SlideShare a Scribd company logo
1 of 2
SHAHERYAR ALISHAHERYAR ALI
House No. R-105, Bagh-e-Ibrahim, Malir, KarachiHouse No. R-105, Bagh-e-Ibrahim, Malir, Karachi
Email: shaheryar-ali@hotmail.comEmail: shaheryar-ali@hotmail.com
Cell No: +92-345-3310816 / +92-321-8902805Cell No: +92-345-3310816 / +92-321-8902805
OBJECTIVEOBJECTIVE
To get suitable position as a Electrical Engineer in reputable organization in accordanceTo get suitable position as a Electrical Engineer in reputable organization in accordance
with the qualification & experience to boost up my career and safe my future.with the qualification & experience to boost up my career and safe my future.
ACADEMIC QUALIFICATIONACADEMIC QUALIFICATION
 B.Tech (Pass)B.Tech (Pass) inin ElectricalElectrical (Pass) from(Pass) from Indus UniversityIndus University..
 HSCHSC (Pre-Engineering) from(Pre-Engineering) from Islamia Science CollegeIslamia Science College in 2in 2ndnd
Division.Division.
 DAE (Electrical)DAE (Electrical) in 1in 1stst
Division fromDivision from Pakistani Swedish Institute ofPakistani Swedish Institute of
TechnologyTechnology..
 SSCSSC (Computer Science) from(Computer Science) from Gulshan Technical High SchoolGulshan Technical High School in 1in 1stst
Division.Division.
 IELTsIELTs fromfrom AEO PakistanAEO Pakistan..
 HSEQHSEQ training fromtraining from Aman TechAman Tech for 15 days organized byfor 15 days organized by K-ElelctricK-Elelctric..
EXPERINCEEXPERINCE
K-Electric formallyK-Electric formally
(Karachi Electric Supply Company)(Karachi Electric Supply Company) Jan . 2011 – Till DateJan . 2011 – Till Date
Sub-Engineer, Operation Supervisor , Assistant EngineerSub-Engineer, Operation Supervisor , Assistant Engineer
(Shutdown & Troubleshooting)(Shutdown & Troubleshooting)
 Responsible for the operations of 11KV circuits.Responsible for the operations of 11KV circuits.
 Shutdown arrangement for new connection, troubleshooting & maintenance of theShutdown arrangement for new connection, troubleshooting & maintenance of the
11KV line from grid station.11KV line from grid station.
 Doing both overhead & underground cable & sub-station isolationDoing both overhead & underground cable & sub-station isolation
 Declare & forwarding to UGM, SSM, M&C.Declare & forwarding to UGM, SSM, M&C.
 Preparing safety measurements before shutdown according to the define SOP.Preparing safety measurements before shutdown according to the define SOP.
And using all PPE, SPE.And using all PPE, SPE.
 Operating OCB (Oil Circuit Breaker), VCB (Vacuum Circuit Breaker) andOperating OCB (Oil Circuit Breaker), VCB (Vacuum Circuit Breaker) and
isolators of different vendors like Seimens, Areeva, JP (Johnson & Phillips),isolators of different vendors like Seimens, Areeva, JP (Johnson & Phillips),
FICO.FICO.
 Fault tracing of PMT & transformer from different vendor like Seimens, JP, PEL.Fault tracing of PMT & transformer from different vendor like Seimens, JP, PEL.
Standard Board (Pvt.) LtdStandard Board (Pvt.) Ltd Jan. 2010 – Dec 2010Jan. 2010 – Dec 2010
ElectricianElectrician (Electrical(Electrical MaintenanceMaintenance Department)Department)
 Troubleshooting of electric panels of Seimens & Areeva. And repairing ofTroubleshooting of electric panels of Seimens & Areeva. And repairing of
breakers & contactors.breakers & contactors.
 MotorMotor maintenancemaintenance and electrical panel wiring.and electrical panel wiring.
 Erection work for all kind in electrical equipment.Erection work for all kind in electrical equipment.
COMPUTER SKILLSCOMPUTER SKILLS
AutoCad (expert in manual), MS Office, Adobe Photoshop, Adobe illustrator, AdobeAutoCad (expert in manual), MS Office, Adobe Photoshop, Adobe illustrator, Adobe
After EffectAfter Effect
PERSONAL INFORMATIONPERSONAL INFORMATION
Father’s NameFather’s Name :: Hakim AliHakim Ali
Date of BirthDate of Birth :: 44thth
September 1992September 1992
NIC No.NIC No. :: 42201-8938767-942201-8938767-9
Passport NoPassport No :: MH1817671MH1817671
ReligionReligion :: IslamIslam
NationalityNationality :: PakistaniPakistani
Marital StatusMarital Status :: SingleSingle
REFERENCEREFERENCE
 Reference will be furnished upon request.Reference will be furnished upon request.

More Related Content

What's hot

NZ CV Jordaan Johannes
NZ CV Jordaan JohannesNZ CV Jordaan Johannes
NZ CV Jordaan Johannes
johannes shaun
 
Eng.Tamer CV
Eng.Tamer CVEng.Tamer CV
Eng.Tamer CV
Tamer Ali
 
CV ELECTRICIAN 2016 DYN UPDATED
CV ELECTRICIAN 2016 DYN UPDATEDCV ELECTRICIAN 2016 DYN UPDATED
CV ELECTRICIAN 2016 DYN UPDATED
MUHAMMAD ZAMIR
 
Danish CV Electrician
Danish CV ElectricianDanish CV Electrician
Danish CV Electrician
DANISH AKSAR
 
Salah mansour's cv chief electrician
Salah mansour's cv chief electricianSalah mansour's cv chief electrician
Salah mansour's cv chief electrician
Salah Mansour
 

What's hot (20)

Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
Case Study | How we solved an Earth-fault (mal)Tripping that was causing trip...
 
JOEL ELECTRICIAN CV
JOEL ELECTRICIAN CVJOEL ELECTRICIAN CV
JOEL ELECTRICIAN CV
 
NZ CV Jordaan Johannes
NZ CV Jordaan JohannesNZ CV Jordaan Johannes
NZ CV Jordaan Johannes
 
my Resume
my Resumemy Resume
my Resume
 
Eng.Tamer CV
Eng.Tamer CVEng.Tamer CV
Eng.Tamer CV
 
lisa hays
lisa hayslisa hays
lisa hays
 
CV ELECTRICIAN 2016 DYN UPDATED
CV ELECTRICIAN 2016 DYN UPDATEDCV ELECTRICIAN 2016 DYN UPDATED
CV ELECTRICIAN 2016 DYN UPDATED
 
Electrical Supervisor
Electrical  SupervisorElectrical  Supervisor
Electrical Supervisor
 
Insulation Resistance Testing / Megger
Insulation Resistance Testing / Megger Insulation Resistance Testing / Megger
Insulation Resistance Testing / Megger
 
Case Study Importance of relay selection in grid connected industries
Case Study Importance of relay selection in grid connected industriesCase Study Importance of relay selection in grid connected industries
Case Study Importance of relay selection in grid connected industries
 
Danish CV Electrician
Danish CV ElectricianDanish CV Electrician
Danish CV Electrician
 
R Venkatesan
R VenkatesanR Venkatesan
R Venkatesan
 
Gogul a nair
Gogul a nairGogul a nair
Gogul a nair
 
How we saved a Process Plant from break-down
How we saved a Process Plant from break-downHow we saved a Process Plant from break-down
How we saved a Process Plant from break-down
 
Coral Aquarium maintenance
Coral Aquarium maintenanceCoral Aquarium maintenance
Coral Aquarium maintenance
 
The Elektro Tipp - PV Generator Junction Boxes
The Elektro Tipp - PV Generator Junction BoxesThe Elektro Tipp - PV Generator Junction Boxes
The Elektro Tipp - PV Generator Junction Boxes
 
resume
resumeresume
resume
 
Salah mansour's cv chief electrician
Salah mansour's cv chief electricianSalah mansour's cv chief electrician
Salah mansour's cv chief electrician
 
Lachlan M Innes CV
Lachlan M Innes CVLachlan M Innes CV
Lachlan M Innes CV
 
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power TransformerCase Study - How Proactive Electrical Maintenance team saved a Power Transformer
Case Study - How Proactive Electrical Maintenance team saved a Power Transformer
 

Similar to Shaheryar Ali CV

Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)
rasta man
 
Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16
Ranjan Roy
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
asish jana
 
Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16
Ranjan Roy
 
Update_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_LusdocUpdate_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_Lusdoc
Jerry Lusdoc
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)
Ali Ahmad
 
ElectricalInstrumentation Engineer
ElectricalInstrumentation EngineerElectricalInstrumentation Engineer
ElectricalInstrumentation Engineer
muhammad siddiqui
 
WRWall Resume JAN2017
WRWall Resume JAN2017WRWall Resume JAN2017
WRWall Resume JAN2017
Wade Wall
 
azhar ali cv new 2
azhar ali cv new 2azhar ali cv new 2
azhar ali cv new 2
azhar ali
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
Ahmed Atallah
 

Similar to Shaheryar Ali CV (20)

Update CV
Update CVUpdate CV
Update CV
 
Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)Resume Ronald z.Amban (1) (1)
Resume Ronald z.Amban (1) (1)
 
asaires
asairesasaires
asaires
 
Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16Ranjan Roy- 25.10.16
Ranjan Roy- 25.10.16
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16Ranjan Roy- 12.12.16
Ranjan Roy- 12.12.16
 
Simon CV
Simon CVSimon CV
Simon CV
 
gautham CV updated
gautham CV updatedgautham CV updated
gautham CV updated
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
Simon cv
Simon cvSimon cv
Simon cv
 
Update_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_LusdocUpdate_CV_2015_Jerry_Lusdoc
Update_CV_2015_Jerry_Lusdoc
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)
 
NAVNATH UPDATED CV
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
 
ElectricalInstrumentation Engineer
ElectricalInstrumentation EngineerElectricalInstrumentation Engineer
ElectricalInstrumentation Engineer
 
H TYAGI LATEST (1)
H TYAGI LATEST (1)H TYAGI LATEST (1)
H TYAGI LATEST (1)
 
WRWall Resume JAN2017
WRWall Resume JAN2017WRWall Resume JAN2017
WRWall Resume JAN2017
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
azhar ali cv new 2
azhar ali cv new 2azhar ali cv new 2
azhar ali cv new 2
 
CVJ_29466149_20150624093911
CVJ_29466149_20150624093911CVJ_29466149_20150624093911
CVJ_29466149_20150624093911
 

Shaheryar Ali CV

  • 1. SHAHERYAR ALISHAHERYAR ALI House No. R-105, Bagh-e-Ibrahim, Malir, KarachiHouse No. R-105, Bagh-e-Ibrahim, Malir, Karachi Email: shaheryar-ali@hotmail.comEmail: shaheryar-ali@hotmail.com Cell No: +92-345-3310816 / +92-321-8902805Cell No: +92-345-3310816 / +92-321-8902805 OBJECTIVEOBJECTIVE To get suitable position as a Electrical Engineer in reputable organization in accordanceTo get suitable position as a Electrical Engineer in reputable organization in accordance with the qualification & experience to boost up my career and safe my future.with the qualification & experience to boost up my career and safe my future. ACADEMIC QUALIFICATIONACADEMIC QUALIFICATION  B.Tech (Pass)B.Tech (Pass) inin ElectricalElectrical (Pass) from(Pass) from Indus UniversityIndus University..  HSCHSC (Pre-Engineering) from(Pre-Engineering) from Islamia Science CollegeIslamia Science College in 2in 2ndnd Division.Division.  DAE (Electrical)DAE (Electrical) in 1in 1stst Division fromDivision from Pakistani Swedish Institute ofPakistani Swedish Institute of TechnologyTechnology..  SSCSSC (Computer Science) from(Computer Science) from Gulshan Technical High SchoolGulshan Technical High School in 1in 1stst Division.Division.  IELTsIELTs fromfrom AEO PakistanAEO Pakistan..  HSEQHSEQ training fromtraining from Aman TechAman Tech for 15 days organized byfor 15 days organized by K-ElelctricK-Elelctric.. EXPERINCEEXPERINCE K-Electric formallyK-Electric formally (Karachi Electric Supply Company)(Karachi Electric Supply Company) Jan . 2011 – Till DateJan . 2011 – Till Date Sub-Engineer, Operation Supervisor , Assistant EngineerSub-Engineer, Operation Supervisor , Assistant Engineer (Shutdown & Troubleshooting)(Shutdown & Troubleshooting)  Responsible for the operations of 11KV circuits.Responsible for the operations of 11KV circuits.  Shutdown arrangement for new connection, troubleshooting & maintenance of theShutdown arrangement for new connection, troubleshooting & maintenance of the 11KV line from grid station.11KV line from grid station.  Doing both overhead & underground cable & sub-station isolationDoing both overhead & underground cable & sub-station isolation  Declare & forwarding to UGM, SSM, M&C.Declare & forwarding to UGM, SSM, M&C.  Preparing safety measurements before shutdown according to the define SOP.Preparing safety measurements before shutdown according to the define SOP.
  • 2. And using all PPE, SPE.And using all PPE, SPE.  Operating OCB (Oil Circuit Breaker), VCB (Vacuum Circuit Breaker) andOperating OCB (Oil Circuit Breaker), VCB (Vacuum Circuit Breaker) and isolators of different vendors like Seimens, Areeva, JP (Johnson & Phillips),isolators of different vendors like Seimens, Areeva, JP (Johnson & Phillips), FICO.FICO.  Fault tracing of PMT & transformer from different vendor like Seimens, JP, PEL.Fault tracing of PMT & transformer from different vendor like Seimens, JP, PEL. Standard Board (Pvt.) LtdStandard Board (Pvt.) Ltd Jan. 2010 – Dec 2010Jan. 2010 – Dec 2010 ElectricianElectrician (Electrical(Electrical MaintenanceMaintenance Department)Department)  Troubleshooting of electric panels of Seimens & Areeva. And repairing ofTroubleshooting of electric panels of Seimens & Areeva. And repairing of breakers & contactors.breakers & contactors.  MotorMotor maintenancemaintenance and electrical panel wiring.and electrical panel wiring.  Erection work for all kind in electrical equipment.Erection work for all kind in electrical equipment. COMPUTER SKILLSCOMPUTER SKILLS AutoCad (expert in manual), MS Office, Adobe Photoshop, Adobe illustrator, AdobeAutoCad (expert in manual), MS Office, Adobe Photoshop, Adobe illustrator, Adobe After EffectAfter Effect PERSONAL INFORMATIONPERSONAL INFORMATION Father’s NameFather’s Name :: Hakim AliHakim Ali Date of BirthDate of Birth :: 44thth September 1992September 1992 NIC No.NIC No. :: 42201-8938767-942201-8938767-9 Passport NoPassport No :: MH1817671MH1817671 ReligionReligion :: IslamIslam NationalityNationality :: PakistaniPakistani Marital StatusMarital Status :: SingleSingle REFERENCEREFERENCE  Reference will be furnished upon request.Reference will be furnished upon request.