1. City of San Diego, City of San Diego As-Needed Engineering Services: Task Order No. 65,
subcontractor to Michael Baker International.
Working as a Sub for Michael Baker International EVARI provided data collection and
compilation services for H&H and water quality modeling. The geographic scope of this project
included 32 sub watersheds within the larger Chollas watershed. This data included previous
Upper Chollas Creek Watershed Master Plan model data, City of San Diego data storm drain
inventory, AMEC updated City of San Diego storm drain inventory, Caltrans storm drain
inventory, La Mesa storm drain inventory, Lemon Grove storm drain inventory. Data gaps were
filled using non GIS sources including; google street view, AsBuilt Grading plans and survey data.
Extracting data from primary sources and GIS data that was in scope for modeling purposes was
determined by working close with Michael Baker, Rick Engineering and Tetra Tech. The
determination of storm water infrastructure’s weight on a model required and understanding of
how conduit dimensions, material, slope and potential energy entering natural channels affect
the storm water flow and quality.
Pacific Gas and Electric (PGE) Contract Work Authorization.
Evari GIS Consulting is providing comprehensive audit and enterprise tier GIS Consulting services
directly to PacificGas and Electric in support of PGE’s LEDStreetlight Upgrade Program. The work
includes geocoding and field auditing services for approximately 100,000 LS1 and LS2 street lights
across PGE’s 70,000 square mile territory. GIS Consulting services include leveraging PG&E’s Esri
Enterprise License Agreement (ELA) to support the geocoding, field audit, outreach, light
assignment to contractors and support for 3 contractors. This system includes over 50 named
users with various levels of access to view and edit data. The systemis load balanced within the
Amazon Cloud and leverages SqlServer and ArcGIS Server (Enterprise Advanced).
1. City of San Diego, Local Government Partnership (Environmental Services Department)
with funding through San Diego Gas and Electric
Afterworkingasa subcontractor on2 previouscompetitivelybidstreetlightconversionjobs,the Cityof
San DiegoEnvironmentalServicesDepartmentcontracteddirectlywithEvari toprovide staff
augmentation.Evari isinthe secondyearof thisannuallyrecurringcontract.Under thiscontract,Evari
providesInvestmentGrade Auditservices,Facilitate the Citypursuitof fundingarelease of worktobe
accomplished,Update SDGEandGE LightGridSystemwithpostconstructiondata,Geospatial
photometricanalysis,Equitable lightingAnalysisandlastlyrepresentCityof SanDiegointerestsat
conferencesanddecisionmakingbodies.Evari will provide mobile GISdeployment,traininganddata
managementservicestoCitycontractorsduringworkto convertthe 50+ decorative fixture types,lights
on seriescircuitsandotherlightswhichwere notconvertedaspartof phase 1 and 2. Evari providesa
streamlinedapproachtosubmitdatato secure the new meteredrate change afterbeingaddedtothe
meterthroughGE LightGrid.Evari alsoworkscloselywithGEin theirdeploymentof anautomated
parkingmanagementappthroughSanDiego’sstreetlights.

More Related Content

Similar to Project Summarys

Dj pow work samples
Dj pow work samplesDj pow work samples
Dj pow work samples
DanielJPow
 
Max Bolen Resume 12202016
Max Bolen Resume 12202016Max Bolen Resume 12202016
Max Bolen Resume 12202016
Max Bolen
 
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
Philip Tunnah
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
apwacoachellavalley
 

Similar to Project Summarys (20)

Environmental Projects
Environmental ProjectsEnvironmental Projects
Environmental Projects
 
Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...Optimize Process Management to Improve Business Outcomes - Webinar, September...
Optimize Process Management to Improve Business Outcomes - Webinar, September...
 
Heather McCall Resume
Heather McCall ResumeHeather McCall Resume
Heather McCall Resume
 
Manoj_Jawale_CV
Manoj_Jawale_CVManoj_Jawale_CV
Manoj_Jawale_CV
 
TechM GIS Utilities
TechM GIS UtilitiesTechM GIS Utilities
TechM GIS Utilities
 
CLARK PE RESUME
CLARK PE RESUMECLARK PE RESUME
CLARK PE RESUME
 
Cyber city 3d water infrastructure management marketing
Cyber city 3d water infrastructure management marketingCyber city 3d water infrastructure management marketing
Cyber city 3d water infrastructure management marketing
 
Dj pow work samples
Dj pow work samplesDj pow work samples
Dj pow work samples
 
Data Goldmines
Data GoldminesData Goldmines
Data Goldmines
 
Advanced Technologies
Advanced TechnologiesAdvanced Technologies
Advanced Technologies
 
My_CV (1)
My_CV (1)My_CV (1)
My_CV (1)
 
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGEWATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
WATER SUPPLY DISTRIBUTION SYSTEM BY USING WATERGEMS SOFTWARE AT SAIGAON VILLAGE
 
Max Bolen Resume 12202016
Max Bolen Resume 12202016Max Bolen Resume 12202016
Max Bolen Resume 12202016
 
Draft EIS - Kemper County IGCC Project
Draft EIS - Kemper County IGCC ProjectDraft EIS - Kemper County IGCC Project
Draft EIS - Kemper County IGCC Project
 
SAP FY23 - COAH.ppt
SAP FY23 - COAH.pptSAP FY23 - COAH.ppt
SAP FY23 - COAH.ppt
 
System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...
System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...
System Architecture of Cloud-based Web GIS for Real-Time Macroeconomic Loss E...
 
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORKA CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
A CASE STUDY OF BANAWADI VILLAGE OPTIMUM DESIGN AND ESTIMATION OF SEWER NETWORK
 
Heathman.Amanda resume
Heathman.Amanda resumeHeathman.Amanda resume
Heathman.Amanda resume
 
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARDENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
ENR MOUNTAIN STATES 2013 BEST PROJECTS AWARD
 
RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)RFP for Coachella Valley Associated Governments (CVAG)
RFP for Coachella Valley Associated Governments (CVAG)
 

Project Summarys

  • 1. 1. City of San Diego, City of San Diego As-Needed Engineering Services: Task Order No. 65, subcontractor to Michael Baker International. Working as a Sub for Michael Baker International EVARI provided data collection and compilation services for H&H and water quality modeling. The geographic scope of this project included 32 sub watersheds within the larger Chollas watershed. This data included previous Upper Chollas Creek Watershed Master Plan model data, City of San Diego data storm drain inventory, AMEC updated City of San Diego storm drain inventory, Caltrans storm drain inventory, La Mesa storm drain inventory, Lemon Grove storm drain inventory. Data gaps were filled using non GIS sources including; google street view, AsBuilt Grading plans and survey data. Extracting data from primary sources and GIS data that was in scope for modeling purposes was determined by working close with Michael Baker, Rick Engineering and Tetra Tech. The determination of storm water infrastructure’s weight on a model required and understanding of how conduit dimensions, material, slope and potential energy entering natural channels affect the storm water flow and quality. Pacific Gas and Electric (PGE) Contract Work Authorization. Evari GIS Consulting is providing comprehensive audit and enterprise tier GIS Consulting services directly to PacificGas and Electric in support of PGE’s LEDStreetlight Upgrade Program. The work includes geocoding and field auditing services for approximately 100,000 LS1 and LS2 street lights across PGE’s 70,000 square mile territory. GIS Consulting services include leveraging PG&E’s Esri Enterprise License Agreement (ELA) to support the geocoding, field audit, outreach, light assignment to contractors and support for 3 contractors. This system includes over 50 named users with various levels of access to view and edit data. The systemis load balanced within the Amazon Cloud and leverages SqlServer and ArcGIS Server (Enterprise Advanced). 1. City of San Diego, Local Government Partnership (Environmental Services Department) with funding through San Diego Gas and Electric Afterworkingasa subcontractor on2 previouscompetitivelybidstreetlightconversionjobs,the Cityof San DiegoEnvironmentalServicesDepartmentcontracteddirectlywithEvari toprovide staff augmentation.Evari isinthe secondyearof thisannuallyrecurringcontract.Under thiscontract,Evari providesInvestmentGrade Auditservices,Facilitate the Citypursuitof fundingarelease of worktobe accomplished,Update SDGEandGE LightGridSystemwithpostconstructiondata,Geospatial photometricanalysis,Equitable lightingAnalysisandlastlyrepresentCityof SanDiegointerestsat
  • 2. conferencesanddecisionmakingbodies.Evari will provide mobile GISdeployment,traininganddata managementservicestoCitycontractorsduringworkto convertthe 50+ decorative fixture types,lights on seriescircuitsandotherlightswhichwere notconvertedaspartof phase 1 and 2. Evari providesa streamlinedapproachtosubmitdatato secure the new meteredrate change afterbeingaddedtothe meterthroughGE LightGrid.Evari alsoworkscloselywithGEin theirdeploymentof anautomated parkingmanagementappthroughSanDiego’sstreetlights.