1. | 1
SHARAFAT HUSSAIN
Architect
00966592603762
apex_architect@hotmail.com
shussain@systra.com
PERSONAL SUMMARY
A team leader with excellent communication skills and academic qualifications.
Possessing a proven abilityto ensure projected architectural designs are functional, safe and economical and meet the
needsof the client. Excellentcommunicationskillsto keep in touchwith clientsto ensure that the projectdesignsmatch
theirneeds. Easygoingbynature andableto getalongwithboth workcolleaguesandseniormanagers,currentlylooking
for a suitable architect position.
Personnel Qualification
Academic Qualification
Academic Degree Date Certified Name of Institution Country
MSc Construction Project
Management
2011
Edinburgh Napier
University, UK
United Kingdom
CSCS – Construction Skills
Certification Scheme
2012
CITB, Construction Skills,
UK
United Kingdom
Bachelor of Architecture 2009
DCET Affiliated MUET
Jamshoro
Pakistan
Key Experience to the Project
Experience ofArchitecturalDesigning (InteriorDesigning,Landscaping)&Planningof the Project,Project
controls,costestimatesand DetailArchitecturalDrawings.ProjectManagementforInfrastructure Planning
/TransportationPlanningforShort term and Longterm Phases of MasterPlanningProjects.Preparationof
agreements,contractdocumentsinaccordancewithFIDIC/ PPRA / PEC
Professional Registration / Affiliations
Name of Organization Registration No
PCATP(Pakistan CouncilofArchitectsandTownPlanners) A-3060
IAP (Institute of Architects of Pakistan) A-1410-13
CIOB (Chartered Institute of Building) 1504983
SCE (Saudi Council of Engineers)
SoftwareKnowledge
Auto Cad, Photoshop,Ms-Office,Google Sketchup,123DDesign
ThesisTopics
MSc:Researchon ConstructionSafetyin DevelopingCountries
Bachelor:Research&Design “SkiResort” at Naltar GilgitPakistan
2. | 2
Personnel Experience
Period
(month/year)
Designation
Position
Employer’s
Name and
Address
Project Name and Description
From To
May
2015
Present Architect Civil RMTC
Riyadh Metro
Transit
Consultant,
UrubaRMTC
office
Iconic Metro Station Riyadh
DowntownMainStation(QasrAl Hokm)(3E2)
Western MetroStation (3B2)
Otherstations, Elevated, Underground,Shallow
Underground,Park& Rideand Depots
Depots
Dutiesand responsibilities
CoordinatingandDevelopingtheArchitecturalaspectsofMetroProject,speciallyfocusedinArchitecturalDesign
including Operation facilities, Stations and Platform features, Technical rooms.
Responsible ForReviewThe StationsDesign (Elevated, Underground, shallow, at Gride) & Depots
HighlightTheBasic IssuesOfDesign
Make ComparisonBetween oldClientDesign And Current
Makepresentationfor different issueto highlight
Attend meetingswithclientandcontractors andWrite minutesofmeeting
Comprehensive StudyOf Iconic Stations)DesignFrom Very InitialStage ToCurrentDesignStage, Including
BasementParking,SurfaceParking,Internal EachFloor DesignForMetroStation, BRT Station,MarketAnd
Mosques,DetailReviewOf Plaza, Landscaping Include Hardscape,Softscape,StakePark, Bus And Car Drop
Off Space,Make PresentationForClientADA ToUnderstandThem TheDifferenceAnd EvolutionOf The
Design.
ComprehensiveStudyOf Iconic DowntownMetroStation(3E2)DesignincludingPlaza,Eid Plaza, Mosque,
mainentrancetometrostation, eachfloor, undergroundparking,undergroundatrium,metroplatform,retail
areas.
Site Supervisionfor allArchitecturalWorks (Masonrywork, Plastering,Painting,Flooring,FalseCeiling,wall
Cladding,RoofCladding,Landscaping,Streetscapingetc ).
Review construction plans (Shop drawings and Engineer drawings) indicating expected duration, and
estimated cost through completion, expected benefits and projected improvement in system
performance for each alternative.
Review MaterialSubmittal,Method Statementofwork, and Specification.
Period
(month/year)
Designation
Position
Employer’s
Name and
Address
Project Name and Description
From To
Aug
2012
April
2015
ArchitectEngineer Shahzad
Associates
Consulting
Architect,
Engineers&
Planners
Yusra Medical Hospital(500beds) Islamabad,
Groundplus22 Floors
ShaheedMohtarmaBenazirBhutto, Offices&
ConventionCenter (2000seats) at University of
Karachi.
ConstructionofGroundStation ForMarineRemote
SensingNationalInstitute Of OceanographyAt
DhabejiKarachi,Jointventure with ChineseGOVT
3. | 3
TownPlanning,LayoutandSurvey of Landapprox.
50 acresat Cantt. Bazar MalirKarachi
Designing&SupervisionSewerage System, Water
Supply& RoadsWorks for WWF Hyderabadand
Kotri.
Designing&Supervisionof Infrastructure,External
developmentservices& Gas worksfor WWF Kotri.
Re-modelingOfKPT FootballGroundAt Keamari,
Karachi
Survey andfeasibilityreport for KPT Railway
Station, Karachi
Duties and responsibilities
Responsibleforplanning,scheduling,andcoordinatingthetechnical andmanagementaspectsonprojects
Preparationof informationregardingDesign,Schematic/DetailedDesignDevelopment,StructureSpecifications,
Materials, Colour
Monitoring and Preparation of Construction Drawings
Site visits to inspect the quality of the work (including samples, mock ups and off site tests as required) and to
monitor progress and ensure that the works are executed in accordance with the Works Information and in
accordance with good practice
Attend meetings and provide reports as requested bythe project manager to communicate
Preparation of agreements, in accordance with FIDIC / PPRA/ PEC
Project Management and monitoring the progress e.g. qualitycontrol
Preparation of reports and presentations
Check the environmental impact of the project.
Inspect the Works on completion. Record and issue a list of defects to the Contractor at the appropriate time in
accordance with the terms of the Works contract
Coordinate similar lists of defects from other Supervisors. Ensure that the contractor has rectified the defects
within a reasonable time and issue a certificate to the contractor when all defects have been made good
Period
(month/year)
Designation
Position
Employer’s
Name and
Address
Project Name and Description
From To
Feb
2010
Aug
2012
Architecture,
Interior and
Site
Supervision
L’Arche UK Infrastructureand externaldevelopmentof
Pennywelland MuirhouseRegeneration,21Century
HomesSchemeEdinburghUK
Designandsupervisionof NewHousingSchemeat
West PitlonEdinburghUK
Duties and responsibilities
InitialInvestigation and ResearchofProject, Conceptual Architectural Design,
Examinedesigndrawings,shopfabricationdrawings,standarddetails,methodstatementsandspecifications
Site Survey, ModelingandPresentation
TenderConstructionDrawingsIncludingDetailing
Monitorthe Progresswith schedule,Co-ordinate withDesignteam tomeetthe clientrequirements
Preparationprocessedwork,determiningtheneededquantitiesandprepareasbuiltdrawing,inthe site
Checkthe safety policiesareinplaceandareimplementedbythe contractorandthatthere is adequate
protectionfor the public andothersand allHealth andSafety Statutory RequirementsorRegulationsarebeing
observed by allthose responsibleforeither designingorconstructingtheWorks.
4. | 4
Projectmeetings,and take minutesof meeting,MaintainRecord,etc
Inspectthe Works oncompletion.Recordandissuealist of defectsto the Contractor
Period
(month/year)
Designation
Position
Employer’s
Name and
Address
Project Name and Description
From To
Dec
2008
Feb
2010
Architect Shahzad
Associates
Consulting
Architect,
Engineers&
Planners
DesigningandSupervisionof FederalGovt.
EmployeesHousingScheme,Karachi.
Interior DesignandSupervisionOf Auditorium at
DawoodCollegeofEngineering&Technology
SewerageDisposalSystem at KhairpurDistrict
Govt. Khairpur
DesigningofPakistan Navy Welfare Housing
Scheme(PNWHS)Gharo.BahriaFoundation
Karachi.
Water Supply, Sewerage& RoadsWorks at
Hyderabadand Kotri. SWWB, Karachi.
DesigningandSupervisionof Developmentof
KarachiRevenueEmployeesJudicialHousing
SocietyLtd. Landsector41-A, KDA Scheme-33
(approx50 acres)
DesigningandSupervisionDevelopmentofSports
FacilitiesatNEDUniversity
Duties and responsibilities
InitialInvestigation and ResearchofProject,
Architectural Designing&Drafting,SpaceDevelopment,
Sketching,Site visit, Site Surveys, DevelopingConcepts
ConstructionSupervisionofconstructionworkincludingcheckingthe
contractormock-upforfinishingitems
Checkthe qualitymanagementproceduresareinplacethroughouttheconstructionphase
Preparationof Conceptualplans
Preparationof Drawings
Site Visits to followup activitiesat the site
Inspectthe Works oncompletion.Recordandissuealist of defectsto the Contractor