drive up costs. 5. Lack of Effective Project Management: Inadequate project management practices can result in missed deadlines and increased expenses.
  • 13. Strategies to Mitigate Cost-Related Issues 1. Requirement Stability: Establish a robust requirement management process, involving stakeholders from the beginning, to minimize changes. Implement change control procedures to assess the impact of any requested changes on cost and schedule. 2. Risk Management: Conduct a thorough risk assessment at the project's outset to identify potential technical challenges. Allocate resources and develop contingency plans to address these challenges effectively. 3. Scope Management: Implement a strict scope change control process. Evaluate any proposed scope changes for their impact on cost and schedule before approving them. 4. Resource Optimization: Continuously monitor resource allocation to ensure it aligns with project needs. Adjust staffing levels as necessary to prevent overruns or underutilization. 5. Effective Project Management: Employ experienced project managers who are well-versed in managing large-scale government projects. Utilize project management tools and methodologies (e.g., Agile, Waterfall, or hybrid) that suit the project's nature. 6. Benchmarking and Knowledge Sharing: Analyze successful government software projects, learn from their best practices, and implement similar approaches in Project Alpha.
  • 14. Real-World Examples: 1 1. HealthCare.gov (U.S.): Initially faced significant cost and technical challenges but successfully recovered by implementing rigorous project management practices, improving communication, and leveraging agile development methodologies. 2 2. UK Government Digital Service: The UK government's efforts to transform its digital services included projects like the "Digital by Default" program, which aimed to reduce costs by improving online service delivery. They achieved significant cost savings through better procurement practices and a focus on user-centric design. 3 3. Estonia's e-Government Initiative: Estonia's digital government initiatives have been praised for their cost- effectiveness. They streamlined public services, reduced bureaucracy, and achieved significant savings by digitizing various government processes and promoting e-residency. 4 4. Singapore's eCitizen Portal: Singapore's government invested in the development of the eCitizen portal, which provides a centralized platform for citizens to access government services. This project achieved cost savings by consolidating services and improving user experiences. 5 5. Australia's Digital Transformation Agency: The Australian government's Digital Transformation Agency focuses on optimizing government IT projects' cost-effectiveness and efficiency through better procurement, agile methodologies, and rigorous project management.